Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
13876 SW LIDEN DRIVE-1
- ,;..,.,.,•, -��ww:.-.0 ..,.k:4:li.7d.�Atuliyyrw�Gu�4i�J+w+{n1�9; a��1as41a,ldu"lti:.i:::« ry,.. I w OD rn r ri d M z d H 1. M .I ,r I .,�,_ 13876 SW raIDEN DRIVE Page No. 1 CASE HISTORY FOR CASE NO.: MST94-0464 DON MORISSF.TTE 13676 SW LIDEN DR 12/29/98 Action DeerriFcion Req/ Schd/ End/ Action Notes Disp By Update Upd Code Sent Doi Done Date By - .*B- _ --- -------- ------------- ---- -- -------- -------- -------------- ------------- ----------- ---- --- ------- -— MS:"A007 Application received / / / / 12/15/94 PASS KAR 12/19/94 BLT MSTA010 Ilan check deposit paid / / / / 12/15/94 PASS KAR 12/19/94 BLT MSTA020 Plan check by 12/19/94 / / 12/19/94 PASS RT 12/19/94 BLT MSTA030 CheC.k for prcl. restrict. / / 12/19/94 12/19/94 PASS 3JG 12/19/94 BLT MSTA092 (F) Issue combination permit / / / / 03/10/95 JSD 03/10/95 JD MSTA097 Issue plumbing signature form / / / / 03/10/95 JSD 03/10/95 JD MSTA705 Foot/found Insp / / / / 03/20/95 pending- j-bolts need to be planed at 45 PASS RB 03/20/95 RB degrees; mono pour. MSTA710 Post/Beam Structural / / / / 03/30/95 0 1- add post under beam pony wall DIP rS 01/30/95 KAS adjacent to furnace plenum N 2- mini of three stuis at corners M-3- two 24/24/12 isolated piers not poured MSTA710 Post/Beam Structural / / / / 04/06/95 #-1- provide gusset at post supporting A/N KS 04/10/95 KHB beam adjacent to firnace, also nail studs at corner ( same location) MSTA711 Post/Beam Mechanical / / / / 03/30/95 PASS MS 03/30/95 MRS MSTA717 PLM/Underfloor / / / / 03/30/95 PASS MS 03/30/95 MRS MSTA720 Mechanical Insp / / / / 05/23/95 SEE FRAMING THIS DATE FAIL RB 05/24/95 RB MSTA120 Mechanical Insp / / / / 05/27/95 1" CLEARANCE B VENT/FRAMING IN GAR DIS GS 05/27/95 GES MSTA720 Mechanical Inep / / / / 06/02/95 PASS TLP 06/09/95 RB MSTA722 Plumb Top Out / / / / 0'S/11/Q5 PASS MS 05/12/95 MRS MSTA725 Framing Insp / / / / 05/23/95 POP REPORT FAIL RB 05/24/95 rn MSTA725 Framing Insp / / / / 06/02/95 PASS TLP 06/06/95 TLP MSTA726 Framing <REINSP> / / / / 05/25/95 PREV FRAME CORR MOT DONE DIS GS 05/25/95 GES MSTA726 Fzaming <REINSP> / / / / 05/27/95 BRACE OR DOU3LE KING POSTS OVER 75" PEND GS 06/02/95 TLP SEE MECH THIS DATE STRAP TOP PLATES AT DEN/BORM WALL CONNECTION OK TO INSUL MSTA735 Gas Line Insp / / / / 05/25/95 APP GS 05/25/95 GES MSTA"140 Insulation Inep / / / / 05/02/95 PASS TLP 06/06/95 TLP MSTA745 Gyp Board Insp / / / / 86/09/95 pending adequate attachment thru out PASS RB 06/0-,/95 RB MSTA755 RAin drain Inep / / / / 03/22/91 PASS MS 03/23/95 MRS META760 Water Line Insp / / / / 03/22/95 PACS MS 03/23/95 MRF Page No i CASE HISTORY FOR CASE NO.: MST94-0464 DON MORISSETTE 13876 SW LIDEN DR 12/29/98 Action Det-ription zeq/ Schd/ End/ Action Notes Disp By Update Upd Code Sent Done Done Date By MSTA765 Appr/Sdwlk Insp / / / / 06/20/95 1) Expansion joints required at every PEND LT 07/24/95 NL 40' & at cold joints (1/2" felt) 2) Be prepared to protect finish 3) Complete forme for wing on approach on West aide MSTA770 Misc. Inspection / / / / 08/01/95 EFA MJR 08/01/95 MJR MSTA770 Misc. Inspection / r / / 08/01/95 EFA MJR 08/01/95 MJR MSTA705 Mechanical Final / / / / 07/28/95 see building final this date FAIL RB 07/29/95 RS MSTA795 Mechanical Final / / J / 07/31/95 PASS RB 08/01/95 RB MSTA797 Plumb Final / / / / 07/27/95 PASS MS 07/31/45 MRS MSTA799 Building Final / / / / 07/28/95 see report FAIL RB 07/29/95 RB MSTA799 Building Final / / / / 07/31/95 PASS P.' 01/'.'5 RB MSTA960 (F) Issue Cert. of Occupancy / / / / 07/31/95 JF ;07/% JF MSTB706 Erosion Control / / / / / / PASS USA 01/08/96 RO MSTB750 Shear Wall Insp / / / / 05/x2/95 see report "%IL RB 05/02/95 JDA MSTS750 S'iear Wall Insp / / / / X5/12/95 PASS TLP 05/15/95 TLP