13469 SW SUMMERWOOD DRIVE BLDG 2 STE A-7 • y � r y ¢ gg
yyyy
• 1
ADDRESS: •
�i
I=fflff WnCA i Ivt-
i
-
i
1
f
4
t
i:\records\microtlm\targets\building.doc
.. rw
lYef�
From:"David Scott"<DAVID.CGT>
To: nck,mikes,hap,george,jeanne,jean
Date.Wed,24 Dec 1997 14:23:42+0000
Subject:summerwood
Reply-to: david@ci.tigaro.or.us
X-mailer Pegasus Mail for Windows(v2.54) .
jj X-PMFLAGS 128 Q
To clear up arty confusion that took place re the termination of
crawls out there.. Hap ant I had gold Torry that we would allc w the
crawls to discharge on adjacent grade..we allowed this because the
r buildings have foundation drain•,which would collect y water that
migrated back toward the structure and then carry it oL'into the
storm system...apporantly this message didn't get forwarded along �1
anyway, over-all on the issue of the crawls...Tony has informed me '
that they are putting them in for everything...so we don't need to do
any temp c of os d everything else is ok(incl pingleng)we can do
regular c of os
thanks
i;
fY. 1
f„
i
Jeamte Temple � _- _--_—-----J- -_- -1 - Wed,24 Dec 1997 14:52:15
i
ACTIVE CASE: Grp Smry Edit Prcl Name Actn Cond Log-note Fee Doc Tag Misc Xit
List related cases in project group # 8122
69MASTER
° :MST97-0416 : PROJECT:SCHOLLS FRY RD TWNHM: STATUS:F : UPD: 02/04/98 : :PHN: °
° PERMITTEE:BOWEN REAL ESTATE GROUP PRIM. . :MST96--0115 : °
° SITE AODRESS: 13469 SW SUMMERWOVD DR JUR. . . :TIG: °
06DESCRIPTION OF PROJECT
° Unit A-7, Bvilding 2, Lot 10 0
0
0
° REISSUE: DWELLING UNITS: 0 : REQUIRED SETBACKS---------- ° IM
° CLASS OF WORK. :NEW: BEDRMS: 0 : BATHS: 0 : LEFT. . : O : ft RIGHT. : O : ft °
° TYPE OF USF. . . :SFA: FLOOR AREAS----------- FRONT. : O : ft REAR. . : O : ft °
° TYPE OF CONST. : 5N FIRST. . . . : O :sf REQUIRED-------------------- °
° OCCUPANCY GRP. :Rl SECOND. . . : O .sf SMOKE DETECTORS . : : °
° STORIES . . . . . . . : 0 : THIRD. . . . : O :sf PARKING SPACES. . : O : °
° HEIGHT. . . . . . . . . O : ft TOTAL------ . O :sf °
° FLOOR LOAD. . . . : O :psf BASEMENT. : 0 : 0
° VALUE. . $ : 0 : GARAGE. . . . 0 : °
�� NOTES (3) aaaaaaaaa £ a : oaaaa�
° Lot 10, see MST96-0115 for case history and fees. ° PgUp °
o pgDn o
Ell
1
i
f
n
ACTIVE CASE: Grp Smry Edit Prcl Name Actn gond Log-note Fee Doc Tag Misc Xit
List actions for this case
---MASTER PERMIT-
:MST96-0115 : PROJEC:T:SCHOLLS FRY RD TWNHM: STATUS: F UPU: 03/06/98 : :JT
PERMITTEE:BOWEN REAL ESTATE GROUP PRIM. . :SUB95-0005 :
SITE ADDRESS : 13475 SW SUMDIERWOOD DR JUR. . . :TIG:
DESCRIPTION OF PRO%'ECT (1)
Unit A-6, Building 2, Lot 7
REISSUE: DWELLING UNITS: A : REQUIRED SETBACKS-- ------ -- M
CLASS OF WORK. :NEW: BEDRMS: 0 : BATHS: 0 : LEFT. . : O : ft RIGHT. : O : ft
TYPE OF USE. . . :SFA: FLOOR AREAS-- -- --- --- FRONT. : O : ft REAR. . : O : ft !
TYPE OF CONST. : 5N FIRST. . . . : O : sf RFQUIRED---- ---------------
OCCUPANCY GRP. :R1 SECOND. . . . O : sf SMOKE DETECTORS . :Y:
STORIES. . . . . . :2 : THIRD. . . . : O :sf PARKING SPACES. . : O :
HEIGHT. . . . . . . . : O : ft TOTAL---- - - : O : sf
FLOOR LOAD. . . . : O :psf BASEMENT. : 0 :
VALUE. . $ : 482593 : GARAGE. . . : 2240 :
NOTES (3)---
PROCESSING, REVIEW & INSPECTION PERMIT for several units, as PgUp
well as an Administrative Permit for C/O purpose. PgDn ,
i
h
4i
i
i
�a
I
r _
4
.
ill
ow
CITY OF TIGARD
DEVELOPMENT SERVICES
13125 SW Hall Blvd., Tigard,OR 97223 (503,153.94171
•
CERTIFICATE OF
OCCUPANCY
PERMIT M. . . . . . . s MbT97--0411;
DATE 11aSHF-D i 11/07/97
i
PARCELS tS133DO--08400
'..)ITE ADDRESS. . . s 13469 SW SUMMCRWOOD DR
5U13b I V I S I CIN. . . . : SC HOI_t.S FERRY ROAD TCIWNHOME:9 ZON I NG s R--25
BLOCK. . . . . . . . . . : LOT. . . . . . . . . . . . . :011+ JURISD.ICTIUNsTIG �
� CLASS'OF- WORK. :NEW�_____.__..__._..__.._.__.__.__..______.________._________________.._.--__,.,_..__
f YF'E OF USE. . . s SFr ±
TYPE OF CONSTR s 5N
OCCUPANCY C}RP. :40Q
OCCUPANCY LOAD s 0
a
emrdr 4 a s Unit A-7, N;i.ildrno 2, lot If
Ownero
ROWEN DEVELOPMENT CC
I 111 SW FIFTH AVENUE
SUITE 27ZGe
POPTLANO OR 97204
Vhone *s
OWNS N
1'hpilB �}:
Reg
'This Gert i f irate
grants occt.rpatnc:y of the Above referenced bt.0 lding or port .ion
thereof And r nfirms that the building has Leen ingljected for compliance wit!
the State of regen SE.Iecialty Clodes fur- th4�,iNGi cct_tpancy, and rase uncler
which the re erenr_ed permit was iaxue�.i.
r DUI1_bING INSPECTOR __FIU CIA L
POST IN CONSPICUOUS Flt.ACF
0
t
�, r
Page No. 1 CASE HISTORY FOR CASE NO. : MST97-0416
BOWEN REAL, ESTATE GROUP
13469 SW SL8M4iRW0OD DR
06/08/98
Action Description Req/ Schd/ End/ Artion Notes Disp By Update Upd A
. Code Sent Done Done Date By
-- -------- -------- -------- -------------------------------------
' MSTA960 (F) Issue Cert. of Occupancy M
p y / / / / 11/0'i%97 mailed an 1/9/38 MAIL JT 01/09/98 JT
�H
r;STBooe Fermat created / / / / 10/06/97 ADMN JMH 10/06/97 J *.
MSTBQ92 (F) Issue combination permit / / / / 10/06/97 ADMN JMH 10/06/97 J•H ,.
MSTB700 Erosion Control Inap 844-0444 / / / / / / 10/06/97 J*H
�c
MST13789 Smoke Detector / / / / 11/07/97 PASS RB 01/07/98 RB
MSTB799 Building Final / / / / 11/07/97 11/21/97 to Jill "or c/o approval PASS RB 11/21/97 JT
!.i
�L
1' 4
1 �)
11
di: 7r
1
(3
1
0
' 1 �
Page No. 1 CASF HTSTORY FOR CASH 140.• M.ST96-0115
BOWEN REAL EST:-TR GROUP
13475 SW SUMMEPWGID DR
05/26/98
Action Descript.on Reg/ Sehd/ End/ Action Notes Disp Py llydate Upd
Code Sent Done Dane Late By
1
M4TA005 Application received / / % / 02/13/96 PASS JMH 00/03196 JDA
MSTA008 Permit created / / / / 03/21/96 PASS JMH 08/02,'96 .TDA
MSTA010 Check for prcl. restrict. / / / / 03/21/96 PASS JMH 08/02/S6 JDA
i KnTA012 Plans routed to Plane Rxaminer / / / / 04/23/96 used thin Action to record letter to PEND THP 04/23/96 JHP
typing
MSTA026 Plane approved b Plans Exmr 05/28/96 APPR JHF 05/29/96 JHF
PP Y / / / /
MSTA030 Reviewed plane routed to DOTS / / / / 66/07/96 APPR J14F 06,/05/96 JHF
META 080 (7) Ready to issue / / / / 07/31/96 PAID JMH 07/31/95 J+H
MSTA092 (F) Tesue combination permit / / / / 08/02/96 RASP JDA 08/02/96 JDA
1 MSTA097 Issue plumbing signature form / / / / 12/06/96 OR JDA 12/06/96 RAS
1 MSTA098 Issue elect_ic signature form / / / / 12/06/96 01 JDA 12/06/96 KAS
MSTA155 Development conditions met / / / / 12/03/97 PISS JDA 12/03/97 JDA
MSTA70S Pooting Insp / / / / 08/26/96 AP? GS 08/26/96 ORS
MSTA705 Footinq Insp / / / / 01/02/97 2 of 3 garages PART GS 01/02/97 ORS
MSTA706 Foindation Insp / / / / 09/09/96 APP GS 09/09/96 GES
M9TA706 Foundation Inap / / / / 01/09/97 garage walls PAI " GS 01/09/97 GRS
MSTA710 Post/Beam Structural / / / / 01/2.8/97 mach PEND GS 01/28/97 GRS
MSTA710 Post/BeAm Structural / / / / 02/06/97 APP GS 02/06/97 GES
MSTA711 Poet/Beam Mechanical / / / / 02;06/97 APP GS 02/06/97 ORS
MSTA712 Underfloor insulation / / / / 02/10/97 APP GS 0:./10/97 GHS
MSTA717 PIM/Underfloor / / / / 01/09/97 PASS MS 01/10/97 MRS
MSTA720 Mechanical Inap / / / / 07/30/97 SEE COMMENTS FOR FRAMING INSPECTION THIS PASS Re 09/01/97 J•H
DA1'E
MSTA722 Plumb Top Out / / / / 06/24/97 Unita B2, BC, A6, A7, A8 6 A9 PASS Me 06/26/97 J«H
MSTA721 Electrical Service / / / / 07/15/97 A7, A6, 03. A9, AS, B3, 6 sarvicen 6 6 PASS BRP 07/15/97 J•H
roughtne
MSTA725 Framing Inep / / / / 07/16/97 A6: Add stud adjacent to furnace plenun. FATI, Re 07/22/97 J•H
Guardrail/handrail required to be no
leas than 34-inches, guardrails need to
be at least 36-inchen in height.
Additional nailing req'd at firewall
gypsum let layer. Pirestop ^firowall" at
plat level with in wall, include wiring
and plumbing' holes. Strap top plate at
bedroom south end off-Pat c 48-inches.
Enclose lid and firentop four At chase
behind shower. Nail gyp board within
t
chase (part of 2-hr wall).
B2: Seal heat duct within soffit/floor
cavity north bedroom closet.
' i•
Page No, 2 CASH HISTORY FOR CASE NO.+ M.9T96-0115
BOWEN RRAT, RATATR nPOUP
13475 SW SUNMEFWOOD DR
05/26/90
Action Description Req/ Schd/ Rnd/ Acti,-vi Notes Diep By Update Upd
code Sent pone Done oats B;
Goft: Nail OSB panel above outlet.
Seevra, b-vent into place and support at
rhange of direction within attic abo,,e
laundry room and maintain clearance to
combustibles 1-inch. Firestop 2-hour
%%11 at ceiling/floor levele. Nail gyp
abiln ceiling level (note) edge within
laundry room. Back-to-back electrical
outlets > fireblock if within 24-inches
latarall.y.
03: Oyp of 2-hour in complete adjacent
to B-2 Unit. Also, between A7, B-vent
in laundray sam as B2. tack to back
electrical outlet fireblock needed.
Nail aide TJI hange: in loft. £irser.op
2-hour wall with floor/ceiling. Nail
gyp within chase behind showbr. Rnclope
chane at lid behind shower.
A7: Nail off-set plate in rear of garage
strap needed. Firestop floor-ceiling
between, also between 63.
AS: Add ^tuds by plenum box in garage.
Strap plat off-set at kitchen. Truss cut
into over laundry room. Firewall not
Installed yet. Shower blocking
required. Enclone chase behind shower.
Nail gypboard within chase behind
shower. Add lid behind shower. Nail
gyp within chase behind shower.
Fireblock electrical ho;as within 2-hour
wall. Firewall incomplete at A7 wall
Maintain 1-inch clearance for b-vent at
truss. Prmide atud at furance plenum.
Firestop 2-hr. wall.
A9: Stud missing at furnace plenum.
Fireblock at truss within laundry room.
Nail plat nouth end shower water lines
at top plate. Shower blocking. Rnclone
lid behind shower at north and.
Firestop floor level. Electrical outle'..
fireblocking between AS. A/h-vent
within 4-feet of vertical wall needs
extension. B/Heat ducts installed
underneath stairs cavity in all units;
especially A-units. Either remove or
re-route to conditiaaed space. C/dryer
venting must met dryer specifications
1•
Yege lkt. 7 CASE HISTORY FOR CASE NO.: M13'96-0115
i•
h0WFN REAL FSTATR GROUP
13475 OW SUMN4RW)OD DR
06/26/98
AJtiai Desariptiatl Req/ S,-hd/ Rnd/ Action Noteo Dinp By Update Upd
r
CCde BtMt Dercre Don-e Date By
_______ ________________ -------- ------- --. -- - ----__—----------------_____----___- -.. --------
MBTA735 Gas Lin+ Insp / / / / C7/23/97 all units pressure above 10 lbs., see PASS RP 07/23/97 J•H
rcport in file for details.
Note: Units A6, AS, A9: sleeve gas line
with lomil tape thru brick veneer.
p
Ms1A745 Gyp Hoard Inns / / / / 18/06/97 pending- proper nailing and firewall PEND RB 08/15/97 RB
fire-caulking
MSTA745 Gyp Board Insp / / / 08/14/97 pending- missed nailing PASS RB 08/15/97 RB
b-vent clearance
bring down b-vent below ceiling.. A6
1
MBTA755 Pain '11201 fnnp / / /' / 09/16/95 goes to summer ck contr says aPpr by APP Gs 09/17/96 GFS
leth�
I VARIFIED THIS WITH LETHA SHE SAID IF
NOT POSSIBLE TO GET TO STORM THIS Is OR i
MSTA990 (F) Issue Cert. of occupancy / / / / 11/0'//9'7 JT 01/27/98 .f1 •,i
N, MSTB705 Rootir_
g Tne p / / / / 12/10/96 garage PART' G8 12/10/96 GE9
f4ST13705 Footing Insp / / / / 11/22/96 PASS TLP 12/19/96 TLP
MSTB706 Foundation 1-,N / / / / 09/16/96 APP 09 09%16/96 OEs
ti
MSTB706 Foundation :nsp / / / / 12/10/96 garage PACT 08 12/10/96 GRS
MSTB710 Pont/Beam Structural 10/14/97 / / 10/09/97 Conditional approval: I. Provide special coND RB 10/14/97 J-H
inspection report for low point drainu r
and pictures to reflect notched beam
support. 2. support all ducts missing
straps aril hangern.
Note: Under floor (meth) ventilation to
be achieved by heat duct underneath
stairs, once constructed.
MBTH711 Pont/Beam Mechanical 10/14/97 / / 02/49/97 PASS Gs 11/09/97 J+11
MST13714 Ftg Drain Bem't Walls / / / / 09/16/96 nee note rain drain this dato APP GS 09%16/96 GES
14STP724 Electrical Rough-in / / / / 07/15/97 A7, A6, B3, A9, A8, B2 - 6 rough-in" OK PASS BRP 07/15/97 J•H
1
r
h
fade no. 4 CASE HISTORY FOR CASE NO.: MST96-0115
'.+oWh71 RFA1, FsTATR GROUP
13475 SW SUM .RWOOD DR
1lotim Description Req/ Schd/ End/ Action Notes Dinp By Update Upd
Cede Beast Done Done Date By
....... .............................. ........ .'----•-- -------- ---------------------------------------
MI
---------_-----------'MlI 775 MeabMieal Inep 00/14/97 / / 07/24/97 A-6: FAIL RB 08/14/07 JON
1. close up fire spacer to firetop and
secure into place > fireplace chase.
2. Fire caulk with 500 degree caulking
of 2-hr, within attic.
3. Fire@top plate line between unite
including vertical wall@ and lower
level.
4. Block continuous venting through
penetration.
S. Extend firewall down to plate within „
attic of garage.
6. Block off electrical outlets within
241" back to back.
B-2:
Insuen name an A-6; If's 2, 3 6 6
7. Firespaceer needed at h-vent in t�
laundry Also, drop sleeve to bottrxa of
chord of ceiling joist. t
lesue.n name an A-6 8's 2, 3 6 6; name as
B-2 #7
S. Nail plate plumbing in laundry.
A-7: �A
Issues same as A-5 f♦'n 2, 3 6 6
A-8:
Insuen name as A-6 O's 2, 3 6 6; same as
B-3 #8 1h
A-9:
Insuen same an A-6 ff'e 2, 3 G 6
9. Block garage/laundry room : garage
ceiling level.
i
k�
t
Page No. 5 CME HISTORY FOR CASE NO.: MST96-0115
BOWE'N REAL ESTATE GROUP
p�
13475 SW SUMMERWDOD DR
05/26/98
Action Description Req/ Schd/ find/ Act ioa Nolen D]rip By Update Upd
Cods Sent Done Done Date By
M 719730 Framinq Insp / / / 07/22/97 1. Enclose chase of fireplace at 10' PASS RB 07/28/97 J*H
,4SI interval at ceiling level.
2. All through hole penetrations through
(- � firewall need to be fire-caulked.
( 3. Firestopping still incomplated at
:-hr. wall separation between unite.
4. complete nailing of 2-hr second
layer.
L$ ' 5. Nail second layer of mech. chase
6. What's happening to mach duct under
.(` stairs.
7. Strap plate at south end bedroom wall
< 40" offset.
B2, 133, A7, A8, A9 not inspected issues
incomplete.
'Y
B3:
1. Nail where missed.
2. Firetape where marked.
{ A7:
1. let layer between B3-not complete.
2. 2nd layer fire caulk through hole
• '`� �_ penet.ations (between A8).
A8: lot layer in garage incomplete.
fire caulk threugh holes.
A9: Fire caulk through holes.
MSTB730 Framing Inep / / / / 07/33/97 A6: Insulate behind mech at basement, PASS RB 08/01/97 J-H
fireotop floor level at shaver and
insulate water line of shower.
BI: Flat ceiling appears to be R-30,
requirep R-38 value.
Firestop thru-hole penetrations.
Enclose lid of b-vent thru ceiling.
Firestop floor level at shower.
Insulate behind mechanical at basement.
Firestop separation wall (2-hr) at
fllor and ceiling levels.
Add bearing support within garage.
b Same as B2.
A7-A9: Firestop thru-penetrations.
Insulate behind mechanical at
basement.
F
*a-
4�
.I.
fye Itot CASE HISTORY FOR CASE NO.: MST96-0115
BOWEN REAL ES^,'ATE QROUP
11475 SW SUMDIF.RW)01) M
08/7t/!t
Action Mmaription Reg/ Schd/ End/ Action Notes Diep By Update Upd
sect Done Done Date By
------- ------- --------------------- ----------------- ---- --- '------.. __.. •
Q
"ST3748 Insulation Inep / / / / 07/01/97 PRr INSULATION INSPECTION pAit RD 07/18/97 J•H
1. Complete firewall (firestopping) at
floor and ceiling levelo noted in every
unit and in every floor.
2. Re-call for firewall requirement
inspection.
3. INSULATION:
a. Firestop all thru hole penetrationa.
i.e., plumbing lines, electrical wiring,
etc.
b. At showers, adjacent to exterior
a walls, make sure insualtion in approved
to warm aide and that plumbing in
protected from freeze.
c. Insulation missing at tub/shower
locations; Also, fill voids or gapn
where not full in stud wall opucen.
d. Unable to view insulation at
tub/shower in A9 unit, concealed behind
sheetrock. 1
MSTB75o .4hear wall Ir.jp / / / / 07/02/97 1. Block where needed. FAIL RB 07/07/97 J*H
2. Nail gyp sheathing an marked.
MSTB750 Shear wall Inep / / / / 07/09/97 Approved pending corrections: Nail where PASS RB 09/14/91 0-:1
minced, including where house wrap is
already installed. Also, anal all tearn
in house wrap where removed .and gyp
shear notched. Finish nailing required.
i
Mr
i
I
4
;:1
,i.
Wrw
_ ,i�
�{{
) #M7�11{fle�5�4 �k�^1 iM:ilMtiiliMFlhnW..tW/.(A.' .. .,
Page No. 7 CASE HISTORY FOR CASE NO. : MUT96-u115
BOWEN REAL ESTATE OROUP
13475 SW SUMMERWOOD DR
05/26/90
Actirm Descr+ption Roq/ Schd/ End/ Acticm Note. Disp By UrAate Itpd
Code Sent. Done Dome Date By
-------- -------- ---..-..--— ------- ---- --- -------- ---
NBTD755 Pirevall Insp / / / / oe/u6/97 PEND RB 00/15/97 PR
2-hr firewall:
pending- first layer w/in babitable
space (A-6,7,8,5 n2,3)
Fire-tape joint edges
.tail an needed
i
AM inspection- i
second layer (same units) w/in attic
fire-caulk thru hole penetrations
PM inspection-
second layer (same units) below ceiling
nail e" oc
B-vent clearance- 1" req'd
allow full passage behind interior wall
at laundry rms
MSTD759 Firewall Inap / / / / 08/14/97 pending- fire-taping all joints at 1-hr PASS RD 08/15/97 RD
wall
MST13798 Mechanical Final / / / / 11/07/97 Approved, Units A-6,A-7,A-8,A-9 only, PASS RB 11/12/91 J•H
B-2/3 need smoke damper re test.
MTB798 Mechanical Final / / / / 11/10/97 Units B2 6 83 approvod although Rick not PASS RD 11/12/97 J•H
happy with workmanship. From now on,
j� furnace appliance will be installed at
rough in so fire dampers can be
inspected.
I
,t
�`,'�`'w .. '� .. SZb:�14�, �� .,t L�k ,,�. �,r .4, �i4yr!•' ijiy^.
Page No. 8 'ASE HISTOR'. FOR CASE NO MST96-0115
BOWR�i RM, ESTATE 3ROUP
13475 SW SUMMERWOOD DR
05/26/98
Action Description Req/ Schd/ End/ Action 1lotee Disp By update Upd
Code Sent Done Done - Date By
--'---- --------- -------- -- ----- ---------------------------------------
MSTB790 Mechanical Final / / / / 11/03/97 Building Final 6 Mechanical final notes: FAIL RB 12/26/97 J•11 •
1. Provide low point crawl drain - All
units.
2. Provide a barrier between front porch
and adjacent keyntono wall at 13475 -
A6.
3. Weatheratrip frrmt door, A6.
4. Rxtend dryer venting above floor
level, A-6.
5. Return air grille missing A-6.
6. Range vent.in,. seal end behind siding
A-6
. Enclose soffit, and damper within
garage - B-2.
S. Seal gap at electrical conduit if of
furnace B-2. !K'
9. Extend dryer venting above floor R
level.
10. Seal range vent joint - also dose
not work B-2.
11. Weatheratrip doorn - 8-2.
12. Vehicle barrier required in garage
B-3.
13. Enclose soffit/damper in garage -
B-3.
14. Weatherstrip doors - B-3.
15. Protection needed at B-vent against �.
flam spread paper in garage - A-7.
16. Weatheratrip doors in A-7.
17. Extend dryer venting above floor -
A-7.
18. Weatherstrip doors, A-9.
19. Extend dryer venting above floor -
A-B.
20. Seal washer box perimeter - A-8.
21. Return air grille missing - A S.
22. Vehicle barrier poet required in
garage A-9.
23. Weatheretrip doors A-9.
24. Make sure that ALL mechanical heat
duct grilles get covered (carpet being 'w
inatalled this date.) Also, crawl
accesses.
25. Provide hardware thruout ALL units 1
where needed.
26. Plumbing final required.
W�
a
.Y » d
uare�a:,e.•sarrz�e4t�poealu s:a.rte�.wt�i: x�, ci nw. rc T4�lAtf,4{Srx rn :tt.,
•:t ���"' 1 ���{.e i I t ., rJ Y ,Fa, � ,� �i A �S-
a�
� is ,➢�V'.{{�1lM:'�+LiG.�.dho«,1i s..��,�.7j"� r� Ma��'�, ,)
k Page No. 9 CASR HISTORY FOR CASE NC.: MST96-0115
BOWRN RRAI, RSTATR GROUP
13475 SW SUMR;RNOOD DR
05/76/99
{
i
Action Description Req/ Schd/ hhd/ Action Noten Disp By Update Upd
Code Sent Come Done Date By
i
MSTB799 Building Final / / / / 11/07/97 Approved, Unit A-6 only. (Building PASS RB '11/71/97 JT '
finals on the remaining units in this
building on separate permits.) !,
all of building N2 permits to Jill on `
11./21/97 for c/o approval
KMM950 (F) Issue Cert. of Occupancy / / / / 11/07/97 MAIL JT 03/06/99 JT b
MS'IW960 Case Finaled / / / / 01/02/99 01/02/99 JT
M5111796 Rlectrical Final / / / / 10/31/97 Electrical approved all units: A6, B2, PASS VRP 11/10/97 J•H
B3, A7, AS 6 A9.
MSTD797 Pliab Final / / / / 11/04/97 Approved a9 noted: PASS MS 11/04/97 J•H
1. caulk tube and showers for 11467 R
13471 Summerwood.
r:Y