Loading...
15333 SW SEQUOIA PARKWAY BLDGS 227 228 229 ............... KEYNOTES I. (;(A(,kLIL WULW&A' %I*f 10 PAAhro T(VJ(_AJ 2, 6" rXIRUDER CURB, TAPER A I WALY, V) J. MKI 1,ARKING -- SEE DETAIL 4/5b4 LAJ 'n too 4 4" WHITE PAINT STRIPES 7YPICAL t'd 5. DISABLED SYMOCk - SEE DETAIL 6/'64 6. DISABLED SIGN - SEE DETAIL 1/504 ig py 1. DISABLED VAN AC(,'c-,!; - SEE DETAIL :/504 5'--Ow CONCRETE PAO AT EMER(,EhC( EXIT V) 9. CANOP f ABOVE V) 10. LXMING URIVFWA( 4 ry V" X 'u Lai O C.. 0 Cqo j7� z 3i 0 LAJ ...... ......... ........ SITE CRIT5ERIA -6 0 e, W S Z u \_ BLDG. "ONE Ip SITE AREA 214,899 S.F. cr) B L 1)G. AREA w C,4 BLDG. #227 31 ,872 S.F. SW SEQUOIA PKWY ...................... 8 1-D #228 22, 485 S.F. Lai BLDG. #229 8,995 S.F. c 0 TOTAL= 63,352 S. F. UJ 00 E B-2 < PROPOSED USE: SPECULATIVE' of 4t: (.'ONSTRUCTION TYPE IV SPRINKLEREE) 0 (-�4.0' Typ. 0 PARKING � w ..1. 9. h TJ .3 181 Oma; 25 4 I PROVIDED 5, 0/1000 32 1 REQUIRED 1 : 350 26 &\ 4,6.0' AT PARKING 1 4 BIKE PARKING 11 : 15 (21 REQ.) LANDSCAPING 10 r" rL .,., 1 REQUIRED 2 5;;',' T PROPOSED 27% 57,210 S.F. < 22 33 cc 33 32 6 --- -- ; BUILDING #228 CL 2 LLJ 14.0', A_ W z 4 BUILDING #227 5 4 SD4 ICU- r I Qo O" 33 3 J2 Q 0 5 7 0 a 5.01 lyp. AT WI 10 6 _�7 DOOR C/ _ - \ /� i / 80.01 100.01 80.0' _v_ ctry QF TnAADf 04 oA 10 Actproved..... .......... ...... ........ . OD Condftomogy Appmw.1... ..... ... .. .... 6 FrxorUjfh.ov6"K ,d PERY17 NO. C� See letter to.FY,o-,v......... ..... N7 AlUich. ....... ..... 9 \\�CI4 j 4F r jj- N 5 ,r. IR14%w BY. CAW / 13K "5 BUILOING #229 C"ECKED7 9'v -Ryv TYP. -AT DOOR _.. '_1-; i 44 wS 14- OWADVAL Cr C� 4 C; 9.C'1--,, 00 C14 TYP. 26� LL SW 72ND AVE n cS D 1 SITE PLAN V1C1.N1.TYMAP________ O N T.S 20207 ' 'iFQUOIAPARKWAY 15353 SEUU01APARKWAY.1-5333 REDWoof), 1000 :wP 92-0149, W 06 227 BLIP 92 0150. HLDG 228 13UP 92 0151, 13trt)(' 229 AS FILED FOR PERMIT MAY 8, 1992 MICROFILMED FOMR- I (ILAN MADIF. IN CHINA IN —--- C3 -mow 4 GENERALNOT.ES - 1. SU SHEET SD3 FOR GENERAL NOTES. GIN wx � . A e "'.-- � _,,, .. ) ;1 \` •,,; �w.-, _ • ' < a rc 04 YI OIL GRADING NOTES - _ - - .... -t- w- 1 Q 1 \•1 �. \ I i 1. ROUE H GRADING: BRIN(, ALL. FINISH GRADES APPROXIMA rE LEVEL-S V) L a INDI"ATEU. WHERE GRADES ARL NOT CTHERWISE INDICATED, FINISH G*ApES �. ARE TO BE THE SAME AS ADJACENT SIDEWALKS, CURBS, OR THE OBVIOUS GRAIIIE OF ADJACENT STRUCTURE. GRADE 70 UNIFORM LF CLS OR SLOP}:; ' • aC d'� V HETtIEEN POINTS WHERE GRADES ARE GIVEN, ROUND OFF SURFACES, A1/010 ABR JPT CHANGES IN LEVELS. ROUGH GRADE TC ALLOW FOR DI OF' Z CONCRETE SLABS, WALKS, AND THEIR BASE COURSES. GRADE FOR PA,IED DRIVES AND PAVED PARKING AREAS AS INDICATED AND SPECIFIED H,REIN, •yi/ C AND PROS:DF FOR SURFACE DRAINAGE AcC,i •` Q S+IOWN, ALLOWING FOR THICN►iESS p OF SURFACING MATERIAL. Q �► L r FINISH GRADING: AT COMPLETION O' JIM AND AFTER HACKFIWNG BY .t O fL :L Lj OTHER CRAFTS HAS BEEN COMPLETED, REFILL AND COMPACT AREAS WMiCH 1''''�•-• _.,- „,. -• '`f .. -°"" _______--- HAVE SETTLED OR ERODED TO BRING TD FINAL GRADES. GRADING TOLERANCES: T11I ROUGH GRADE AT PAVED OR LANDSCAPED AREAS: 10.1 FT. •�\ _ _ -------- T _ -- FINISH GRADE PRIOR TO PLACING FINAL SURFACING: 10.03 FT C� 2. EXCAVATION: EXCAVATE FOR SLABS, PAYING AND OTHER dMPr;,.:_MtNTS TO W C "J SIZES AND LEVELS SHOWN OR REQUIRED. ALLOW FOR FORM CLEARANCE AND ~ . 4++ ._-..., �; I Krff ',` .�, .. �.^_.�.., ....., �_ — -___. _ ---__-__ __--- --- - � "_.- i-•-,�' yI "_"�, . .+ OPROPER COMPACTIONWITH REQUIRED 8 � IN1AL WQW SEOUOIA PKWY J ( EXCAVATOR(S) MUST COMPLY O 2575417�OUGH757.571;---- X AVATOR S) SHALL NOTIFY ALL UTILITY COMPANIES FOR UNE LOCATIONS SEVENTY-TWO (72) HOURS (MiNIMUM) PRIOR TO START CIF WORK. DAIIACE TO r ~ L r '•"� �' S EXPENSE.IES SHALL BE CURREC ED AT THE PERMIT HOLDERti' - O cr Lj cc }1� "' -~ L', (' 3. SEE GEOTECHNICAL REPORT PREPARED FOR T�dS PROJECT FOR BACKFILL - t `- : " ' T "`••:;;• "•'•" --.._. _ � � \�'a AND COMPACTION REQUIREMENTS. - A ._ , sry ti r rat,,,.-- 4. EFFECTIVE EROSION CONTF'OL IS REQUIRED, EROSION CONTROL DEVICES C' 4 ._..� _l, AN MAINTAINED MEETING THE D.E.O. RFQUiREMENTS -= E OF CL • -,. MUST INSTALLED D M 1 7 T'N� `\♦ ". '_ _._ `•""�yi•'I THE CITY INIAY, AT ( TIME, ORDER CORRECTIVE ACTION AND STD" AG "/, • ! w' - - "-- --------- - _ Y•'f -� 1 f{}� �`: WORK TO ACCOMPLISH EFFECTIVE EROSION CONTROL. J r- 1 164 .-.. / � � �`� .....�'{� '``. V�� •'.......^��- - { `�`�` ��` "'�" 'F DRAINAGE CONTROL IS REQUIRED. DRAINAGE. SHALL BE O I ,. 4 "t` .�- __.... 5. EFFECTIVE "f - ' �, \ .. "`' _•--- - CO TROLLS" WITHIN THE WORK SITE AND SHALL BE SO ROUTED THAT Rim rn a' (,_ - ADJACENT PRIVATE PROP�:RTY, PUBLIC PROPERTY AND THE kECEIVING _ I 164.40 �P ` . ._ --:. _ ,' / L, I� �� U 4 I I �1 `'•• SYSTEM ARE NOT ADVERSELY IMPACTED. THE CITY MAY, AT ANY TIME, ORDER -- } ImCO \ , 1 QCs FI!YC CORREt:i:`:E AC"fUN AND STOPPAGE OF IVOFIK TO ACCOMPLISH EFFECTIVE �'- DRAINAGE CONTROL. l ' { !.�' • : 63 i i it RI I I I 165 \,.,�♦ I \ � ` �,� J I - r , , "1 (� •.1 „_ ,' I 4....- / r` , _- -- - -" \ \\\1 1 -.. /'"..r^ '(}'1'. � ',....••..r'" !••{��'••"' ^,� LEGEND RIM EXIS 71NG CONTOUR 1 40 LINE 91191 BUILDING #2,:.8 i I � - ..-- \ ,-�w"'-� � I 167 PROPOSED CONTOUR UNE F,F.- 4.00 MATCH PROPOSED GRAD'NG FOR STING SPOGRAEPACTRUST BLDG. 225,26 EXIzQ ALONG GE OF PAVEMENT I 1 - ,�.." - \\ '.� ' �` . / / I 70,50 PROPOSED SPOT GRADE j1\ I I 1 (� i ro \ p F� ( + 7//, � - T Ui't + i?� d Z I I I I� OftLill ` RIM � � �. 0 �-, �� � 1( ,�/ /�' ; � Elf BUILDING #227 . lal � � I .. __,••. ham" -- I �\ 1 5 •t OT/.t F *165.50 \ RIM I 6191 r X161 , ' (•' � ,'p.1 db \ � � �;•' �♦ ... � ''y - � 170 1 RIM ` i 1 % !� \.. \ _'#r•) r i A ,tel / F�"`) J^ /'e:i'`_.. 1 h0C ;^ `1 163 rxi r ,� 164.80 ¢° I RIM 161.40 j • '� ti �..� l6, Ln _ RIM r' 1 � ^�• �- � RIM DATE- 1166.50 .r ��..1 I i �__` ' i i !, j, ` h .- ATE:1 .50 ✓ , �- DnAa . BY: 1 I I BUILDING #229 E,'E 5tf. .. . F.F.-1 Q4.00 t - - i ` _y '.v�`1 r.. �.� .. � �' 9'tl�'�% ���` �.- , E3cic4 J i �. - 11 i 1 •\ I •� (•,_,� ` 16 RIM ' � � MATCH PROPOSED GRADING FOR _.. �7 [��16) -�T7 I 165 PACTRLIST BLDG. #225,226 •., / --- - 163 1 31 �_�_�__ -_L'._ _ _ _�-� ...✓ �,`� ""- _ 162 ---.__ - - ----- -- `- 161 _•__ ---------._,. — 16.5 _..,_------ ' ,,. .•• n-r•• ... , z:�-an�r...:--•a-�- _'., -�-•. - •... 160 "'---- •-•----- --"-( 1 fi 1 � 160 /�' SW 72ND AVE - _ w• .s.,. Nr-•w .. r' - D 4/_ C,4 , GRADING PLAN _ _ O to 0 C14 oil AS FERMITMAY � � -fir*1W live 92049IV ,BLDGY 227 3 SUP 02.0150,8L AY15333 REDWOOD,70� FILED J 1:gOG228 BUP 92-0151, BLDG 1299 �/ MICROFILMED in I I i1l I I1I I I r1l I I I1I I I III III I I III III III . 1 Pon- �� � 4)MAD n� 6 C�� � �` IN � � � � '! CIS � Ldi .\.! _ \. tf'• 1 rel. C G - r - �� . ., �,.�.,, •' �� GENERAL NOTES 1 ALL WORK SHALL CONFORM TO THE REQUIREMENTS OF THE CITY OF TIGAK, F- C*1 C,•• � ARD WATER1,�TRIC', UNjr IED 5E'WERAG AGENCY AND THF r1Bi; rD' A .._ -- p' ZN OF THE UNIFORM PLL''e81NC .DOE AND UNIFORM BUILDING r, C G vt A ', a,v 'tea�..... l •\� ..r �ti _f`f -- - ry l\ ` \l` � I4 . ; 2. WATERLINE MATERIAL. TO WITHIN FIVE FEET BUILD:'• . 5 114 .I`�T �•-5-a . , :"l - 5 TITAN JOINT, FORMII%/, °!./ RI/h4`♦ R LINES: DUCTILE IRON, TEST: E AN STERILIZE AS REQUIRED BY TIGARD WATT UNIFORM PLUMBING CODE, • 3 :r: 'N r 3. SANITARY SEWER MATERIALS: •N C ' 1 .. , - _ , ,. y..• M\ t `\J'. �,`y • �,�, . .,? ,y .: , '' 11 �V� \ _ !' iI f ` �.-- � -r INTERIOR AND ' � PVC CONFORMING 10 ASTM G_3034.WITH!N 5 OF BILDING: CA TIRON F1PE tOTHER AREAS: -NERALLY DIAGRAMMATIC, THEY DO NOT 4. THE WORKING ORaWNG� ARE iO CcG • - ..,., .- ._... ''� w. -'" .._,. . ._ •-' -'`�.,� _-�-- ._• ,, SHOW EVERY OFFSET, BEND OR ELBOW REG°JIBED FOR INSTALLATION IN THE ,.. � '� ' '" •-" -"'o_ ` •- __....•� _.--•''"" y- --- SPACE PROVIDED. THEY DO NOT SHOW EVERY DIMENSION. COMPONEWT r. `�s•ti` \ ,�- y t. r __. .- -- ' PIECE, SECTION, JOINT OR FITTING REQUIRED 'TO CC*APLETE THE PROJECT. ALL LOCATIONS FOR WORK SHALL BE CHECKED AND COORDINATED WITH --,__-___T EXISTING CONDITIONS IN THE FIELD BEFORE BEGINNING CONSTRUCTION, �y,J --�- EXISTING UNDERGROUND UTILITIES LAYING WITHIN THE LIMITS OF SHALL BE VERIFIED AS TO CONDITION, SIZE AND LOCATION EY UNC04u,01MG, PROVIDING i SUCH 1S PERMITTED BY LOCAL PUBLIC AUTHORITIES IMITH _ S'W �EOUOIA PK �r- JURISDICTION, BEFORE BEGINNING CONSTRUCTION. CONTRACTOR 'TO NOTIFY Ly,J c -.. f,.--' - ENGINEER IF THERE ARE ANY DISCREPANCIES. U 86 i r _, 1 5. PROVIDE CLEANOUTS AS REQUIRED IN 1988 UNIFORM PLUMBING CODE -X 1 ;�� +„-. ,/'Y a• �l -XST % -,T' /'7.na.:. _;. \,••^.,.� l� 1 4_ f�_XI`�T. F.H. _-- -- ``•`,,,•.. (tel `- ! � 9 6641 / �1 CHAPTER 4, SECTION 406, AND CHAPTER. 11, SECTION 1107. w co 7..a 6. FOR WATER LINE CONSTRUCTION, SEE SHEETS Wt AND W2 ~ 7. CONTRACTOR SHALL VERIFY AND CONFIRM EXISTING CONDITIONS PRIOR TO 9t r- >r\ COMMENCING WORK. NOTIFY ENGINEER OF D15CREPANCI . O r IE 160.50 �� E-160.50 ' " �... WM .w _ ,• -,,_,__._ - •'' .. � •""' F 69t 8. EFFECTIVE EROSION CONTROL IS REQUIRED. EROSI��y CONTROL DEVICES • CO / CO .' \. FDC •.- _._ _ , �"`\� _._-- _ _ e• MUST BE INSTALLED AND MAINTAINED MEETING THE D.L.Q. REQUIREMENTS. ----- �... �" _ I � 7 � �� � /` � � �J'7 ,. '�.~== THE CITY MAY, AT ANY TIME, ORDER CORRECTIVE ACTION AND STOPPAGE OF r C , - �""� `'� ✓ �" - -' 0 0 A EFFECTIVE EROSION CONTROL. .Y WORK T � I 't ! "�. .J ' _�`�r r ., _��•r.�:..--'"'µ+ ACCOMPLISH EFF T R R �N, r _ 'o i Y -A ""` t ✓, -., /' r. 9. EFFECTIVE DRAINAGE CONTROL IS REQUIRED. DRAINAGE SHALL BE O ' N I \ 7 �~ -~ CONTROLLED WITHIN H WORK SITE PUBLIC ND SHALL PR PROPERTY, E SO ROUTED THAT AND THE RECEIVING t 1 J y a _ �1N 1,91 + \ ��91 ADJACENT PRIVATEPROPERTY. 0 U �, 05% ~'`• SYSTE!4 ARE NOT ADVERSELY IMPACTED. THE CITY MAY, AT ANY TIME, ORDER I J' RIM=162.40 " ®` z< N 1a1` ® --IE=159.90 6/i� ; ,p- "- " '� 'tom •-,. ' ^ CORRECTIVE ACTION AND STOPPAGE OF WORK TO ACCOMPLISH EFFECTIVE (1 •C ..\ � � DRAINAGE CONTROL. fi- STM. \ "z ��-"' IE 11.50 + \ ; I \' 10. TERMINATE BUILDING FIRE SERVICE AT 5' FROM BUILDING. Q 4 :,i• Iif' FW .0 CV i r 6" O 2.0% MIN.(TYP) ' CO 11 `\ � f . EXISTING TOPOGRAPHIC INFORMATION IS FROM TWO '2 SOJRCES. I , o IE=159 69 �. - -.-_ -- CO - , \ \. 1 1 11 F ) CL m u-, ; ' + �r, �� _. CONTOURS AND EXISTING UTILITIES ARE FROM DAVID EVANS & ASSOCipTES AERIAL SURVEY. INTERIOR SPOT GRADES WERE PROVIDED BY PACTRUST. i p CO co j � I z O 1E-159.41 i O ® \V �-� r' . RIM=16 + j IE=159.90 ^ �/_ 6 -STM: ® vi ' I =161.50 I •f. I z +a 1,0% MIN j ILDIf�JG #2 8 0 _ _ _ 1 , .._� �--, i�� !--' LEGEND IE 163.00 r ' I C _ D '' CONNEC TO 1 EXISTIN 1.5 IE=159.30 N - CO r-ti _ U + IE=163100. STORM ' RAINS Q _- ,I E=155. O(VERI ; ) -- 6" STM_ ®-- , ® -, I cn \ t\-- 1 ~., ,� ; ' .rte �t,� EXISTING ;TORM LINE ' n 6 STM. ®' y'� �\ .J _ tf` 4.0% MIN. Z r cn r- , 1.09a [ \\ \ � _ - EXISTING WATER LINE 1? ! i I I . IE=156.53 i i G, vi I IE=159.11 s CO \ l • 1 1 r 8" STM 0 2.Or� o , IE 9.10 i ' ,n ' - •_"'•-- RIM 163.80 \ ;ar r• tW+Gt �. PROPOSED STORM LINE vi cn o _-_ - a• i� ' =161.30 \ r "j C - o ® --- iJ N ,\\ \� lJ ,J j J --- -•• PROPOSED WATER LINE {J , RI.M=162.4 t ., \\ IE 161.50 i IE=159.90 ca; I t ...- / ti�>' = I , r'�9t�� / I • PROPOSED SANITARY SEWER -- to TM. IF 158. 8 + \ �-- ' i CO i ® 1.0% MIN. I c • EXISTING . IRE H�i P,ANT NG BUILD Q 1 it a l /\\ Ut�l ( }f� J �•' PROPOSED FIRE HYDRANT E7777 4' S.S. 2.0"� �I o vi I _ Ice _ i I Co " `r1 \� J - \ .`_ -r%j' i / �^ -{' nC PROP !' F.D.C. Q STM. ® j ! N \ /V �✓_ . w l CSE 1E=155.10 2.0% MIN L 'rte, IE=158.70 CO I I \ j -L i O i I a ' -- �`� ` �I v PROPOSED CATCH BASIN jam' i I - <C,\ j I, l -tom IM j lE- 63.00 \ c �1 f • PROPOSED CLEANOUT IE=158.50 CO \ • t aj• ^A \ / t % 1 C� { / v. '�,, ..._. v' O" + �\Il ® ,�� rj j`1' r' O PROPOSED DOV.NSPOUT Cly, t ,ear �!`y- I r I -f =15 .5 RIM=163.901 I " 1E=154.10 IIs,-154.30 c3 ' ;, � '• � � / � ` , 1 4 S.S. 2.0% MIN. �4" S.S. ® 2.b% 4" S.S. ® 2.0% ® CO C 4": S. ® 0% IE=161.40 CO i� \ r8 6" STM. ® 1.0% CO RIM=161.40 CO LC - IE-157.70. f ( � j r 7\ 6" ® 2,0%MI / \ 1 v��. � ` 1 IE=158.80 IE- 158.90 -- r �• 1 =158.70 6" O 1.0% MIN. 6" STM. ® 1.0% 1, lQO Ln ® i IE161.50 IE=161.50 i _...,. . „ + I IE=163.00 I` �. `u ;� �.. 1. \I ��,, . ....., _ - -aL IR1M -TE-='T5-7i62 6 STM, O \- ;"'� CgNNECT TO 161.001 EXISTING 1E= 58.50 /�S6"� TM. ® 1.0% `• `\ i ® 8 SANITARY SEWER ST I u. f \ _ 4.G% iN. IE=151.84 (VERIFY). f I STM.® t�=1 .0 ( l y�l 1 \ -- --- ----- j \ `t `. ✓- .� S. St4UMAKER SIN. --�-- ;BLIT TNG #22g I - _ �a _ �d - w � �.... 7 / i h ; IE-16 .'00 IE-162.00r•r 4' `.) ( ,"^i-, 1\ I 4 b � I I � QV` 1 1 i_ 1•\ 1 � -- - ,�'{i. `-•'y �.. . - ' ^ST. �' ' ADJUST MANHOLE'�,.., J ' - r �, ( E N 1 ® ` t 2 DW j F" .•� � TO GRADE CB ! RIM=162.50 04 IE=157.05 I RIM=164.00 IE =150 r,1 r j j W IE=160.00 E=161.50 1 , 6 FW 6" 1.0% MIN, . _ \., 12" 5TM. 0 6% `� 2" TM ® Q.7 . - 12�®1. % ,tet( -T _l- E- 8 FDC CON ECT TO EXISTIN J -- C .MANHOLE _ ,� . •:rY-�. ..:_'a, , ._ - _ -. . ... ADJUST MANHOLE - = 154. ) -'�',•. I . T E Ot (VERtEY TO GRADE i. !. RIM=163.00 CONNECT TO-'EYTSTING--..._ -- - - - IF=16O.5,7- - --- - -// 15" STORM DR1,IN STUB -- - -- -- lE 154.05 (VE,<IFY) - _ -- --- --- -- - - !- - - SW 72ND AVE .� ,� .•---� CONNECT TO EXISTING ,'t ._..... �-..•.-_- ._.- , , -.,.- '. . . -• 12' WATER LINE. - • r. J r UTILITY PLAN _ S Do o w') M1MIOi1YW1` 5F,000IAPARKWA`t 15353 SFOUOIAPA171, FILED ��''` 8 , 1992 79UP 92.07,9,sLOG 8Upg2.pir� 9�C3.16333 REDVyt700.7000AS i OR PMAY �� � / 2a BUP 92 MICROFILMED R ( I I I I� I 11111 I i , I1 f � 11111 � I I I I ' ii }�- a�i '4T MADR TIN) CHNA IN I I z coisict?m rc IV- 0" (10) PACK" TANGENT POINT OF CURB OR AS SHOWN UN PLANS (FPL Ot NUWALK ,--1 114' GALV, STD, PIPE f _��tt PLAN BROOM FINISH SUR:*ACi W� J TOs- (IF CURB Q CON EVEN VATH PAVING E X fRUDFD OF SIDEWALK 8 GNA(A PER STATE Rf�ojlfPEMENT FINISH 9 5/8" SEE DE fAil. //SO4 ruis" ivro-o J RADIUS EDGE Pt AN f0a EACH SlOf }ITS A 7 OC rr, 6" CONCRETE V) R - 7F x (yoss -M (SEE DETAIL) ON PLAN XTRUDED CONCRETE CURB 6"0 CONC. FILL FINISH Lj TYPICAL EXTRUDED CURB DIMENSION +I+wiv SET IN EPL: CEMENT ',AME AS ADJ. SLAB NKN FINISH GRADE A.C. PARKING (SEE -ASPHALT PAVING n 1, ALL D#SWLD 5 IRV SABLED SlAWOL, TYPICAL. PAVING SECTION) PAIN TED PER 56, A OREC�pm LAW kv TH i LAJ ZZ Wj 44 7 243. do SEE DETAIL O/SD4 AW '�;fAAQE f0 L z -COMPACTED FILL oc 2, 01SA&L.EL CAN TO K CONCRETE WITH 1,f I �h rl fff - - PAINT SIRIPE TO S" FOR IN W-44 Tl:, -CRUSHED ROCK B,.SE 01:�7 VAN ArffS`S LOCATIOWS CONTROL JOINTS AT 4'-00 O.C. M m IAND WA f OC "NTERED C,6 *0 AND EXPANSION JOINTS AT m. (TYPICAL) FOR STAkDARD OtSABVI 20'-0" O.C. y'-0_" W Ili— ELEVATION (Typic T'VA iipAcEs e,rAT r)i,411 SIDEWALK EXTRUDED CURB AND TAPER CONCRETE CURB r2 3 �CO RIBBON RACK DISABLED PARKING STALL V 3/4'-• 1 -07r. cy) 0 �SD4 SD4 VERIFY LOCA PON W1 OWNERS REP. N. ON! c -----CAULK PIPE INTO HUB 46 00 DISABLED SIGN NO. OP20-6B (.090 ALUMINUM —HINGED TRAP 0 PLATE WITH WHITE LEGEND co Ir 7' 6\ Q) ON BLUE BACKGROUND) TYPICAL -2'-4" x 2'- 4" x 2" PkqkK OT14 D.UV, WAXID MUT(MY CAST IRON GRATE C3 N WOLATORSWU I to PLAN T 70g'L MN",w ---------VAN ACCESS SIGN NO. f---�4) 112"0 HOLES 0 + ORS 101 W OR20-61) (.090 ALUMINUM EACH FACE ATBASE SECTION, CRUSHED PLATE WITH WHITE LEGEND COURSE LEVEL ROCK BASE OR LANDSCAPING �u VAN-ASE ON BLUE BACKGROUND) r 3 112" X PROVIDE AT VAN SPACE ONLY -PAVING ----------CONCRETE FRAME CASING X CLEANOUT FRAME AND COVER ri J* WIDE PAINT STRIPE 90 OR 04 rNs"09,00%94r, TYPICAL rora4w J 2.) V)o Z M .01 0 1/4" STEEL ALL WELDED CONSTRUCTION. ASPHALT ----------------GALVANIZED STEEL POST -----45' ELBOW 14, o r EMULSION COATED INSIDE C) AND OUT. 2'-0" x 2'-0" VERT x DEPTH REQUIRED SEWER LINE 1. ALL DISABLED SIGNAGE TO COMPLY WITH ELEVATION 5' WYE m ORDINANCE ORS 447.233. -SLOPE AND I.E. VARIES L 2. VAN ACCESS SIGN SEE PLANS 4" 10" RcQUIRED AT "AN AC-CESS PARKI G SPACES NOTE: CN ONLY. —MIN. 2'-0" COVER ON ALL PIPE IN DRIVE AREA-. 2) LYNCH TYPE CATCH BASIN OR EQUAL ELEVATION Nt r7 -CH BASIN, W/SUBGRADE HOLES CLEANOUT ro DiSABLED PARKING SYMBOL PARKING SIGN 8 �CAI ,.=l._C 01 V) VM-4) 314"=1'- 00 I �SD,4j V) NATIVE BACKFILL COMPACTED TO 85% OF MAX. DENSITY Fr- (SEE SPECIFICATIONS FOR COMPACTION REQUIREMENTS) —PROPOSED PAVEMLIJ AREA SEE TYPICAL PAVING SECTION 1 112"- "" GRANULAR BACKFILL COMPACTED TO 98% LANDSCAPE AREA PAVED AREA OF MAX. OFNStTY (SFE _SPECIFIC,ATIONS FoR Vot 0 COMPACTION REQUIREMENTS) 0 0 0.. 0 3 112"-0" GRANLIL-4 BACKFILL COMPACTED TC 4517 �/ �' ' - OF MAX. DENSITY (SEE / ,?, - SPECIFICATIONS FOR COh;PACTION REQUIREMENTS) --3/4" - 0 GRANULAR ', �• / ,. , / BACKFILL, (SEE SPECIFICATIONS FOR COMPACTION REQUIREMENTS z 0: N -AW IL CL LL- ------SEE UTILITY PLAN FOR PIPE :HECw,-- SIZE AND TYPE (MAIN PIPE) 6o UTILITY TRENCH DETAIL N.T.S. air Room" z,W S D 4 292077' SFQUOIAPA.PvIVA� F!y�.s�j"jAL UiQQ��15353 SEQ0f)lAPAR;;A,' 14 AS FILED FOR PERMIT MA`' 8, 1992 #,r",4Ai4w Orr jp 13UP 92 01+51 13166­�29 • MICROFILMED 11111 11111 11111 IllillI IIIIIi� �III �1 111 � I17 AMR- OL40 4114ADW N CMNA aIBAW IM1.L_SEDIML14I 2AER LB GRA VEL CC S7 RUQ?I{Qb L!jL&A : c . W " O a , _ o E a Od H PN �p C too W ON W �N SW SEOUOIA PKWY W Ua c a) sALf� - EMSTING N"n" — PLANT L_:S7 SYMB. COMMON NAME BOTANICAL NAME 0 arx ® w l n RO RED OAK OUERCVS BOREALIS I� f I _ FC FLOWERING CHERRY PRUNES SERRULA N L I JB JACOUEMONTII BIRCH BETULA JACOUEMCNTII ON HC HOCAN CEDAR THUJA PLICATA U `� CAM HINOKI CYPRESS CHAMAECYPARIS U G �7 1 Ll SUR SUN TOLERANT RHODODENDRON (I' O.C.) = 0 l SHR SHADE TOLERANT RHODODENDRON (1' O.C.) — _ 0-0 _ uw LS MIN OF. RHODODENDRON, AZALEA. VIBURNUM, ILER, Q � �Ay COTONEASTER, ANDROMEDA. NANDINA a-m IVY ' uN c - SimSUR Ila — BUILDING #228A IL -- LAW ` J i — ` w CL 14 ID Z Q BUILDING #22�+ An \ \ i -- — 9 O uwN R 3iWRIL" \\ 1\ 1 .- TE — 8-92 ` ) LAM DRAWN B ;tie — SUR CAW _ BUILDING #229 - - LA CNE.^1.cEC 5` cul Jim -- 5. _;f„� DRW RE ASIO.NS I NR Y \ f - 1 1 \ / OOB1""'irxocAR.v Sw cAu I \ cusrwa siN¢r ------ --- - -` SW 72ND AVE LANDSCAPE PLAN \ 1'-30.0' L h o JDe �c 29. 077 9 MJOAPARNWAV,15393 5E0001APARKWAY,15]33 REDWOOD.71M A3 FILED FOR PERMIT MAY 8, 1992 _3 �! +P.lB91/v.BLOa.l2i,.... iMP S�'4.5•ar�56ry;M iYP.YFNF1.1tt.00 x'1B — ----- a Arrl� D1 19 X17 . , 29 * MEOW- KEYNOTES 1 1 AL)JMINUW 510WRONT SY5 If W CL 9 2 11k)GY vENCER OVER COMM IL PAWLS 0 S BRI(,se LINE A8rjYF '4 (4 V) 4. METAL ENTRY CANOPY 5, CONCRETE SHEAR *ALL - 5V DETAIL 5/Ag 3 5 8. '5' 's 9' STOREFRONT DOOR 6 < /> < 8 > 7. 5* CONCRETE !kAb TYPICAL. SEE INTERIOR PLA.%!, F10 OrMf*'. 334-00 76' 3" 0 12' ti 50' FOR 'LAE! SLOCKOUTS �/ -... ._____-___.___ -If S. T.S. 0' x 6 3116' 4 112" 4 26 ._3" SO. CONSTRUCTION JOIGI NT - SEE DETAIL V) c; 4'-0 1/2* 11-4- 6,.$ I/ 3 p A- 1'-4* 5' 4 112" 14'-Ir 0,-r 10. CON TROL JOINT U DE TAIL I 581AB 1 112* 2'-1 51-1 1/2,. 11. 2'--0' x 2'-0' 8LOCX0UT Al RFCUSZi� BArA '7 112 4' 13'-9' 4'- 12. FILLER STRIP TYPICAL 46 r 13. BA]. ROOF 6 14. 101320 PLYWOOD ROOF SHEATHINC Its! EXT 0 0 1 GLUE - SEE NAILING PLAN Q; 0 c� b 0 d d0 15 2 s 6 SUBPURL INS AT 2'-0' O.C.OCW/ r4wPSON F 24H E in C4 cu < c Q 0 0 HANGER EACH END TYPICAL B Do L. 0 c 0� 16. 2 112* x 180 GLULALM PURLINS 1� - 5/8' YV/ SIVF50h a I ------- - HW2,618 HANGERS EACH END TyPICAL, .,TART LA*f04' AT GRID I r'. C C V LAJ a OC4 17. P.T, 4 x 12 LED(XR - SEE DETAIL 141AS & 131A8, TVP. AU EAS' 0 in -j AND WEST WALLS z 3i 18. P.T. 4 x 6 LEPIGIR -- SEE DETAIL 31A8, TYP ALL Nr-*TH Ano F.0.C. SOUTH WALLS Lj r 'vTRFLOW DOWNSPOUT AND 6'0 0IJ -ro-e F.O.C. 20. DOWNSPOUT/OVERFLOW BLOCKOUT - :4-L DETAiL 10/A10 0 c < -c m �E o I OA 21. DAYLIGHT OVERFLOW To EXTEIOR kT V-0' A.F.F. WITH 6*0 ID 0 c -4 In CA. CL u G.L. 6 39_' F G.1 . 6 x 28X" CAST BRASS SPOUT - 'VERIFY WITH OWER REP. C C I.. 22. 5 1/8' x 13 112' GL. 8M, COLIC rop JOIST - SEE STRAPPING A N NAILING PLAN FOR LOCATIONS C, 23. CLEANOUT TURN TO WEST, ACCESS THROUGH FUTURE Cy) r I 0:� " 7 MECHANICAL ROOM �4 OC I I Lj L J 24. 3' x 7' H.M. DOOR f-Q&- rl 5" 25. DOUBLE 3' x 9' STOREFRONT DOORS Z . F,0.C. _�.L. 6XLx 39" 28X L C - c I" L-- < > u 86 TL 10,'--7" r (D T Ll 0 0 LALJ 00 0' C7) L J Q) TA 18'-7- < T&16'-9 G 0-111% G.L. IK x 3 9 41. 6 39- G 0) T/B 1,P'-7 C D 1 W 6-c 1 - ---I - - ) - 0 F CL Or A 20 T F,0,8 A8 11 r -i Qj 1) \ � I I - - 0 N 5 L J I(D GL B A, T/a e 'C 6-) T 16'-9" 'D '61 6 G.L. 6X" x 39" r r - - - I Ta c PI) TA I *-l*" G TIL 17*-1" 7 F@)(P. 2'-1 ' 2'-1"' 35' IC" TYP. 10 -0 - U \, -1 , -4 L < Al- F,0& F.0 OC r tie CL AH m T/B 16'-9" F. . . A7 F.O.C. G.L. 6•X" x 39 G.L. 6X" x 30" 6 F c; IA., r) j -c C IY4 -------Lj 04 11 - (D T/B 16'-a" to F1 H T 0) L -1 20 7- z G TIB Ic-'-9- 0 (D OC OD G'y 5 21 c"I 'I r- 1 F,, B. 7G.L. 6 x 39" L _6 x 16 F.0 C. i14 C IX L J C G F. le ej FOC.-_ L < a_ X. C14 C) v rpa (D T IB 17'-1" 7 9 F Q.0 19 A8 L 3 z F B. T/9 19 - OTZB 16--g- to to G G.L. 39" r-,� G.L. 6N- x 30" G.L. 6�" x 27" 0 XA7,r L C = C IA" C N In L C41 U) to T/B 19 "*Vr D25 TYP. G 25 &771 A.8 r .-i- F.O.C./ 20 T/B 16'-4" F 0 B. F.0.r, L F.O.0 LA- a -----4 T moo S/ T E3 16 9 1! j 0 - F.O.C. r G.L. 6X" x '17' D Q 0 0 13 --2--) C 1A L J L -i c F O.B. G.L. 6X" x 39" - -1 BELOW WINDOW 10 A8 O F.O.B. F to to SITJJER7�6 2 p I I i FOC F.O.B. W) OA 18 STRAPPING AND NAILING PLAN ip ' ry "' C.L. 6X" x 39" F--1 G.L. 6 x 3 J r G.L rn L i-i 15 A. PLYWOOD -NAILING TYPICAL J' roe <K> F.O.C. C I Y4 C 1 1.) 10d 0 6" O.C. 0 EDGES OF SHEETS 2.) 10d 0 12- O.C. 0 INTERIOR OF SHEETS F.O.B. L -J F L;6 F.OT. F.O.C. B. DOUBLE ROW OF 1 -�- 0 4" O.C. 0 GLULAM BEAM vVjT"IN 7YPICAL ® GLUCAN BEAMS -4- F.O.C. 8'-0" OF O.S. WALL, 01 F.0 8 x C. (1) SIMPSON ST6224 0 LEDGER 0 PANEL JOINT'S - -?IIDS OA A 03 0 N (92100 M (13/A8N "4' G.i- 6 x ,39" F 7 G.1- 6 x30" D. SIMPSON LTT19 0 6'-0" O.C. TO SLI9PU LINS ALL NORTH & I SOUTH WALLS (31A8) X���- N : to L'-J ch r6 C IY4" 2' DATE. E. SIMPSON I-TT208 TO PURLINS ALL EAST & WEST WALLS (141A8) W) 1� 8 20 14 ob F. SIMPSON SAH PURLIN 70 PURLIN 0 GRIDS 8,D.FH,K & L (5/AB) .1 - 1 1 F.0.': - O Q.c � W) I 10 - 0 1�1 ----F T m G. GL. SM. COLLECTOR JOIST - SEC' DETAILS 8/A8, 9/A8 & IOIAS DRAWN f 8 % t'4 H. C4, ROOF FILLER STRIP MIN. 8'-0" AWAY FROM O.S.O,S. WALL -F O.C. 9 F 0-B. -F.O.8 .1 1�1 8 00 T IS TOP OF BEAM 01HECKED F,OB. Q) F 011, RFLQjy BELOW WINDOW X.,,\ I, t -w L ------ m TOP OF LEDGER M ----------- ----------------- - W;MZ4 AK 4 TZ-L - t 9 RE'OS134S: Q 8 10 F.0-8 0 COLUMN m CID C6 2'-6" (6 i. cl� AB 2'- 112 eA 2'-1 '.12" CD A 9 2'-6" -F.00. 4'-3" 9 0 1/;" T yp, (7) 3 (71 LL -0. AT COLUMN 33'-3" i� ) EO. 32'-a" A EQ. 2'-6" _EO 011 37'-6" -17'-6" 50 L 4 50'- 9'_0 1124-1) 2 50'-0" 40'-0" 47'-6" 50'-0" 40'-0" F.86B AT 47'-6" L AT UMN N FO.B. 137'-6" 13-7'-6" F.O.B, Rc4r vz--C/v 8 < > V-ss-gu SC4.). Floor Plan #227 sh Foundation Root Plan #227 1/161-' 0 1/16"=I'-011 C11>-1 A FOOTING SCHrL---DULE-- MARK I f N(,,' i WIDTH DEPTH LONGITUDINAL TRANSVERSE REMARKS S4rE T REINFORCING REINFORCING nJ 5'-0" (4) #5 (4) #5 Alcu (13 6" 5'-6" 1'-2" (5) #5 (5) 0% a !. -2. 6'-3 6'--3" (7) #5 (7) #5 N 6" V-2" (4) #5 #5 0 18- O.C. FTG, 0 1.S. FACE OF' 5,14 WAu 29207-1 DIAP&tKWAy 3 SEOU01APARKINAY 15353 SEQUF .7449M AS FLED FOR PERMIT MAY 811992 mffr JM-2" ?Mw�i7- PM-42'"50 BLOG 228 13UP 92-0i5l, F3Lf)r, 229 "WWI ft 0 1:1 MIGROFILM �DII 11 1 1 1 1 1 1 1 1 1 1 11 1 1 1 1 1 mm- GLM 4MADRIN ck4ImA IN 16, 14 2 9 #9 4f Er- 6 4'- 1'-0 0)11r L qu A 8 G.L.L _771 �GIL jpD 12 A9 L 1 10 N 0/ 1�7-c E:F:Oc 7X" m or --------. ._._.._._.._ E: KEYNOTES .� _�.__ c 1. ALUMINum STU�ku k0kT �f'STE�1 2. BRICX VENEER 0%0 CGt4CRE FE PANEL'S ` 1 J. 11PICAc VENEER OVER 49TAL STUDS (A 2 4. METAL ENTRY CANOPY }•. 5. VERIFY AND LOCATE Ail OR1CX E1U'AJ1 !{�N JGiNT1 Mf, OWNERS REPRESEN FA'f1 of c T _ —__ _-- -----••--- -_._.- - -- _ - _— -_ __._.-_._.__.__._.._T._. , - _. __ _____. B. PANEL PARTIALLY - r-R AWIT). SAL 0 .i CONCEALkG SEE ?/Ap i 0, 1 INFOIRWA TION; ALSO SEE 5/A9 FOR IN IERIOR CLOW- �E TE (A C. C SHEAR WALA V) _ 7. BRICK BE fOlvu 4 4 S. PAINTED CONCRETE AT SOUL PANEL ! • � :c p. REVEAL PATTF?N (MATCH N11NDOW ;YSfE1/) SEE 1/A2 10. 3' x 7' H.M. DOC* W1IH RELI TE A80''of TO f1'—�Y 00 Ci) 3 7 cj4 tl% V) C9a0 :. 4 Q E V in ) C G • SOUTH ELEVATION F; BUILDING #127 ,�'s"", -o" Z ! 3oo 8 8 7 6 1 Uv .� LGi- t .� r- CL TIARCL A. IN _TALASHING Cr)r.d - . L LJ A) I I N FIN R. } E LI- FLR. r IL W 0i v.AT EAST ELEVATION = o WEST ELEVATION BUILDING #227 '%'�"-' -° BUILDING #227 '/16 - ' -° O - A <m> 0N 0 z U v ~ t r/qASHINc ls- CL T7 wa -c>!-- - -� I I I EE I I I I H-- H - � m •' osFIN. FLR. ) - - - -lrA - l -- - � a _ l 10 DA2 23 1� 2 NORTH_ ELEVATION BUILDING #227 r, ' Z*Zo M J G E C A13 A 12 F 1_0 A 8 FA7 6 A 4 � •-- /ns I,As I1As /A9 /As i/As A9 T Tyr, ' SIM. SIM. SIM, SIM. M m - - —--- — - J L_- - - - l- - -- - J L_ - - - - --I �- - - - - -� I- - - - - l_ _ _ - J L-- - _ - -I I- - - - -� I - --I r- - � 3/4" ao __- -- - i 6 1 1 B 17 `v --- A9 A9 --A9- TYPE. TYP. . . l -- 1 - - - - TYP. - - - -- cMa l [ 11 , - - — - __ - L r SOUTH PANEL EL-EVATION REVEAL CDETAILBUILDING #227 '%16"-''-0" A2 1 Building #227 1 1/2"=1'-0" 1 8 8 7 6 5 3 1 A 16 D 15 A 14 C 11 C 9 C 7 C 5 A 3 E{ 2 A 1 ^p- - t A9 4/A9 1/A9 3/A9 3/A9 3/A9 3�A9 I /A9 2/A9 I/A9 �' - -- -- DR A^' B s. T _ -T/E..---- _- - ---- — -- - ----- ---------"..---- —.�._ ----- ---- --CONCRETE PILASTER c Gw / BK -� L _ , t _. _ _ ._ . _ -- - _ - J L - - _ - - I _ - - - - - -- - OQ - --- -- r•----------- - oo �. -- �.__,_ I _ J L I I L_ N I i I N I I I I FIN. FLR. 1 FIN. FLR. G:=3 CC r-- -- _, - C;� C.-� C�C I-= C=C CC L C CC -BRICK WEST PANEL ELEVATION EAST PANEL ELEVATION BUILDING #227 1%16"=ml'- 0" BUILDING #227 '%10.. .'.-0" <A> < REVFAI.- - �_ 23 U 22 D 1 D 20 D 19 D 18 A 17 f/A9 �4/A9 4/ 99 q/Aq 4/Ag //A9 1/A9 SEALANT M „ RETURN BRICK EDGE »• _ _ -_ .- I -- - ---- -- -J L __ - . I - -- El r r- -1 _� 1 _ -- -- - - - --- -I �- --- �_ _ r I I I S�`. _ � r-— — — — — — —- _J ' _=__=__ _ _ - ——_ —— ———-- - - ` - - --- ____- --- - - --- - -_ - - r _Ln H__ ±u=f:i I __ _ _2 VERTICAL REVEAL -_ - - A2 FIN. FLR. �__ - - -- - - - ---- - - _ --- - ---•Y` 3— _ _ 1mmmmmmmmmm_�' I_� —_�c A2 AT BRICK % ON N. g1 o A 2 N + NORTH PANEL ELEVATION BUILDING #22' 7 AS FILED FOR PERMIT MAY 8, 19.92-1 1 227 3GOUOIAPARKyy��'..1�1fi . SE000IAPAtiNVyK�'"f�"s RL'L71MD�D,70M ��� �L,� 227 SUP 92 0150 F►ui3.228 SUP 82-0151, BLDG 229 1F MICROFILMED + � Ill0 Dili I � ili � l Dill r I � . 11 � � Ili I Ii � l � i i � , � l i I � II � � i I Illil i � lll � i. KEYNOTES 1, ALUMINUM �,I(*0W.4of 2, hWl(,K ofNEER QVEP (,(04r.*fTf. PANELS 3, Bkt(:K LINE ABOW La 4, 5" r-ONGRUTE SLAII TYFfr-A.L III- 6. 1.5, 6' s 6' x 3/16- c 6, COf4STRUCfIQN JOINT Ck SEE Of TAIL 115A/AS a *;; 7. CONTROL JOINT - SEE DEETA& 150/AS to 8. 2'-0' x 2'-(Jo BLOCKWT AT RECESSED BASE t V) W. 9. FII.LER STRIP TYPICAL 1-1 10. 8,U. ROOF 11, 19132- PL,(*000 RW SHEATHING INTERIOR WITH EXTUOIC0 cz Z • wi o Gt UE -- SEE NAILI#'(j PLAN 12. 2 o 6 SUSPURLiNS AT 2'--0' J.C. W/ SIMPSON F26h HANGER EACH END TYPICAL 1.- 0 0 13. 2 1/,?' 18' GLULAM PURLINS C - 5/8' W/ ShAPSION < 44 r. P, 1 2 3 < 4> < 2 3 4 5 HW2.618 HANGERS EACH END TYPICAL START LAYOUT AT V) GRIDS 4 & 5 100 - L) I a. c c q* ------ 100 o" 0 r4 14. 2 112' 21' GLULAM PURLINS C - 314* *1 ',.'MPWo LAJ 0 50,-0" 50,-o HW2.621 HANGERS EACH END T(PICAL AT 30' BAYS i:_ 0 w -14 - ---, -.1-1(. 501-0" 50,-0" 15. LEDGER AT ALL EAST/WEST WALLS 4 v *-2 - SEE DETAIL 14A/M L 12'-6" -12*-6- 50,-0" _1217_§:, 121-6" -IC.,, 121-6" IOL T S) Z 21 a� a 1 50' 0 2 INSPECTION REWIRED FOR KWIK b LAJ 3 --on 7-6 I'l (71-3 1/2' ?--a I t2 71-6 1/z` 1 (SPECIAL (A 8,-3.. T 2'-1 112' 2--1 112- 411-5 1, 0 ( I 'A� u 2 7. V-111" N,�lv-f 2.- 2'-r�V 2*-4" --- - u 7- Eo. 45-0, M" , 45' 9* 4 LI 17, DO*4SPOUT/OVERFLOOV BLOCKOUT I�EE DETAIL 101Ai,4 51' 112* 4 112" i-�* 2'-4 2'-4" c < c _1 18. 4 x 6 P.T. LEDGER AT ALL NOPTH Atib SOUTH *A" - %' u m Z 46 m 3j ai In a) Im m cd Imi 6 6 6 6 d DETAIL 31A8 4 fl- 46 o 'o, d 6 b b 0 6 6 j 0 6 6 6 6 19. 5 1/8- X 13 712- GLULAM BEAM COLLECTOR JOIST - Sf,' 6 d (-3 d b 6 6 6 • LZ U., t�' LA- u- I,: L:: L,: STRAPPING PLAN FOR LOCATIONS Z, L.: 15 20. CANOPY ABOVE, TIE DOWNSPOUT TO BERTICAL ROOF DRAIN In, CA A Cr) ca 4- 21. PANEL ABOVE ckf /A\ F.0.C. r 22. DOUBLE 3' 7' ;A. DOORS W1 PELJTE AOOVE T F08- F.O.C. L -1 oo- 16 A10 0 I 20 C14 u 8d c N �n I N 2 10. 9 o 20 Ug W) 8 0 A9 T/L 17--4- a IF.U.C. CA TA is- Lj CIO a F.0 F.0.c:IQ A F.0 0 r r G.L. 6X" x 22X G.L.GL6 X 2 , Y� -7- 1-- -11 - T/B 78'-C' =4-- C 4 F.O.C. 4/ L—.J Qf F08.( A —L -j TA co i 16 22 NOTE: T/B 16'- T L 18' .07-C—-6 \'05 16--ic (D GLULAM BEAM OFF 0 1 T 18'--Fb , 1 ,' NOTE: .1 -- A CL N! ' n I GRID 2 3/4- SEE 1 4 5 4 COLUMN/FOOTING AND cl4 DETAIL 201A9 I A8 A8 &7 <B GRID 2 314 G.L. 6)�" 31 r c C T IN" ci "N\ 0 A10 GLUL A,M BEAM OFF I I ---ll G.L.\f N x 34X" TA lc_ D (D-/ T UL OA TYP. c)) T 17'-1 G G T/B la'-6' 1 — ej --r---4 c: Lo (D G.L. 6%" 3114" r n G.L. 6)(" 341 " T 16'-6" __o :L C I,, C 16 4 '1' 4�. 2 m 2 I AS ASk 8 in '� i l�,10 NI I K" A10 Lo IN T 16'-1" 0- T/B 04 TYP. F.O.B F.O.C. G.L. 6 " x 33" r -i G.L. 3-X" x 36" C I" C T/B 18'-F. L J 1,Y4 A8 TZP 17--l'-- c: F.O.C. L LL-I 00 CY- x" 00 CD 1\�oof I II I 0 .......... 7L.9 8'- 4' -B 16'-6 0- c; A7 Iq C14 CN 00 ' 01 i2 10 T�# c: A10 (:5 c: 8'- F 0.Q.- 1 8 1 O �-. F.a u.- r- G.L. 33" G.L. 6-V x 36" r- -I 0 I A L Ca, E -7-0 L J C IY4" C • /"l�6 D A T TA 16'-10- _/B lb--7- i k\��o 13 uin Il) ;W) 18'-C' r -I TA 17'--4" M 0 9 (A� x 31 L. 6X" x 34�6" 0 C 1A., -0 \ — rc Ci L J 12 STRAPPING AND NAILING PLAN Ln A. PLYWOOD NAILING TYPIL-AL C14 F.0.C. L -J 1.) 10d 0 6- O.C. 0 EDGES OF SHEETS C -><X 2.) 10d 0 12- O.C. 0 INTERIOR OF SHEETS r -i B. DOUBLE ROW OF 10d 0 4" O.C. 0 GLULAM BEAM 'A!'PIN NOTE: G.L. 6 x 34X c F 8'-0" OF O.S. WALL, TYPICAL 0 GLULAM BEAMS GuLL;,l,,�!,19-nn TIN(' ANn GLULAM BEAM OFF C. (') SIMPSON ST6224 0 LEDGER 0 PANEL JOINTS GRIDS I o 0 I -�ll r5 TE: W) A & K (13/A8) W) GRID 2 314" 6 N01— I�10 A8 A8 A7 GLULAM BEAM OFF10 D. SIMPSON LTT19 0 6'-0" O.C. TO SUSPURLiN'S (3/A8) GRID 2 314" - SEE Ln 15 TYP. N/S WALLS 16) ­0 21 N >< in r4"\y�61 1 OE7AIL 20/A9 >< - 1 15 A9 E. SIMPSON LTT20B TO PURLINS (14/AB) TYP. E/W WALLS F.0,R.T F.O.C. 17 �Al 0 �O F.0.C. r F. SIMPSON SA36 PURLIN TO PURLIN 0 GRIDS C AND H 6-g" x 221 G. GLU-LAM BEAM COLLECTOR JOIST - SEE (8/AP & 91A8) F.Q.Q. -- .1 IT$ C LJ H. SIMPSON ST6236 EACH SIDE 0 ROOF BEAM JOINT TYP. -,7 r 171.1 OLJOf 13 ALL JOINTS - SEE (4/A8 201A8 SIM.) DATE: <>— ey .1 1 20 N r3 A in TOP OF BEAM 15 0 W) 11 20 DRAWN BY: - C14 08 --- Gr TOP OF LEDGER -- CA* qK w C4 L –%., A10 13 13 CHECKED BR: )I. i F.O.C. A8 A9 DR* 1`7 r REVI!SION F.0,C. 16--j L -j 13 14 D15 Floor Plan #228 Foundation Roof Plan #228 - 1/16"-1'-0" — '/1c," 1'. 101. FOOTING SCHEDULE MARK LENGTH WID',H pf-p7i, LONGITUDINAL TRANSVERSE REMARKS REINFORCING REi'Nc*ORCING SJ,4E`E- -R C DETAIL 14/A9 AT CORNL �ONDITIONS 6'-o" f" -c" 1'-2" (7) #5 (7) #5 J-4. J-2, B-4, Akflr' FZ-2 E03 4'-6" 4'-6" (5) #5 (5) #5 j FTG. AT PANEL 7YPICAL cu 0% -0" 7'-0" 1'-4" (8) #5 (8) #5 j FTG. AT PANEL TYPICAL A 3 N, 0 p'- O" 9, o" 2'-0" (9) # (8) 07 DE I AIL 15/A9 1-01) l OF cn Xe NO IT SEQUO A PARKWAY 1'53,53 2920 / Orr FILIF 52 0149, ULW�227 '�EOUOIAPARKIVAY.15333 BMW(C) 7 -­­ ) u wo. AS FILED Fr)R PERMIT MAY 8, W2 , 4'p 7" SUP 92 0151. SLOG 229 - r MICROFILMED I 1 i i 0 41 �j 0 "ORR U Ec= 3 3 > 64 < ---T-T-, r 7 L T 4 'q(A8 b i i i i I �l Uy P a 13 KEYNOTES _. . _ . 1 < t. ALumpium s rokt i 2, BRICK VENEER WI k "r.NCRI r i "Ahi L 3. BRICK VENEER OVER METAL STUDS 0, 4 'o 4. WRIFY AND LOCATE ALL ORICY f',ykAlo"4JC44 "NTS 01TH LAJ lei y. 0 010 4 A7 A7 O*Wi',qS RfPRESLhfAIj','E 4 TAlASHINQ--\ 5. DOUMI J' x 7* 14,M, DOOR W1 kELITE A904 6. CANOPY A A T/HRICK 7. OWNS OPTION: PAINTED IV04Y WEC-4, SCREEN, "A"i To BALA5TED SCREEN AT CORI-' (IMILTS F(A O-ONLk T7 A -T, ___1_� t . c o BRICK AT I" AIR SPACE V) c Pow, .'IN. a SOUTH EL_-_ ATION LAJ C 1 1/16*-1' C =0 ! ? coo 4 C zz < < > < <4 < Val 0 I. ID 0 Z 2 A4 "s, \ N "s, -02 QD 04 TIFLA-SHING T/rLASHING T/EIR LJ — T -T -- 0 7— ON 0 6 t Li (R. T/"FTC:J 16 T/FTG.-) IN-0 I 4pAri U LJ Co 0 BRICK AT I" A R SPACE. 0 BRICK AT I" AIR SPACE Q) WEST ELEVATION EAST ELEVATION BUILDING #228 BUILDING #228 0 A K ON 7 U = \J> 3 3 U -02 A7 A7 N I I N0) T/FLASHING u, W.) 16 w lj :3 I I C) T/FLASHINGJo TIBRICK o m L J Nit 06 SPACE TYP. BRICK AT I" AIR SPACE 3 1 T(P. i-1/0��Tl\ SPA NORTH ELEVATION HUILDING #228 co V) z4z 0 J> T/FLASHING SLOPE' I' t < < > < W) F—AF', A 1t [A ll� 10 FA 9 A 81 F 14 =21A'I j 2,Ag 2=/A 9 2/A', 1 2' .1 Sim. Sim. LAJ C4 '"'L - ---- I - 7 T/t 11 F L F A L----------------JI --------------- ----------------------- L-------------------J ---------------- Aq A9 13 1 SIA9 A9 CK T7�T�G [=:=:3 C, T/EIRI SOUTH PANEL ELEVATION T/FLASHING , 1/1 6"�l'- 0" BUILDING #228 'v4 AT �RLL ENTRY AREA W El (ST( EFRONT GLASS TO SLAB) Ln 4 5 4 2 -14 1 0 in uj . LLJ C4 -4 9 19 B 1 -3 1 =2 64 r 21191 r,3/Agl 6=1A 9 /Ag f 4� -F 7131 B 7� A -F� F � F I F F F671 11 1AW;j =A9 L FA 17 A 16 14 CK t 5-8-92 Sim, Sim. CD EXTERIOR WA`14- Sim. Sim. ELASHING T/it C4 LLL -- TA CAW 6K TAN..) t ---L6" x 6* x 318" HILT!r TImL 9T r -i r I r r r -TAL BACK FLASHING---- HDI 314- AT 3'-6 D.C. Y.JBRICK CHECKED BY: I I M L---- --Jl IL--------------------------------i i I j L---- i-----Jl —TYPICAL FRAMING SU WALL SECTIONS. CLIPS 0 9" o.C.— C14 5 > < 4 1 ;]3 --1 r 13 ci —METAL BACK FLASHING REVISIONS:tl 3 137 A9 A 9.j A9 B.U. ROOFING- --B.U. ROOF FIN. ':IR. FIN. FLR,CAH 9 C'=3 c_3 - =� cM [---] r r N i T/FTG.:) WESTING ELEVATION EAST PANEL ELEVATION LEDGER SEE SHEET A 7 r�rENtNcL] 'ING #228 BUILDING #228 PURLIN SEF SHrt-T A3 BU 'LE, <3 < i K --i.;L. PURLIN SEE SHEET A3 F1772� FA-T2- 712 31 2�2 f A F211 AT201 i ATI 81 FA, F F F L2�1 A�91 BRICK CESSF- 2 —21A91 BRICK SECTIQN RETURN ICK SECTION END WALL RE D BRI E21A91 T Sim. GA4 BUILDING #228 3 /,1 i, -A4—) R 1;11 1'f t4 G, T r 00 1 13 19 1 13 09 9 FTN. Ft R. A9 AS A4 -1- jL .................. G c:=j NORTH PANEL ELEVATION n,A '8'lF0U0tAPApl(VVAY 1 #228 AS FILED FOR PERMIT MAY 8, 19921 _61 JeWm rr,-327 "333 "MMUff"M 92 228 F3UP 92-0151. SLOG 229 MICROFILMED w I MNFA- 'JULM 41MADE IN 0 CH44A IN f J .. .. C-- KEYNOTES �- 1, 2 81fir,1v VENLER (-)WR (,"AsCkf 'E "A►if.± --------•--- 3. HNlr,K ZINE Afifik +ll A 4. f!' x 12' Off[) GRI Vi- IN 5, f:ONCRE TE SL,A19 T YPICAI 4 +t► 1 6 L: 6" x 6' x 3/16' At T b'/ STC `JIE1 kl;lf 7 CONSTRUCTION JOINT - SfF DETAIL. 15A/A8 o 0 B. CONTROL ,/DINT SEE DETAIL 159/AS IJ) 9 2' 0' i 2'-0" BL OC'M OU T Ar RE CE S SED BASE r/ 10, FILLER �iRIP TYPICAL 11. B.U. ROOF • a ,1c 12• 19/32" PLYWOOD ROOF WATHING INT. W/ EXT GLUE - SEE NAILING PIAN • O • 13. 2 x 6 SUBPURLINS AT 2' -0' O.C. IN/ SIMPSON F26N %I _ HANGER EACH END TYPICAL ~- c O O 14. 2 1/2' s 18' GLULAM PVRLINS C - 5/8' W/ SIMPSON � HW2.618 HANGERS EACH ENO TYPICAL START LAYOUT • Q10 A Vl p 204GO b a a < 15. 6'0 DGWNSPULIIT AND 6"I OVERFLOW - c 16. DOWNSPOUT / OVERFLOW BLOCXOUT - SEE DETAIL 10/A10 W o (` • lts r_ 17. 3' x T H.M. DOOR W/ REL!TE ABOVE 1-4 I? 18. RETURN BRICK BULKHEAD BELOW WIND%w z t Q Q 09 19. EXTEND BRICK TO INSIDE FACE OF FUTURE FURRING L�.1 - 1.. t r� V'i �7 • C O G :t _ � (4. Q� L Q '1` O 1 2 3 4 5 1 2 3 4 5 QOII 10A5--0" _ J __.._ _ —100'-0"_ r _- 25'-0" -- - 255-0" 25=0" _ 25'-0" - 5" 25'-0" - 4 25'-0" -_ _ 25'_-0" _- ---- _ _ _ 25'--0" ,i �) t 1/Z' ___� 2S'-0" - ..---_- 50' -- --- -- --- _ 25'-0" - 4 1/2" ,�-._ ---- -0" 50'-0" -- _- 2S'-0" - - iW (� T'-A" 4 El?. = ZO'-1 1 2" (9 EQ. 45'-0" 4 EQ. = 20'-2 1/2" 2'-8" 1'-1 I 20'-11 i /2.. —_- -- - v__.---45' 9'I 2'-1 1/2 --- Z0'-11 _ Z' 1 112" \ 7 cp CO m r 4] O �] LA- LZ m o0 0 1,-3 ro +`�. ° 1'-s'ro :t ° ��: I� O O 16 A8 is O 4. I� �J �J I C3 C F OV.RFLOW I O'.FRFLOW i r -1 , / .,IM r. 4– 19 rJ _ O.B. ------ _--- - ------ - - - _ --------------------- ------------------------ ---- ---------- --- --- - -- OA - I - -------- �_ - -----_ - _ r � I I A9 J F.0•C- C I 10 I I �- i 10 I b o C`J L •1 N I I I I N N a Nx d ' i C'4 ,Q, a 10 1 • b ; ; v -1 I A 9 U 4 I — N F.p.E I I I I F.O.C.ir__— � A x (_ N -\ t 3 i I A9 _ _ F.o.c.L _J � F.0.8. • I I I � �- - --I O4 iv ' I ; I A8 -- i' I Y + 1 I I i 8 \ I 6 1 1 4 I I m 1 -1 �� I ( i 48 A8 A10 I I 1- ; T 5 ' I A8 w 0 9 6 a 1 I ci ' 6A1 11 5 I I N O OofA10 A7 I I\ I �O Q - -, - _ I I 14 A8 � a 7 b I SIM. l 1 0 0� _ + I I I I } � � � I N0 a 7 '1 L._—.—J L-- --J -- �j A10 A10 3 (� e / eA W+ i A10 J i ++._ �� ! n 7 ( Q � AB i 1 tD I I I I I 12 N F. F.O.C. N I M i u 1 •- 18 20 -_ xP x .';7 t I m A,o o ` II 9� U I Q +-- - - I '�`' F C.1_ r J c� cep F.O.B. , 19 ,7 rtn io 1- A 10 a O _ I I r � A101 I i I I � N � 16 U � ; I o i � • A10 l o I 4 I Lo _ I � N !I i 3 W A$ o A5 I 13 F.O.B. F_0,C. Ag i -.-- 1'E:=jT -----—- -- - - --- - --- - - - - - F O N =. FOB. N c. (----I I I °p \ 2 ---� 3 N A8 A TE: -5-52 �RAVN ay. 'AW Floor Plan #229 DF?w iE _ ® Foundation / Roof Plan #22�` yaw' IA., PENOSIONS: T L 1611" 16'-6" 11B16'_11" T, -- -- STRAPPING AND NAILING PLAN dOr— C A. PLYWOOD NAILING TYPICAI FOOTING SCHEDULE. 1.) 10d 0 6" O.C. 0 EDGES OF SHEETS ` 2.) 1Od 0 12" O.C. ® INTERIOR OF SHEETS MARK LENGTH WIDTH DEPTH L ONCI RUE INAL TRANSVERSE REMARKS CE --- `/ -' t E ) 8. DOUHLE ROW Or 10d 0 4" O.C. P GLULAM BEAM WITHIN Rf ;VFORCING REINFORCING '`� B'-0" OF U.S. WALL, TYPICAL 0 GLULAM BEAMS ti.`r• rk e. C. (1) SIMPSON ST6:14 0 LEDGER 0 PANEL JOINT GRIDS 1 &. 5 (13/AB) I I I D. SIMPSON LTT19 0 6'-0" O.C. TO SUBPURLINS GRIDS CfI 7'-0" 7'-0" 1'-4S- _-(8) #5 (H) #5 TTG. r WALL A & C (3/A8) E. SIMPSON LTT20B TO PURLINS (14/AB) 5'- 6'" I 5'-6" l'--2" (5) #5 (5) #3 SEE DETAIL 13/A9 — -' F. SIMPSON SA36 PURLIN TO PLIRILN TYPICAL (5/A8, ---- - (U _ G. SIMPSON ST6236 EACH SIDE TYPICAL (4/A$) A5 0N 1 I 1 IB jZ6 TOP OF BEAM O - - � T� TOP OF LEDGER I) �B 18'-j6- T 18 =18'--6 _ L 18'-6" 2920?-,► ..__ Y,V333 S9-9VP0PARK*AY.ib353 . 5LQU;)IAPARKINAY,,� REuWQop.70oo + ______ –�__ __�._____ -_____ __ _ — _____ _._.-_ AS FILED FOR-PEF�1'vIIT MAY 11992BUR- _ - AP, SUP 42-0149 BLDG.227 BLIP 92 0150, BLDG 228 BLIP 92-0151. BLDG 229 ICROFILMED III III III II I I III I III III III I I Ili I I III i t 1 � 1 I I I � I I I II I - I I I I I1II � I (� 1I1I1 111 1 iILI !'grit- ut.Ne MADE' IM 6 cM1Nn IN I - - CL L KEYNOTES I' MR SPACt AT BRICK I Jag" AIF SPACE AT BRICK_ I" AIR SPALL Ar BRICK I" AIR SPACE AT BRICK 1 j2" AIR SPACE AT BRICK I" AIR SPACE Al BRISK Zu4INUN - '•ONr SYSrE4 an /I R CONCRE TE PANEL La A. ._ --- _- — -- - - — H n `t _. BACK YFNf l:. 6 S 3 4 ; BRICK 2' ONUVEhItHORINE-IN tat SIUUS Q o e A7 A7 C'A H B S IyTEU"ROOF MECH./1 AIASTED SCgEE,OOONNCRAT OPTIC S 'AWt O <^o I f/ilASn1NC T/TLASHINC _ -__ - 6 Sox 7' H.MBDOOR WITH RECITE ABOW.. W MS uNG -_.. - ::. _. i/FLASHING Q C a _ _ -.._ _ .•§__ o d z •4 �fi -s _ g r o 114 _ ___ Q •C e0a LIJI - Z ; ;vi sg • II♦ 6 J 1 2 J 1 2 < 00 �J SOUTH ELEVATION _ - EAST ELEVATION BUILDING #229 ' -D BUILDING #229 /B 1 -0 �N W N k•, H Z LAJ A C 1 U'�d illC :• AIR SPACE AT BRICK K._ 1 1/2" AIR SPACE AT BRICK 1" AIR SPACE AT BRICK 1" AIR SPACE AT BRICK 1 1/2" AIR SPACE AT BRICK 1" AIR SPACE AT BRICK _ O Lj O N ) B 1 � N L 0 � Q B Q a i NC _ T/FLASHINC O � Q T/iLA5p11.W — T SHINC CL — _- -- — N D _ 1 ON C T/FLARIG T 1" U Cn L, Lj -T-F /Z Typ. C) FIN. FLF. CL m y (D,/' 1 w P T I I 0 1/1- HE E NOTED) NOR-PH ELEVATION - WEST ELEVATION BUILDING #229 BUILDING #229 o rn N C Q A 5 1 > A 7 A 6 A S A 3 A 2 A l •mow `vBTM. RICK I AS 2/M 2/Ap I I/A. r-2--A.1 a/A► T/lt SIM. SIM. 'N TSL' SIM. SIM. OBJ _ I11I r� AIR SPACE MIN. 1" TA �. _ T - __. __.- �� SEE ELEV. FOR 1 1/2" i I I LocAnoas I I ---- I " M OCA A^ ^I - �. _J TW. FRAMING I i 7/OPENING ---�- m 13 19 13 18 m 13 19 A9 n9 A9 A9 A9 A9 0_C�r r. . 2) /70 TEK SCREWS AT 6" O.0 E FIN. FLR. _ _ _ FIN. FLR. 24 GA METAL STUDS DATE. SOUTH ELE�i ATION EAST ELEVATION o r ' r-G G.Q s- oDRAWN :. CAW BUILDING #229 BUILDING #229 O I CHECKED B, DPW b REVISIONS, I � A C 1 •� a � MAT A 11 A -o A 9 A 8 C� 2 AI .z/AB a/Ap vi a,/A9 a/Ae a/Ap BTM. P1C1( rrr��T ^I T� SIM. SIM. N T/lE SIM. SIM. ❑❑❑ E = I I I b LI I I --_J L_ __ _ __ -_ _ _ J L -_- _ _ f/2-0 P.D. AT 2'-0" 0.0 . . `.. .- _ _ _ _ _ _ __ _ __ -- J L.-_---_-_--_ _ _ _ _ _ _ _ __J LJ ,n I_. __ _ - - _ _. - _ - _ _ - _ _ �1 e. N Oi 3 Z T/$LAB I-J �` =,v-, SHEE" A9 A9 A8 A9 wm AB A9 >M b t N ru FIN. FLR_ .. _ _ _ - _ _ .--_-__ FIN. FLR. _ _ _ _.. _ _ _ _ _ FLASHING TYP. NORTH ELEVATION WEST ELEVATION BRICK SECTION In "=1'-0" - 1/B"@i'-0" BUILDING 0229 3/Arm BUILDING #229 BUILDING #229 "B AS FILED FOR PERMIT MAY 81992 292077 :BAI BBR iNglit,11(80,Blt: MICROFILM 29X KEYNOTES I ',Ot DIE I? CIJURSEE 2. ROWLOCK COURSE I- ------~^: 3. ',1 ANDARG COURSE � 4. FLASHING t^ 5, P.T. BLOCKING 6, P,T. 2 x 6 W/ 16d At 1' 0" O.C. CAST IN CONCRETE 7. P.T. 2 x 12 8. 1.6" x 3 1/2" x 1/4" x CONT. WITH "HIL No HDI 3/4" AT Y-15" U.C. AT CONCRETE, WELD AT ANGLE SUPPORT c-J 9. LMBED 'F' AT 4'-Ow O.C. ("- 10, 6" 2•' '.;A. STUDS AT 2'-0" O.C. WITH (3) /10 TEK < CL SCRI_WS AT STUD AT VERTICAL. ANGLE Q 11. L4" x 3 1/2" x 1/4" x CONT. AT 4'-Om O.C. VERTICAL 12. METAL. BACK FLASHING TYPICAL 13. P.T. 2 x 14 (n 14. 6" 20 GA. STUDS AT 4'-0" O.C. WITH (3) X110 IEK F ,� SCREWS AT EACH END (CONN. TO VERTICAL BOLTED STUD) Q Z VI 15. 14 GA. TRACK W .._ Z 16. 6" 20 GA. STUDS AT 2'--0" O.C. AT RECESSED ENTRY *_ WITH 5/8" EXT. GYP. SOFFIT (3) #10 TEK SCREWS ,J U EACH END Z O 17. USAL 2 x 4 OFFSET WINDOW SYSTEM W Ln 18. 6" 20 GA. STUDS AT 2'-0" Q.C. WITH 1 1/2"0 PIPEfL COLUMN AT 4'-0" O.C. WITH 16 GA TOP TRACK - SEE � 'j s, DETAIL 4/A10 I < �•. T/FLAS 5 G �,\\N. SLOPE 1" 13 T FLA �' OPE 1' `../ Q) T/R 00 ol I + 5 vv 4 4 1 2' At0 5 �Or EE 1' _--0 5 " --� 5 �-- t 2 T/VLAStlJNG - ----� .- 7/FLASHING SLOPE 1" ,� T/FLAS G LOPE 1 �, 2 L —'k _ 00 T `r Q3 - _ -- 4 r I / [ 112" + 1 - 2 f 2 1 2" O 3" 0--_ --2" Z" `;/ 1 U-- U --- 2 *� I 2" 12 12 trP AT BRICK O N T / a---- — AB E GLASS U NBLDG #229) (BR CK BULKHEAD BELOW) cl) t" .- 1 2" (BLDG #228) I I [ ' U L. TYP .AT BRICK TYP AT BRICK TYP AT BRICK I 1 ___ •- ABOVE GLASS [] ABt 'L GLASS ABO E GLASS 0 4- M 3 3 (BR -K BULKHEAD BELOW) �BR(CK U AA 1XI I � z ATkl. l f W Q i U LL ACCENT AREAS (S � I REFRONT GLASS TO SLAB) A8 (S GJ 9 Ca Y q 1 a `f 9 ) 9 l .-�. W i t�• 1 [ J _ W 2 ( 2 j ------------- `✓ _ — I 1 BTM./BRICK _ BTM.IBRICK i r 1 BTM_/BRiCK BTM. BRICK , BTMLBRICK Q - -- L-� lL l 11.I = �— y( 0 I 10 3 �yy�_�_L_1I 010 3�-- t I 2'C Lr�. N O3 ----`�� C� N ��'\ L)10 �' ; ;= `"' 11 a L�L 7( ��I .►/ - 0 31 2 02 -- 2 11 0 0 --, �,- $ 7ENINGr-- � _PENING t OPEN_I__,TLOPENING _7/OPENING -- - - 8 0-91 s C.JL-__._._.1L., ._JI a I. C -;i.. . 7, C _IL_._._ �I (� MULLION MULLION C_� _....�C _.x { G C`.(.. ..__jI _ Jl_ r C� >> I ' 1 Lei _ -Ji: 1 C_ DC__JL. . a 4 rn M �L�_a _,_ ll��_ C_. _Jl, Q' A102 &2 ar__:_A:��_ - 2 . . BTM. RICK BTM BRICK MJ( - BTM.LBRICK \ BTM. 'BRICK BTM./SILL r , 'I` BTM./SILL i(- + BTM./SI , ( BTM./MULLION , Jr7�1 Ell- 1 tC _��_ I2 C R 11 L 1 i IIt ( JLC .,, L--j. T I r sLAB -- _ I T SLAB 1 - -- T/SLAB �I ` I {_J I --MAX. 2� SLOPE AS REO'D FOR �j BRICK COURSING AT WALK AT ENTRY I_1 ( L_ IJ /11 BRICK SECTION AT GLASS _ BRICK SECTION AT STOREFRONT _ _ _ _ �� �� • ��' 3 BRICK SECTION AT GLASS �" 4 BRICK SECTION A' STO�iEFRCN 5 BRICK SECTION AT . ASS A 9UILDING ;x'227 3/4"-1' -0" ! A7 BUILDING #227 314"=l'-O" ry A7 BUILDING #228 & #229 A7 BUILDING X228 - + 3/4"=1'-0" tiUILDlNG x228 & y '. 9 3/4'=1'-0" A7 C 292077 itWA1AiF�,liNs eMlr,hr AiAYI',►OD a0p 92 o", dLbr, i'27 333 rO, BLOG 228 BUP 92.0181E 229 AS FILED FOR PERMIT MAY 8, i.A2_ MICROFILMED � � I IIS Ill I I ill I I III Ill III I I III I 111 1 1 Ill 11111 I I I III III I I III III I � I I I 14, i l i I I !�- (il11� MADE IN CHINA IN I I ROOT ON PL YW000 -8-U.U. ROOF ON PLYWOOD x` �y 4: � '•'� / r •a, j 4 O as _—_. ---FIBER CANT .t G - /-n• -SIMPSON LTT19 AT 6' 0" ! (, BNA iiA•AE NU ► /ii i• - r SM. SEE PLAN FOR c v, / �__-._- __ r r i SIZE �i d N / O.C. WITH 3/4"/ P.B. - -- --- SIMPSON HC7-8 NAUIMi Aw STR,Avfttiff PLA.- ----(2) LA.• - i ti, m WITH SPECUL INSPEC110N UNLESS NUTED ON PLA►JS Q �•_. (?) SLOE Q'5 1/1 x BASE Q 1/2" x 8" x 6" �- PUT+11N - 5EF FRAWMG FOR 517E MJD MAN=W/(2) 3/4"MM.B.W/ SLOTTED HOLES -.-- - -- 1/4" x 11" x 6 1/2' SIDE R --SlMPSON ST6236 EA. SIUF A8 (1) EACH SIDE -BASE Q 112' x 6" x 8" --� —SEE DETAIL 1/A8 -. --- -� 3/4' x 4' x 8' W/ -- —PILASTER BELOW i - SIAIFSfa /5 hNAGf 2) 3/4' x 4' N-W.S 114 I I c Gl. BM. - SEE ROOF �1 T PJkLU4 J*tf AT fA�r Z O y - EACH PANEL 2 x 6 SUBPURLIN --- FRAMING PLAN FOR SIZE �, r' DAP 1OP OF BEAM AS \ SID[ (f CJL� SIZE L.L� VA C O \�` NECESSARY TO ACCOMODATE AS REOI�!WEO FOR {A, ftp HINCE CONNkCTOR -� .15" 1 i CONCRETE PANEL P.T. 4 x 6 LEDGER _ 8M U .(� w WITH 3/4" DIAMETER P.B. �'1 1,/2" —" I -. ' A7 4'-0" O.C. GL. B�V1,/PILASTER - S :CTlON " a 2 _ TYPICAL_BEAM/PILASTER CONN. W STRAP AT SUBPURLIN/WALL CONN. Q a HINGE CONNECTION _ _ Q 5�., PURLIN/PURLIN CONNECTION \ " ' f 0f, VIEW 1 1/1 1'- o" N A8 - - ! 1/2"-1 -0" ,:� A8 3/4"-1'- 0" ag - -- -4 LL N ,. ..--- -------- - --- - 4 AT 1'--0" O.C. f'- ;';?` j COLLECTOR JOIST 4 1 J4-H-�1/2" REE. U V � . C 316 R 3/4" x10" x10' Q W/(4) 3/4" " N.W.S. W 00 1 4 W/ 7" GAGE __-H.U. ROOF ON PLYWOOD r� _ /J (y SHEATHING l-} 0 - '�- -�' 1/2" x 9" x 9" i/4 SACT f 3 IAM Q - / / BEAM � *ti' `'"-- L3 x 3 x 5/76 x 1'-5" j� -� 1/4` X 6 7/8" x BM DEP 1H - 1" O W/ (4) 7/8"0 M.B. ��'' W/(2) 3/4"0 BOLTS - Q ---14 CA. TOP dt BOTTOM --GL. BM. SLOPE SEAT AS "-�- AT 4 1/.'" O.C. TRACK —T— REQUIRED OR SHIM TO �- rr�� r � - (2) � 1/� x 5" x 8" %� � �`-�'�i 1 2 ASSURE FULL, FIRM BEAR..NG - / (2) SIMPSON HHU5.125/12 ,� � t 1/2■ r ` �/4' i 7- �62 AT BEAM SEAT �`` W/(2) ../4 x 4 N.W. / H4NGERS, DRILL HOLES FOR NAILS O L -, 16 (2) TIES Q �' ----- ---(8) # BARS SEE 16/A9 GLS 1/8 x 13 1/2 `-J SIDE C 1/4' x 5' x 7' U .; �--EMBED "F" AT 4'-0" O.C. MAX. ---R 1/4" x 1'-6" x 8 1/2" r #3 TIES Al 1'-0" O.C. COLLECTOR JOIST - SEE W/ (2) 3/4.0 M.B. WITH (4) 5/4" DIAMETER M.B. i'-11' PLANS FOR LOCATION W/ SLOTTED HOILES U c }"– I " 10- 1 1/2' 1 1/2" 4 x 4 x 1/4 AT 4-0 O.f,. - 2" 5" 3' r 5" 2" - \ R 3/4' x 5' x 8' W/ (2) U � Q i • �� _ �..--__-.BASE 4 7/8" x 1' 6" � � J r-i- 314'0 x 4' N.W.S. Q .- 3 16 h - } a _ 3 16 2 i- T.S. 6" > 6" x 3/16" -^_ � � � w rn -�i � � - -!—�" SECTION o 0 0 -- a _ elet� Vl�r - o -, -EMBED "F" aT 4'-O" O.C. MAX. O O W / i C , 6" 24 GA. STUDS AT ��- 2' 0" O.C. ------- -----�,-- ---- BEARING R 7/8" x 6 7/8" x 6 1/2" 1 / /2' ELEVATION 3 16 �;--� CONCRETE HEADER REINFORCING Q �, TYPICAL COLUMN CAP Q 8 COLLECTOR JOIST AT CONC. COL. s BEAM CONN. � � ,"� COLLECTOR JOIST AT CONC. PANED 1 112"="-O" A8 314"=1'-0" ^ A8 1 ./2"=1'-0" A8 1 1/2"=1'-C" a A8 FOP VEIW 2'- -- BRICK F0^.TiiV(i 1A8 I---- --- --- - 314" DIAMETER P.B. WITH (�^j K WASHER TYP. _ x 2'-0" 6LOCKOUT -'r --- r -- PURLIN - SE- PLAN FOR Q + SIZE AND LO;ATION -f- �� \ BASE R 3/4" x 10" x 10" 9" a" WITH (4) 3/4" D)AMETER -- + + P.T. 4 x 12 LEDGER P.B. r' SEE PLAN FOR LOCATION \ - -L 4 x 4 x 114 AT 4'-0" O.C. l \, �. i I _----_ _ \\// - 6" 24 GA. AT 2'-0" O.C. v 3 JG GAPER x- ---- .-- ,_ �COPE & BEND WEB AT TOP � FJOTING � �--- - --� � --��� --� 'n I ? • .. . \ I ( BOTTOM TRACK FOR MAN. - T.S. 6 x 6 ; 3/16 LEDG<=R ELEVATION b --' (3) x+10 TEK SCREW ATTACH -' ..ASHING- t1) STUD AT EACH VERT. 1/4 ri ,4 - - • '` — -L�k. '. 9 _ - - - - 2 ' 3_ 16 2 �,NGLE W/ 110 TEK SCREE WS A$ 1 1 2" = 1'-0" i L__. 3 16 2 AT 6" O.C. NOTE: IF DIST, TO EDGE - L 6 x. 3 112 x 114 x CONT. OF CONC. IS [_ESS THAN 4• 6", BOLT STRAP BF_LOIh' ROOF \ ---6" 14 GA. TOP & BOTTOM TRACK i 4�, � - - A8 1) S;MPSON ST6224 14A Ec" DRAINING COARSE A7 EACH LEDGER SPLICE A8 GRANULAR SASE B TL. STUDS i -- - .- -"— -KWIKLTT19BOL 1'311 (BY k 1 -�" , T. EY JOINT CON�,N000S r __ SPECIAL INSPECTION) A �p `�-�• B ANGLE I =t=_ AT EACH PURLIN CONSTRUCTION RUCTION JOIN I �---- _ ------ _ --- ---- _ ___ -BASE �' 3/4" x 10" x 10" � T. 4x12 LEDER A N, "1' . \� SEE DETAIL 14A/AB FOR = -- PURLIN - SEE PLAN FOR BOLTING SIZE AND LOCATION --- ----PREI�AANUFACTURED ZIP-S" -- -_ ---NON-SHRINK HIGH \ oa. FUTURE SUSPENDED CEILING I � - STRENGTH GROUT -- --r- , - - "COPPERSEAL" SPEC. #202 \ PANERETE . ' /---------FOOTING - SEE PLAN �--PANEL JOINT - - - — --P.T. 4 x 12 LEDGER 4�1 � --- i EMBED IN "COP-R-7l TE" FOR SIZE AND REINF. SEE PLAN FOR LOCATION - MA,StIC - -----SEE SOILS REPORT FOR ---- - - -- FOUNDATION SUPPORT ` CONTROL JOINT „ SECTIOPV >~o vir'i1�JDOW HEAD _ BASE PLATE Q ,s LEDGER _ gas LEDGER B��LTING Q ` �;ONSTRUCTION/CGhJTROL JOINTS < — ' _1. I -- I A8 - — __ -- - :' ecu 3/4"=1'-0" cv A8 3/4"=1'-0" 1 1/2"=1'-0" v A8 .� CHECKc_ �y: kW EVSIONS. A=9" IQII [A=9" A`9" -7 8=112 PANEL + 112" B=112 PANL L + 112_" � t./4 t• � \_ (2) 1�5 AT 4" O.C. +-- - -- E 112" x6" x3" A - - --- -- ---R1/'2x7x9 I LAlBLL1 A - - - --CONCRETE PANEL -_-B.U. ROOF ON PLYWOOD - 1» - --- 1 x 5 112 x 12 EACH I I SHEATHING I PANEL WITH (2) 314"0 x � SIMPSON ST6236 STRAP 1/4� RETURN/ 1/4� 1 1/2"� 8" ^E BLDG. 127E 3 1/2 NELSON WELD STUDS -� -' C<' 1 x 5 1/2 x 12 EACH EACH SI. - - GRID B do J ONLY �---� —'----�, ---� j � 3'-0" i _ PANEL WITH 3/4"0 x 3 1/2" _ _ f 114 �'-----(2) 1y.5 AT 4" O.C. - -(2) Z_ 5 x 9" , -i- - NELSON WELD STUDS BM. AT VARING SIZES PROVIDE ADD17IONAL LAws 1�•------- -_ ---L 2" x 2" x 318" x 6" EMBED 'E' R 1/2" x 3 x 9 M� --- 8 ��4, } (SHOP FAB S*i1M) AT END 4" LMEED 'jj �; a ""'"" AS REQUIRED TO ASSURE F IRM EO EO -_] I 1 - r I 43EAM SEAT SEARING AT _ _ c-� I ;. . i►'?rl.. ftT's lFAlro'+Q•'LST.. I 3 1/2' i ...".....".,-..,�.. -_.-(2) N5 0" i °• .wcr a' _ _�._----- -- (2) 1/2" 0 x 3" NELSON WELD � + :r-w�� ,ws � Q --� STUDS (ALT. (2) y5 x 6") II - --- �~----- ---SIDE R 1/4 x 9 1/2 x BEAM � L4" x 2" x 1/4' x 6' -- -- _- I I GL. BM. - SEE DF TAIL 15/A6 tom- M leJ�� DEPTH -1" WITH (2) 3/:"0 M.B. FOR BEAM SEAT CONN. + 2'-O„ _ } SIZES 7/A8 Fait a - - 1/4" x 6" x 4" - 3 HAIR PIN 24» 1 E11@.Ej?_T' 19 1 ---- _-EJEARING R 7/8 x 6 7/8 x 8 1/2 3` TS. 6 x 6 x 3/16 I 1/2" 0 PUNCHED HOLE BEND LINES --- NOTES AND INSTRUCTIONS: _ NOTES AND fNSTRINFOR S: __-___..._ WELDING STEEL REINFORCING TO BE ASTM A-706 GRADE 60 WELDING STEEL REINFORCING t0 BE ASTM A-'706 GRADE 60 WELD EMBEDS/CONNEC'T'IONS _ " D. �' n WELD Eti�I EDS __ 18 E �AM CONN. AT CORNER �s BEAM CONN. AT CORNER _ _-- - " ' 20 COLUMN CAP WITH STRAP ,cv,1 3 -1 0 r� 3"-,-1' 0 r A -_�-u;. A 1 Q1 _0ARK �0`5 F'��Fp p ;♦l�, BUP 9?0149• WAY16353 5E41101APARKWAY,15333 RE 0 ,OUP 92.0150, BLDG 228 BUP 92.0151, BLDG 229 AS FILED FOR PERMIT MAY 8, 19, 92 �PRIL :41 IA'i 0 MICROFILMED � � i i � � i ; i i i ili i ili il � iill i � IIi i hili 1 Ilii i III 1 i III II ! I I III III III I 9 nm-I OEM I I MADS� CH04I � IN � I I 1 � I � I� � �: --a 1/8 . u ,/x coNmTloN VARIES ---� COLI OR .0151 BEAM SEAT OR COLLECTOR 1•-4'- � (3) E . JOIST - SEE PLANS OLLECIOH JOIST �- ',1 9 {) W/ STD, HOOK W/ BM. DEPTH - S I/x" IA IIA SEE DETAIL 8/A8 N/ DBEAM DEPTH A t B0TT7y IIA Q. BEAM SEAT SLOPE OWIAY N, g W ROOF SLOPE SEE DETAIL IB/AB A8 A9 OF $EE PLAN, 7�_ T/t AND 19/A6 T/f 1 0(3 A9 _ W _ I I b A9 i r2l A9 S A9 EL 11g - 16 COPRENE BEARING - " in 118 -0' �' J ' 0'I118 PAD 5 1/2" x 9 1/2' IIBaA9 F`IkS d Hf8 6' O.C. 1 T-I" x•-I' ?!_0" 7 TIESO 8' O.C. 3'-0" 2'-1" ti AT OVERLAP10 oe .'. 1' 0 A9 o A9 18 EACH FACE W Q N, TIES • 3. O.C. I B 9 9 13 TIES O 3' O.C. bA9y�A I - TIES O 72' O.C, 7YP. ! pg TYP. `� y+_ A9'• _ jl(iRA 9aOP BOTTOM- _ _ _.._- _ T/$LAB' SAB LZ QZatjy- _ _ _B 8AR5 -� ._ r __ , _ r__ __ WNp _ T G �___� ...t ) /6 �_ � 7/�TC. L_ -___� T ;F_ ---(3) -_ � � --'�TG [_ ] - T/'FTG • : • 12) 03 (8) E.F. - �J) #5 PERT. AT ¢ OF PANEL - _ - - (2) N5 1/2' CGNGRETE PANEL 2 -1',�1�.__-_ 3S'-JO' '• ' - W/ #4 AT 12' O.C. U Q NOR17 AND VERT. AT < F.i W PANEL 2 ,; 18 18 ri_'�PANEL REINFORCING z PANEL REINFORCING 3 PANEL REINFORCING PANEL REINFORCING s SHEAR WALL 00') rn BLILOING /227 L'B'=1'-J' A BUILDING #227. #228 & #229 1/8"=7'-0" BUILDING #227 1/8"=1'-0" BUILDING #227 1/B'=1 -0• A BUILDING 1227 :/F'.-"- WIN F— l To" Z -CONCRETE PANEL ILJ ( ) S[ tr 4) #5 AT 4' OO.C. AT TOP 4 4 CONCRETE PANEL y}_ 0 1'-0' OF WALL (AT E OF WALL) P.7. 4 x 10 TOP f W/ 314'0 EMBED 'B' o EMBED 'A' CRETE A'.LL PANEi 00 r 0 O� A.B. AT 4'-0' O.C. CONT. I W N ufu�l 0) A9 /A9 O -\ 1/4 3" ; L2 x 2 + 3/16 x 4' Q N y:2 4) 77Q (2) #5 EMBED 'e' a' � O CONNECTION 'C' 3/76 4- O INSIDE FACE EMBED 'B' M w cK I o (2) 05 AT EMBED SEE 12/09 j j W ON d L ' 04 AT 10` O.C. EA. WAY _ _ __ ___ I I > N Q 0 L______ ---___.______ __ II U 03 1 I 2E t lie 2E U(4) #e (2 EACH FACE) J 4 T B10 A9 OUTSIDE FACE \v\�BACKER ROD � ALL �y �I SEALANT 'i FABNELLD '8' EACH END EACH U �_ T� _ 7/SLAg 3/d" MAX. -BACKER ROD - 7 G a 3/4' CHAMFER TVP. _ C 1/2" MIN. SEALANT EMBED 'D' EACH END EACH T iG. ! PANEL m L -'"----! 3/4" CHAMFER TYP. --EXTEND (7) 15 BARS FROM 3/4" MAX. OR FOOTING $RE - SEE CONCRETE HEADER NOTE: PROVIDE CONNECTION AT V-0" BELOW TOP f 1/2 MIH' FOOTING SCHEDULE AND • • W AT MO-POINT OF PANEL ' FOUNDATION PLANS NOTE: PROVIDE CON- CTION AT 1'-0" LR. (_____�CENTERLINE OF FTG. A- 1/2" 1 1/Y BELOW TOP l W AT MID-POINT OF PANEL CENTERLINE OF PANEL I MIN. (2) EA,.' END EACH PANEL PANEL REINFORCING [SHEAR WALL a END TO END CONNECTION OUTSIDE CORNER CONNECTION rio1PANEL TO FOOTING_ SLILDING #228 1/8"=1'-0" 1 112"=1'-0" NOTE: -SEE PANEL ELEVATIONS FOR REINFORCEMENT AND THICKNESS 3"= V-0" NOTE: -SEE PANEL ELEVATIONS FOR REINFORCEMENT AND THICKNESS 3"=1'-0" 314-- - SEE EMBED DETAIL 16/AB -SEE EMBED DETAIL 16/A6 -TOOL ALL INTERIOR EDGES OF CONCRETE PANEL -TOOL ALL INTERIOR EDGES OF CONCRETE PANEL 8_ Y ti S1 2 7,_8.. N. TO FOOTING 5 1/2 N IGLU-14M BEAM - SEE PLAN SEE 10/A9LrIj 6" �O' INSIDE FACE OF PANEL - .0 • 11 / ABOVE ROOF CONN. TO F007IN SEE DETAIL 1'I/A9 0 c 4 x 10 P.T. TCP R W/ SEE 10/A9 SEE DETAIL 19/49 8 �__� FOR REINFORCING Q - J/18 3/4"o x 10' A.B. O 48' O.C. FOR REINFORCING yq CONN. TO FOOTIN CENTERLINE OF PANEL 11 9 A9 SEE 10/A9 f - INSIDE FACE OF PANEL I� 1 I/Y 1" II (2) #S I A9 IM' — _I— _ — _ _ Ck FTC. ��/ ABOVE R00" #— s' T �� SIM. AT MIDPOINT OF PANEL POINT - • (2) #5 AT EMBED H A7 1'-0' O.C. - 8 8 1 1 C CUT EMBED TO 9' FOR 9 \G9 / t 8 ;'• AT CENTERLINE OF PANEL E.W. I �.` - - CONN. AT ROOF AS SEE DETAIL A9 SIM. FOR REINFORCINGRING v AT MIDPOINT SIM. ABOVE ROOF #3 TIES AT 1'--0. O.C. \ SIDE f 1/4" x 13 112' x 8 1/2' ` `j 1 ABOVE ROOF \� > 'o M.B. 1 1/1" --1 — — Tc. 3118 VERT. SLOT " BRG. f 5/8" x 7` z 10 � � 8 pg 1 5 SEE DETAIL IS/Ag I W/ (2) 5/8'o z 8' N.W.S. -11" ABOVE ROOF FOR REINFORCING 1 1/Y 1/1 c^y ter•` .. . ..wa.. O 5" O.C. �- CLk. CLR. 4 SEE DETAIL GING --_-- --- V _ -yJ HAIR PIN CONN. TO FOOTING b FOR REINFORCING SEE 10/A9 r--� CONN. TO FOOTING -r �- (6) #6, (J) E.F. CONT. 18• SEE IO/A9 1'-P �1'-11' .-SEE DETAIL 16/A9 6 #8 A7 50'-0' PANEL FOR REINFORCING DA fE' BLDG. #229 CONN. 70 FOOTIN 5-8-92 #3 TIES Y O.C. 3'-0' FROM f 3/4' x 10' z e' SEE 10/A9 COLUMN, 6' O.C. OTHER LOCATIONSTRAWN B' y—�- -SEEAT PANELIL LEG BEYOND 9 1 1 I F. g5': 6O" x 6 W� 13 PANEL TO" BUILDING #2.28 9PANEL D n PANEL TO PANEL#228 = D PANEL TO PANEL CAW BUILDINC #228 CHECKED 0- I II o DRW 1 1/2 GLULAM BEAM REVISIONS: =jlB SECTION AT HEAD 3/18 TVP. 'k W 2) 3/4' x 4' NELSON f 1/2' z 5 112' x V-4" 8 W SUDS , CONCRETE HEADER REINFORCINGtz ROOF BEAM AT SHEAR WALL LINE OF SOFFIT ABOVE a 1/2' . 6• . V-4* �AO1 ,/2"=V-o^ 1 1/2"=1'-0" f 3/8• . s . 5' I I 21-1 .— —______-____ -_- __ 2'-l" I 1,_ • •. \ #5 + 3'-O' EACH SIDE (LT TIES AT 1'-0' O.C. vii 5 fr, 4 . - __ '. naK% (2) EXTRA AT TOP ft 13 TIES AT 1' ' O.C. ROT12) ry� -� W/ (2) EXTRA A TOP W ti - —� BEARING f 7/8'x6 7/8•x6 t,2' BOTttOM ____-I f 1/4' . 10 1/2' x BEAM O ; a,a•�"ai �aw¢.n,.. • • • -- - • \� DEPTH -I• W/ 3) 3/4' • MB a^"'i�.R u • • • (10) AT TOP Wf 1 1/2• "� " 'r ' z t ./r 1 112"- _ - >v M5/8 _.2 s/a., vrnT. SEC' .CLR. rw CLR. 4 '- CLR. SHIM SOLID O f 1/2' . '' "-4' �,;_�- I • _ --_ - • • • • f 112' . 5 . I' 4' - - -- END OF BEAM- I\ b • • • —(4) #8 AT PANEL LEC �f 3/8' + 5' . 5' I • • • • • • • (e) #7 i i f a eM "\ - Q4 9 (B) #6 A7 PANEL LEG V 1 _ f S/ \ A` „ N H h'T 7. AT 12' O.C. —#3 TIES AT 10' O.C. \ `—((2))x/5 • 3'-O* ry ry _ W/ 2) EXTRA AT TOP W 1 111-VC6) 06 E.F. VERs. (12) 0 TOTAL BOTTOM � + 0' 3/te �: PANEL LEG REINFORCING n PANEL LEG REINFORCING u CONCRETE COLUMN REINFORCING PANEL LEG REINFORCING zo BEAM CONNECTION 29207; 1 112'=1'-o" 1 1/2"=,'-D" SHEAR wnu t 1/r-r-o" BUILDING#228 ft #229 1 ,/2'>•1'-0' A9 BunolNc Iz28 - -- BUP990780•BLO0.916 BUP92-0il,,BLb0.279 FILED FOR PERMIT MAY 8, 199 14 I,, 21 1,111a MICROFILMED �1111111 11T 11111 1111 1JII1 1 11111 11111 1 11111 11111 1 111I1 � I I ILEI 1 � 111 � .I m , �. � 41MAM M CHWIA y� IN 1 �d �, 1 tAIU ...- 13 1 tt 216 ,. I } Al CON T.- 1Y 0 c• A O 1S,"Or �` i` 1 8 3 I�✓nl FLASHING CLIP S __ _My41K ", :L ,►t �, W 1' p. `� \ ---" -WINDOW Sr);EM 4 OFF;F:i trp' C1" A 10 A10 ;v a / 1G 0 •-r E 16 �. GA. TOP TRAGI FIELD -"---P Y. a.li vj#rr c N 0 �1 -�' \ r % ` ° A1� A1� (iIMrBR1CK iMELG TO PIPE /� .w t• ' i 8 fM/SILL O \ / ---4�UTURE GYP. BD. ^'• 1 ` /' ,�" /� 1570 MAX. 9 ( !i95 MAX. �U y __.__-- _ _ o t +:a K v / Sl Opt A 10 L- St..Uf'I I -1 1/2"0 PIPE t/) ► d n/f .\. ' I r ` + N, I COLUMN AT 4'-0' O.0 SET BRICK ? • MAX �, - v- !! C fi. _ Y \ ` µl t , SLOP J~ '1 `t 0I If I I 1N EPDXY STUD WALL ._-__- ME TAL WX FLA 11- f ' !. •_ ?X MAk. - 1 I BLDG. FAPFR - 8" 24 GA. METAL STUDS ( --"" • rail 1 x 1 E 15 L p • v . . # II Ar ?'-0" l).C. F11Wk CANT a OVER 1/2 EXTERIOR / • �, v • A C�"�-r - A 0 GYP. SHf THING II 2 1/4"0 x 8" CORE 1/7 t • . , . DRILL HOLE p 1"•- ryI ' AI Al / \ .•, 1 4 I 7 1 7 a 3 �I / -#4 12„j.-__- ,L?.l'1. 0 \ A10 S 0" � A10 A1U - .. 9 14 5;E WAX. 13 A10 A10 - g SL LI PE \ A 10 6 1 1 - I W r• • A10 A10 11111 � 'pfs ✓y ' - r Z ! f 00 TOP k BOT. CONE. i W j Jy 13 , 1 " ` FLASHIN" -- - . v� C ,• A1Q A 1 _ 6 n� - .. - �`� A 10 A1,0 "� C.OPPERSEAL U 0 • O T C / '� Q V 0 b 8 ® I - 4cs, M -i Q - PLAN BULKHEAD WALL DETAIL FLASHING AT PARAPET a� ENLARGED ENT, �Y PLAN 2 ENLARGED ENTRY P 3 ENTRY PLAN a 5 t3u1LU1NG #228 l/8 1' o' A10 HUIWINC 19 1/rf.`1, 0„ — -- -- --- / _ 3 4"-1'-0” LiUILDING #22/ r. 7— Lj SEE DETAII. 11/A S FOR STRUCTU`''(AL INFO. U 115 BLL-, PAF"1 15,1 6UILDINC PAPER C7 4'-0" LUDO V 1/2" EXT. GYPSUM BOARD \ - -- 15# BUILDING PAPER so �--- CN r Q _...-- __------ ---- WINDOW S`'STEM -----•-r�!RD 5CPEE!r (� - __._, BRICK Q ,'` O ON 1/2" CXT. GYPSUM BOARD �D �\ __�1�. __�" -- SEALANT � .._ i" AIR GAP /'K - - 1" AIR SPACE MIN. (VARiLS) _- --'""J 1" n!h' GAP MIN. (VARIES) J CASING BEAD 1/2" EXT GYPSUM BOARD --SHIM ! 0 w f. BRICK \ i - - - --BRI.K ��' /- COR!jER BEAD - - FUTURF GYPSUM BOARD -CORNER BEAD /� - I "COPE-ERSE_AL" SPEC. #202 _ -- _ O w EMBED IN "CDP-R-TITE" W MASTIC FUTURE GYPSUM BOARD f L _ - 1 1/2"0 PIPE COLUMN �� SEE 4/A 10 \ 6" METAL STUDS ! �} --R-19 BATT INSULATION � � (2) 2 x fr--� � }- \ / -6" METAL STUDS FUTURE GYPSUM BOARD U 4 P' 14 GA. TOP & BOTTOM TRACK - R-19 BATT IN.,,LAT10N _ wl cn� - - _ -6" METAL STUDS 2 x 4 L"- = i1 ��- SUSPENDED CEf;.ING � � 1 ;�'�"0 PAPE COLUMN -- •- 1 SEE 4/A10 - --R-19 BATT INSULATION \ \ CONC:TETE PANEL LEG —6'0 OVERFLOW DAYLIGHT V C -- c1/2"0 PIPE COLUMN � SEALANT-- �- - 15 BUILDING PAPER ON 70 OUT'S1DE. VERIFY HFaCr- Q •+ SEE 4/A10 1/2" SH;M LA-MMEW -�_ 11 EXT. GYPSUM BOARD c \ SHIM- --- \, WI H AND FINISH OPENING m ce SEALANT BELOW 1" AIR GAP MIN. (VARIES) 1 \\�-----6"/ INTERNAL DRAIN --_•_____ _ -BRICK WINDOW SYSTEM � WINDOW HEAD � ,BRICK BELOW WINDOW SILL s BRICK BELOW WINDOW SILL s BRICK BELOW WINDOW SILL ,o DOWNSPOUT/OVERFLOW DRAIN 3 =1 -0" \ QUO "LITEIDE CORNER BUILDING #229 3 1' -U" � INSIDE CORNER 3"=1'-0" Al INSIDE CORNER - BUILDING /229 �. H.M. DOOR AND FRAME-------- 1/8" x 2" BENT ---- _ �- & 3/4"0 P.B. TO ^�� -FUIURE GYPSUM BOARD SLAB M -- WINDOW SYSTEM —� -_ FUTURE 7S 8 x 8 x 3/16 - -� r- 1/2" SHIM CORNER BEAD SEE DETAIL FOR -J CASING BEAD I CONNECTIGN TO STRUCTURE BT►/./8R!CK COURSE — 1 -� FUTURE GYPSUM BOARD R-19 BATT INSULATION T/SILL --CORNER BEAD 4 MANUFACTURERS ANCHOR PER I t BTM WEEP- I - - ,------FACE FINISH C;YF. BD RECOMMENDATIONS SYSTEM \ SILL BE'.OW AT BLDG. #229 AT BLDG. #22'1 b�id 1 1/2"0 PIPE COLUMN ONLY SEALANT - ;;�f� SEALANT SEE 4/A10 T.- - - - -6'� h.�ET..^,L STUDS JAMB AT T.S. COLUMN FLASH.NG 1 i2� -H15 BLDG PAPER ` f~ EA-ANT— 1 112"0 PIPE C(LUMN BELOW SEE 4 A OPE. COLUMN BELOW -- f 1/2" EXT. GYP. BD. S E 4/A10 AT BULKHEAD WALL -� x .1.5 - T�--� 1 PROVIDE E)A6- OVERHEAD DOOR � -BILI BELOWC)l AT BLDG. #229 / R / AT HEAD COr..:;" � ► - 1" ME GAP MIN. ° �L, + , ` (DIMENSIhN VARIES - �'� e , 15 BUILDING PAPER OVER - - - TO SLAB `- FOR WELD COV, SEE WALL SECTIONS) " 1 2" LX1-. GYPSUM BOARD _ 9RfCK WINDOW SYSTEM -_--- J`f� j- 1" AIR GAP MIN. (VARIES) \ PLUG WELD AS REQ'D. - - - SEA:A.NT ' 6" METAL STUDS BRICK FUTURE METAL STUDS &- v. o R-19 BATT INSULATION -- r - SYSTEM ® ! -CONCRETE PANEL LEG GYPSUM BOARD \ CUT BRI* - - N.R DOW TEM -- - �- WINDOW SYSTEM AS R�Q'O. I SEALANT-- -- - -- -�- JAMB AT WAIL f 5-8-92 WINDOW SILL _ 12 WINDOW SILL 3 WINDOW SILL61�4WINDOW SILL ,5 ROLLING SECTIONAL DOOR 'aw;�K - - - �,,. j L., .-_ - _ 3"=1'-0" OUTSIDE CORNER 3'=1 -0" AgaINSIDE CORNEF 3'=1'-0' :,v INSIDE CORNER 10 :.NECKED BY: �_- DR W PEVISCNvS 5 1/2" 3 EXTEND BRICK - -- _- -----BRICK ---- -OHD TRACK --------- INSULATED RELITE -FUTURE G`F'SUM BOARD / .. BRICK ,-0 �i ----- CONCRETE STOP 6" ME-A.. STUDS STOREFRONT- '�_3 - ----H.M. FRAME SYSTEM -- � �EALAN- _- � � t 1 _4" - -- --T.S. 2 x 3 x 3/16 HEADER INSIDE FACE OF CONCRETE -- w 1/2"� PANEL. BEYOND ' - SHIM ,.. �. H.M. DOOR � ,� �, WINDOW SYSTEM /_"- SF A� ANI - -- -- I ._ -----__ � v:• M m --EMBED 'F' AT CHANNEL, AT �__._.---EDGE OF CONCRETE ✓tel / -� T.S. 8 x 8 MULLION & AT I �— H.M DOOR FRAME + PANEL BEYOND J FACE BRICK---------`" R - -6" METAL STUDS FACE/CHANNEL MID-SPAN OF DOOR OPENING H.M. DOOR fel---- FLASHING AND SEALANT � 1 _. - -------FUTURE. GY�'SUM f30ARD �----CB x 11.5 _ ---- --�- --.- --------_-_ /"1 - -Gq_NC. WALK -- _-_._ _ �-. _ - �.- - 2% MAX. .7 • ! 1 y -CONCRETE SLAB WINDOW SILL AT SLABr17 BRICK AT ENTRY �e OHD JAMB AT HEADr19 - )AMB AT DOORQ DOOR HEAD RELI _ -_- _ _ _ -_- _- 2 . t�7 za � Q q I 3"=•1 -U' E3U11_UING x/22� - ---`- -- 1"-1'- 0" ;-itT.1 �--- -�- 31�1=0" k� -ITE SIMII AR 1 _� __ ►IICWIW r .iS3 ? R[7UfiP1dd7rr.11f933'""1!!°2111Vf?Cnf. ` ' AS FILED FOR PERMIT MAY 8, 1909. 2 *Aim.Ade w 111 .•r ,,;= BLIP 92-0i4g, BLDG 227 SUP 92-414A, BL'Jr 228 SUP 92()151, BLDG 229 MICROFILMED 7 Dili i mill I � � li 4 I � I � � I � I � II � � I � I � � �II � III �II � III I IIIIII� �1 ' ll1 IIIIIItI Inn- GILAW MAOR IN CHINA I I IN 3/4 x I'--G* x 1'-0* CL W/SO 314-' P.H. ',V/ YIN. 112 N.S. GROUT 5 _,------LAMINATED P(RAMID SKeLI(.411 fyp. T.S. 5 x 6 1/4 (x A$5 PYRAMID A 11 SYSTEM119 SK) LIGH T S 13 TEM RtMOVAHLE CAP FOR CONCEALED f(f hoco VA'w F IK W".0- bUt. I ACCESS T (A D11 I Ec-- V'RI t rj F1 y c I IN G )t T.S. 6 x 6 x 1/4 COLUMN ifjih I(A- fA(A ft"T LJrjmy 0 6 x 6 x 1/4 A-, COLUMNS ASPHALTIC EMULSION COATING W1 CAP 1�; _PROVIDE D114RTER AT WALK TYP. It T( (A 4 1 Im, - - I I wl T 0 T.S. 6 x 6 x 3/16 GA 5/16 CTRICAL CONDUIT lk� T.5. 6 x 6 x 1/4 COLUMN '0c T.S 6 x 6 3P6 J4) 04 VERT. -WIRE MESH SIGN SUPPORT__A7 HEADERS (2) 112"0 BOLTS AND LOCK f WYLJG"f AYTA0WWA' WASHER PER HEADER 0 DOTING SEE DETAIL 2/A11 AIRE ACCESS COVER PLA IE WE OR SIGNAGE sift '�"Joci CLIP C /,­2" 1 V) c Gb (2) .44 4ORIZ. TIES 0 1 - �- ;n --" 0 1 -ILL C PRE DRILLA. C C ot _T I T.S.ts6 6 3116 LAJ 0 094 AND TREAD FOR 1/2"+D BOLTS i7 0 12 (3) 04 EACH W,.( I 'I - ..7�7!� z a T.'S. 6 x 6 x .3/16 Lai 2 >Z 1, Vi V CLR. u A c T.S. 6 x 6 jr 1/4 :to -2 c a, t ROVIDE DIWRTER AT 7 4A'� - 0.%" WALKS TYP. w) 1 m CL 1 .1 C—Al 1 31-0" SQ. All ENTRY CANOPY PLAN _ L""�2T.S. TO FOOTING 3 HEADER CONN. TO COLUMN 4 CANOPY SECTION SKYLIGHT AT T.S.______ 7 -A" BUILDING #227 314'=I' I" t3UIIL)IN(I #227 #2 #221 Ly IA�1 L.LJ IMF CLF?. -,--FACE OF BRICK AT \y/ 7'-0" SOFFIT L.Li - BRICK BEYOND .—OVERFLOW _---BkjCK ANGL E SUPPORT SEE Cc -BRICK VENEER DETAIL 11/A8 _ C"4 _____—CONCRtTE PANEL LEG --2"0 OVERFLOW BECKER 3" HI-PIB 81-3, c ---TIE CANOPY D.S. NOTE: GUTTER/FLASHING ROOF DECK cy- INTO ROOF D.S. TO EXTEND BEYOND ,—BRICK [INTEL ANGLE ROOF D.S. OVERFLOW- SEE DETAIL 111A8 C8 x 11.5 FLASHING FLASHING CLIP AS REQ'D CN4 -----CONCRETE PANEL BECKER 3" HI-RIB CONT. SCREEN OVER SLOPEGL)-:LE_ b ROOF DECK 7 GUTTER TO DS N F--ca x 11.5 ---? 112" x V-4" x -----2" GUTTER (EXTEND 00N.S.J1 _j W1 (4) 5/8"' 6 112" . FLASHING BEYOND Kj ZA 112" x I'- x 1'-0" C8 x 11.5 OV!:RFLOW) W/ (4) 5/rj"* x 6 112" —2"0 O.S. TIE TO VERT 70 --2"' OVERFL'",e NFLSON STUDS TYP. ROOF DRAIN ONCEAL. ' OUTLETPIF� AT FURRED WALL — -3-/ 67-1 `—FUTURE SUSPENDED LO CEILING AT 9'-0" m �j ® -- -- BECKER P­10 LINER PAINTED RELITERAME AND Lj SUFPORT AS REQ'D ....... _ ---BECKER 0-10 LINER Li 10 0 PAINTED --C8 x 11.5 --- -BECKER FACIA PAINTED CANOPY AT CONC. PANEL LEG 8 CANOPY SECTION x 11.5 An BUILDING #228 1 1112"=77 An 13--lILDING #228 1 112"=l'-0" a --------COPE FLANGES AS REQ'D AND WELD TYP. PLAN VIEW CANOPY 6 C3 BUILDING #228 i o ..A*% BY: CAW CHE-'XEDBY: DR* RVASIONS- A 1 '199 OW SUP "F QIJOIA PARKWAY 15153 AS FILED FOR PREMIT MAY 8 2 SEQUL�JAPARKWAy,j6N9 REDWO09 y" Z0,2" if cr-cly 22� 8UP 92-0150, BLOG ?28 8UP 92-0151. BLD0 229 MICROFILMED 11111111111, 1111 1111111 1 Inoll- (11AN 4MADE 1% CH"A I