Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
7150 SW SANDBURG STREET-1
FILE No. 478-92 SANDBURG STREET - 7150 STR OPN PERMIT .DEFINE:entrct-case->eng definition incorrect ENGINEERING PERMIT PERMIT #. . . . . . . : ENG92-0015 DATE ISSUED: 03/20/92 By: _ PRIM. PERMIT #. : SDR91-0019 SITE ADDRESS. . . : 7150 SW SANDBURG ST PARCEL: 2S1010C:-03900 SUBDIVISION. . . . . SALEM FREEWAY SUBDIVISION ZONING: C-P BLOCK. . . . . . . . . . . LOT. . . . . . . . . . . . . :4 ----------------------------------------------------------------------------------- PERMIT TYPE. . : SOP IMPROVEMENTS QUANT RATE VALUE AGREEMENT DATE: / / GRAD/EROS ASSURANCE EXPIRATION--- STREET PERFORMANCE: / / SAN SEW MAINTENANCE: / / STM SEW UTILITIES ALL OTHER TOTAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$ Remarks: STREET OPENING, TO INSTALL A CONCRETE DRIVEWAY APRON AND TO INSTALL A PRIVATE STORM DRAIN LINE TAPPING SAME INTO THE PUBLIC SYSTEM. Permittee: ---------------•- FEES ------•-------- KEY BANK OF OREGON type amount by date recpt 1211 S .W. FIFTH AVE.#400 OPEN $ 55.00 JSH 03/20/92 2.24942 PORTLAND OR 97204 Phone #: (503) 790-7576 Engineer: INNOVATIVE MFTAL $ 55.00 TOTAL Prone #: ------- REQUIRED INSPECTIONS ------- Permittee/Agent Signature: ----STORM SEWER-- -----STREET--•--- M.H. & C.B. CRB LINE & GRADE PIPE LN & GRE, SUBGRADE BCKFLL & CMPCT BASE ROCK AIR & TV TEST LEVEL COURSE City of Tigard, Oregon WEARING COURSE 13125 S.W. Hail Blvd. ---SAN. SEWER--- TRAFF & PED CONT P.O. Box 23397 M.H. & C.O. MONUMENTATION Tigard, Oregon 97223 PIPE LN & GRD STREETLIGHTING Phone #: 639-4171 BCKFLL & CMPCT WALK/APRON/RAMP AIR & TV TEST FOR INSPECTION, CONTACT: ----GRADING----- Carl Vieweg #639-4171 (office) --REPR' S/ADJ, S-- CONTOURS #780-2647 (mobile) DRAINAGE ----PATHWAYS---- EROSION CNTL. a N COPY TO: h MENT/EXCAVATION T1 ® (WHITE)-FILE STREET IMPRU ® (YELLOW)-INSP• APPLICATION NO 7Q 1 Q (PINK)-OTHER AGENCY bldg.' 01 Z DI N A -- 1 (BLUE)-APPLICANT (INSTRUCTIONS ON SEPARATE SHEET) z APPLICATION NO.: APPROVED FEC AMT.: s Kc, OO [7 CI'CY QF "I'iGARU, OREGON y2- zZ'4`t'4?— ' NOT APPROVED Cl1'Y HALL RECEIPT NO ---- --- _� DATE 3 ItD _ PENDING FEE. PMT. ❑ BY — — — — — — — PF_NDING SECURITY ❑ PUBLIC WORKS DEPARTMENT TENANCE BONG Application and Progress Record MAIN >k AS RFOu1REU j PENDING AGENCY "OK" ❑ FOR STREET IMPROVEMENVEXCAVATION ANNUAL. --I EXPIRATION DATE PENDING INFORMATION 11 PENDING VARIANCE 0 --� / ,©/ 9�J BY sg-CZ DATE ISSUED: J 1-Z _1 = _ PERMIT NO 7 CONCRETE RIvE�1R &S — D HEREIN, IN FULL ACCORDANCE WITH CITY REGIUIREMENTS. (I ) APPLICATION IS HEREBY MADS DO E RCBE ATE FOR AND INSTAL!_ _—._--- _`_ DRAINAGE___4I.N-------- A19II-7.5,�7b FTH AVE ST_1 L- -rJJS JAN vim.-L ITLLlLz_- PHO E %�tEY BANK O_�__�-EGON_-_-.12 1---SW-FI624-2090___ APPLICANT ADORl55 TIGARD OR 97223 _- - --.'__'_� NAME PHONE CK PACIFIC Co. 7190 SW S�BURG ST •--,-_ —"- CrJNTRACTOFl� MC NAS AOUriass 97213 # 284-5896____ 4230 N-E. FREMONT ST. PORTLAND OR HONE W B. WELL=S & ASSOC- INC' -.----- — —�----- c1Tv PLANS BY _�--':-- NA E AonwEss 1375.00 OO LLARf _ _- ..MIN. ESTIMATED IMPROVEMENTTOTAL VALUATION ( COST)' FOR ofFlcs _ — _ -_ 1_ 3 _00 0.04 X s_ (2) EXCAVATION DATA: PROGRESS & INSPECTION STATUS DESCRIPTION ITEM DATE REMARKS/TYPE BY STREET CUT CUT MATER.AL INSTALLED — SURFACE CUT ITEM A QUANTITY gTREET NAME TYPE LENGTH WIDTH DEPTH — - 11 T O - - see a tach - E 72nd AVE . Qu 1 g _ T E ESTIMATED STREET OPENING DATE:---------"' � D _. ESTIMATED STREET CLOSING DATE: ---- ..._ STREET uM —�=-- -_- IRR J 1 75.00 CLOSED SECURITY AMT: $ — --- FINAL rovec M' (3) SECURITY NO. __-- IPEC. II 4 It_ NNS •PNC SURETY CO.: _._ HECIt cASN n - CONDITIONS: SPECIAL PROVISIONS / IQ) PLOT PLAN' INUICATF SITE PERTINENT PHYSICAL NOtlf City Inspector Cara.vleweg FEATLIRES: EXCAVATION LOCATION AND EXTENT. (#639-4171A 24 hrs. before I SITE: 7150 S.W. Sandbu g St 1 I sting work. City I 1 k area I ' 2. All work shall conform to a) 1 wor I , standards and specifications. - ��- - - - - - - ffis control sha11 be rovided uNH - i for b the contractor. _---- 757.541 - .571 (Utility's - - - 4. ORS prenotification, etc.) a P lies. ulred - 5. A hard surface pate — I 1 ! at the end of each days work._ I I I I I � es E. SDR 91-0019 & F.0.. 91-01PC appli .WASHINGTON COUNTY OR THE STATE,OF OREGON ERTINENT LAWS AND WHERE (5) NOPE THE CITY OF TICPRD DUES NOT. HEREBY-AGRANT PERMIS310N TO APPLICANTS TO CONDUCT WORK RIGHT-OF-WAY JURISDIClION 15 THAT O THE APPLICANT AGREES TO DEPOSIT THE REQUIRED SECU67171ES, TO COMPL TO SAV TRU:710N SPECIFIr;ATIONS PERTINENT WCONDUCT OF T14E WORK.HICH MAY RESULT FROM AND CANTS ACTIONS HARMLESS THE CITY AND CONS INJURY OR DAMAGE EMPLOYEES AGAINST DATE 'l APPLICANTS SIGNATU ^ !'O s !t•05'n'w .Ml i�.b w[t7 1.26 Ite.07 I C N 7. r TO PUBLIC N5/]21 z S•W SANDBURG STREET a I �0 t AA•7)'I RIO 60 r R7 30 3800 1 o IW Ac 3801 C, I• www TTS OT N �) azo F SEE MA:' T14 I f 2S I 1 ' N RIU 50 i ry ; iN•MeIM•M/Mi RNN�MO M•'iMN�i,•,w wii I i � 1 I r Q mo. O �► 3 900 o w Ac o fy [t 1 � � r✓ r r—' r N �J Ar ) /� I' r r rJ' �l� r \ W !� a f n `VACATED 4 t e2-32715 o R �- , i •t•5]'E 112.04 I n 1. " P 4100 p I tt• y� co aLe ]tom Rr f` '`�� �• wti i: s �•3. 4 Vol ^`' IiII `'' w�0� •.e FOR ASSESSMENT ' I PURPOSES ONLY. ✓. x x 700 \, cf DO NOT RELY ON r19 3AAc #04 o, FOR ANY OTHER USE N AJ•r, }'1 O \900 p,\ .�9 A � C r.(?•iFS N � i n k r E � _ t BOUNDARY AGREEMENT o y q1 573/697 �.• • i O .o �I_ • O O • • t i TIGARD ' tte•to'w w •�•)�'E " loo 112.! 1 2 S ! I D i 1 . f / Y -414 Zd) N I 1 '� 44R ev Op z r wOp 61 I Z x 1— c'x �I 1I �y� COO ry / • i / / p�nZ_ Zlc�bp / WWW NP 1 1 f� A•� I �r w Q l� r.. IX �,. Nt 1 4 L L4 r `� Fad � � I a � � �►0 ,� � U t, / r1- �J r n � Zzz t4 III� PIS E 30 6"■ 6' 10 GA_ 0' MAx IS•'QP aft MESH ' DRIVEWAY RM Una I OpTxwAL amvmLx LOCATIpN A t a OONTRACTION ,I'm �y EXPMNSIOM .POINTS C7 SIDEMWALK CURB JOINT EXPANSION A V-0 7•-6" MIN. MIN. 3•-O" FACE OF CURB O" MAX. O" MAX. PLAN /5' 1-In"EXPOSURE USE EXUSTINO EXPMMSION JOINT OR SAMICUT APO PPlL1AYCCEE COLO JOINT. l SEE 0WQ MQ CS-:06. ELEVATION 8--8 IW z STRECT --�•� _r 6" 10 GA' MESH 2" OF 3r1" MINAS 1-Un"ABOVE use SECTION A—A I. CONCRETE SHALL HAVE A IIMNIMUM SPEAKING STRENGTH OF 3000 PSI AFTER 24 DAYS , 6 SACK MIX 2. CURB JOINT SIAV.L UE A TROWELED JOINT WITH A WHIMUM V2" RADIUS ALONG BACK OF CURB, TIC 3. EXPNMSPON d01Nf3 SHALL BE V2" PREMOLDED ASPHALT IMPREGNATED MATERIAL OR EQUAL, EXTF_MOING FROM SUSMAOE TO FINISHED GRADE 4 SEE O1WG. NO CS-310 10 ANO NO. CS-305 ASHINGTON COUNTY W a �ERARTMENT OIF d.AND USE COMMERCIAL DRIVEWAY of -'AND TRANSPORTATION At PPO. DATECUYIL EN[3lEEil ORAUIr1 A►WA NO. WASK COUNTY Na OATS lig e _ eel _ It LAP 6-e4 NONE DW-201 4 . FINISH GRADE. i MIN. 3" A G IN 2 LIET5 pAw cur -- STREET AREASI OUT OF STREET AREAS, EXISTING °/ r LECTION RESURFACING ?-'0F 9 / • °- : / C SAL S • ' . ' BACKFILL 0. ti CLASS B .3/4!-,J GRANULAR U i BACKFfLL _ A Q n ' z CP a -T •Z o • -•Q o LU tl e • 'o•.e .• . u i) PIPE AAS- BACXFILL IN 3TREU AREAS I 1.IF 3/W IS AGAINST CURB, FILL ROC,% TO BACK OF 3/W 2.IF 3/W 13 NOT AGAINST CURB, FILL. ROCK 2'BACK FROM CURB PIPE BEDDING AND CITYOF TIIFARD BACKFILL DETAILS OREGON DE_51GN AI-�ZOVEO BY [)VA Ij ISY I GA RP-5 A r — SCALE DATE OP-AWING No. NT5 -Ad r - � ..___J_�o __.. hGH ti i — —,_ — - ----- -- _ FUL-57 6aF,Iz IN CITY OF TIGARD EX=ENDMIRE R9UE;:7r :3"Is form is a multi-use form. Appropriate rerkipts must be attacl-iod. DocLmientation MOOrtant for all purposes. Staple document--°- on to form. VENDOR NO. : _ DATE: z PAYi1III.E To: M C RFJQCTES'rM BY: - ti wed �Appro ed rria 10:00 AM to A/P for clierica by _ Friday. fF-- MLSCELTANECUS EXPENDIZURES: - Date Description, Invoice No., etc. Account No. Amount T U00O (70- 2z 941 ��� - `^ ZZ 000 9 Z TOTAL $ Z 075.- Mileage $0.255 - -- APPROPRIMON BUMC F: - _- AS OF: _ SIGNAIW4,E: _ (Up to $25.00) Section Manager — _ Purch. Agent `— ($25.01-2,500.00) Division Manager _� ($2,500.01-7,500.00) Dept:. Nead ($7,500.01-15,00o.00) City Administrator ' ($15,000.01- ?) Local Contract Review Board 1501F -- 71 ,5 r�- I �Ks — �, C11 7 rt OlA7w, tM� a V!�wN W1 e44 n�'r•1 1 z,1 �e F Jc4 Ate we n Kolei n cJ 7c C' d I i CITY OF TIGARD EXPENDITURE REQUEST s and documentation must .ls form is a multi-use formro Appropriate repuestedue Wednesday 10 : O0 ANI to A/P for oe attached to this form. App. 4u checks by Friday. w DATE: September 25, 199 VENDOR NO. : 2. PAYABLE TO: _McCormack Pacific REQUESTED BY : Chris Davies 7190 SW Sandburg Street Tigard Oregon 9722.3 MISCELLANEOUS EXPENDITURES : Date Description, Invoice No . , etc . T_ Account. No . Amount + 9/2` /9 Partial refund of Storm Drain 131-450000 $1 , 260 , 00 I SDC fee, Receipt No . 92-224942 M 1.eage ) . 2 F APPROPRIATION BALANCE : AYA AS OF : SIGNATURE: 611k` _ (Up TO $25 . 00) Section Manager P u r c Agent — ($25 . 01-2, 500 . 00) Division Manager r �`- ($2, 500 . 01-7, 500 . 0n) Dept . Head - ($7, 500 . 01-15, 000 . 00) City Administrator OGS ($15, 000 . 01-?) Local Contract Review Board --- Tu;nrcl F3rnni_h 24-22 UNITED STATES NATIONAL BANK 123(' NO, Ur Oetoi + Tutrxrl.Onrqun I i CIYY©F TIGARD VOID AFTER 180 DAYS AM PAY 10/J7. /92 ****J ., 2600 C C I * **1 , 2x0 D C L L A F ; AND NC C E N T S — TO IIil ORDER OF MCCORMACK PACIFIC CITY OF TIGARD 7190 SW SANDBURG ST T I G A R D 0 R Q 7 2 2 3— nutnnr,,,,,sic,nntore— —_ MIIRIoUaWa o, -- .,Authorized Signature --- ITY OF TIGARD, TIGARD, OREGON NO. 43911 1 'YV« DATE If,V .INC DESCRIF'TI�Oti I ------ _—___ AMOUNT L9/ ?0/92 r2FFUPaD _'_ - __ --—-—--- -- 126C . 00 i f i S �r4,vt't� �e,`��S '� CITY OF TI ARD September 14, 1992 Sr- * �" G OREGON Key Bank of Oregon 1211 S .W. Fifth Avenue, Suite 400 Portland, Oregon 97204 Ms . Sandy Annas : I am in receipt of your letter dated September 1, 1992, which c:unim is Key Bank of Oregon to construe,. sidewalks along Tax Lots 700, 3900, and 4100 . This letter is to insure that what was intended to be required under SDR 91-0019 is fulfilled. Key Bank of Oregon, or any subsequent owners of Tax Lots 2S1-1DC 3900 and 4100, and 2S1-1DD 700, shall be required to construct a sidewalk along the frontage of the above mentioned Tax Lots when Tax Lot 2SI-lDD 700 develops . Please sign below acknowledging the above and return the original to this office . Thank you for your b.elp in this matter. If you have any questions please call . Sincerely, Chri., .opher R. Davies, P .E. Development Review Engineer City Of: Tigard :AI'EDGED: _ C SEP 2 1 1992 Sandy Anna �- F;, ,. Vice President and Manager Key Bank of Oregon d�/CD:I-Neyhks.l 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639-4171 TDD (503) 684-2772 — — Key Bank of Oregon d'� A KeyCorp Bank Bank Properties BANK 1211 S.W. Fifth Avenue, Suite 400 Portland,Oregon 97204 (503)790.7577 SEP 4 1992 CITY OF TIGAR'D September 1, 1992 Chris Davies City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Dear Chris: Please be advised that Key Bank of Oregon understands it is our responsibility to construct sidewalks along tax lots 700, 3900 and 4100 at such time as the property develops. Si ..ere)y, _ Sandy Annas, Vice President and Manager SA/sc America's neighborhood bank AIL At r June 23, 1992 CITY OF TIGARD Key Bank, Inc. Attn: Sandy Annass \ OREGON 1211 SW Fifth Avenue \ j Portland, OR 972.04 Dean Ms. Annass: Jim Waddle of the Waddle Design Group has requested that I outline the City of Tigard's general policies related to access from a 3 development site to a public street. Specifically, Mr. Waddle was interested in future access from two parcels owned by Key Bank to SW 72nd Avenue. These parcels front on SW 72nd on the curve south of SW Sandburg Street. SW 72nd Avenue is classified as a major collector streot by the Comprehensive Plan's Transportation Plan Map. In general, the City discourages direct access to mao.r collector streets and arterial streets if a property has a reasonable alternative access point. However, the City will not prohibit direct access to a collector street: on which a parcel. has frontage if there is no reasonable alternative. As a condition of approval of granting access to a public street for a proposed development,. the City may require street improvements to be provided by tho site's developer to assure that the access will not reoult in undue traffic congestion or a traffic safety problem. Such improvements may include widening the roadway with turn and merge lanes, traffic signals, streetlights, site grading to improve site distance, or other measures necessary to assure traffic safety. Additionally, it is possible that as a condition of development approval for the first of these parcels to develop, the City may require that an access easement be granted in favor of the other parcel so as to result in a reduced number of driveways. At this point, without a development plan for either of these parcels, we are unable to be specific as to what roadway or site improvements may be necessary for the City to approve access for either of those parcels to SW 72nd Avenue or whether these parcels would be required to utilize a joint access . Howey,:-.r, the City can assure you that these are both buildable parcels and can be provided with access to SW 72nd .Avenue. Please contact me or Chris Davies of the Engineering Department if you have questions. IJe ' cerely, ! to nt Review Planner 13126 SW Hall Blvd,P.Q.Box 23397,Tigard,Oregon 97223 (503)639-4171 r entire frontage of SW 72nd Avenue (on the east side) from SW Bonita • Road to SW Sandburg Street. The only exception would be along the frontage of this development and the one property to the north. (The City can require the property to the north to install a sidewalk under the condition in SDR 90-0012.) In the Engineering Department's original comments for the Site Development Review 91-0019, it was stated that it is normally required that the applicant finish the improvements along the frontage of the Bite. With this application those improvements would involve both tax Iota 3900 and 4100. It was determined that with such limited improvements (an access drive) the improvements which were required along tax lot 4100 frontage could be delayed until future development. The Engineering Department also determined that with the i_ reased development activity in the area (primarily to the south) ti,at the applicant should now be required to install a sidewalk along the entire frontage of SW 72nd Avenue (both tax lots 3900 and 4100). This would enable the sidewalk to be continuous and to relieve any potential pedestrian problems. In addition, it was required that the property to the north would install a sidewalk if this development occurred; thus completing the sidewalk along this area. V. The City of Tigard Planning Commission reviewed and considered the applicants request and the information presented above. The Planning Commission voted unanimously in favor of this appeal to amend condition of approval number 3 to read as follows: The applicant shall be required to sign an agreement to cons=,such sidewalk for the entire frontages of tax lots 700, 3900 and 4100 time as the property to the south develops (tax lot 700) . The Planning Commission has found that an on-site water quality facility is required as per Washington County Resolution and Order 91047. City staff is directed to work with the applicant in approving an acceptable on-site water quality facility. Additionally, the Planning Commission has determined that the decision to underground utilities shall he delayed until a decision is reached by the City Council regarding the general undergrounding policy. All other conditions approved under the December 11, 1991 approval .issued for SDR 91-0019 remain the same. THIS APPROVAL IS VALID IF EXERCISED WITHIN 18 MONTHS OF THE FINAL DECISION DATE AS NOTED BELOW. It is further ordered that the applicant be notified of the entry of this order. PASSED: This I-;iv,day of 1992, by the Planning Commission of the City of Tigard. ) Hairy Sap a Tigard P a ning Commission rp/SDR91-19.pfa Vj FINAL ORDER 91-01 PC KEY BANK PAGF 5 (IMP014TANT MIEN AG DATE TIME—r--- P.M. P.M. OF PHONE.--- 00 AREA COVE NUMSFR/ TULEPHOM FLEABE —W!ff 10 CAME M BE YOU WKICALL AGMMN WANTBT()WF.YOU PAW Y BFIAL ATTENTION MEBSAii�E-- T90 SIGNED Lrrmo N u %%--- — C5 TOPS *44A4 k� j.*e*c*-oxry e- JAAk ��o isS�1e°S .ST•'/� yc� 1� �� resolv�il• /-/ ersc�. c�l�� � I �Q� cvo{ ►�Ja.�� f ®�a� � a� maw/ •...,s.rras. Fee cA.A i4t/Ae4l V l� -T Alt. �r ,' .oN.e�1 ;,17 y � � b 70 �ij / r�� -41 In 2,6 • e:'% � � -fes /�' � d.� ,�. .'x�� .� CO "i L4 Z ., i Icke J U�Ww If Q L4 19 cr >/ I Z to d7 99 A4 z ZIP- - — _. .J uiu .o•�'„. ��\� : J in C �j M q t � v o � N N Cil V PJ \ cu O :a i I M U' D o . :: .. .. .. I .� . . r i CL U? zim � I . w iI` �'D Z F- F- ? F- M 1-4 z- a ¢ ate w T E a LJ �L _ ¢ _ i z Li W E J E r A > r O :. (A�CC �CL W w wa = U- W O Ci C_ a W W 4 LL J LO QS _, 4 f- Y Li y �O �G r+ w CL I i !:6 i(jI u) in, iii i moi-` !C4 9 M 6, U7 p Iil H iC9U7QO t -d CL 0 F- f U' Mc0M co I` Z L7 N O LL i CC ni O 0 N Z) � r } a A Z� F- L-L Z H.M m I H r 2 I m It U ill cn O Wf I I w u cul N :L 3 O Ch IT W I CD Q w (ncc. IN t� to C7 E a H } u E W E •• O Y li Y Ix ii Ld U, Z l_ CL a 3'. i L.1 HIC1w ED (� E w Z Zco co U U Q Q w o � A a �i W Z J W Q f- SA T a CL 'J a Si cn ( • , ' , ' UNITED FNBANK OREGON PORTLAND O02t1 v �J ENGINEERS•CONTRAC 0115•C ONSTRU(MON ,I R" DATE CHECK NO • - �- 7190 Southwest Sandburgy Street I Tigard,Oregon 9722: + 5O3/b24.2o90 �_3/2Q/92__a 5886 — -__ * S•00*-- I i PAY• k*1,-,-' FIFTY—FIVE DOLLARS AND NO I I t PAY McCORMACK PACIFIC TO THE CITY OF TIGARD 1 ORDER OF 00 1 588 Gill 1: 1, 230002201: 020 0008 10211' — --" — --` CITIZENS BRANCH • r , UNITOFOSTATESREOONNATIONAL PORtIANOANK 020 15887 I-.Nrrvet:R�•cONTRAcrORS•%'0N1;M0 I ION MANAciF.W, _DATE CHECK NO. _ 7190 Southwest Sandbarg Street Tigard.Oregon 97223 503/b24-2090 �3�9/_`�Z 15887 *1375.00** PAY: '- :CONE 'THOUSAND THREE HUNDRED SEVENTY—FIVE DOLLARS AND NO CEN'T'S% ?c'r McCORMACK PACIFIC TOTH PAYCITY OF TIGARD 1rlJI Jf �- -- - 11'0 1I588 711' I: L 2 3000 2 201: 020 0008 t. 70110 I I I� i� O's J m b a'wz ��t 0 0 wLJ H-O a' p r` psi w am� ora a� I I� i� aa7W4 I aLL— o Wi7N ~p � LUz 0 i Oz i�� q <vi w p I l :0 09107 a 503 221 1709 WADDLE DESIGN P,02 KEY BANK SERVICE CENTER REMODEL CONSULTANTSLIST OF QWNERD fir' \ KEY BANK OF REGON ) s�a'C gl- �'.� 7 D • 75-7 Le 1211 SW FIFTH A ENUE SUITE 400 PORTLAND,OR N 97204 ARCHITECT: 1 WADDLE DESIGN GROUP, ARCHITECTS, AIA 1700 SW FOURTH A ENI.JE, SUITE 105 PORTLAND,OREGO ,97201 PHONE 221-2003 FAX 221-1709 UNIAAj CONTRACTOR: CCORMACK PACIFIC COMPA 7,190 SW SANDBURG STRE T TIGARD,OREGON HONE 624-2090 AX 639-4134 i STRUCTURAL ENGINEFJL- WALKER / DILORETTO / Y(IUNIE INC. 215 SW HOOKER STREET PORTLAND, OREGON,9720 PHONE 221-0555 FAX 223-1025 UYlL FNGINF .R: Z r W. 11. WELLS AND ASSOCIATES, INC. 4230 NE FREMONT STREET' PORTLAND,OREGON 97213 PHONE 284-5896 PAX 294.8530 1_.ANDSCAPE ARCHIIECT: CHRISTOPHER FRESrILEY, LANDSCAPE, ARCHITECT 1020 SW TAYLOR STREET' C7 PORTLAND,OREGON 97205 PHONE 222-9881 4: ... C�`' zA �e � 1 0 DESIGN GROUP ARCHRECTS.A.LA FACSIMILE TRANSM% ;TAI. TO: FAX.: ' -�-�-3 FROM: JN =----------- DATE RE: f:OT J- --t �-mon0--- .Vff. %CLQ --------- 1�0.W?6 .-4. -- -------- A 119 - -------- A'n? G,rrt 4m�_n_� -N � ------------5Z��_--- ------------------ �-Nd P -- --L,Z),I-S�(L E TOTAL PAGES PLEASE CALL IF YOU DC NOT RECEIVE ANY PART OF THIS FACSIMILE TRANSMISSION. ViANK YOUI lel 503 221 2003 1700 SW 4th Ave. Suite 105 Fax 503 221 1709 ® 503 284 8530 W2 WELLS ASSO. 03/19/92 11:36 001 r I PAR TRANSMITTAL R WEO su MRS INC. 4220 N.S Ft Sh" Padm ,OM= 9TE13 • ''hone(S0�284.06 I n(Sq 284 530 DAZE: 19" -`Z- No. ct PAa 2- PAX -PAX NO. PROM: ' ✓a HARD W" TO IM DW: 0 Yes �'NO (1*04 m. IF 'nMM ARE ANY QUfffl"I M OR W YM DO NM UMW AU, MbWM, PI33 M CAU (W 284-SIX 503 294 953E EJB WELLS & ASSO. 03/19/92 11:36 002 Joe W.B. WELLS & ASSOCIATES, INC. SHEET No. OF 1 4230 NE Fremont St. CALCULATED ev_ DATE PORTLAND, OREGON 97213 (803) 284.8896 CHECKED SV _ DATE SCALE SEIZE/ ICE C.GAN 1' ,, .. ... .. �.. .. i..........`...... i.. �... - _ ��,�b 1(c �'�C 1�1 "12.5 C,...d►'1S'�'Y V ch o� Co��f" �,�{'"�►� z�'�, I Pipe rop c\(iLj 35 CFe 2q -- -7OC) • c» _.__t��A L.. �I 13�5•.00 Ph 1 ♦IZ949d 26 9 E y SL SCN�' r 5 3/l(V/`i Z Are- 7 `Z4 0 r s Need leer a • n n 1 ►1-x,"e' fe es I tV*nA e_ Ili (IMRONT FOR. _7 / DATE IL PHONE �� � d7 1 IAREA COOS NUMBER EXTBNBtON REMCALL CAME RI GR YOU WILL CALL AGAIN WANTSTOsmvw RMM 1iCt=*p YpUp CALL WMAL ATTENTION IMESSA SIGNED____ r PTHC)IN U.3.A wsiw.� 1 OPS FORM 30028 'i r p I lf.6 IL Ife.07 9.26 CH. 47.14 !i P� 3 N'O•''� M t ] 11 a t r ti '10�iVfL1C� NS/Sif 1 N .. +n►�7n- SAN' SRC STREET R 4 O SW. S/�1�A/6.V• / .moi Z 1 Q 410 f0 f ff•�3•E t 0 3801 I O N So 3800 r / 76Ac. 23 Ac 1 o wn „- SEE MA�' I ti o F I I I D 41 50 N 90 53 2wrrwr ! c N P t 3900 I ! 3 2 /9 Ac j ' t ` � t � 11 I, � � Ij is F • � w 4 1 <° I VA'-ATEO ee d a o t 02-32715 j 4 ' U: 412.04 �' � f ff•5]rf ' + i � I �. 4100 '..POAc. Be eot �, ` t O t. C.3 f q, ff• q +o "--� � MENT ry�e' ! I i r,•;', PURPOSES GNLY. r DO NOT RELY ON �• 1000 f.. FOR ANY OTHER USE >. 1 T _ X « 58A RO4o �'f ti r ►• � `E�i I 1 900 Qf .A9 Ac \ 1 r `1 j —0oUN0A11Y AGRffMENT JYD/097 1 V W I* Ir O O O '0 TIGARD t f wso'w 04 2S I IDC .2•,52'1 loo 112.3 t' i rk I� o , 401-A2 n N M N N / „ z 9 •�� , S ee° 93'F 1%.64 — - — - 90 xD no53 , 224.41 4 s Il t H9• SEE MAP ��, SAN d BU RG 25 1 IDC. 701 z�b3_— xeriiT— - y. ?!O Ac 701-AI N 702 N00 Ac N N 0' 4 —l"0 ww --mg 96 Ito0 700 °- 2 IBAc 4 99N74 1 —Tj�-- eoc I I V U\ Hee^4 T eo"w l Nes•Sa' c IIS w c0a 900 07 4 66 Ar 2 A T ��Jti 1000 10> ',w�• • it .6B Ac - �!� b o 8 (C 5 No 4196) Co ' b _ (Ca. No 9884) lib a� . N 481 4r WW + 90UNDAAY AGREEMENT ITS/set \ �+� �7 9 no of w 1 996 44' w 5"03 S&3 _ IN es S ly N LINE JAMES HICKUN O 1. r 45\ Q• i ` N A9•U'E 1911.101 ��) 40 FROM TNt 1 1/4 con SEE MAP 1 s No U,68G 1 'RE-ENT COR 2S 112AB JAMES MICKLIN D L.C. 'l t i�tl•.Yl - � �iN#R 1a�V CITY OF TIGARD Washington, County �-� NOTICE OF FINAL ORDER - BY PLANNING COMMISSION GQrI4 1. Concerning Case Number(s) : SUR 91-0019 2. Name of Owner: __Key Bank of Ore on Name of Applicant: Waddle Desiqn Groff_ 3. Address 1700 SW 4th Ave_. L105 City Portland State OR Zip 97201 4. Address of Property: 7150 SW Sar;dburg Street Tax Map and Lot No(a) . : 2S1 1DC, 3900 & 4100 5. Request: An appeal of the Director's decisionsrmft:tin9 construction of a 5,752 square foot adciti.��n to an existing Office building, subject to certain conditions of development approval. Spec,ificallythe "apellants appeal condition of approval V3 whish requires that a sidewalk be constructed_along the site's SW 72nd Avenue frontage_ APPLICABLE APPROVAL CRITERIA: Community Development Code Chanters 18.32. 18.120, and 18.164. Zone: C-P (Professional Commercial.) . The c-P zone allows public agency administrative services, public support facilities, professional and administrative services, financial, insurance, real estate, and busineBs support services among other uses. 6. Action: _ _ Approval as requested X� Approval with conditions Denial 7. Notice: Notice was published in the newspaper., posted at City Hall, and mailed to: X __ The applicant and owner(s) X Owners of recozd within the required distance X� The affected Neighborhood Planning Organization ^X Affected governmental agencies 8. Final Decision: THE DECISION SHALL BE FINAL ON February 26,_ 1992_ UNI.F:SS AN APPEAL IS FILED. The adopted findings of fact, decision, and statement of conditions can br obtained from the Planning Department, Tigard City Hall, 13125 SW f' . 1, P.U. Box 23397, Tigard, Oregon 97223. 9• AaPeal: Any party to the decision may appeal. this decision in accordance with 18.32.290(B) and Section 18..32.370 which provides that a written appeal may be filed within 10 days after notice is given and sent. The appeal may be submitted on City forme arid must be accompanied by the appeal fee ($315.00) and transcript costs, (varies up to a mrir.imurn of $500.00) . The deadline for filing of an appeal is 3:30 P.M. Fel-ruary 26 . 1992 10. Questions: If you have any questions, please call the City of Tigard Planning Department, 639-4171. CITY OF TIGARD PLANNING COMMISSION FINAL ORDER NO. 92-01 PC A FINAL ORDER INCLUDING FINDINGS AND CONCLUSIONS WHICH :!MENDS THE CONDITIONS OF APPROVAL OF AN APPLICATION FOR A SITE DEVELOPMENT REVIEW (SDR 91-0019) . THE APPEAL OF THIS DECISION WAS MADE BY JAMES WADDLE OF WADDLE DESIGN GROUP (APPLICANT'S ARCHITECT) . The Tigard Planning Commission, at a public hearing on February 3, 1992, has reviewed an appeal of development conditi.ond placed on Site Development Review SDR 91-0019. The Planning Commission has based its decision on the facts, findings, and conclusions noted below. I. SUMMARY OF THE REQUEST CASE: Key Bank or Oregon Sits Development Review SDR 91--0019 SUMMARY: The applicant's architect has appealed Condition of Approval numbers two and three as listed below: Condition number two (2) requires that prior to building permit issuance, the applicant shall be required to install a water quality facility which meets the requirements of Resolution and Order No. , 91047 as approved and adopted by the Unified sewerage Agency (USA) of Washington County. The appeal. form requests that the use of dry wells be deemed acceptable to the City, in lieu of the construction of other water quality facilities, subject to a soils report and detennination of compliance with Environmental Quality Commission requirements. Condition numbar three (3) staterr that prior to building permit issuance, the applicant shall be required to install a sidewalk along the frontage of tax lot 3900. Additionally, the applicant shall be required to install a sidewalk along the frontage of tax lot 4100 at such time that future development occurs. The appellant contends that requiring the installation of a sidewalk along the frontLge of SW 72nd Avenue is not timely. The appellant requests condition t3 should be amended to allow the signing of a non- remonstrance agreement with impi-ovements to be completed in the future. APPLICANT/OWNER: Ivey Bank of Oregon 1211 SW 5th, Suite 400 Portland, OR 97204 ENGINEER: Waddle Design Group 1700 SW Fourth, #105 Portland, OR 97201 COMPREHENSIVE PLAN DESIGNATION: commercial Professional ZONING DESIGNATION: C-P (Commercial Professional) LOCATION: 7150 SW Sandburg (WCTM 2S1 1DC, tax lots 3900 and 4100) APPI.ICAB'.E LAW: Community Development Code Sections .18. 164.030(A) (1) (a) , 18.164.030(A) (1) (c), 18. 164.070(A) , 18.164.120(A) and FINAL ORDER 91-01 PC KEY BANK PAGE l A Site Development Review was approved by the Planning Director on December 11, 1991 to allow the construction of a 5,752 square foot office addition to the existing office building. 4. Appeal Information The appli.cant'a architect has appealed Condition of Approval numbers two and three as listeJ below: Condition number two (2) states that prior to building permit issuance, the applicant shall be required to install a water quality facility which meets the requirements of Resolution and Order No. 91047 as approved and adopted by the Unified Sewerage Agency (USA) of Washington County. The City rngineer may waive this requirement to the extent allowed by the regulations of the Enviroiunental Quality Commission and USA as they exist at the time the Public Improvement plans are approved and installed. Condition number three (3) eta,-es that prior to the building permit issuance, the applicant shall be required to install a sidewalk along the frontage of tax lot 3900. Additionally, the applicant shall be required to install a sidewalk along the frontage of tax lot 4100 at such tirle that future development occurs. The appeal form states that the use of dry wel'.s may be acceptable to the City in lieu of other water quality facilities, subject to a soils report and determination of compliance with Environmental Quality Commission (EQC) .requirements. In addition, the appeal form also states that requiring the installation of a sidewalk along the: frontage of SW 72nd Avenue is not timely. Condition #3 should be amended to allow the signing of a non-remonstrance agreement with improvements to be completed in the future. SII. COMMENTS The staff report was presented by Senior Planner Dick Bewersdorff and Development Review Engineer Chris Davies. Mr. James Waddlu (applicant's architect) presented oral testimony in favor of the appeal. No other public testimony was received. A taped recording of tt,e oral testimony was made at the hearing. Minutes of the public hearing are being prepared at this time. IV. ANALYSIS 1. Condition 2 - Water Quality Facility The requirement for the Water Quality Facility is mandated by DEQ and is being administered by USA of Washington County. The City of Tigard is under agreement with USA and :.herefore is also required to administer the • aqui cement. The use of dry wells may or may not meet this requirement. The purpose of ,.his requirement is to ensure compliance with certain standards in water ;uality. It is required that the applicant's engineer demonstrate that a proposed facility will meet these minimum requirements. Sufficient data has not been presented at this time which would permit the Enqineering Department to make a recommendation on the use of dry wells. 2. Condition 3 - Sidewalk Installation Section 18.164.030(A) (11L_l states that streets within adevelopment, and adjacent streets, shall be improved in accordance with this title. FINAL ORDER 91-01 YC KEY BANK PACE 3 Section 18.164.030(Al (1) (c) contains the Code standards for allowing the execution of a non-remonstrance agreement in lieu of the installation of street improvements at the time of development (attachment A). The acceptance of such agreements is discretionary. Section 18.164,.120(A) states that all utility lines including, but not limited to those required for electric, communication, lighting and cable television services and related facilities shall be placed underground, except for surface mounted transformers, surface mounted connection boxes and meter cabinet_ which may be placed above ground, temporary utility service facilities ,luring construction, high capacity electric linea operation at 50,000 vol.tb or above. Comprehensive Plan Policy 8.1 (Traffic Ways) Implementation Strategy 5 requires developers of land to dedicate necessary rights-of-way and install ne^essary street improvements (emphasis added) to the City's standards wrhen su--h improvements have not been done prior to the developer's propcials. These necessary dedications may be required upon approval of any development. proposal. The applicant has stated that the sidewalk and undergrounding of utilities should be delayed for the following reasons: 1. Properties directly to the North, South and across the street do not have sidewalks at this time; 2. It will create a potential safety hazard for pedestrians who use it because it has no connection on either end; 3. The South end would terminate a� she blind corner of SW 72nd Avenue (at- tax lot 41[,0) and the North end would terminate at a 6 foot landscaped hill; and 4. Construction of the sidewalk and undergrounding of utilities at this time places an economic burden on a project which consists of a remodel and 5,000 square foot addition. The Planning Commission has reviewed the following staff comments: Southwest 72nd Avenue is currently fully improved, meeting major collector stand&rds, from SW Fir Street to south of SW Upper Boones Ferry Road; except for sidewalks and undergrounding of utilities. The improvements were installed as part of a Local Improvement. District in the early 1980'9. After the L.I.D. , and as new development occurred along the frontages of SW 72nd Avenue, it has been a requirement of the developer to install sidewalks and underground utilities. Therefore, it is very unlikely that the City will form an L.I.D. to install sidewalks and undergrounding of utilities at various and scattered locations. There has been one exception to the sidewalk installation requirement. This exception was for the development to the north of this proposed development. At the time of the development to the north (SDR 90-0012) , it was determined that the sidewalk would be delayed until such time as either the Giant Sequoia trees were removed or the sidewalk was extended. The City has approved numerous developments along SW 72nd Avenue since the formation of the L.I.D. sidewalks have been Lnstal.led as part of these developments. In addition, the property due south of this proposal has recer.tly been subject to City Development Review. If development occurs, the City would then have a sidewalk along the FINAL ORDER 91-01 PC KEY BANK PAGE 4 '- �'! ��•J..11y.1..,.�pp.Y:.d.1Y.st_. _.:a_a.:_�_..':.^_.r__::iui,a . . entire frontage of SW 72nd Avenue (on the east side) from SW Bonita Road to SW Sandburg Street. The only exception would be along the frontage of thin development and the one property to the north. (The City can require the property to the north to install a sidewalk under the condition Ii SDR 90-0012.) In the Engineering Departments orifi -nal. comments for the Site Development Review 91--003.9, it was stated that it is normally required that t`ie applicant finish the improvements along the frontage of the site. With this application those improvements would involve both tax lots 3900 and 4100. It was determined that with such limited improvements (an access drive) the improvements which were required along tax lot 4100 frontage could he delayed until future development. The Engineering Department also .,etermined that with the increased development activity in the area (primarily to the south) that the applicant should now be required to install a sidewalk along the entire frontage of SW 72nd Avenue (both tax late 3900 and 4100) . This would enable the sidewalk to be continuous and to relieve any potential pedee^. :.-Lan problems. In addition, it was required that the property to the north would install a sidewalk if thin development occurre#,,; thus completing the sidewalk along this area. V. DBCISION The City of Tigard Planning Commieeion reviewed and considered the applicants request and the information presented above. The Planning Commission vrted unanimously in favor of this appeal to amend condition of approval number 3 to read as follows: The applicant shall be required to sign an agreement to construct a sidewalk for the entire frontage of tax lots 700, 3900 and 4100 at such time as the property to the south develops (tax lot 700) . The Planning Commission has found that an on-site waster quality facility is required as per Washington County Resolution and Order 91047. City staff is directed to work with the applicant in approving an acceptable on-site water quality facility. Additionally, the Planning Commission has determined that the decision to underground utilities shall be delayed until a decision is reached by the City council regardir.l the general undergrounding policy. All other conditions approved under the Le ember 13, 1991 approval issued for SDR 91-0019 remain the same. THIS APPROVAL IS VALID IF EXERCISED WITHIN 18 MONTHS OF THE FINAL DECISION DATE AS NOTED BELOW. It is further ordered that the applicant be notified of the entry of this order. PASSED: This ����h day of __�_„f 1992, by the Planning Commission of the City of Tigard. Harry Sap a Tigard P ning Commission rp/5DR91-19.pfo a FINAL ORDER 91--01 PC KEY BANK PAGE 5 18.164.030 Streets A. Improvements: I. No development shall occur unless the development has frontage or approved access to a public street: �. a. Streets within a development and streets adjacent shall be improved in accordance with this title; b. Any new street or additional street width planned as a portion of an approved street plan shall be dedicated and improved in accordance with this code; and C. rho Director may accept a future improvement guarantee in lieu of street improvements if one or more of the following conditions exist: (i) A partial improvement is not feasible due to the inability to achieve property design standards; (ii) A partial improvement may :reate a potential safety hazard to motorists or peda,strians; (iii) Due to the nature of existing development on adjacent properties it is unlikely that street improvements would be extended in the foreseeable future and the improvement associated with the project under review does not, by itself, provide a significant improvement to street safety or capacity; (iv) The improvement would be in conflict with an adopted capital improvement plan; (v) The improvement is associated with an approved land partition on property zoned residential and the proposed land partition does not create any new streets; or (vi) Additional planning work is required to define the appropriate design standards for the street and the application is for a project which would contribute only a minor portion of the anticipated future traffic on the street. B. Creation of Rights-of-way for Streets and Related Purposes: 1. Rights-of-way shall he created through the approval of a final subdivision plat or major partition; however, the council may approve the creation of a street by acceptance of a deed, provided that such street is deemed essential by the Council for the purpose of general traffic circulation: Revised 02/21/89 Page 411 A Y M� J �.•w •yr .tel �•.�� r � _ end CIS �� w -- ----- ` � � Hi U , d i CITY. OF TIGARD NOTICE OF DECISION SITE DEVELOPMENT REVIEW SDR 91-0019 KEY BP.NK (WADDLE DESIGN CROUP) APP.ICATION: A request by Key Bank (Waddle Design Group, architects) for Site Development- Review approval to allow construction of a 5,752 square foot office addition attached to an existing office building. The building is located on a 3.39 acre parcel located to the northeast of the curve of SW 72nd Avenue opposite SW Tech Center Drive. Zoning: C-P (Commercial Professional) . Location: 7150 SW Sandburg (WCTM 2S1 IDC. Tax Lots 3900 and 4100) . DECISION: Notice is hereby given that the Planning Director's designee for the find of Tigard has APPROVED the conclusions on whichve request the decisionbwastto bae d are noted below: The findings and A. FINDING OF FACT 1 . Background Development of the Key Bank Service Center was approved by the City of Tigard in the mid-70s (Files SDR 38-73, SDR 19-75, and SDR 33- 77) . The building and site improvements were constructed in several phases. The Plan designation ane zoning for the tax lots 4100 and 700 to the east were changed from Heavy Industrial (I-H) to Commercial Professional (C-P) on c—ober 24, 1984 so as to match the designations of tax lot 3900 (Cn 21-84/ZC 1.4-84) . No other land use or development applications involving the subject parcels have been reviewed by the City of Tigard. 2. Vicinity Information Properties to the north and east of the subject site are zoned I-P (Industrial Park) and contain a variety of industrial uses. The parcel immediately to the north contains two buildings, including the administrative offices for McCormack-Pacific, Inc. its the westernmost building, and a multi-tenant flex-space industrial building along the property's eastern boundary. The Key Bank Service Center shares use of a driveway from SW Sandburg Street with this easternmost building on the McCormack-Pacific site. This driveway and parking area is located on tax lot 3801, a separate parcel owned by Key Bank. Properties to the northwest of the site across SW 72nd Avenue are also zoned I-P and are developed with a variety of industrial uses within the Tech Center Drive industrial park. Properties to `he west and southwest are zoned I-H (Heavy Industrial.) and are developed with a variety of more intensive industrial uses. SW 72nd Avenue abutting the site is a 44 foot wide paved major collector street which includes curbs and storm sewers. A sidewalk is located along the west aide of this str--t. No sidewalk is provided on the east side of SW 72nd Avenue near the subject site, although sidewalk construction was required as a condition of development approval for two flex-space industrial buildings proposed to be buil.t. on the western portion of the Williams Controls property to the south (SDR gl-0007/MLP 91-0004) . Building permits have not been issued for those building. SW Sandburg Street abutti.-Ig tha site is a fully developed local street with curbs, sidewalk, and streetlightinq. NOTICE OF DECISION - SDR 91-0019 - KEY BANK PAGE 1 3. Site Information and Proposal Description The 3.39 acre, two parcel site presently contains a 2.9,042 square foot two-story office building and an 83 space parking lot served by an access driveway from SW Sandburg Street. All of the current development on the site is located on tax lot 3900. Tax lot 4100 is vacant and covered with brush and small trees. The southern and western edges of the site slope steeply to SW 72nd Avenue. The applicants request Site Development Review approval to add 5,752 square feet to the existing building through enclosing the existing central courtyard and by adding a small room and exterior exit on the rear or western portion of the building. The parking area would be expanded by 43 parking spaces. The a development of a new access d.rivewa parkinto thePplicante propose area from sw 72nd Avenue in the southeastern corner of thesite traversing the slope above 72nd to the northwestern corner of the site. Additional landscaping is proposed in the expanded parking arca and along SW 72nd Avenue. The only proposed development on tax portion of. the driveway and some landscaping. lot 4100 is a 4• Agency and NPO Comments The Engineering Division has reviewed the proposal and provided the following comments: a. STREETS: The site is located on S.W. 72nd Avenue in the vicinity of the "S" curves. S.W. 72nd Ave. is classified as a major collector street and has the following minimum standards: 60 feet of right-of-way with 44 feet of pavement, and curbs and sidewalks on both sides of the street. Adjacent to the site, all improvements are installed except for the sidewalk. The existing right-of-way is 30 feet from centerline. Therefore, the only improvement required as a condition of approval of the proposed expansion is the installation of the sidewalk along the frontage of the site. Currently access to the site and existing buildings is provided from a driveway which connects with S.W. Sandburg St. The applicant is proposing to install an additional access Point from S.W. 72nd Ave through T.L. 4100. The only other improvements that are proposed, except for the access drive through T.L. 4100 to T.L. 3100, 1_8 some landscaping which would be installed between S.W. 72nd and the access drive. Normally, it is required that the applicant finish the improvements along tha frontage of the site, which, in this case, would involve both tax lots. The Engineering Department feels that this IS somewhat of a unique situation in that no "development" is planned at this time for T.L. 4100. The applicant is using It only for an access point and that if in the future there were plans for development, we would be able to require the installation of the sidewalk. Therefore the applicant should be required to install a sidewalk adjacent to S.W. 72nd Avenue only along the frontage of T.L. 3900. The applicant should also be aware that if there is any further nt requiredanned thattime. eto be in talled at t100thsidewalk shall be NOTICE OF DECISION - SDR 91-0019 - KFY BANK PA{:F b. SANITARY SEWER: The existing ctructure is currently connected to the public sanitarl, sewer system. Therefore, no additional requirements should be required at this time. C. STORM SEWER: There is an existing public storm sewer syetem located adjacent to the site in S.W. 72nd Avenue. Therefore, the applicant should be required to connect the existing on-site drainage system to the public system. Effective December 1, 1991, the City is required to comply with a new requirement of the State Environmental Quality Commission (EQC) . The EQC is requiring that all new developments, that add additional impervious surface area, within the Unified Sewerage Agency (USA) service diatr.ict must include a stormwater quality treatment facility on site. Previously, developments without a suitable site for stormwater quality treatment were allowed to pay a fee in lieu of on-site stormwater quality treatment, with the fees to be used to construct regional facilities. The Engineering Department feels that the new requirement is inappropriate. For many small developments, it is not feasible to build an on-site facility. Construction of numerous small facilities will create maintenance problems for the cities and USA. However, we have no choice. Effective December lst, we must require the facilities as a condition of development approvals or be in violation of State regulations. This issue was not addressee in our earlier staff reports, as we expected the issue to be resolved between USA and the EQC. The Engineering Department is still hopeful that the issue will be resolved within the next three months. Therefore, the applicant should be required to install a stormwater quality facility; but we recommend that the City Engineer be allowed to waive this requirement if the regulations are subsequently amended. The Tigard Water District has commented that the existing one inch diameter water meter will be inadequate to serve the expanded building and landscaping irrigation needs. The water meter will need to be replaced with a one and one half inch met••�r at the applicant 's expense. In addition, the Fire District should review the adequacy of fire protection plans for the proposed expansion. The Tualatir, Valley Fire and Rescue District, the City of Tigard Building and Operation Divisions, PGE, GTE, and NPO N5 have reviewed the proposal and offered no comments or objections. No other comments have been received. B. ANALYSIS AND CONCLUSION Site Development Review The proposal for construction of a 5,752 square foot addition to the existing Key Bank Service Center :wilding conforms with Community Development Code C-P (Commercial Profesgional) zoning district NOTICE OF DECISION - SDR 91-0019 - KEY BANK PAGE 3 I requirements far usage (administrative offices are a permitted use) ; with minimum building setback from property boundaries standards; with the maximum permitted building height. (45 feet maximum allowed; no additional building height proposed) ; with the maximum permitted site coverage (85 percent maximum coverage allowed - approximately 50 percent coverage proposed) ; and with the minimum site landscaping standard for the zone (15 percent minimum landscaping - approximately 50 percent landscaping to be provided) . The existing and expanded site improvements comply with Community Development Code requirements for Parking for administrative office use (100 apaces required for 34, 794 aq. ft. of offices; 126 spaces to be provided) , access driveways (2 access points required for 100+ required parking spaces; 2 driveways provided), adequate internal circulation, vision clearance at driveway/roadway intereections, and provision of necessary publi= services (water, sewer, storm sewers) for the proposed erpanded use of the site. The site plan, however, does not provide for an appropriate number of designated handicapped parking spaces as required by the Oregon Revised Statutes (3 required; 2 provided) . The site plan will therefore need to he revised to add one additional designated han(licapped parking apace. No bicycle rack parking spaces presently exist or are proposed. Code Section 18.106.020.P requires that 1 bicycle parking space within a rack be provided for every 15 automobile parking spaces. Therefore, the Bitr- plan will need to be revised plan to provide for nine bicycle parking spaces in a secure rack. The developed portion of the site is already attractively landscaped. The landscaping plan includes some additional landscaping in the presently developed area along with extending this landscaping theme through tie expanded parking area. The plan also would provide for the planting of nineteen pin oaks along the SW 72nd Avenue frontage of the site as street trees. C. DECISION The Director's designee app,oves Site Development Review 91-0019 subject to the following conditions: PRION :O THE ISSUANCE OF BUILDING PERMITS THE FOLLOWING SHOULD BE COMPLETED (UNLESS OTHERWISE NOTED, STAFF CONTACT IS CHRIS DAVIES OF THE ENGINEERING DIVISION, 639-.4171) - 1. ".he site plan shall be revised to provide for a minimum of 9 bicycle rack parking spaces. Design details relating to the l)rotection of bicycles from maneuvering vehicles shall be provided for Planning Division approval. The site plan shah also be revised to provide for a minimum of three appropriately located designated handicapped accessible parking spaces. STAFF CONTACT: Jerry Offer, :'tanning Division, (639-4171) . 2. The applicant shall install a water quality facility meeting the requirements of Resolution and Order No. 91-47 as approved and adopted by the Unified Sewerage Agency of Washington County. The City Engineer may waive this requirement to the extent allowed by the regulations of the Environmental Quality Commission and Uni.fiPd Sewerage Agency as they exist at the time the Public Improvement plans are approved and installed. NOTICE OF DE71SION - SDR q1-0019 - KEY BANK PAGE 4 G 3./ Thb aopli.cant shall be requires, to instAll a sidewalk along the frontage of T.L. 3900 at this t'me; and will be required to install a sidewalk along the frontage of T.L. 4100 at the time future development occurs. THE APPLIrANT SHOULD BE AWARE OF THE FOLLOWING SECTIONS OF THE COMMUNITY DEVELOPMENT CODE RELATIVE TO THE REQUIRED PUBLIC IMPROVFMENTS; THIS IS NOT AN EXCLUSIVE. LIST. 1. SECTION 1.8.120.060 BONDING AND ASSURANCES A. On all projects where public improvements are required the Director shall: 1. Require a bond in an amount not greater than 100 percent of other adequate assurances as a condition of approval of the site development plan in order to ensure the completed project is in conformance with the approved plan; and 2. Approve and release such bonds. B. The bond shall be released when the Director finds the completed project conforms to the approved site development plan and all conditions of approval are satisfied. 2. SECTION 18.164 STREET AND UTILITY IMPROVEMENT STANDARDS B. 18.164.120 Utilities 1. All utility lines including, but not limited to those required for electric, communication, lighting and cable television services and related facilities shall be placed underground, except for surface mounted transformers, surface mounted connection boxes and meter cabinets which may be placed above ground, temporary utility service facilities during construction, high capacity electric lines operating at 50;000 volts or above. C. 18..164.180 Notice to City Required i. Work shall not begin until the City has been notified in advance. 2. If work, is discontinued for any reason, it shall not be resumed until the City is notified. THE FOLLOWING CONDITION SHALL BE SATISFIED OR A SATISFACTORY PERFORMANCE ASSURANCE SHALL BE POSTED PRIOR TO ISSUANCE OF AN OCCUPANCY PERMIT FOR THE PROPOSED ADDITION. 4. The proposed landscaping materials and other proposed site improvements shall be inscalled in conformance with the approved site and landscaping plans. STAFF CONTACT: Terry Offer, Pla•:ning Division, (639-4171) . THIS APPROVAL IS VALID IE' EXERCISED WITHIN EIGHTEEN MONTHS OF THE DECISION DATE LISTED BELOV- NOTICE OF DECTSION -- SDF 91-0019 - KEY BANK PAGE 5 D. PROCEDURE 1. Notice: Notice was published in the newspaper, posted at City Hall and mailed to: k The applicant and owners Owners of record within the required distance .The affected Neighborhood Planning Organization �K Affected government agencies 2. Final Decision: THE DECISION SHALI. BE FINAL ON 12 / uw ESS AN APPEAL IS FILED. 3. Appeal: Any party to the decision may appeal this decision in accordance with Section 18.32.290(A) and Section 18.32.370 of the Community Development Code which provides that a written appeal must be filed with the City Recorder within 10 days after notice is given and sent. Appeal fee schedule and forms are available at Tigard City Hall, 1.3125 SW Hall Blvd. , Tigard, Oregor:. The deadline for filing of an appeal is 3:30 p.m. l�^L��-��_ 4. Questions: If you have questions, please call City of Tigard Planning Department, City of Tigard City Hall, 13125 SW Hall Blvd., Tigard, Oregon. � r) APPROVED BY: Dick Beweradorffi DATE Senior Planner br/SDR91-19.jo NOTICE OF DECISION - SDR 91-0019 - KEY BANK PAGE 6 �_ ��MNMMtiw�wM���13S�Ii\ .�I�Y I�.-Y.iP'l.-YM�.w__�./�F%�✓-.wi.-T�.M���/I�1 �•• -..i�Yi��-. _ -Jlwr•�Sr.�Y'^�MYf/"ti +�.+.•.�+wgw�..•.wu+�:�.��.w.rrivs w�.�►ww•-•wrww. C AAV I +-FL I o o LE I LJ I ( T -- � r•7t}lrw '•yw- —.__2S:�L'1:__. .. ...L.-_._..._ _...__....1—'_'�_.'__- '- - - ..,v..-- -^�: .w,.'.'1•M!'�'.w.-.lk._"'t'T .,_�.Y:}.Lffifli�':+'Ai