13380 SW SUMMERWOOD DRIVE BLDG 7 STE D-10 1h �,
.. t
•mow.,,.,....... ... .y .� , ,. � ..,....i.w,_ .. ���1 af�� }'� 'i�. ,�' y'v':
a.�t
ADDRESS: `.k �
b3WO
b - 10
i
i
?47.
;I 1
i
i
i
t
f
is\rpcords\microflm\targets\building.doc
i�
AA�
From:"David Scott'<DAVID.COT> '
To:rick, mikes,hap,george,jeenne,jean
Dew Wed,24 Dec 1997 14.23:42 +0000
Subject:summerwood
Reply-to. david@Dci hgard.or us
X-mailer Pegasis Mad for Windo•rs(v2.54)
X-PMFLAGS. 1,'8 0
` To clear up am confusion that tock place re the termination of
crawls out lhere...Hap ani I had told Tony that we would allow the
crawls to discharge on adjacent grade...we allowed this', .ause the
buildings have foundation drairns which would collect any water that
migrated back toward the stnx:ture and then cant'it out into the
storm system. apparandy this message didn't get forwarded along
anyway, over-all on the issue of the crawls.. Tony has informed me
that ttley are putting them In for everything. so we don't need to do
any temp c of os if everything else is ok(incl ping/eng)we can do
regular c of os
thanks
I
k
1
I
I
l
1
I
I
r
I_ ,t
`M
1
I
Jeanine Temple —1 — Wed,2.4 Dec 1997 14:52:15
f
ACTIVE CASE: Grp Smry Edit Prcl Name Actn Cond Log-note Fee D(-,,c Tag Misc Xit
List related cases in project group # 8127
OaMASTER PERMITaaaaaaaa � aaa ��da5�� aa� aaaaaa�
° :MST97-0440 : PROJECT:SCHOLLS FRY RD TWNHM: STATUS:F IJPD: 02/04/98 : :PHi4:
• PERMIT'TEE:BOWEN REAL ESTATE; GROUP PRIM. . :MST96-0120 :
° SITE ADDRESS: 13380 SW SUMMERWOOD DR JUR. . . :TIG: 0
OADESCRIPTION OF PROJECT (1) aaaaa�. aaa as aaa � aaa �3aa � a aaaalid a a�
0 Building 7, I'rii.t D-10, lot 36 o
0
0
fla������a�5���aaaa�a,��aaaa�aa�aa��aaaaa��aaaaaa�aaaa���aaa�A�.aa���aaa�aaaa�����
0 REISSUE: DWELLING UNITS : 0 : REQUIRED SETBACKS-----.- --. - a
° CLASS OF WORY. :NEW: BEDRMS: 0 : BATHS : 0 : LEFT. . : O : ft RIGHT. : O : ft
° TYPE OF USE. . . :SFA: FLUOR AREAS-------- -- FRONT. : O : ft. REAR. . : O : ft 0
° TYPE OF CONST. : 5N FIRST. . . . : O :sf REQUIRED- - ---- - ------ ------ 0
• OCCUPANCY GRP. :Rl SECOND. . . . O :sf SMOKE DETECTORS 0
0 STORIES. . . . . . . : 0 : THIRD. . . . . O :sf PARKING SPACES. . : O : 0
HEIGHT. . . . . . . . . O : ft TOTAL--- --- O :sf 0
° F4'0OR LOAD. . . . . O :psf BASEMENT. : 0 • 0
° VALUE. . $ . 0 : GARAGE. . . . 0 : 0
OANOTES (3) as a a�aaa� aaaaa as aaaaa aaaaa aaa aaaaaaaaaa a a as as a�
0
0
PgUp o
° PgDn 0
aaaaaaaaaaaa�a�aaaaaaaaa���aaaaaa��aaa�a�aaaa�aaaaaaa��i��aaa�aa�aaae���aQaa�aai
1
r
,
;. .. .nM.w..,_,,,,.. 4+.ax.wY!+u,paw RMiAM+"N�'.'dl�l'A9k°tW.hn•ewrarwrs.;.Mw.,....... t ,',,7r ,,. '-. .', . •;;,:ly'
.SF A M'ACHED UNITS, PARCELS 34--39 AT BLDG #7 8430 square feet
See following permits for C/O' s : MST97-0443 , 0442, 0441, 0440, 0439
REISSUE: DWELLING UNITS: 6 : REQUIRED SETBACKS--------•--
CLASS OF WORK. :NEW: BEDRMS: 0 : BATHS: 0 : LEFT. . : O : ft RIGHT. : O : ft
TYPE OF USE. . . :SFA: FLOOR AREAS--- ---- --- FRONT. : O : ft REAR. . : O : tt
TYPE OF CONST. : 5N FII.,ST. . . . : O :sf REQUIRED- ------------------ - -
OCCUPANCY GR.P. :R1 SECOND. . . : O : sf SMOKE DETECTORS. :Y:
STORIES . . . . . . . : 2 : THIRD. . . . : O : sf PARKING SPACES. . : O :
HEIGHT. . . . . . . . : O : ft 'TOTAL---- - - : O :sf
FLUOR LOAD. . . . : O :psf BASEMENT. : 0 :
VALUE. . $ : 521408 : GARAGE. . . : 2298 :
1`(OTES (3) — -- -- -- --
PROCESSING, REVIEW & INSPECTION PERMIT ONLY PgUp
3/97 CHNGD PROJ NAME FRM SUMMERWOOD #7 TO SCHOLLS FRY RD PgDn
d
ACTIVE CASE: Grp Smry Edit Prcl Name Actn Cond Log-note Fee Doc Tag Misc Xit
List related cases in project group # 8127
ASTER PERMIT - - - - —
:MST96-0120 : PROJECT:SCHCLLS FRY RD TWNHM: STATUS:F : UPD: 01/09/98 : :JT
PERMITTEE:BOWEN REAL ESTATE GROUP PRIM. . :SUB95-0005 :
SITE ADDRESS : 11339 SW PLUM TI_'RR JUR. . . :TIG:
-DESCRIPTION OF PROJECT (1)----- — - —
SF ATTACHED UNITS, PARCELS 34-33 AT BLDG #7 8430 square feet
See following pezmi.ts for C/O' s : MST97-0443 , 0442 , 0441, 0440, 0439
REISSUE: DWELLING UNIT'S : 6 : REQUIRED SETBACKS------------
CLASS OF WORK. :NEW: BEDRMS: 0 : BATHS: 0 : LEFT- : O : ft RIGHT. : O : ft `
TYPE OF USE. . . :SFA: FLOOR AREAS- -- ------ - FRONT. : O : ft REAR. . : O : ft
TYPE OF CONST. : 5N FIRST. . . . : O :sf. REQUIRED--- ----- -------------
OCCUPANCY GRP. .R1 SECOND. . . : O : sf SMOKE DETECTORS. .Y:
STORIES. . . . . . . : 2 : THIRD. . . . : O : sf PARKING SPACES. . : O :
HEIGHT. . . . . . . . : O : ft TOTAL- O : sf
FLOOR LOAD. . . . : O :psf BASEMENT. : 0 :
VALUE. . $ : 521408 : GARAGE. . . : 2298 :
NOTES (3) ---- - - - - - -
PROCESSINU, REVIEW & INSPECTION PERMIT ONLY PgUp
3/97 CHNGD PROJ NAME FRM SUMMERWOOD #7 TO SCHOLLS FRY RD PgDn
s
f
i
?l�sJ�l 4f
�I
i
r
f��'� —�..,....,,,,,..., -__.-....nn'^.aIwaAvs^R11MRl,fytNy�fgllll�rsi+lm.H•;r.. 1
h
1.c iY F E
4
.R----�,
t _
CITY OF TIGARD
DEVELOPMENT SERVICES
13125 SW Hall Blvd'., Tigard,OR 97223 (543)639-4171
CERTIFICAIC OF
OCCUPANCY
PERMIT il. . . . . . . t MST97-0440
OATF TS 5IJED: 12/23/97 r
PARCEL : 1 J 1 "3DB--1 1000 �
ITE ADDRE aS. . . t 13380 SW SUMMERWOOD DR
:3UNDIVISION. . . . t SCHOLL.S F'FRRY PORD 'cOWNHOMES 7.ONINCsR-•25
FII._iIGK. . . . . . . . . . : LOT. . . . . . . . . . . . . c0;36 1LIRISDICTIONs'TIG
T YPE OF USE. . . c SF()
I YPE OF CO%ISTR t gN
11C;C:UPANCY Ls2P. t P:3
OCCUPANCY t_OAD t 0
Vmssr'k>,s t wilding $ Unit 0-16, lot 36
tI jWFN OF VEI_C?PMFNT
.111 SW FIFTH AVENUE
yUITE 2260
PORTLAND OR 97204
I
s 1WNE R
G
l
this Certificate grsnt3 occupAnC.y of the aahove referenced bt.:ilding or portion f
they,00f anti ronfir-ms that the building has been inspects d
for" compliance with
the StOtp of Oregon rpecianity L'";adl�s far^ tf�e yrn,.lp, e•upanc. , 1ci LIMP s_IndV-
which the t-rfer^ended peI^mit was i sssked.
BUILDING INSPECTOR SOILDING OFFICIAL
1
POST IN CGNSP I CUfll iS PLACE
I
I
6
1 INSY .'L 7f,�7y,F� 11 ` $ fcf mss„I�i _ i �"1�G 3:•� r ! c ., t
�
1
t�+ k� M
,..e � Lt e�•3
...
!l, 4't$��#i� `It {~� v�° i• ',' �t `'3�1 r"(o-'a}h1I4r:7F3� w
p
.��F ..t ,.. _.........,..«,r.+w.n,.,...w._. �............... ... .:.... _.......w�wM«..,w.w.�w..N.r�.Nar.w.....a.:.k.w>.7..'�1 ��1ww
N'' a
Ff�
Page No. 1 CASE HISTORY FOR CASR NO.: MST96-0120
BOWEN REAL 13,STATF GROUP
11339 SW PLUM TEAR
Action Dascription Req/ Schd/ End/ Action Ncten
Dinp By Update IIPd �{ r
Code Hent Dcne Done Date By 1
lV •' --- -- ---
_____--
Ir ;•
MSTA005 Application received / / / / 02/13/96 PASS .7MH 08/02/9'. JDAt9 ;
MST.1008 Permit, Created / / / / 03/21/96 PAS5 .rMll 08/02/!'6 JDA
fli
MS1'AO 10 Check for prcl. restrict. / / / / 03/21/96 PASS .7M1! GB/02/96 JDA
MSTA012 Plano roited to Plans Rxaminer / / / / 04/23/96 used this action to record le-ter to Pk.TID JHF 04/23/96 JHF $,
typing v
MSTA026 Plann approve(; by Plane Exmr / / / / 05/28/96 APPR MF 05/26/96 JHF' c '
1
MSTA030 Reviewed plans roilted to DSTB / / / / 06/07/96 APPR J11F 06/06/96 JHF
SSSI MSTA090 (F) Ready to issue % / / / 07/30/96 PA33 TMH 07/3"/96 J*II
KS"rA09'1 Iosue plumbing signature fors / / / / 12/06/96 0► JDA 12/06/96 WAS
MSTA099 Inoue electric signature form / / / / 12/04/96 OR .IDA 12/06/96 1CA^
j MSTA705 Footing Inap 10/74/96 APP G8 10;24/96 GE9
1 MSTA706 Foundation Inep / / / / 10/31/96 APP GS 11/01/96 GRS
KSTA7l0 Pont/Beam Structural / / / / 03/31/97 BOLTS AT ENDS OF SILL PITS; 2 PONY WALIB D7S G8 09/10/97 TIP
MISSING; NUTS AND WASHRS
NOTA713 Crawl Drain / / / / / / sump pumps Installed- Need GFCI }TOTE 12/22/97 RB
protection
Drainage addressed at exterior 1
i
i
MSTA717 pLm/Underfloor / / / / 01/15/97 PASS MS 01./16/97 MRS
MSTA'720 Mechanicai Inep / / / / 08/01/97 Furnace not net., unknown unit. PART MS 08/03/97 J•H �
Exhaust. fan Unit D7 needs to be hooked
up.
.y.
1
•.,.,..:..... ..„_ •^�+M.+IY�I�I�S�RT'-`4-!�YO�&'MM'�'kk1�1AM1�dIYFI.YWruyW�MwTn4�'RTWM1!r. ..
.. • .,.+. .w..n ern.'ovati:e,u"ML:.1WN•{d'.taAY.Y....
Page Nn. 2 CASE Hi STORY FOR CASE NO.: KST96-0120
BOWEN REAL ESTATE GROUP
11339 SW PLUM TER_R
01/09/98
i
Action Description Reg/ Schd/ F.nd/ Action Notes Diep By Update ttpd
Code :lent Done Done ---- Date By
-
--- ------------------------------ -------- -------- - - ------------------------------------- r
MSTA'72n Mechanical Insp / / / / 06/05/97 D-1; D-8; D-9; D-10; C-8; C-9. PAIL RA 08%07/97 RB "r
i
provide adeguato gas connector at
fireplace �.
enclose lid of moth chase - main fl
bedrm
chane duct w/in closet- enclose lid
enclose fireplace flue
exhaviot venting disconnect
D-9- added- main tl. exhat,nt vent
disconnect
insulate duct w/in attic above kitchen
b-vent cellar at garage ceilinq
L-10- added- Samr as D-9 above.
C-9- added- Same D-7/D-8 above 6
1 dryer spec's must be mot D-9 B vent:
collar :+
C-9- gas connector
exhaust vent disconnect
b-vent collar
dryer venting- epee's f
NSTA722 Plum* Top Out / / / / 07/09/97 Units D7, D8, D9, D10, CO. C.9 approved PASS RAP 07/18/97 J•H
MSTA723 Electrical Set-vice / / / / 07/30/97 D8,D9,D7,D10,CS,C9 PASS HRP 08/01/9',' J•H
SERVICR OKAY 6 UNITS
ROUGH IN OKAY 6 UNITS
MSTA725 Framing Inap / / / / 09/08/97 see rough meth 090897 report FAIL GS 09/14/97 J*H
MSTA726 Shear Wall lnsp / / / / 07/09/97 Approved pending: PART RB 07/15/97 J*H
1. Nail where missed (marked) do not
Roane wrap until completed.
2. Block garage wings and where HO's
exist/cut into sheathing - Llock with
stud.
ASTA726 Shear Wall Inap / / / / 06/09/97 Unite 135, D6, 4 C7: PASS RB 08/20/97 J•H
Nail wings on all edges and ends
including cut outs for electrical panel.
Block as needer and nail 4" oc
MOTA727 Low Voltage / / / / 12/22/97 11779 Plum Torr PASS BRP 12/27/97 JT
11341 Plum Teri
A.' ....
�1
Page No. 3 cmir, HISTORY FOR CPSE NO MST96-017.0
i(
BONEN REAL ESTATE GROUP
11339 SN PLUM JE
0110106
Action Do-+criptim Req/ 8chd/ fid/ Action Notes Dimp By Update Upd
Date By
Code Sent Done Dome ,,
MSTA73S Gas Line Snap 06/16/97 gas line tests: C-'S 1.9.3#, 176003; C-4 PASS 99 06/19/97 J•H �'� 1♦
-17#, 176026; D-3 23*0, 176017;
D-4 15.6111, 176004; C-6 14#, 176036;
tested 1320-1336
MSTA740 Insulation Insp 04/11/97 under floor 30 11 Complete PART TLP (14/14/97 TLP
12/05/96 req. backwater valve PASS 14R 12/06/96 MRS
14STA755 Rain drain Insp ^�
1 '
03/21/96 J•H
M9TA761 Nater Service Insp / / / /
MSTA780 —REINSPECTION» / / / / 09/19/97 paid for reinspection fns on 9/19/97 of PAID GEO 09/19/97 J�H
-r. $30.00, receipt #97-299392.
l48TA790 Electrical Pinel / / / / 12/22/97 13360 Summerwood
PASS BRP 12/3tl/97 JT
11]41 Plum
13362 Summerwood
13464 Summerwood
13462 Summerwood
11339 Plum
All of building #7 finals approved
WTA795 Mechanical Final / / / / 12/22/97 see building final this date FAIL RB 12/22/97 RB
WITA798 Mechanical Final / / / / 12/23/97 C-8; C-9; D-10;, D9; D8; D7 completed PASS RB 12/30/97 JT
all of building 07
Y
MSTA797 Plumb Final / / / / 12/16/97 nump pump diachare needs to go to rd PART MS 12/19/97 MRS
syn.
i
M:4TA'199 Building Final / / / / 12/22/97 electrical final FAIL RB 12/22/97 RB '
plumbing final
usa approval
sump pump VS low point drain t`
C-8 Lot 715
weatherstrip doors
install door hardware
extend dryer venting for connection
cover ground w/ visqueen
insulation neoded at return air at
garage nide- adjust filters w/in
seal overflow at exterior siding
grade/slo>pn 6-min
C-9 Lot 34
weatherstrip doors
install door hardware
r.
`b
',,.:.. --vim..- :..,..,,......,.....»-._..,..-.. .._
f i
L
Page No. 4 CASE HISTORY FOR CASE NO.: MST96 J3.20
BOWEN REAL FSTATE GROUP
11.339 SW PLUM TTRR
01/04/98
1
Action Dencripticxf Peq/ Schd/ End/ Action Notes Disp By Update Upd
I
Code hent Done Done Data By
-
---- ----- .---------------------- --'-
seal exterior aiding
insulate return air w/in garage; adjust
filtern w/in
fireplace inoperative
6" min clearance grade/elope
D-10 Lot 36
weatherstriF doors
secure handrail
fining grade/slope 6"
D-9 Lot 3'7
cap in sidewalk needs to be recenned
weatherstrip doors
smoke detector not working
interconnected
made/elope 6" min.
D-8 Lot 39
weatherstrip doors
install door hardware
grade/slope 6" min
seal exterior aiding
D-7 Lot 39
cap in sidewalk needn to be recessed
weatherstrip doors
grade/slope 6" min.
meal exte for aiding
utility exhaust vent underneath gyp
sheathing
M.9TA799 Building Final / / / / 12/23/97 completed Issues PASS RB 01/05/98 JT
all of building N7
MBT8705 Footing Insp / / / / 11/05/96 APP as 11/05/96 ago
MSTB708 Erosion Control / / / / n9/30/97 PASS USA 12/22/97 RB
MSTS724 Electrical Rough-in / / / / 07/30/97 ROUGH IN OKAY, 6 UNITS: D8, D9, D7, D10, PASS BRP 08/01/97 J•H
CS, C9
4.,
. s!
5 CASE HISTORY FOR CASE NO.: MST96-0120
BOWEN REAL ESTATE GROUP
111'9 Sw PLUM 'rERR
01/09/98
Action Descriptio", Rey! Schd/ T3nrl/ A,tion Notes Disp By Update T)pd
Date
cod* Sent Date Done li}
-------- —
MBT8725 Mechanical Inap i / / / 09/08/97 (Inspection covers framing i rough-in FASL G8 04/14/97 J*H
mechanical for Unite D7, D8, D9, D10,
CO, C9; an noted.)
Unit D7
1. Fireplace gas connector needs to be
checked at final.
2. Provide minimum 1-in. clearance at
fireplace b vent w/collar.
1. Complete fireblock of fireplace vent
chase (also at Living Room vault roof
line.)
4. Direct fan vent termination into peak
strip vent.
S. Diagonal brace roof trueees at all
gables.
All Unite:
6. rirestop electric penetrations in
firewalls.
7. Firestop between electrical boxes,
back to back within 24-inches.
B. Attention needs to be paid to riser
i
height of garage to hone stepa.
Units Dln a Ce
I. windows by slider door need to be
tempered. f`
2. Need gyp board nailer at duct chase
Idown ntaire).
1. Move attic access to above kitchen.
4. complete fireblock of kitchen ceiling
line.
S. Repair door header upstairs.
6. Soffit for dryer vent, some
corrections apply to all units.
r
4
Page No. 6 CASR HISTORY FOR CASH NO.: MST96 0120
BOWRN REAL ESTATE GR0UP
11139 SW PLUM TRRR
01/09/98 -
Action Description Req/ Schd/ bSid/ Arti.on Notes Disp By Update Upd
CcXie Sent Don" Dony
Done Dat,Dat,r B •
------- ------------------------------ ------- -------- -------- --------------------------------------- ---- -------- _--
MSTB725 Mechanical Insp / / / / 09/17/97 1. Poet 6 beam structnral issues, 128 FAIL RB 09/19/97 J^h
report 033197.
2. Post & beam mechanical issues, not
inspection of record.
3. Post Unit numbers/addressen.
4. ^8: a) seal exhaust vent at main
floor bathroom. b) Please note firewall
gyp na.rrls to be offset joint-to-joint
(viewed at main floor bathroom). Fire
caulk within attic. c) Firestop with
rock wool between units. Both main
floor and upstairs ALL UNITS. d)
firestop between showers at lid.
S. C9, b, c abovo apply.
6. D10 - D7: need to be re-checked for
all possible violations noted above and
.n prior inspection cards.
i;
INSPECTION TERMINATED. REINSPECTION FRE
ASSESSFZ. �
MBTB725 Mechanical Innp / / / / 09/19/97 See framing notes this date. FAIL RB 09/21/97 J•H
NM729 Mechanical Innp 09/24/97 / / 09/23/97 Roughin approved, D7, De, D10, C9 & C8. PASS RA 09/24/97 J*H
Approved pending corrections:
DRmechanicalfurnace flue disconnected
within attic, maintain clearance to
combustibles (support same) with
19-gauge wire (or) 1.2-gauge metal strap.
MSTB730 Framing Inep / / / / 09/17/97 INSPECTION TERMINATED FAIL RB 09/19/97 J*H
s'
MSTB730 Framing Insp ! / / / r,9/19/97 Framing 6 Rough in Mechanical ^ALL RB 09/21/97 J•H '
1. Cards not left on job mite to verify ~+'
corrections.
2. Firestoppinq between units RE:
Firewall still incomplete - marked.
3. Firestopping at already gyp attic,
firewalln still needs firecaulking.
4. Same bearing support needed where
marked r.t kitchen_.
5. Insulation mined at D-7 garage.
6. Connect exhaust vent at C-9 main
bath, D-7 garage b-vent (re-routing)
maintain clearances. Fireplace flues
still noed 1-inch clearances. e
I 4i
C1+
....- _.
i
c
w<
aid
I
Page No. 7 CASH HISTORY FOR CASH NO.: MOT96-0120
BOWEN REAL RSTATS GROUP
11339 SN PLUM TRRR
..,�j 01/09/98
Action Description Req/ Schd/ nid/ Action Notes Disp Ry Update Urd
Code sent Done Done Date By
s
MBT8730 Framing Insp 09;24/97 / ! 09/23/97 Approved perding corrections: PASS RB 09/24/97 J*H •
Firentop abm7e kitchen (g)p-wall thru
penetrat.lonn within attic) D-unite. Ce
i C9: Pireetop party wall at coiling
level; including bored holes.
MBTB745 Insulati,in Insp / / / / 07/03/97 APPROVED PENDING CORRECTIONS: PASO RB 07/07/97 J•H
1. Between CS i C9 - insulate behind
shover gyp wall.
2. Between CO, C9 L D10, firestop plate
above ceiling (upetairn ok).
3. Betwe n D10 i D9, firestop plate
fireplace chase - ok
4. Between D9 i DB, firestop plate
fireplace chase - ok, above ceiling g
upstairs (no insulation - flat) ok for
gyp cover ane-side. yl,
S. D-7, fireplace chase ok q
MSTB745 Insulation Inap / / / / 09/15/97 See file for paged 1 L 2 of this FAIL PB U9/19/9i _ST
inspection.
MBTB74S Insulation Insp / / / / 09717/97 INSPECTIONS TERMINATED, 8E2 MUCH PAIL RB 09/19/97 J•H
ROUG4-IN OF 091797.
MST8755 Firewall Insp 09!24/97 / / 09/21/97 see framing, approved pending PARS PH 09/24/97 .T+H
u
corrections.
i
MBT8755 Pirewall Insp / / / / 09/26/97 INT LAYER FIREWALL - APPROVED PENDING PASS RR 09/29/9.7 ,1-H
CORRECTIONS:
1. Firetape where marked AND/OR
required.
2. Nail gyp at 8-inch oc where neec:ed.
3. Apply 2nd layer in laundry at D7.
RECALL FOR GYP INSPECTION.
I(
f
I
i
•
CAST HI.9TORY FOR CASE NO.: MT96-0120
BOWEN REAL ESTATE GROUP
11339 SW PLUM TER.R
01/09/99
1
Action Description Req/ schd/ End/ Action Noten Dinp By Update Upd
Code Sent Done Done Date By
3
a ------- -------------------------- ------— -------- -- --- ------ --.
i
MT9755 Pirewall Insp / / / / 09/25/97 1ST LAYER SHEETP.00K FAIL RB 09/29/97 J•H
1. ^IRRWALL BETWEEN UNITS SHALL BE AS
FOLLOWS: see illustration for
description (using 5/8-inch gyp board). '+
Use firetape and or mud to glose gap at
Joint connection.
2. MISSED HAILING - not ready (below
ceiling).
3. DID NOT YIEW 1ST LAYER IN ATTIC
SPACE. Unless 9/13 dated inspection
report was in regar3 to this location,
please check contractors copy of report
for indantification of location.
4 Pirecaulk as needed above ceiling. �a
NOTB760 Gyp Board Insp / / / / 10/01/97 1. Re-nail an marked. PASS OS 10/01/97 J•H
2. Backing need in a few places.
MSTD791 «REINSPECTION» / / / / 09/17/97 MECHANICAL/STRUCTURAL $15 BACH ASSESSED PAID RB 09/29/97 J•H
AT 091797 T_NSP.
PAID SEE A780
MRT13791 Plumb Final 12/30!97 / / 09/04/97 final plumbing for building approved per PASS MS 12/30/97 JT
Mike Sheehan, in response to an e-mail
from me. Jeanne t.
:
MST13960 Case FinAled / / / / 01/05/98 01/05/99 JT 1
MS77)710 Poet/Beam Structural / / / / 04/10/97 PASS TLP 04/:10/97 TLP
MSTD711 Pout/Beam Mechanical / / / / 04/10/97 PASS TLP 04/10/97 TLP