13473 SW SUMMERWOOD DRIVE BLDG 2 STE B-2 ADDRESS:
,3q7-S._.
I
t�
i
i
i
I
I .
►
I .
I
i
I
►
I
I yk�
T
i:\records\microf IniVarnefs\building.doc
. ., i ,w � i�a� ���-••i�ire•�.s�u:e: x ,.,a+. a,c :e:.aaa, � .�. a ., I +yx;� �,.,y� x � ..::r �,.��h .�� �.i�� ,
,
F'LoN1 r✓r'1 j��,,9r k 1' 4}at di �
i
'• „1�1i+%,rtMsa.teJ werww, +.r..-..... ..,:..,.. Bei. w.d1MMMS..,,.i.w+Mltt,.WV1�YM1Feaqc,.x{+•:,..,,apr�,M{C•:R4�`:'.?a1a.,aa'rw�9tnwPwe1:M:M..arw.s..a..,.,,....... ...:..... ......�... .......�:'y�'.. _
a w
Y�1
r.
From:"David Scott' UAVID.COT>
To:rick,mikes,hap, george,jeanne,jean I`
Date.Wed,74 Dec 1997 14:23:42+0000
Subject summerwood
Reply-to:david@ci.tigard.or us
X-mailer Pegasus Mail for Windows(v2.54)
X-PMFLAGS: 128 0
To clear up any confusion that took place re.the iermination of
crawis out there...Nap anf I had told Tony that we would allow the
crawls to discharge on adjacent grade..we ollowed this because the
buildings have,foundation drains which would collect any water that
j migrated back toward the strixture and G,err carry it out into the
storm system ..apparently this message didn't get forwarded along
anyway, over-all on the issuc of the crawls...Tony has informed me
that they are puffing them in for everything..so we don't need to do
any temp c of os if everything else is ok(incl pingleng)we can do
regular c of os
I
thanks
j'
t
I
i
1,
i
f
i
f
i
4
r
Jeanne Temple -- — — _ Wed,24 Dec 1997 14:52:15
•Y
R'
ACTIVE CASE: Grp Smry Edit Prcl Name Actn Cond Log-note Fee Doc Tag Misc Xit
List actions for this case
66MASTER PERM IT$9669666656666666666666666666666666666666666lz66666666a666666666C �t1
0 :MST97-0413 : PROJECT:SCHOLLS FRY RD TWNHM: STATUS :F UPD:02/04/98 : :PHN: 0
0 PERMITTEE:BOWEN REAL ESTATE GROUP PRIM. . :msT96-0115 : 0
0 SITE ADDRESS: 13473 SW SUMMERWOOD DR JUR. . . :TIG: 0
46DESCF.IPTION OF P:ZOJECT (1) 6666666666666666666.`.666669 996666646666666664666666q •
0 Buil3ing #2, Unit B-2, Lot 8 0
0 0
fl66666666666666666a66666666666666666666666a6666666a6a666666666666.6a66666666666�
0 REISSUE: DWELLING UNITS: 0 : REQUIRED SETBACKS---------- 0
0 CLASS OF WORK. :NEW: SEDRMS: 0 : BATHS: 0 : LEFT. . : O : ft RIGHT. : O : ft 0
0 TYPE OF USE. . . :SFA: FLOOR AREAS---------- FRONT. : O : ft REAR. . : O :ft 0
0 TYPE OF CONST. : 5N FIRST. . . . : O :sf REQUIRED------------------- 0
0 OCCUPANCY GRP. :R1 SECOND. . . : O :sf SMOKE DETECTORS . : : 0
0 STORIES. . . . . . . :0 : THIRD. . . . : O :sf PARKING SPACES. . : O : 0
0 HEIGHT. . . . . . . . . O : ft TOTAL-- - --- . O :sf 0
0 FLOOR LOAD. . . . : O :psf BASEMENT. : 0 : 0
0 VALUE. . $ : 0 : GARAGE. . . . 0 : 0
06NOTES (3) 66666666666666a66aa666666a6666666666a66666a6a6a66666666a��6666666666�
0 Lot 8, See MST96-0115 for fees and case history. 0 PgUp 0
0 admin_.strative permit for building final & c/o only 0 PgDn 0
66666666666666666666666666�d666666666a6666666666666666666666666a666e666666666ai
L'L
i
P'
. .. :s7.c%;�V:� ,y�AlK+1l�'�M'illkik!��WS1�7rawTawranwMsV4'7ftlWpyq�q�,ylE1�
M1 ;Y
1
ACTIVE CASE: Grp Smry Edit Prcl Name Actn Cond Log-note Fee Doc Tag Misc Xit
List actions fc.r this case
--MASTER PERMIT - -- - - ��
:MST96-0115 : PROJECT:SCHOLLS FRY RD TWNHM: STATUS: F UPD: 03/06/98 : :JT
PERMITTEE:BOWEN REAL ESTATE GROUP PRIM. . :SUB95-0005 :
SITE ADDRESS: 13475 SW SUMMERWOOD DR JUR. . . :TIG:
DESCRIPTION OF PROJECT (1) - -
j Unit A-6, Building 2, Lot 7
REISSUE: DWELLING UNITS: 6 : REQUIRED SETBACKS-- --------
CLASS OF WORK. :NEW: BEDRMS: 0 : BATHS: 0 : LEFT. . : O : ft RIGHT. : O : ft i
TYPE OF USE. . . :SFA: FLOOR AREAS--- - -- --- FRONT. : O : ft REAR. . : O : ft
TYPE OF CONST. :5N FIRST. . . . : O :sf REQUIRED--------------- -- --
OCCUPANCY GRP. :R1 SECOND. . . : O : sf SMOKE DETECTORS. :Y:
STORIES. . . . . . . :2 : THIRD. . . . : G :sf PARKING SPACES. . : O : j
HEIGHT. . . . . . . . : O : ft TOTAL---- -- : O : sf
FLOOR LOAD. . . . : O :psf BASEMENT. : 0 :
VALUE. . $ : 482593 : GARAGE_ : 2240 :
NOTES (3)— -
PROCESSING, REVIEW & INSPECTION PERMIT for several units, as PgUp
well as an Administrative Permit for C/O purpose . PgDn
40,
i
,.. _ .. nP-..,sr.-.Rw+ara',1R4lhRW:M7'11AMk6N'- tn.....rr w .:.a,,•.e 1'w.^titl�M `.
CITY OF TIGARD • e
DEVELOPMENT SERVICES
13125 SW Hall Rlvd., Tigard,OR 97223 (303)639-4171
•
CERTIFICATE OF
OCCUPANCY
PERMIT #. . . . . . . t MST97--04137
DATE I SSUED i - 7
1a �`��q-7
PARCEL: 191.330D--•002 00
ITE ADDRE59. . . t 13473 SW SUMMERWOOD DR
USID I V I c3I ON. . . . t 9C:HO1_L9 FERRY ROAD TOWNHOMES 7.ON I NG t R -25
BLOCK. . . . . « . . . . t LOT. . . . . . . . . . . . . 10@8 II.JRI aDICTI0NzTlG
CLASH OF WORK. :NEW
TYPE OF USE.. . . t SPA
r YPE OF CONSTR t gN
1� UCCUPANCY GRP. :R3
J OCCUOANCY LOADsN
i
Remarks t Building 12 tt11t 0.2 fat 8
Owners
BOWEN DEVELOPMENT CO
Ill SW FIFTH AVEI'.1_1E
SUITE 2260
PORTLAND OR 9720,4
iPhone #:
Lontractore
OWNER
Phone #t
Rey #. . :
This Certificate grants occupancy of the &above referenced buildirry or• portion
thereof and confirms that the building has been insper.tecl for rotnnlianc^e with
the state of Oregon Specialty Codes for the grou�j occu nry, and -.urea Under
which the ref 'enced Pet-mit was issrand.
% 1Nit
J
BUILDINC3 I , PEG TOR Wu'lL AG OFFICIAL
POST IN C:ON9P I CUOUS PLACE
.a
�.l
I
F � /
Page No. 1 CASE HISTORY FOR CISE NO.: MST97-0413
BOWFIN REAL ESTATE GROUP
13473 SW SUMMERWOOD DR
Actioll 0MVIPEiOp Req/ Schd/ End/ Action Notes Diap By Update Upd
Coda Sent Done Done Date By
w MSTH008 Permit crt-ated 10/06/97 10/06/97 10!06/97 J•H yyr
MS'TP097 (F) Issue combination permit / / / / 10/06/97 A" JMH 10/06/97 J*H
MS1'D789 Smoke Detector 10/06/97 / / / / 10/06/97 J•H
MSTB'1 9 Building Final 10/06/97 / / 11/10/97 `
f g PASS RB 01/07/98 JT
'w
:9.r
t.
M1 n �ir
of
4
1
f
•
e �
CASE HTSTORY FCR CASE NO.: maT96-0115
BOWEN REAL ESTATE CROUP
13475 SW SuMMERWOOD DR
Req/ Schd/ tlhd/ AOEICG IIOtU Disp By Update Upd
Cosi,. Sent Done Done Date By
`------ ------------- --— --- -------- --- _
h1STA005 Application received ! / / / 02/13/96 PASS JMT 09/02/96 JDA •
MSTA008 Permit Created / / / / 03/21/96 PASS JMB 08/02/96 JDA
M9'CA010 Check for prcl, restrict. / / / / 03/21/96 PASS JMl 08/02/96 JDA
M.9TA012 Plans routed to Plans Examiner / / / / 04/'3/96 used thin action to record letter to PEND JHF 04/23/96 JHF
typing
e
MSTA026 Plans approved by Plans Exmr / / / / 05/2.9/96 APPR JHF05/28/96 JHF
MSTA030 Reviewed plans routed to DSTS / / / / 06/07/96 APPR JHF 06/06/96 JHF
PAID JMH 07/31/96 JIM
MSTA080 (F) Ready to issue / / / / 07/31/96
MSTA092 (F) Issue combination permit / / / / 08/02/96 PA88 JDA 08/02/96 JDA
MSTA097 Inoue plumbing signature form / / / / 12/06/96 OK JDA 12/06/96 AAS
MSTA098 Innue electric signature f-rm / / / / 12/06/96 OK JDA 12/06/96 KAS
MSTA,SS Development conditions met / / / / 12/03/97 PASS JDA 12/03/9; JDA
M9TA'705 Footing Inap / / / / 09/26/96 A?P GS 08/26/96 nRS
MSTA'705 Footing Lump / / / / 01/02/97 2 of 3 garages PART GS 01/02/97 GE.9
MSTA706 Foundation Insp / / / / 09/09/96 APP 09 J9/09/96 GES
MSTA706 Foundation Ir,sp / / / / 01/09/97 garage walls PART GS 01/09/97 GRS ��
MSTA710 Poet/Beam Structural. / / / / 01/28/97 mech PEND GS 01/28/97 GES -
MSTA710 Poet/Beam Structural / / / / 02/06/97 NPP GJ 02/06/97 GES
MSTA711 Post/Beam Mechanical / / / / 02/06/97
inn GS 02/06/97 C.RS
MSTA712 Underfloor insulation / / / / 02/10/97 P GS 07/10/97 GES
MSTA717 PLM/Underfloor / / / / 01/09/97 PASS MS 01/10/97 MRS
MSTA720 Mechanical Insp / / / / 07/30/97 SEE COMMENTS FOR FRAMING INSPECTTON THTS 1_SS Rb 08/01./97 J-H
DATE.
M.9TP.722 Plumb Top Out / / / / 06/2.4/97 Units B2, BC, A6, A7, AS & A9 PASS MS 06/26/97 J•H
i
MSTA723 Electrical Service / / / / 07/15/97 A7, A6, B3, A9, AS, B2, 6 nervicen 6 6 PASS ARP 07/15/97 J"H
I"
II
roughins
S
MSTA725 Framing insp / / / / 07/16/97 A6: Add stud adjacent to furnace plenum. FAIL RB 07/22/97 J•H ,
Guardrail/handrail required to be no
lens thsul 34-inches, guardrails need to
be at least 36-inches in height.
Additional nailing req•d at firewall
gypsum lot layer. Firestop "firewall" at
plat level with in wall, i',iclude wiring
and plumbing holes. Straf top plate at
bedroom nouth end off-set � 48-inches.
Enclose lid and firestop foor at chase
behind shower. Nail gyp board within
chane (part of 2-hr wall).
B2: Seal heat duct within noffit/fl.-or
cavity north bedroaa closet.
�► A
CASE HISTORY FOR GASB NO.: MST96-0115
BOWEN RRRI. ESTATE GROUP
13475 SW SUMMHRWOOD DR
Action Descript Req/ schd/ Mid/ Action Notes Disp By Update Upd
„de Sent Done Done - ---------Date By
---- ”' -_ --_-_ --- r
------ - --- --------------------------- i.
Lvft: Nail OSB panel above outlet. ;
Secure b-vent into place and nupport at
change of direction w.lthin attic above ?4,
laundry room and maintain clearance to
ccmla:elibles 1-inch. Firestop 2-hour
wall at coiling/floor levels. Nail gyp
above ceiling level (note) edge within
laundry room. Back-to-back electrical
outlets > fir"block if within 24-inches {:
laterally.
B3: Gyp on 2-hour in complete adjacent
to B-2 Unit. Also, between A7, B-vent
in laundray sum an B2. Back to back
electrical outlet fireblock needed.
Nail aide TJI hanger in loft. Firestop
2-hour wall with floor/ceiling. Nail
gyp within chase behind shower. Rnclose
chase at lid behind shower.
A7: Nail off-set plate in rear of garage
strap needed. Firestop floor-ceiling
between, alno between B3.
AS: Add etude by plenum box in garage.
Strap plat off-set at kitchen. Trues cut
into .rarer laundry room. Firewall t.ot
installed yet. shower blocking 2'
required. Enclose chase behind nhower.
Nail gypboard within chase behind
shower. Add lid behind shower. Nail
gyp within chase behind shower.
Fireblock electrical boxes within 2-hour
wall. Firewall incomplete at A7 wall.
Maintain 1-inch clearance for b-vent at
truen. Provide stud at furance plenum.
Firestop 2-hr. wall.
A9: Stud ,r.issing at furnace plenum.
Fireblock at tnue within laundry room.
Nail plat south end shower water lines
t at top plate. Shower blocking. Enclose
lid behind shower at north and.
Firestop floor level. Blectrical outlet
fireblocking between As. A/b-vent
within 4-feet of vertical wall needs
extension. B/Heat ducts installed
underneath stairs cavity in all unite; f
sapecially A-Unita. Hither remove or 1
re-route to conditioned apace. C/dryar
venting must met dryer specifications.
r,
INVa
IT
J �t� r. �w ..12..f..,. t L t-... .!. ff1 1 }",a S ..t
S,
is
Page No 3 CARR HISTORY FOR CASE NO.: KIT96-0115
BOWEN PRAL ESTATE GROUP
13475 .9W SUMMERWOOD DR
os/16,198 r�)
Action Description Req! schd/ End/ Action Noted Disp By Update Upd
code Bent Dome Done Date By
- ---------- -------- -------- --`- ----- --'---------- ---- --- -------- --- �F'. .
I,
;i
MSTA735 Gas Line Inap / / / / 07/23/97 all unit• pressure above 10 lbs., see PASS RB 07/23/97 J-H
report in file for details.
Note: Units A6, AP, A9: aleeve gas line
with 10mil tape thru brick veneer.
MBTA745 Gyp Board Insp / / / / oB/OG/97 pending- proper nailing and firewall PEND RB 08/15/97 RB
firo-caulking
MSTA745 Gyp Board Insp / / / / 08/14/97 pending- missed nailing PASS RB 09/15/97 RD
b-vent clearance
bring down b-vent below ceiling- A6
MSTA755 Rain drain Insp / % / / 09/16/96 goes to summer ck contr say* appr by APP G9 09/17/96 ORS {
letha
I VARIFIRD THIS WITH LETHr SHE SAID IF
NOT POSSIBLE TO GBT TO STORM THIS I9 OR
MSTA960 (F) Issue Cert. of Occupancy / / / / 11/07/97 JT 01/27/98 JT
MSTE705 Footing Insp / / / / 12/10/96 garage PART GS 12/10/96 GEB
MSTB705 Footing Insp / / / / 11/22/96 PASS TLP 12/18/96 TLP
MSTB706 Foundation Inap / / / / 09/16/96 APP G8 09/16/96 GBS
r
MSTP706 Foundation Inap / / / / 12/lU/96 garage PART GS 12/10/96 GUS
MBTB710 Post/Beam Structural 10/14/97 / / 10/09/97 Conditional approval: 1. Provide special GOND RB 10/14/97 J+H i.
inspection report for low point drains
end pictures to refloct notched beam
support. 2. Support all ducts missing
straps and hangers
Note: Under floor (mach) ventilation to
be achieved by heat duct underneath
stairs, once constructed.
MSTH711 Post/Beam Mechanical 10/14/97 / / 02/09/97 PASS 09 11/09/97 J-H
MSTB",14 Ftg Drain Bsmlt Wall* / / / / 09/16/96 see note rain drain this date APP GS 09/16/96 GR9
MSTB72.4 Electrical Rcsrgh-in / / / / 07/15/97 A7, A6, B3, A9, A8, 82 - 6 rough-ins OF. PASS DRP 07/15/97 J*H
�•i
r
.w
ry�
a .
�:�� �� r r' ���i "Irl3va A� ,BrJ t•t�� m - ;^} a.i�+ "C'}' ,
+li 4 tt�Ry{t
+1 r
't+
GAR HISTORY FOR CASE NO. : MST96-0115
BOWEN REAL ESTATE GROUP
13475 SN SUMMERW)OD DR
N,
Acticet Descript-1-1 Key/ Schd/ End/ Acti-M Noten Disp By Update LVd
Code Sent Done Done Date By
'.i ---- --- "'
MOTB725 Mechanical Inap 08/14/97 / / 07/24/97 A-6: FAIL RB 09/14/97 J'H
1. Close up fire spacer to firstop and
secure into place � fireplace chase.
2. Fire caulk with Soo degree caulking
of 2-hr. within attic.
3. Firestop plate line between unite
it,cluding vertical walls and lower
level.
4. Block continuous venting through
penetration.
5. Extend firewall down to plate within
attic of garage. "
6. Block off electrical outlets within
24" back to back.
B-2:
IMMrlen Mame an A-6; #'a 2., 3 6 6
t.
7. Firenpaceer needed at b-vent in
laundry. Also, drop sleeve to bottom of
t
chord of ceiling joist.
B-1.
Innues name an A-6 #'s 2, 3 6 6; name an
B-2 #7
S. Nail plate plumbing in laundry.
A-7:
Inarres name an A-6 #'a 2, 3 h 6
A-8: L
Issues name as A-6 #'s 2, 3 6; name as
B-3 #B
A-9:
Issues name an A-6 #'s 2, 3 6 6
9. Block gar-age/laundry room garage
ceiling level.
{
fir. .t
y
i
pa" S CASE 113 TCFY FOR CASE NO. : MST96-0115
BOWF:N REAL ESTATE GROUP
13475 SW SUNMEPWOOD DR
Os/1i/It
Aetim Dporiptim Req/ 8chd/ arid/ Action Notes Mop By Update Upd
Code Sent Done Done , Date By
-------------------- -------- -------- -------- --------------------------------------- ---- --- -------- ---
M A730 Frafing Insp / / / / 07/22/97 1. Rnclose chase of fireplace at 10' PASS RB 07/28/97 J*H
Interval at ceiling level.
2. All through hole nenetratione through
firewall need to be fire-caulked.
3. Firestoppirg still incompleted at
2-hr. wall separation botween unit.".
4. Canplete nailing of 2-hr second k
1 ayer..
5. Nail second layer of mech. chase
6. What's happening to mach duct under
stairs.
7. Strap plate at south and bedroom wall
< 46" offset.
B2, B3, A7, A6, A9 not inspected ieauss
incomplete.
B3:
y
1. Nail where mused.
2. Fire.tape where marked.
A7:
1. let layer between B3-not r-Anplete.
2. 2nd layer fire caulk through hole
penetratiooa (between AB).
A8: net layer in garage incomplete.
fire caulk through holes.
A9: Fire caulk through holes.
MM#20 Prating Insp / / / / 07/30/97 A6: Insulate behind mech at. basement, PASS RB 08/01/97 J*H
fireutop floor level at ehalrar and
Insulate water line of shower.
B2: Flat ceiling appears to be R-30,
requires R-36 value.
Firestop thru-hole penetrations.
Enclose lid of b-vent thru ceiling.
Firestop floor level at shower.
Insulate behind mechanical at basemen_. '
Firestop separation wall (2-hr) at
fllor and ceiling levels.
Add bearing support within garage.
83: Same ar A2.
A7-A9: Firestop thru-Penetrations. Ili
Ineul,tte behind mechanical at
basement.
(Vl
. :
Page No. 6 CASE HISTORY FOR CASE NO.: MS796-0115 N
BOWEN REAL ESTATE GROUP ,
13415 SW SIIMMERWOOD DR
05/26/98
Action Description Req/ sehd/ End/ Action Notes Diap By Update Upd
Code sent Dane Done Date By
------- ------------------------------ -------- -------- --------—---------------------- ---- --- ---- ---
k
(x17746 2awlation Insp / / / / 07/01/97 PRS-INSULATION INSPECTION PASS RH 07/1.9/97 J•H w
1. Complete firewall (firestopping) at
floor and ceiling levels noted in every
unit and in every floor.
r
2. Re-call for firewall requirement
inspection. t
3. INSULATION:
a. Firestop all thru hole penetrations,
i.e., plumbing lines, electrical wiring, {
etc.
b. At showers, adjacent to exterior
walls, make sure insualtion is approved
to warm side and that plumbing is
protected from freeze. +�f
c. Insulation missing at tub/shower
locations; Also, fill voids or gaps
where not full in stud wall spaces.
d. Unable to view insulation at
tub/shower in A9 unit, concealed behind
sheetrock.
MSTB750 Yh4Ax hall Insp / / / / 07/02/97 1. Block where needed. FAIL RB 07/07/97 J•H
2. Nail gyp sheathing as marked.
07/09/97 Approved pending corrections: Nail where PASS RB 08/14/97 J+H
missed, including where house wrap in
already installed. Also, seal all tears
in house wrap where removed and gyp
shear n.,tched. Finish nailing required.
i;
li
i
qi-
Li
tl
11 1 131
:
4 lj 1�Y�u l Jltd*,, ';� jymu n'' J .: iqi v�M+ ,M4c��4 •
`nI
_........rwA.,rtwtl �AJLttptnr' .
d
Page No. 7 cASE til STORY FOR CASE NO.: MST96-0115
BONEN REAI, ESTATE GROUP
1
13675 SN SUMMERWOOD DR
05/16/98
E
Action Description Red/ Schd/ End/ Action Notes Diep By Lpdate Upd
CodeSentDoneDoneDate
--- ----- -- ---- --— ---- ----------------- --------------------- ---- --- _..-. �Y.
MBTB755 Firewall Insp / / / / 08/06/97 PEND RB 08/15/9' RH
2 hr firewall:
pending- first layer w/in habitable
i
space (A-6,7,8,9 B2.,3)
Fir-j-tape joint edges
nail an needed
Ip.
i
AM inspection-
second layer (same units) w/in attic
fire-caulk thru hole penetrations
PM inspection- +�
second layer (same units) below ceiling
nail e" or
B-vent clearance- 1" req'd r
allow full passage behind interior wall
at lawidry rms
NOT9755 Firewall Insp / / / / 08/19/97 pending- fire-taping all joints at 2-hr PASS RB 08/15/97 RB
wall
MBTB798 Mechanical Final / / / / 11/07/97 Approved, Units A-6,A-7,A-8,A-9 only, PASS RB 11/12/97 J-H
8-2/3 need smoke damper re-tent.
NOTS799 Mechanical Final / / / / 11/16/97 Units B2 5 S3 approved although Rick not PASS RB 1.1/12/97 J*H ,
happy with workmanship. From now on,
furnace appliance will be installed at
rough in no fire dampers can be
Inspected.
i
q
r;.
•
Page No. f GSR HISTORY FOR .^.ASB NO. M8T96-011
HOWEH RkAL ESTATE GROUP
13475 SW SIP 4"WOOD UP
05/16j94 �•
Action Description Req/ Schd/ End/ Action Notes Disp By Update Upd
code Sent Done Dane --- Date By
_"'--_ '_"----___-----.. -'_" -"' -------- --- •
MSTD798 Mechanical Final / / 11/02/97 Building Final i Mechanical final notes: FAIL RD 12/26/97 J•H
1. Provide low point crawl drain - All
units.
2. Provide a barrier between (rout porch
and adjacent keystone wall at 12475
A6.
3. Noat:herstrip front door, A6.
F a. Extend dryer venting above floor
level, A-6.
5. Return air grille missing A-6.
y. t 6. Range venting seal and behind siding
F
A-6.
1
7. Enclose soffit, and damper within
Y garage - B-2. .
8. Seal gap at electrical conduit if of i
furnace B-2.
9. Extend dryer venting above floor
level.
10. Seal range vent joint - also doom
not work 9-2.
11. Weatherstrip doors - B-2.
12. Vehicle barrier required in garage
B-3. yF'
13. Enclose soffit/damper in garage -
B-3.
14. Weatherstrip doors - B-3.
15. Protection needed at B-vent against
flaw spread paner in garage - A-7.
16. Weatherstrip doors in A-7.
17. Extend dryer venting above floor -
A-7.
18. Weatherstrip doors, A-8.
19. Extend dryer vanting above floor -
A-B.
20. Berl washer box perimeter - A-8
21. Return air grille missing - A-B.
22. Vehicle barrier post required in
garage A-9.
23. Weatherstrip doors A-9.
24. Make sure that ALL mechanical heat
duct grilles get covered (carpet being
installed this date.) Also, crawl
accesses.
25. Provide hardware thruout ALL units k�
where needed. G
26. Plumbing final required.
I.
I Page No. 9 CASE H18TORY FUR CASE NO.: MST96-0115
BOWEN REAL ESTATE GROUP
1347w, SW SUMMSRWOOD DR
00/26/96
AOtim befiftipt10M Req/ Schd/ End/ Action Notes Disp By Update Upd
Sent Dome Dane Date By
-""'• ------------------------------ __ -------- ------- ------`-------------------------------- ---- --- --"""' "' .
MSTP799 Building Final / / / / 11/07/97 Approved, Unit A-6 only. (Building PASS RB .11/21/97 JT i
finals on the remaining units in this
building on separate permits.)
all of. building #z permits to Jill on
11/21/97 for c/o approval
MSTB950 (F) Issue Cert. of occupancy / / / / 11/07/97 MAIL JT 03/06/98 JT
a
MSTB960 Case Finaled / / / / 01/02/98 01/02/98 JT
FL9TD796 Flectrical Final / / / 10/31/97 Blectrical approved all unites A6, B2, PASO BPO 11/10/97 J•H
B3, A7, AB i A9.
.i MSTD797 Plumb Final / / / / 1.1/04/97 Approved as noted: PASS MS 11/04/97 J-H
1. Caulk tubs and showers for 13467 6
17471 Summerwood.
I
II
i
i
I
i I
I
I
I
y1
I
I
i
I