13471 SW SUMMERWOOD DRIVE BLDG 2 STE B-7 r
ADDRESS:
3w
St-kmmirwood 6 v .
t
4
i:\records\microflm\targets\building.doc
•
From:"David S.:ott"<DAVID.COT>
To:rick,mikes,hap, george,jeanne,jean .
Date:Wed,24 Dec 1997'14 23.42+0000
Subject summerwood
Reply-to:devid rl Ugard or us
X-mailer. Pegasus Mail for Windows(v2.54)
X-PMFIAGS: 128 0
e
To clear up any confusion that took plate rethe termination of
cr:w Ms out there . Hap ant I had told To iy that we would allow the
crawts to discharge on adjacent gradn...we allowed this because the
buildings have foundation drains which would collect any wa►"that
migrated back toward the structure a..d then carry it out into in
storm system ..apparantty this message didn't get forwarded Jong
i
j anyway,over-all on the issue of the crawls.. Tony has informed mei
t that they are putting them in for everything...so we don't need to do
any temp c of os 6 everything else is ok(incl ping/eng)we can do
regular c of as
thanks
a,
z
f
� Jeanne Temple — 1 — V1ied,24 Dec 1997 14.52.15
-
". rfr
a
{
i
, s
s
ACTIVE CASE: Grp Smry Edit Prcl Name Actn Cond wog-note Fee Doc Tag Misc Xit
List related cases in project group # 8122
O6MASTER PERMITa� � aaaaaaa�� aaaaaa � �� �da � �a � � C
° :MST97-0415 : PROJECT:SCHOLI.S FRY RD TWNHM: STATUS :F : UPD: 02/04/98 : :PHN: °
° PERMITTEE:BOWEN REAL ESTATE GROUP PRIM. . :MST96-0115 : °
° SITE ADDRESS : 13471 SW SUMMERWOOD DR JUR. . . :TIG: °
0 flarESC'RIPTION OF PROJECT
° TJnit B-3 , Build4-ng 2, Lot 9 °
0
0
0 ° REISSUE: DWELLING UNITS : 0 : REQUIRED SETBACKS---- ------ ° �
° CLASS OF WORK. :NEW: BEDRMS : 0 : BATHS : 0 : LEFT. . : O : ft RIGHT. : O : ft °
° TYPE OF USE. . . :SFA: FLOOR AREAS- - ----- -- - FRONT. : O : ft REAR. . : O :ft °
° TYPE OF CONST. : 5N FIRST. . . . : O :sf REQUIRED-- ----- ----- ------- o f
° OCCUPANCY GRP. :R1 SECOND. . . : (. :sf SMOKE DETECTORS. : : °
° STORIES. . . . . . . : 0 : T14TRD. . . . . O :sf PARKING SPACES. . : O : °
° HGT;HT. . . . . . . . O : ft. TO:'AL- ----- O :sf °
° FLOOR LOAD. . . . . O :psf BASEMENT. : 0 : °
° VALUE. . $ : 0 : GARAGE. . . : 0 : o
09NOTES (3) �a� a aaaaaa�aaaaaaaaaaaa a aaa aaa aaaaaaaaaaa � o aaa a aa�
° See MST96-0115 for case history, Lot 9 . ° PgUp °
j ° ° PgDn °
aaaaaa�aaaa��a���a�aaaa�aa�aaaa�aaaaaaaaaaaa�aaaaaaaaaaaa�aa�aa�aa�eaaaaa��aa�i
low
1
I
r
J
i
' /^' .d''^:i"Kt MCMIM'IPS/Rh4ygyMlXWaw++rwvli.. ...... ..JrNY'MMAMI16iAfY
'tt
�-+Wsvaa'sw..�...._. .........�...«w .,..,r•...,+ nPtMY1iW'le.LL"4#d'�'?'�.,,dl'ti+-: .,,.er7. xiY+ aFw+bnanaJN!A+Maaflt wk;;�
P
1
ACTIVE CASE: Grp Smry Edit Prcl Name Actn Cond Log-note Fee Doc Tag Misc Xit
List actions for this case
—MASTER PERMIT ----�— — —
:MST96-0115 : PROJECT:SCHOLLS FRY RD TWNHM: STATUS: F UPD: 03/06/9$ : :JT
PERMITTEE:BOWEN REAL ESTATE GROUP PRIM. . :SUB95-0005 :
SITE ADDRESS: 13475 SW SUMMEWOOD DR JUR. . . :TIG:
DESCRIPTION OF PROJECT (1) — ----
Unit A-6, Building 2, Lot 7
i
REISSUE: DWELLINP UNITS: 6 : REQUIRED SETBACKS--------- - ± �
CLASS OF WORK. :NEW: BEDRMS : 0 : BATHS : 0 : LEFT. . : O : ft RIGHT. : O : ft
TYPE OF USE. . . :SFA: FLOOR AREAS--------- - FRONT. : O : ft REAR. . : O : ft `
TYPE OF CONST. :5N FIRST. . . . : O : sf REQUIRED------------------- -
OCCUPANCY GRP. :al SECOND. . . : O : sf SMOKE DE'T'ECTORS. : Y: f
STORIES. . . . . . . :2 : THIRD. . . . : O : sf PARKING SPACES . . : O :
HEIGHT. . . . . . . . : O : ft TOTAL------ : O : sf
FLOOR LOAD. . . . : O :psf BASEMENT. : 0 :
�. VALUE . . $ : 482593 : GARAGE;. . . : 2240 :
NOTES (3) --- ----- --_�__
PROCESSING, REVIEW & INSPECTION PERMIT for several units . as PgUp
well as an Administrative Permit for C/O purpose. PgDn
q'
t
r
:....... .. ...... ... r
r.". .:i,...,.is .. -----------
.
,ii..••.Ii
ti ,lIla 6 1
v
+�`trh► !'M!?+pM�+'t,yk�, n. `�EIIM.?'bPM.imr nr,,•xaswr•.,;N++.•wa.a..e.+oawutlr• :. , '. ., P is;r ,. .
- - rwIldF1.Mi
CITY OF TIGARD
DEVELOPMENT SERVICES
13125 SW Hail Blvd., Tigard,OR 97223 (503)6394171
CERTIFICATE OF
OCCUPANCY
PERMIT il. . . . . . . : MST97-041 •
GATE ISSUFDt 11/:0/97
FARC:EL t 1 S i 33DB-06300
S I T L ADDRESS. . . : 13471 !:W SUlv1MC RW000 DR r
SUBDIVISION. . . . SC:HOLL_S FERRY ROAD TUWNHOMES ZONI NC3 a R-25
I I
BLOCK. . . . . . . . . . e LOT. . . . . . . . . . . . . 10@9 JURISDICTION:TIG
_._.____....__...__.-._____._.......,.......-__....._.,_..
CLASS OF WORK. iNFW
TYPE OF USE. . . t SFA f
TYPE OF CONSTRsSN f
OCCUPANCY GRP. :*&R
OCCUPANCY LOADt0
Remarks : Unit 0-3, Building 2, Lot i
i
Owner:
i
BOWENDEVE!.OPMCNT CO
1 1 1 SW F:C'1 H AVENUE.
SUITE c2�0
PORTLAND OR 9'7004
Phone R:
Contrat`tor.t _.___ .._ _... .. .__._ ....__._..._ ___._.. . . ...
OWNER
I
Phone M:
Reg ti. . :
This Certificate grants occupancy of the mbo-•e referenueri building or portion
thereof and onfill e►s that the building has been inspec_ted for compliance with
► he State of Oregon Specialty Code$ fo theZLOF-F
oe�.t:upancy, and use �_cnrier,
Ihic:h the r ferencpd permit was isec.Aed.
i.JILDINO INSR CTOR AU ICIAL
POST IN CONSPICUOUS PLACE
i
1
IV
Page No. 1 CASE HIS"ORY FOR CASE NO.: MST97-0415
BGWEN REAL ESTATE GROUP
13471 SW SUWERWOOD OR '
06/08/98
Action Description Roq/ Schd/ End/ Action Notes D!Rp By Update Upd
Code Sent Done Done Date By
------- ----11------------ ------------ -------- -------- -------- --------------------------------------- _- -------- ---
at.t
MSTA960 (F) Issue Cert. of Occupancy / / / / 11/10/97 mailed on 1/9/98 MAIL JT u.1/u9/98 JT
MST9008 Permit created / / / / 10/06/97 ADMN JMH 10/06/97 J"H
MSTS092 (F) Issue combination permit / / / / 10/06/97 This permit for building final ADMN JMH 10/06/97 J•H
information and C of 0 issuance only
MSTB789 Smoke Detector / / / / 11/10/97 PASS k8 01/07/98 RB
M.ST14799 Building Final J / / / 11/10/97 11/21/97 to Jill for c/o approval PASS RB 11/21/97 JT
s'
i;
J
Page No. 1 CASE HISTORY FOR CASE No.: MST96-0115
i7OWEN REAL ESTATE GROUP
13475 SN SUM4ERNOOD DR /
05/26/98
Action Description Req/ Schd/ Rnd/ Action Notes Diap By Update Upd
Code Sent. Dane Done Date By
-- - --------- -------- --
MSTA005 Application received / / / / 02/13/96 PATS „-W 08/02/96 JDA
,4. MSTA008 Permit Created / / / / 03/21/96 PASS AkM 08/02/96 JDA
i
,} MSTA010 Check for prel. restrict. / / / / 03/21/96 PASS 61101 08/02/96 JDA
l
M8TA012 Plans routed to Plano Examiner / / / / 04/23/96 used thio action to record letter to PEND THY' 9.1123/96 JHF
typing
MSTA026 Plans approved by Plane Exmr / / / / 05/28/96 APPR JHF 05/:8/96 JHF
MSTA(130 Reviewed plans routed to DSTS / / / / 06/07/96 APPR JHF 06/06/90 JHF
MSTA080 M Ready to issue / / / / 07/31/96 PAID JM 07/31/96 T•11
MSTA092 (v) Issue combination permit / / / / 08/02/96 PASS JDA 98/02/96 JI)A
MSIA097 Issue plumbing signature form / / / / 12/06/96 OK JCA 12/06/95 KAS
MFTA098 Inoue electric signature form / / / / 12/06/96 OH JI'A 12/06/96 YA3
Pl4TA15S Development conditions met / / / / 12/03/97 PASS n4 12/03/97 JDA
I4STA705 Footing Inep / / / / 08/26/96 APP 09 08/26/96 GHS -
MSTA705 Footing Insp / / / / 01/02/97 2 of 3 garages PART GS 01/02/97 GES
MSTA706 Foundati an Inep / / / / 09/09/96 APP GS 09/09/96 GES c `
MSTA706 Foundation Insp / / / / 01/09/97 garage walls PART GS 01/09/97 GES
NOTA710 Pont/Ream Structural / / / / 01./28/97 meth PEND GS 01/28/97 GES
MSTA710 Poet/Beam Structural / / / / 02/06/97 APP GS 02/06/97 GES
MSTA711 Poet/Boam Mechanical / / / / 02/06/97 APP GS 02/06/97 GES I� "
MPTA712 Underfloor insulation / / / / 02/10/97 APP GS 02/10/97 GES
MSTA717 PIM/Underfloor / / / / 01/09/97 PASS MS 01/10/97 MRS `
MSTA720 Mechanical Insp / / / / 01/30/97 SEE coMMENTS FOR FRAMING INPPECTION THIS PASS RB 08/01/97 J*H
DATE
MSTA722 Plumb Top out / / / / 06/24/97 Units B2, BC, A6, A7, AO & A9 PASS MS 06/26/97 J•H
r
NSTA723 Electrical Service / / / / 07/15/97 A7, A6, 183, A9, Ad, B2, 6 services S 6 PASS BPP 07/15/97 J•H
roughins j
NSTA725 Framing Inep / / / / 07/16/97 AS: Add stud adjacent to furnace plenum. FAIL RB 07/22/97 J•H
Guardrail/hatt.irail required to be no 11
lees than 34-inches, guardrails need to i
be at leant 36-inches in height.
Additional nailing req'd at firewall f
gypsum let layer. Firestop "firewall" at 4
plat level with in wall, include wiring p
4
and plumbing holey. Strap top plate at
bedroom oouth end off-set < 4e-inches.
Enclone lid and firentop Poor at chaee i
behind shower. Nal gyp board within
chane (p-at it 2 hr wall)
B2: Seal heat dL-t within soffit/floor
cavity north bedroom closot.
11!!�
I_J
Page k4o. 2 CASE HTS7'OPY FOR CABG NO.: MST96-0119
BOWN PEAL ESTATE GROUP
114'75 SW SUM•tERi/OOD DR •
Of/�f/ff
Aetim Description Reg/ Schd/ Wid/ Action Notes Disp By Update T)PO
Cc" Sent Done Done Date By .
Loft: Nail USB panel above outlet.
Secure b-ver`. into place and support at
change of direction within attic above
laundry room and maintain clearance to
combustibles 1-inch. Firestop '-hour i
wall at ceiling/floor levels. Nail qyp
above ceiling level (note) edge within
laundr, room. Back-to-back electrical
- I
outlets > fireblock if within 24-inches
laterally.
B3: Dyp an 2-hour in complete adjacent
to B-2 Unit. Also, between A7, B-vent
in laundray sam an B2. Back to back
electrical outlet fireblock needed.
Nail side TJI hanger in loft. Firestop
2-hour wall with floor/ceiling. Nail
gyp within chase behind shower. T3nclose
chase at lid behind shower.
A7: Nail off-set plate in rear of garage
strap needed. Firestop floor-ceiling ,?
between, also between B3.
AS: Add etude by plenum box in garage.
a
Strap plat off-net at kitchen. Truss cut
into over laundry room. Firewall not
installed yet. Shower blocking
required. Eiclose chase behind shower.
Nail gypboard within chase behind
shcwer. Add lid behind shower. Nail
gyp within chase behind shower.
Fireblock electrical boxes within 2-hour
wall. Firewall incomplete at A7 wall.
Maintain 1-inch clearance for b vent at
truss. Provide stud at furance plenum.
Pirestop 2-hr. wall.
A9: Stud missing at fitrnsce plenum.
(
Fireblock at truss within laundry room.
i'
Nail plat south end shower water lines
at top plate. Shower blocking. Rnclose 5
lid behind shower at north and.
Firestop floor level. Electrical outlet
firehlocking between AS. A/b-vent
within 4-feet of vertical wall needs d
extension. B/Heat ducts installed
underneath stairs cavity in all unit9;
especially A-unite. either remove or
i"
re route to conditioned space. C/dryar
venting must met dryer specifications.
1�
P"o 110 2 CASE HISTORY FOR CA99 NO.: MST96-0115
ROWHN RF,AL ESTATR GROUP
13475 SW SUMVFTWOOD DR
08/26/90
Action Description Req/ Schd/ End/ Action Notes Dinp By Update Upd
Code seat Dane Done Date Bi
----------------------------------- -1 --- -------- ---
MSTA735 Gas Line Inop / / / / 07/23/97 all units pressure above 10 lbs., see PASS RA 07/23/97 J-H •t
e
report in file for details.
r Note: Units A6, A8, A9: sleeve gas line
with lomil tape thru brick veneer
MSTA745 Gyp Board Inop / / / / 09/06/97 pending- proper nailing and firewall. P;M PB u8/15/97 RH
fire-caulking
MET1.�45 Gyp Board Insp / / / / 08/14/97 pending- missed nailing PASS RB n8/15/97 RB
b-vrit clearance
bring down b-vent bel;ow ceiling- A6
MOTA795 Rain drain Insp / / / / 09/16/96 goes to rummer ck contr says appr by APP G3 09/17/96 098
letha
I VARIFIRD THIS WITH LETHA SHE SAID IF
NOT pOSSIBLR TO GET To STORM THIS IS OR
MSTA960 (F) Issue Cert. of Occupancy / / / / 11/07/97 JT 01/27/98 JT
MSTB705 Footing Insp / / / / 12/10/96 garage PART GS 12/10/96 OHS
MSTB705 Footing Inep / / / / 11/22/96 PASS TLP 12/18/96 TLP
MSTR706 Poundation Inep / / / / c9/16/96 APP GS 09/16/96 GES
M.STB706 Foundation Inop / / / / 12/10/96 garage PART GS 12/10/96 GES
MSTH710 Post/Beam Structural 10/14/97 / / 10/09/97 conditional approval: 1. Provide special COND PH 10/14/97 J•H
L
t inspection report fo: low point drains
and pictures to reflect notched beam
suprjrt. 2. Support all ducts missing
rtraps and hangers.
Note: Under floor (mach) ventilation to
i
be achieved by heat duct underneath
stairs, once constructed.
M9TP711 Post/Beam Mechanical 10/14/97 / / 02/09/97 PASS GS 11/09/97 J+H
MSTB714 Ftg Drain BemIt Walls / / / / 09/16/76 see note rain drain this rats APP GS 09/16/96 GaS �»
MSTB724 Electrical Rough-in / / / / 07/15/97 A7, A6, B3, A9, AS, B2 - 6 rough-ins OF PASS BRP 07/15/97 J•H
P.: I
6.
,.,«�,.��«,•w�+«+n w*r4MW1�i'MAtroM�1kM�1�+,:
re" nO. 4 CASE HISTORY FOR rA-96 NO.: MST96-0115
BOWRN R,%AL 6S,rATH NROUF
1.347', SW SUM4ERWOOD LR
05/26/90 -
t
Action Description Req/ Schd/ End/ Actionn Notes Disp By Update Upd
coda Sent Done Dore Date By
__- ..__
MBTE725 Mechanical (nap 09/14/97 / / 0'7/24/97 A-6: FAIL RB 09/14/97 J•H
1. close up fire spacer to firntop and
secure into place > fireplace chase.
2. Fire caulk with 500 decree caulking
of 2-hr. within attic.
3. Firestop plate line between units
including vertical walls and lower
1
level.
4. Block continuous venting through
penetration.
5. Extend firewall down to plate within
attic of garage.
6. Block off electrical outlets within
24" back to back.
B-2:
Inguen name an A-6; #'a 2, 3 & 6
7. Firespaceer needed at b-vent in
laundry. Also, drop sleeve to bottom of
chord of ceiling joint.
B-3:
Issues name an A-6 #'s 2, 3 6 6; name an
B-2 #7
8. Nail plate plumbing in laundry.
A-7:
Inman name an A-6 #'n 2, 3 6 6
-8:
Issues samc- an A-6 #'s 2, 3 rk 6; name an
B-3 #8
A-9:
Issues name an A-6 #'n 2, 3 6 6
9. Block garage/laundry room > garage
ceiling level.
{Y
F
a
1
IT
I •, i � d i >fr t F �w4�r,�" 'y4 ti b "
60
A 100
CASE AISTORY FOR CASE NO.: MST96-0115 «
1; Page No. 5
HONBt3 RRAI, &gTATE GROUP
1347S 3N SUMMRSRNO01A DR .'
Disp BY Update Upd
` d/ End/ Action Notee
,G keg/ echDate BY '.
�+ Action Description
S sent. Dane Do
ne
code - ------
--- F
fJ Y10
I, . 1
fireplace at lo'
PASS RB 0'1/28/97 J•H
07/22/97 1. Enclose chase of
MSTB710 Framing 'nnp
interval at ceiling 1011161.
i 2. All through hole penetrations through
firewall need to be fire-caulked.
3. Pirestopping sti7.1 incompleted at
2-hr. wall separation between units.
q. Complete nailing
of 2-hr second
layer.
5. Nail second layer of mach. chase
6. Mhat,s happening to mach duct under
stairs.
7. Strap plate at south end bedroom wall
< 48" offset.
52, B3, A7, 148, A9 not inepacted issues
incomplete.
B3:
1. Nail where missed.
2. Firstape where marked.
A7:
1. lot layer between B3-not ca*iplets.
ii
2. 2nd layer fire caulk through hole
penetraltions (between A8).
A8: let layer in garage incomplete.
fire caulk through holes.
AS: Pira caulk through holes.
07/30/97 A6: insulate behind mach at banement, PASS RB 08/01/97 J*M
NBTB730 Framing Insp
t firestop floor level at shaver and
insulate water line of shower.
B2: Flat ceiling appears to be R-30,
requires R-38 value.
Pirestop thuv-hole penetrations.
Enclose lid of b-vent thru ceiling.
Pirestop floor level at shower.
Insulate behind mechanical at basement.
Pirestop separation wall f2-hr) at
fllor and ceiling levels.
Add bearing support within garage.
B3: game as B2.
A7-A9: Firestop thru-penetrations.
Insulate behind mechanical at
basement. �,
.�..._. e..�-...d
X,
1 ®
Page No. 6 CASH HISTORY FOP CASE NO.: MST96-0115
BOWEN RW, HSTA,H GROUP
17475 SW SUMMFRWOOD DR
05/26/90
Action Description Req/ Schd/ End/ Action Notes Disp By Update Upd
Code Sent Dane Done Date By
1 -.----- ------------ -------- -------- -------- -----------------` -------------- ----- ---- -- -------- ---
i MSTB745 Insulation Insp / / / / 07/01/97 PRS-INSULATION INSPHCTION PASS RB 07/18/9'1 J-I1
_ 1. complete firewall (fireotopping) at
floor and ceiling levels noted in every
unit and in every floor.
2. Re-call for firewall requirement
inspection.
3. INSULATION:
a. Firestcp all thru hole penetrations,
i.e., plumbing lines, electrical wining,
etc.
b. At showers, adjacent to exterior
walls, make sure insualtion is approved
to warm side and that plumbing to
protected from freeze.
c. Insulation missing at tub/shower
locations; Also, fill voids or gaps
where not full in stud wall spaces.
d. Unable to view insulation at
tub/shower in A9 unit, concealed behind
sheetrock.
MBTl750 Shear Nall Inap / / / / 07/02/97 1. Block where neoded. VNIL RB 07/07/97 J*H
2. Nail gyp sheathing an marked.
MST2750 Rhear Mall Inap / / / / 07/09/97 Approved pending corrections: Nail whore PASS RB 00/14/97 J•H
missed, including where house wrap iie
already installed. Also, meal all tears
in house wrap where removed and gyp
-r shear notched. Finish nailing reVired.
}
WTA
'� w..W .r�«�.ikw�MiW1�rV
1
1 Y I •
Page No. 7 CASE HISTORY FT/R CASE NO.: MST96-0115
BOWUN REAL. RSTATR GROUP
�m 17475 SW 3UMMERWOOD DR
05/26/96 '
i
Action Description Reg/ schd/ End/ Accion Notes visp By Update U0
Code Bent Done Done Gate By
------- -------------------------------- -------- -------- -— ------- .--------------- ---- ----
MSTB755 Firewall snap / / / / 06/06/97 PEND R9 08/15/97 RB
2-hr firewall:
pending- first layer w/in habitable
space (A-6,7,6,9 82,3)
Fire-tape joint edges
nail an needed
i
i
AM inspection-
second layer (same units) w/in attic
fire-caulk thru hole penetrations
PM ingpection-
second layer (name unite) below ceiling
nail A" oc
B-vent clearance- 1" req'd
allow full passage behind interior wall
at laundry rma
MM755 Firewall Insp / / 1 / J9/14/97 pending- fire-taping all joints at 2-hr PAPS Rn 09/15/97 RB
wall
M-ITR'19a Merhanical Final / / / / 11/07/97 Approved, Units A-6,A-7,A-8,A-9 only, PASS RB 11/12/97 J•H
B-1/3 need smoke damper re-test.
M.9TB796 Mechanical Final / / / / 11/10/97 Units B2 i B3 approved although Rick not FADS RB 11/12/97 J•H
happy with workmanship. From now on,
furnace appliance will be installed at
rough in so fire dampers ran be
inspected.
ip� a
MIN
p� y
fl
'*e
r' .mti
'�
w
,a
J �,
Page ho. 8 CAST. HI9T'ORY FOR C. IN NO. M9T96-0115 • �'
B(tWEN REAL ESTATE c3ROUY
13475 SW SUMMERWOOD DR
/ 05/26/98
d
f�k
K
Action Description Reg/ echd/ End/ Action Notaa Diep By Update Upd1
code Sent Done Done Date By .
-------- -------- ----- -• -------------------------------------- ---- --- -------- --
RY'
MST0798 Mechanical Final / / / / 11/03/97 Building Final i Mechanical final notes: FAIL RB 12/26/97 J*R 'Y
s
1. Provide low point crawl drain - All
units, f`
2. Provide a barrier between front porch
and adjacent keystone wall At 13475
A6.
3. Weatherstrip front door, A6,
4. Extend dryer venting above floor
level, A-6.
5. Return air grille missing A-6.
6, Range venting seal and behind aiding
t
A-6.
i
7. Enclose soffit, and damper within
garage - B-2.
8. Seal gap at cloctrical conduit if of
furnace B-2.
9. Extend dryer venting above floor
level.
10. Seal range vent_ joint - also does
not work B-2.
11. Weatheratrip doors - B-2.
12. Vehicle barrier required in garage
B-3.
13. Enclone soffit/damper in garage -
B-3.
14. Weatherstrip doors - B-3.
15. Protection needed at B-vent against
Elam spread paper in garage - A-7.
16. Weatherstrip doors in A-7.
'a
17. Extend dryer venting above floor
A•7,
18. Weatherstrip doors, A-8.
19. Extend dryer venting above floor
A-8.
?o. Seal washer box perimeter A-8,
21. Return air grille missing A-e.
22. Vehicle barrier post required in
garage A-9.
23. Weatherstrip doors A-9.
24. Make sure that ALL mechanical heat
duct grilles get covered (carpet being
installed this date.) Also, crawl
accesses.
25. Provide hardware thruout ALL units
where needed.
26. Plumbing final required.
�• rvWW�...,� .. ,_.r...x..re w«n Iwx. xr ..� .a.....v..n..x..wMYvnMiMmN�llll�Mi(kYW'M.4P�.Marw�.w.wnr.._.w,..i.
pop mei ! CASE III5TORY FOR CASR NO.: MST96-0115
80(4EN RRAL ESTATE .ROUP
11475 SN St1PMRRNOOD DR
as/26/tr �
Action Description Req/ rchd/ End/ Action Noten Diap By tlpdatB Upd
('ode Rent Dome Dore Date BY
"""-- "------ ----- ----------------'-'---- ---- --- ------- ,
i
MBT0799 Building Final / / / / 11/07/97 Approved, Unit A-6 only. (Building PASS RB 11/21/97 JT
finals on the remaining units in thin
building on separate permits.)
all of building k2 permits to Jill an
11/21/97 for c/o approval
M9TB950 (P) issue Cart. of Occupancy / / / / 11/07/97 MAIL JT 03/06/98 JT
M818960 Came Finaled / / / / 01/02198 01/02/98 JT
MSTD796 Electrical Final / / / / 10/31/97 Ilectrical approved all units: A6, B2, PASS BRP 11/10/97 J•H
B3, A7, A8 & A9.
i
NSTD797 Plumb Final / / / / 11/04/97 Approved an noted: PASS MS 11/00/97 J•H
1. Caulk tube and showern for 13467 &
13471 Summerwood.
N
46j
I-
r'
i