JUL-01-03 TUE 0848 AM P. 01
S�CSAL
REQ u-:T-REZ
1,u 141;'I,L E W-1V TECHNii(;q 1, P.C. 231.1 NEAlamedo
Portland, Oregon 97212
(5QJ)28?.UJJf,Fax 282.1671
July 1st, 2003 Our ref.- 03-1845.079
Bill Mitchell
7050 SW Lola Lane
Tigard, Oregon CITY OF TIGI.RD
Appro-led....... .... .. .................. I �i
RF. 6EOTECHNICAL LVALUATION rnditfonattti Approv.�1 ....... .......... i 7
f o on!y th" k rk as cJ4 -,.:nbPd it
FOUNDATION SETTLEMENT NE9MIT rlu—4q3
7060 SW LOLA LANE See I.otie, to Foj'uw..... . I I
TIGARf), OREGON At:•-h
Jtib yy��irens:Z00_..`W
3j EAV-- .Ate 77.1 -4.3.._
Dear Mr Mitchell: ,
We are pleased to present the results of our geotechnical evaluation of the
settlement of the front corners of the house and the garage The property is
located and 7060 SW Lula Lane, in Tigard, Oregon We have proceeded with our
report based o,, your verbal authorization.
The soil to the area of the liuuse is a Soft to Medium Stiff, Brown, Claycy Silt.
The Oregon Department of Geology and Mineral Industries (DOGAMI) have
mapped the aiea. The geology is presented on the UOGAMI publication Open
File 0-90-2 Earthquake I{azard Geology Map of the Portland Metropolitan Area,
Oregon.
We explored the subsurface conditions in the area of the front coiners of the house
and the garage We advanced ?. borings to a depth of i) feet using a one inch
diameter hand auger. In both boruigs we encountcred 3.5 feet of Soft, Brown
Clayey Silt Fill over Medium Stiff, Brown Clayey Silt(native) No groundwater
was encountered
C,eotechnical Engineering Conclusions and Recommendations
The front corners of the house and garage foundation have settled approximately
two inches. The settlement appears to be the result of soft, uncompacted clayey
siii fill beneath the foundation. To support the foundation wall and prevent
seasonal movements we recommend the shallow, conventional concrete
foundations at the front comer of the house and the garage be wide pinned' to
support vertical loads. 'These and other related points are discussed in more detail
in the following paragraphs.
OFFICE COPY
JUL-01-03 TUE 08:48 RM P. ' 2
July Isi.2003 2 03 1845.079
Undelpirnin Design
We recommend the existing, foundations at the front corners of the house and
garage be underpimied with 4 A. B. if ChAnce helical soil anchors or an equivalent
method 'The Underpinning anchors shrill be capable of achieving the emh--dment
depths and capacity limitations presented below.
Beruing Material: Medium Stiff, Clayey Silt
Minimum Tip Embedment. 10 ft below base of the footing,
Maximum Tip Embedment 20 feet below the b.Lse of the
footing or as approved by the
geotechnical engineer.
Anchor Ultimate Capacity 20 kips for Anchors
Anchor Proof Testing: 100 Percent of Design Load
Note: Underptnmrig anchors shall be installed according to manufacttuers
published recommendations.
Anchor Proof Testing Procedure
All of the anchors and should be proof tested. T! r proof testing she consist of
loading the each anchor in 5 equal increments to 'c',1%of the design load The
100%load should be held for 10 minutes. If the a hor movement between I and
10 minutes is less than 0.1 inches the anchor is ace table. If the anchor moves
snore than 0.1 inches the anchor should deepened id retested or abandoned and a
new, redesigned, replacement anchor installed.
Closure
This report has been prepared exclusively for the use c. William Mitchell for
specific application to this project. We are available to discuss any queAions you
may have concerning this report,
Sincerely, Lo HELLF. (jEOTECHNIC.4L, P.0 Craig C. LaVielle, RE ,
1N�
CITYOF T I G A R DBUILDING PERMIT
/ \ PERMIT #: BUP2003-00405
DEVELOPMENT SERVICES DATE ISSUED: 7/2/03
13125 SW Hall Llvd., Tigard, OR 97223 (503) 639-417 PARCEL: 1 .25DB-09500
SITE ADDRESS: 07060 SW LOLA LN
SUBDIVISION: THE RAZBERRY PATCH ZONING: R-4 5
BLOCK: LOT: 015 JURISDI('.i,3."- TIG
REISSUE: F LOOR AREAS_ _ _ EXTERIOP 1LI RUCTION
CLASS OF WORK: AIT FIRST: sf N: �S: 6- W:
TYPE OF USE: SF SECOND: sf PROJECT O_PE_ NINUS? _
TYPE OF CONST: sf N`� S: E: IN:
OCCUPANCY GRP: k:), TOTAL APEA: sf ROOF CONST: FIRE RET?
OCCUPANCY LOAD: BASEMENT. sf AREA SEP. R/,I'ED:
STOR: HT: ft GARAGE: sf OCCU r'F.P. RATED:
BSMT?: MEZZ?: REOD SETBACKS _ REQL:RED_
FLOOR LOAD: pc;f LEFT: ft RGHT: ft FIR SPKL: _ SMOK DET:
DWELLING UNITS: FRNT: ft REAR: ft FIR ALRM : HNDICP ACC:
BEDRMS: BATHS: IMP SURFACE: PRO CORR, PARKING:
VALUE: $ 2,495.00
Remarks: Underpin fireplace.
Owner: Contractor:
IRELAND, ELIZABETH R + LZB INC
MITCHELL, WILLIAM H 619 SE 12TH AVENUE
7060 SW LOLA LN PORTLAND, OR 97214
TIGARD, OR 97223
Phone: 503-313-2236
Phone: 503-235-4625
Reg #: LIC 76450
_ FEES REQUIRED INSPECTIONS
Dn3cription Date A Amount Finallnspection
�; I'ILUJ Pernut 1.1ee 7/2/03 $72.10
1 1 \X1 8" StaleTax 7/2/03 $5.77
�Itl I111I.N] Pin Rv 7/2/03 $46.87
Total $124.74
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes
and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is
not started within 180 days of issuance, or if work is suspended for more than 180 days. ATTENTION: Oregon law
requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through OAR 952-001-0100. You may obtain a copy of these rules or direct questions to OUNC by
calling (503)246-6699 gr 1-800-332-2344.
Issued By:
Permittee (�
Signature: `1_.L ,tt y �.4A,-
411639-4175
A,~4 II639-4175 by 1 p.m. for an inspection the !text business day
_Buildin2Permit AnWication
Received - n Bwl,hrs
Date/By: - - I, Pcrmu No. U� U
1Planning Approval Other
City of Tigard Date/By: Permit No: —_-
13125 SW Hall Blvd, ^ ' Plan Review Other
Tigard,Oregon 97223 Date/By: _— Permit Nom____
Date/By:I'lione: 503-639-4171 Fax: 59*59tt-1960 Dy: Land Use
ate/ Case Na, _
Internet. www,ci.tigard.or.us Contact Juris.: 1 USce 1'aue 2 for
24-hour Inspection Request: 503-639-4175 Name/Method:
TYPE OF WORK REQUIRED DATA:
New construction Demolition I &2 FAMILY DWELLING
x Additi alteratio lac(-men( I LJ Other: ——CMGORV OF CONSTRUCTIOP' Note: Permit fees*are based on the total value of the work performed. Indicate
I &2-Family dwelling Commereir i/Industrial the value(rounded to the nearest dollar)of all equipment,materials,labor,
-- overhead and pr:-ftt for the work indicated on this application.
Accessory Building Multi-Family _
Master Builder Other: valuation......................................................... $__�
-- No.of bedrooms:- No,of baths:
JOB SITE INFORMATION an OCATION -----
Total number of floors............... .................... _
Job site address: S L4J New dwelling arca(sq.R.)... ..........................
Suite#: B1 /A t.#: Garagc/carport area(sq.ft.)...........................
Project Name: Covered porch area(sq.R)............................
Cross street/Directions to job site: Deck area(sq.ft.)............
Other structure area(sq.ft.)............................ __-
REQUIRED DATA:
— COMMERCIAL-USE CHECKLIST
Subdivision: Lot
Tax map/parcel #: Note: Permit fees'are based on the total value of the work performed. Indicate
DESCRIPTION OF WORK the valac(rounded to the nearest dollar)of all equipment,materials,labor,
overhead and profs:for the work indicated on this application,
Valuation......................................................... $
Existing building area(sq.ft.)......................... _
New building area(sq.ft.)...............................�-'- --- — --
V0 Number of stories. .......................................... _
PROPERTY OWNER --1- TENANT --- rype of construction...................................... _
Name: c t _ -- Occupen^.Ygrrup(s): New: --
Address: '20 L 'f0
city/state/zip:. $°tlowitp_d_ V r t� , �_—
,3 ��(_�?, -r t t ' �_ Fax: NOTICE: All contractors and subcontractors are required to be
Pllt�hd
APPLICANT CONTACT PERSON licensed with the Oregon Construction Contractors Board under
- provisions of ORS 701 and may be requireu to be licensed in the
Business game: jurisdiction where work is being performed. If the applicant is exempt
Contact Name: —_- from licensing,the folluwing reason applies:
Address:
City/State/Zip: __ _ — ----–�
Phone: l?IX: ---_ BUILDING PERMIT FEES*
E-mail: Please refer to fee schedule.
CONTRACTOR -- —
Business Name: Z,(3 oic- Fees due upon application. ...... _ - .....
Address: Is'1 5 j--1.2 Y'L4V— _
0q_C. ��� Amount received............... ...... ........... ...... ...
City/State/Zip: Pe),z S -
Phone: ''I- 3 5 -q 7- $ Fax: lL�_ [late received
CCB Lic. #: '7 te q S o --
Authorized e{ Z J 0,1 I- Notice: TNI%permit application expire%If a Per(nit is not
Signature: __— Date: t7 Iso(lays after It has been accepted as complete.
-- '-� ---
•Fee methodology set by Tri-County Building Industry Ser-ice Baarnl.
,' (Please p t name)
i:\Dsts\PermitFornis\BldgPermitAppdoc 01/03 �I '�
ter.
One- and l'wo-Family Ihvelling
Building Permit Applicati-On Checklist Referenccno.:
Cir n /i mrd i" r. – — �— Awicmiedpermits:
Y I City of Tigard J 1dectrical U Plumbing 7al
cc
Address: 13135 SW (fall Blvd,'ligand.(1R 97221 JOther:
Phone: (503) 639-4171
I-ax: (503) 59R-1960
FOLLOWINGTHE r 1 '
ILanduse actions completed.Sec 11111 diction . lit II.- 1,,f ni nil nlIeviews.
2 Zoning.Flood plain,solar balance points,st'll HII i L signatiou,historic district,etc.
3 Verification of approved plotllot. -_ --
4 Fire district approval required.
5 Septic system permit or authorization for remodel. Existing system capacity
r, ,Seiler permit. � —
7 Water district approval.
8 Soils report.Must carry original arplicable stamp and signature on file,,r with application.
9 Erosion control U plan U permit required. Include drainage-way protection,sill fence design and location of
catch-hasin protection,etc. _
10 3 Complete sets of legible plans.Must he drawn to scale,showing conformance to applicable load and state
building cedes. Lateral design details and connections must he incorporated into the plans or on a separate full-size
sheet attached to the plans with cross references between plan location and details. Plan review cannot be completed
if copyright violations exist. _
I 1 Site/plot plan drawn to scale.The plan must show lot and building setback dimensions:property comer elevations Of
there is more than a 4-R.elevation differential,plan must show contour lines at 2-11. narnalsi,by ahon of cnuments and
driveway;fixdprint of structure(including decks);location of wells/septic sN stems.uldw, I„adl„n,:direction indicator;lot
area,,building coverage area;percentage of coverage;impervious arra;existing suucnucs un stir;and surface drainage.
12 Foundation plan.Show dimensions,anchor bolts,tiny hold-downs and rr inforcing pads,connection details,vent
size and location.
13 Floor plans.Show all dimensions,room identification,window size,location of smoke detectors, water heater,
furnace,ventilation fans,plumbing fixtures,balconies and decks 30 inches above grade,etc.
14 Cross section(s)and details.Show all framing-member siies and spacing such as floor beams,headers,joists,sub-floor,
wall construction,roof construction. More than one cross section may be required to clearly portray construction.Show
details of all wall ani roof sheathing,roofing,roof sldlpc,'riling height,siding material,footings and foundation,stairs,
Fireplace construction, thermal insulation,etc.
15 Elevation views. Provide elevations for new construction;minimum of two elevations for additions and remodels.
Exterior elevations must reflect the actual grade if the change in grade is greater than four foot at building envelope.
Full-size sheet addendum%showing foundation elevations with cross references are acceptable.
16 Well bracing(prescriptive path)and/or lateral analysis plans, Must indicate details and locations;for
nun• rescriptive path analysis provide specifications and calculations to e,ogineering standards.
17 floor/roof framing.Provide plans for all floors/roof assemblies,indicating member sizing,spacing,and; 'aring
locations.Show attic ventilation,
18 Basement and retaining walls.Provide cross sections and details showing placement of reha r. For engineereI
systems,see item 22,"Engineer's calculation.." _
19 Beam calculations. Provide two sets of calculations using current code design values for:,II beams,and multiple joists
over 10 feet long and/or any beam/joist carrying:.n+m unrldr„t load.
20 Manufactured floor/roof truss design details.
21 Energy Code compliance. identify(tic prescriptive path or provide calculations.A gas-piping schematic is required
for four or more appliances. _
22 Engineer' calculations.When required or provided,(i.e..shear will,rool'truss)shall he stamped by an engineer or
architects licensed in(Irerdm and shall he sh,ovn to hr applicahlr to the pn,jrru nndrr rrvi v
JURISDICTIONAL
23 Fke(5)silt, plans are required fol Item 11 ahrne. Stic plan,,must hr h I/: s 11 dm 1 1”x 17
24 Two(2)sets each are required for Items 16. 11),20&22 above.
25 Building Plans shall not contain red lines or tape-ons. "Mirrored"builditif.plans will he not accepted.
26 "Reversed"building plans must meet criteria outlined in the permit& System Development Fees document.
27 "Drawn to scale"indicates standard architect or engineer scale.
28 Site plan to include tree size,type&location per approved project street tree plan(it applicable),and COT Street Tree List.
Checklist must be completed before plan review start date. Minor changes or notes on submitted plans may he In blue or black ink.
Red ink is reserved for department use only. W-4614(antuc•oM)
CITY OF TIGARD 24-flour
BUILDIP G Inspection Line: (503)6344 175
INSPECTION 01111L ION Basiness Line: (503)639-4171 MST
BLIP
Received 3 �"
---Date Requested — AM a � PM_—_ —_ BUP
Lucation _ 7Dla D !LZY2_00 1A LH MEC
r~ -
Contact Person Ph(— ) � ��'`' _. PLM -
Contractor Ph(__ _—)
1'enpnVOwner LLC
Footling
un ation� - -----� ELG
Access: ----------- —
Ftg rain` I ELR
Crawl Drain
Slab Inspection Notes: /�� , SIT
Post& Beam ,��
Shear Anchors
Ext Sheath/Shear e4t 1, -t- 0 _
Int Sheath/Shear
Framing --
Insulation b Lt, rAx 14f ?_, Z-0
Drywall Nailing
Firewall
Fire Sprinkler - - - --- ----- ------- ---
Fire Alarm
Susp'd Ceiling -- -- - - -
Roof
Otfve:.5 -
��' Sio
PART FAIL
BING - -
Post&Beam _ - -
Under Slab
Rough-In "�-
Water Service ----
Sanitary Sewer
Rain Drains
Catch Basin/Manhole F
Storm Drain
Shower Pan
Other:
__----- ;+--- -----_
Final
PASS PART FAIL
MECHANICAL
Post& Beam --- ---_-_— -- -- --- -. _..
Rough In ___--
Gac line
Emokn Dampers - - -------------- ---.. ----
Final
PASS PART FAIL - --- - ---------- _- -- - --------- - -
ELECTRICAL
Service -- ---- --- -----..___
Rough-In
UG/Slab ----------
Low Voltage
Fire Alarm
Final L�l Reinspection fee of$ required before next Inspectinn. Pay at City Hall, 13125 SW Hall Blvd
PASS PART FAIL
SITE _ C� PloasP call for reinspection RE:_-____ - _ _ __ F� Unable to irapect-no access
Fire Supply Line
ADA Date ( V(� �/�'` _ ___-._.._ 4
Approach/Sidewalk -- _-- Inspector --- - -__. ---- Lttt
Other:
Final - DO NOT REMOVE this Inspection record from the job site.
PASS PART FAIL
Jul 07 n3 03: 20p EnRTH nNCHORS 5032354027 P
La I/1,U LL C'.E-01 EC, HNICAL P.C
nn,rlornl,UrcRun 97112
l5N) ?87 0111 Fax 292.7671
July 3, 2003 Our ref: 03-1845 079
Bill Mitchell
7000 SW Lola l,a.i-.
Tigmd, Oregon 9"1;:23
RE: CONSTRUCTION MONITORING
FOUNDY0 ION UNDERPiNNiNO COPY 7060 SW Li-I)LA LANE
TIGAR-D OREGON
Dear Mr. Mitchell.
We presenia sairiniary of the installation mid loading, of►he 4 anchors underpinning the
house and garages f iundatirms. The property is located .it 7060 SW Lola bane, In Tigard,
Oregon
The contiactui L'll Inc installed 4, A S. Chance helical anchors to support the house Arid
garages fawidatmis The under mrr ng anchors include 4, 8"-l0"-l2 helix anchoi s Tlie 4
widerpinning uncle yrs were installed to depths of 10 1`e t. Ail of the anchurs were installed
in a::cordence willi the recommendations presented in uui 7/1/03"Geotechnical Evaluatior '
The 4 anchors wt ie uistalicd hascd on the manufacturer's torque/vertical capar ih'
c0i7c1,010n to can-V -29,000 pounds The foundation was lifted a total of approximately
1/8th inches
Based on our ievim , of the available records and ow observations on site it is our opinion
the contiactur has c irnpleted dic installation of the underpintung anchors in substantial
accordnticc with the project plans and specificatimis- We are Available to discuss any
questions you mini have conceining this report
Sincerely,
���101f
LaVIELLF. (iF.'Q7'i (JINIC'Al.,
PC Kam
rt,at,r r
aMsrf
Ciaig C LaViclle, P E , Prmcipal
l0 'd
-- Nd 9:E0 NOW EO-LO-1n('