13464 SW SUMMERWOOD DRIVE BLDG 7 STE D-7 _ r
r�
_a
n
iAreco
;r
i
J
� 1
t
� x 1
i
From:"David Scott' cDAVID.COT>
To: ric! ,mikes,nap,george,je.nne,jean
Date:Wed,24 L'ec 1997 14:23:42+0000
Subject:summerwood
Reply-to:davidiF,6 tigard.or us
X-mailer: Pegasus Mail for Windows(v2.54) 1
X-PMFIAGS 128 0
To clear up any confusion that took place re:the termination of
crawls out there.. Nap ant I had told Tony that we would allow the
i crawls to discharge on adjacent grade...we allowed this because the
buildings have foundation drains which would collect any water that
migrated back toward the structure and then^,arty it olrt into the
storm system..apparandy this message didn'.jet forwarded along
anyway,over-ail on the issue of the crawls...Tony has informed me
that they are putting them in for everything .so we don't nsed to do
any temp c of os if everything else is ok(incl ping/eng)we can do
regular c of os
thanks
.w
Wed,24 Dec 1997 14:52:15
�f
fffl • .
ACTIVE CASE: Grp Smry Edit P cl Name Actn Cond Log--note Fee Doc Tag Misc Xit
List related cases in project group # 81.27
OaMASTER PERM ITriaaaaaa�raaaaaa5aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa4
0 :MST97-0443 : PROJECT:SCHOLLS FRY RD TWN}iM: STATUS:F UPD: 02/04/98 : :PHN: 0
0 PERMITTEE:BOWEN REAL ESTATE: GROUP PRIM. . :MST96-0120 • 0
0 SITE ADDRESS : 13464 SW SUMMERWOCD DR JUR. . . :TIG: 0
QaDESCRIPTION OF PROJECT (1) aaadaa .aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa� �
0 Building 7, Unit D-7, Lot 39 0
0
0
Caaa�iaaaaaaaaaaaaaaaaaaaaaaa.aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa�aaaaaaaa�
o REISSUE: DWELLING UNITS: 0 : REQUIRED SETBACKS----- ------ o A
0 CLASS OF WORK. :NEW: BEDRMS : 0 : BATHS : 0 : LEFT. . . O : ft RIGHT. : O : ft 0
0 TYPE OF USE. . . :SFA: FLOOR AREAS------- ---- FRONT. : O : ft REAR. . : O : ft 0
0 TYPE OF CONST.. : 5N FIRST. . . . : O :sf. REQUIRED---------------- --- 0
OCCUPANCY GRP. :R1 SECOND. . . . O :sf SMOKE DETECTORS. : 0
STORIES. . . . . . . :0 : THIRD. . . . . O :sf PARKING SPACES. . : O : 0 '
0 HEIGHT. . . . . . . . . O : ft TOTAL-- -- - O :sf o
FLOOR LOAD. . . . . O :psf BASEMENT. : 0 : o
o VALUE. . $ : 0 : GARAGE. . . : 0 : o {
a6NOTF,S (3) aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa.aaaaaaaaaaaaaaaaaaoaaaaaaaaaa�
0 See MST96-0120 for fees and case history. o pgtJp o
o
0 Pgl)n 0
aaaa<<aaaC1aaaaaaaaaaaaaaAacis cis aaass aaaaaaaaaaaaa6645a666i.
j`
i
• _ .�t'{i .uv �Y}"':, 5 .:>�'.i�,�'��r)�4,'. .a. � XPi:.
.- 1.'. g ,�' i N.'"� tN',ir.x,:Y��. '; .. t :4j n t_t�� 'f� •S+f�unk� r ?� i y;V
• .,,.,.......w.=. .µ,+nr .r,rrmtY: Ak4!t .41"011!.:MWILMw!+WN/4+Wrirkurfin.�wKy,'y
ACTIVE CASE: Grp Smry Edit Prcl Name Actn Cond Log-note Fee Doc Tag Misc Xit
List related cases in project group # 8127
MASTER PERMIT- -------- ---- --— --
:MST96-0120 : PROJECT:SCHOLLS FRY RD TWNHM: STATUS:F : UPD: 01/09/98 : :JT
PERMITTEE:BOWEN REAL ESTATE GROUP PRIM. . :SUB95-0005 :
SITE ADDRESS: 11339 SW PLUM TERF! JUR. . . :TIG:
DESCRIPTION OF PROJECT (1) - - -- -- --- - �
SF ATTRCHED UNITS, PARCELS 34-39 AT BLDG #7 8430 square feet
See following permits for C/O' s : MST97-0443, 0442, 0441, 0440, 0439
REISSUE: DWELLING UNITS: 6 : REQUIRED SETBACKS- - - ------- �
CLASS OF WORK. :NEW: BEDRMS: 0 : BATHS:. 0 : LEFT. . : O : ft RIGHT. : 0 . f"
TYPE OF USE. . . :SFA: FLOOR AREAS----- - ---- FRONT. : O : ft REAR. . : O : ft
TYPE OF CONST. : 5N FIRST. . . . : D : sf REQUIRED-- --- --- ------ --- --
OCCUPANCY GRP. :R1 SECOND. . . : ) :sf. SMOKE DETECTORS. :Y:
STORIES. . . . . . . :2 : THIRD. . . . . O : sf. PARKING SPACES. . : O :
HEIGHT. . . . . . . . : O : ft TOTAL------ : O : sf
FLOOR LOAD. . . . : O :psf: BASEMENT. : 0 :
VALUE. . $- 5214.08 : GARAGE. . . : 2298 :
1 -NOTES (3) —-- —
PROCESSING, REVIEW & INSPECTION PERMIT ONLY Pgllp
3/97 CHNGD PROD NAME FRM SUMMERWOOD #7 TO SCHOLLS FR;! RD PgDn
ACTIVE CASE: Grp Smry Edit Prcl Name Actn Cond Log-note Fee Doc Tag Misc Xit
List related cases in project group # 83.27
-MASTER PERMIT- -
:MST96-03.20 : PROJECT:SCHOLLS FRY RD TWNHM: STATUS: F : UPD: 01/09/98 : :JT 1
PERMITTEE:BOWEN REAL ESTATE GROUP PRIM. . :SUB95-0005 :
SITF ADDRESS: 11339 SW PLUM TERR JUR. . . :TIG:
DESCRIPTION OF PROJECT (1) -- -- ----
SF ATTACHED UNITS, PARCELS 34-39 AT BLDG #7 8430 square feet
See following permits for C/O' s : MST97-0443, U4 ?2, 0441, 0440, 0439
REISSUE.: DWELLING UNITS : r : REQUIRED SETBACKS- ---------- �
CLASS OF WORK. :NEW: BEDRMS: 0 : BATHS: 0 : LEFT. . : O : ft RIGHT. : O : ft
TYPE OF USE. . . :SFA: FLOOR AREAS----------- FRONT. : O : ft REAR . . : O : ft
TYPE OF CONST. : 5N FIRST. . . . : O : sf REQUIRED---- -------------- -
OCCUPANCY GRP. :R1 SECOND. . . : O : st SMOKE DETECTORS. :Y:
STORIES. . . . . . . : 2 : THIRD. . . . : O : sf PARKING SPACES . . : O:
HEIGHT. . . . . . . . : O : ft TOTAL- ---- - : O : sf
FLOOR LOAD. . . . : O :psf BASEMENT. : 0 :
VALUE. . $ : 5214CB GARAGE. . . : 2298 :
-NOTES (3) -- -- - — -- —
PROCESSING, REVIEW & INSPECTION PERMIT ONI't Pg'Jp
3/97 CHNGD PROJ NAME FRM SUMMERWOOD #7 TO SCHOLrLS FRY RD PgDn
ACTIVE CASE: Grp Smry Edit Prcl Name Actn Cord Log-note Fee Doc Tag Misc: Xit
List related cases in project gioup # 8127
MASTER PERMIT
:MST96-0120 : PROJECT:SCHOLLS FRY RD TWNHM: STATUS: F UPD: 01/09/98 : :JT
PERMITTEE:BOWEN REAL ESTATE GROUP PRIM. . :SUB95-0005 :
.SITE ADDRESS: 11339 SW PLUM TERR JUR. . . ..TIG:
DESCRIPTION OF PROJECT (1)— -- -
L--.A--' ..-..!
CITY OF TIGARD
DEVELOPMEN'r SERVICES
13125 SW Nall,Blvd., Tigard,OR 97223 (503)639.4171 �
CERTIFICATE OF
OCCUPANCY
PERMIT M. . . . . . . t MST97-0443 ( •
DATE ISSUEDc 12/23/9'7
PARCEL t 161331)13-11300
r I TF ADDRESS. . . a 134.4 SW SJMM(.':RWOOD DR �
I_BD 1 V 1 S I ON. . . . t SCHOLLS FERRY ROAD TOWNHOMES T.ON I NG a R- 25
EALLCK. . . . . . . . . . a LOT. . . . . . . . . . . :039 JURISDIC'TIONeTIG
CLASS OF WORK. sNEW
TYPE OF USF_. . . t SFA
TYPE OF CONSTR:5N
OCCUPANCY ORFS. s R3
OCCUPANCY t_OAD:a
Hc mark r : Building to Unit P-7, Lot 39
fI BOWEN DEVELOPMENT CO
1 1 . SW FIFTH AVENUEE
I
SUITE 2260
POPTL.AND OR 97204
1 Phone M:
I
OWNER
Phone Me
Reg
This Certificate pt-ante ncc:�,%panc!y of that above referencecl bmildintl or portion
thpr-eof and confirma that the bmildin6 has been inspected for compliance wits',
the State of Oregon Fpe�ci��lty Cocies fo-• the gt'OLip, A7:c'..1p ncy, dnsl 1.iffe �.tnder,
which the referenced permit was issued. //
U "
_._ .—.._._._..__..._......_..
BUILDINt3 INSPECTOR 13 LAIN Orr CI L
POST IN CONSPICUOUS PLACE
I
t1(
i1
i!
-,i Page No. 1 CASH f1ISTORY FOR CALH NO.: lAST96-n120
j 1)OWrN RHAL HSTATH GROUP
11319 SW PLUM THBR
01/09/98
Act.i�xr Description Rey/ Schd/ lsltd/ Action Nates Df.ap By Update trpd
Code Sent Done Done Dale By .
------------
4 y
MSTA005 Application received / / / 02/13/96 PASS 1M1 08/02/96 JDA
1
M!1TA008 Permit Created / / / 03/21/96 PASS Jr01 08/02/96 JDA
MS'I'A010 Check for prcl. restrict. / / / / 03/21/96 FASB JM 08/02/96 TDA
MSTA012 plaid routed to Plans Examiner / / / 04/23/96 used this action to record letter to PMW JHF 04/23/96 JHF
typing
MBTA026 Plano approved by Plane Sxmr / / / / 05/28/96 APPR JHF 05/28/96 JHF
M9TA030 Reviewed plans routed to DSTS / / / / 06/07/96 APPR JHF 06/06/96 JHF
MSTA08n (F) Ready to issue / / / / 07/30/96 PASS JDA 07/30/96 JAS
OR JDA
M3TA097 Issue plumbing signature form / / / / 12/06/96 12/06/46 TAS
MSTA098 Ieeue electric signature form / / / / 12/06/96 OR tIDA 12/06/96 RAS
I! MSTA705 Footing Inep / / / 10/24/96 APb GS 10/24Jg6 GHS
1r
1 MSTA706 Foundation Inep / / / / 10/31/96 APP GS 11/01/96 GHS
1IIIi M3TA710 Poet/Beam Structural / J / / 03/31/97 BOLTS AT r.NDS OF SILL PLTS; 7 PONY WALLS DIS GS 04/10/97 TLP
I MISSING.; NUTS AND WASHRS
1
I MSTA713 Crawl Drain / / / / / / sump pumps installed- Need GFCI NOTR 12/22'97 RB
protection
' Drainage addressed- at ext. riot
MSTA717 PIM1U.,Jierfla�r / / / / 01/15/97 PASS MS 01/16/97 MRS
I MSTA720 Me:hanical Inep / / / / 08/01/97 Furnace not set, unknown unit. PART MS 09/03/97 I+H
j Hxhaust fan Unit D7 needs to be hooked
UP.
i
r
i'
1arr,
,II
1
S
' Page No. a (--IF 1118TORY FOR CASH NO.: MST96-^120 di
BOWr%N RRAI, RSTA'rR GROUP
11339 SW PLUM TERR
01/09/98
Action Description Req/ Scnd/ Mid/ Action hoten Disp By Update Upd
Code Bent Done Date Date BY
I
MSTA720 Mechanical Inep / / / ; 08/05/97 D-7; D-8; D 9; D-10; c-9; C-9. FAIL RB 09/07/97 RB
provide adequate gas connector at
fireplace
enclose lid of meth chase - main fl
bedrm
chase duct w/in closet- enclose lid
enclose fireplace flue
exhaust venting disconnect
D-9- added- main fl, exhaust vent
disconnect
insulate duct w/in antic above kitchen
b-vent collar at garage ceiling
D-10- added- same an D-9 above.
C-9- added- Same an U-7/D-0 above [
dryer spat's must be met D-9- B-vent
9'
collar
C-8- gas connector
exhaust vent disconnect
b-vent collar
dryer venting- spot's
MSTA722 Plumb Top Out / i / / 07/09/97 Units D7, D9, D9, D10, C8, C9 ayproved PASS RAS 07/18/97 J*H
MSTA723 Rlectrical Service / / / / 07/30/97 D8,D9,D7,D10,C9,C9 PASS BRP 08/01/97 J•H
SERVICE OKAY 6 UNITS
ROUGH IN OKAY 6 UNITS
MSTA725 Framing Insp / / / 09/09/97 one rough mach 090897 repor, PAIL GS 09/14/97 J•H
MSTA726 Shnar Wa.l Inap / / / / 07/09/97 Approved pending: PART RP 07/15/97 J+H
1. Nail where missed (marked) co not
house wrap until completed.
2. Block garage, wings and where We
exist/cut into sheathing - block with
stud.
M}9".'A/26 3h—r Wall Tnep / / / / 06/09/97 (flits DS, D6, [ C7: PASS RB 08!20/97 J*H
t.
Nail wings on all edges and ends
including cut outs for electrical panel.
Block as needed and nail 4^ oc q
MST4727 Low Voltage / / / / 12/22/97 11339 Plum Torr PASS ARP 12/23/97 JT
11341 Plus Tarr
r ,
4
,1
4
�---+
791k
i Pme no. 3 CASE HISTORY FOR CASE NO. MST96-0120
I
HOWEN RFAf, ESTATN GROUP
11:139 SW PIA1M TERP -
ui/oo,7»
Action Deeoription Req/ BCH/ L-j)d/ Acticni Not,n ninp By upiata Upd
code sent Done Pone flat. s .
WTA73S Gas Line Inep / / / / 06.'16/9'7 gam line tante: C-S 19.3#, ..176003; C-4 PASS RP. 06/19/91 J-H
�17#, 17602.6; D-3 23+#, 176017;
.i.p D 4 15.6#, 176004; C-6 14#, 1.76036;
tested 1320-1330
�- K1TA-141 Insulation Inep / / / / 04/11/97 under floo 30 .1 complete PART TLP 04/14/97 TLf'
K3TA755 Rain drain Inep / / / / 12/05/96 req. backwater valve PASS M.9 72/06/96 MLS
M.9T0-61 Water Service Innp j / / / / / 03/21/95 J-H
MSTA780 —RFIN9PRCTI0N» / / / / 09/19/97 paid for reinspection fee an 9/19/97 of PAID GOO 09/19/97 J*1.
$10.30, receipt #97-299392.
i M01a7?0 Electrical Final / / / / 12/22/97 13380 Summerrood PASS ARP 12/30/97 .Tr
11341 Plum
13382 Summerwood
I
13464 Summerwood
13462 Summerwood
11339 Plum 1
All of building 47 finals approved
- MTA795 Mechanical Final / / / / 12/22/97 nee building final this date FAIL RA 12/22;97 RB
1
WTA795 Mecharical Final / / j / 12/23j97 C-8 C-9; D-10;, 139; D8; D7 completed PA.9S RB 12/30/9'7 ,11
all of building #7
MSTA797 Plumb Final / / / / 12/18/97 oumF pump diachare needs to go to rd PART MS 12/19/97 MRS
syn.
MSTA'199 Puildinq Final / / / / 12/22/97 electrical final FAIL RB 12/22/97 RB
plumbing ftnal
una approval
Rump pump VS low point drain
C-8 Lot 35
weatherstrip doors
install door hardware
extend dryer venting for connection
cover ground w/ visqueen
insulation needed at return air at
garage side- adju^t filters w/in
heal overflow at exterior 1idinq
grade/elope 6-min
C-9 Lot 34
weatherstrip doors
install door hardware
µr •
CA
Page No. 4 SE HISTORY MR CASE NO.: MST96-0120
BOWEN PEAL ESTATE GROUP 1
li339 SW PLUM 710R �
01/09/98
Action Description Aeq/ Schd/ End/ Action Notes Disp By Update Jpd �`•
codeSent Done tone Date ev
----- _.._ -- - ---
seal exterior siding
}
insulate return air w/in garage; adjust "
filters w/in
fireplace incelarative
6" min clearance Trade/slope
t-10 Lot 36
weatherstrip doors
ne-:ure handrail
fining grade/slope 6"
D-9 Lot 37
cap in sidewalk needs to be +:ecemsood
weatherstrip doors
smoke detector not working-
interconnected
grade/nlope 6" min.
D-3 Lot 39
weatherstrip doors
install door hardware
grade/slope 6" min
seal exterior aiding
D-7 Lot 38
cap in sidewalk ne,+ds to be recenned
weatherstrip doors
grade/elope 6" min.
seal exterior siding
utility exhaust vent underneath gyp
sheathing
M9TA799 Build Lig Firal / / i / 12/23/97 Ccmpleted Issues PASS RA 01/05/98 JT
all of building #7
W18705 Footing Inap / / / / 11/05/96 APP 09 ll/05/96 GBB
NCT3709 Broeiaf Ccntrol / / / / 09/30/97 PASS USA 12,22/97 RB
M9T6724 Blectrical Rough-in / / / / 07/30/91 ROUGH IN OKAY, 6 UNITS: D8, 09, D7, D10, PASS BRP 08/01/97 J"H
CS, C9
.4;
WME
Page 110. 6 CARR HISTORY FOR CASE NO.: MST96-0120
BOWEN REAL ESTATE OROOP
1133) SW PLUM TERR
01/09/99
Schd/ End/ Action Nntes Diap By Update Upd
Action Description Req/
code Sent Done Done Date By p
---
i-;
MSTB716 Mechanical Inep / / / / 09/06/97 (Inspection covers framing 4 rough-in FAIL 018 09/14/97 J-H
mechanical for Units D7, D6, D9, D10,
Ce, C9; as noted.)
Unit D7 y.
1 1. Fireplace gas connector needs Co be
i
checked at final.
2. Provide minimum 1-in. clearance at
i
fireplace b vent w/collar. a
3. complete fireblock of fireplace vent
chase (also at Living Rcas vault roof
line.)
4. Direct fan vent termination into peak
strip vent.
S. Diagonal brace roof trusnes at all
gables.
All Units:
6. Firestop electric penetrations in
firewalln.
7. Firestop between electrical boxes,
back to back within 24-inches.
S. Attention needs to be paid to riser
height of garage to home steps.
Unite D10 i CO
I. Windows by slider door need to be
k'
tempered.
2. Need gyp board nailer at duct chase tttiif���
(downstairs).
3. Move attic access to above kitchen.
4. complete fireblock of kitchen ceiling
line.
S. Repair door header upstairs.
6. Soffit for dryer vent, some
corrections apply to all units.
r
J.
� 1 .
CASE HISTORY FOR CASE NO. : MS•r96-0120
HOWKN RRAL ESTATE GROUP
11339 SW PLUM TERR
Schd/ Rnd/ Action Noteu Disp By Update Upd
Action Deecripti", Req' Date
BY
Code Sent Done Dome
-- -.------ - ----- --- -------- ---
NWM725 Mechanical Inap / / i / 09/17/9'7 1. Poet 6 beam structural issues, 018 WAIL RB 09/19/97 J*H
report 031197.
2. Poet a hoam mechanical issues, not
inspection of record.
3. Prat Unit numbers/addresses.
4. CO: al heal exhaust vent at main
floor bathroom. b) Please note firewall
gyp needs to be offset joint-to-joint
(viewed at main floor bathroom). Fire
caulk within attic. c) Firestop with
rock wool between units. Both main
floor and upstairs ALL UNITP. d)
fitestop between showers at lid.
1
S. C9, b, c above apply
6. D10 - D7: need to be rechecked for
all possible violations noted above and
on prior inspection cards.
INSPECTION TERMINATED. REINSPECTION FEE
A88B99RU.
}
MM725 Mechanical Insp / / / / 09/19/97 See framing notes this date. FAIL RE 09/11/97 ,It
HBTE72% Mechanical Insp 09/24/97 / / 09/23/97 Roughin approved, 1`17, Ds, D10, C9 4 Co. PASS RB 09/24/97 J•H
Approved pending corrections:
DS-mechanical furnace flue disconnected
within attic, maintain clearance to
combustibles (support same) with
1S-gauge wire (or) 12-gauge metal strap.
MSTB730 Framing Insp / / / / 09/17/97 INBpBCTION TBRMTNATED FAIL RB 09/19/97 J•H
( MSTB710 Framing lunp / / / / 09/19/97 Framing i Rouqh-in Mechanical FAIL RE 09/21/17 J•H
1. Cards not left on job site to verify
corrections.
2. Firestopping between unitm RBt
Pirewall still incomplete - marked.
3. Firestopping at already gyp attic.
firewalls still needs firecaulking.
4. Same bearing mtpport needed where
marked at kitchens.
S. Insulation missed at D-7 garage. 4
6. Connect exhaust vent at C-9 main
bath, D-7 garage b-vent (re-routing)
maintain clearances. Fireplace flues
sti!l need 1-inch clearanree.
i
—WON
Dye 10 7 CASE 11ISTORY PVP CASE NO MST96-0120
i
BOWT24 PEA1, ESTATE GROUP
t:
11379 SW ^LUM TERR
01/0900 4'
Action Description Req/ echd/ End/ Act i,m NDN-<, Disp By Update llpd
pcdo Sent Done Dome Date By
i
i�
IOIT1f730 priming lamp 09/24/97 / / 09/23/97 Approved pendinq correcticnsi PASS RB 09/24/97 J*H i
Firestop above kitchen (gyp-wall thru '
penetratirnls within attic) D-units. CO
a C9: Firsstcp party wall at ceiling
level; including bored holes.
MT:14745 fnnnlatlan Insp / / / / 07/03/97 APPROVED PrADING CORRRCTIONS: PASS PH 07/07/9'7 J•H
t7
1. Between C9 i C9 ._ insulate behind
shower gyp wall.
2. Between C9, C9 F DID, firestop plat"
above ceiling (upstairs ok).
3. Between 030 i D9, firestop plate
fireplace chase - ok
4. Between D9 a D9, firestop plate
fireplace chase - die, above ceiling
upstairs (no ineulaticn - Clat) ok for.
I
gyp cover one-nide.
5. D-7, fireplace chase ok
MSTS745 Insulation Insp / / / / 09/15/97 See file for pages 1 4 2 of this FAIL RB 09/19/97 DST
inspection.
1
MOTD745 insulation Insp / / / % 09/17/97 INSPECTIONS TERMINATED, SEE MECH FAIL RB 09/19/97 J•H
ROUGH-IN OF 091797.
MGTB755 Firewall Insp 09/24/97 / / 09/23/97 see framinng, approved pending PAS? RB 09/24/07 J•H
corrections.
I
MST8755 Firewall Insp / / / / 09/26/97 IST LAYER FIREWALL - APPROVED PENDING PASS RB 09/29/97 J*H I,
CORRECTIONS:
1. Firetape where marked AND/UR
required.
2. Nail gyp at 0-inch oc where needed.
3. Apply 2nd layer in laundry at D7.
RECALL FOR GYP INSPECTION.
I
1
S'
I
ri
7 C
p
i'.
y... i r N`t�i
"
r.
i
CASE HISTORY FOR CASE NO.: MST96-0120
BOWEN R Ab ESTATE GROUP
" 11339 SW PLUM TERR
Actlan Dreariptim Rey/ Schd/ End/ Actirm Notes Diop By Update Upd
OOds Sent Done Donn Date By -
r ------- --------- "" •_______ --- - ----------------------- ---- -- -------- -
t IMSTB795 Firewall Inep / / / / 09/25/97 IST LAYER SHNSTROCA FAIL RD 09/29/97 0
1. FIREWALL BETWEEN UNITS SHALL BE AS
I
FOLLOWS- use illustration for
description (using 5/8-inch gyp board).
i
Use firetape and or mud to gloss gap a:
joint connection.
2. MISSED NAILING - not ready (below
coiling).
3. DID NOT VIEW 1ST LAYER IN ATTIC
SPACE. Unless 9/23 dated inspection
rel,ort ways in regard to this location,
ple-"ee check contractor's copy of report
fol indentification of location. '
4. Firecaulk as needed above ceiling. pp i
14STE160 Gyp Hoard ;rnp / / / / 10/01/97 1. Re-nail ac marked. PASS GS 10/01/97 J•H
2. Backing need in a few places.
I
MOTH791 -REINSPECTION- / / / / 09/17/97 MECHANICAL/STP.UCTURAL $15 EACH ASSESSYT) PAID R9 09/29/97 J•H 1
AT 091797 INSP.
PAID SGB A780
MBTB71?I Plumb Final 12/30/97 / / 09/04/97 final plumbing for buileAng approved per PADS M,9 12/30/97 JT
Mike Sheehan, in reepcnee to an e-mail
from me. Jeanne t.
MST13960 Case Finalad / / / / 01/05/98 01/05/98 aT
MSTD710 Post/Beam Structural / / / / 04/10/97 PASS T1,P 04/10/97 TLP
M.9TD711 Poet/Beam Mechanical / / / 04/10/97 PASS TLP 04/10/97 TLP
l
I
i
r
.
dw
"'i