9009 SW HALL BLVD-2 tu
h
4.
M
r
4
R
D101VIDE0 SPECIALISTS �� a
r ;m;4AU a
-40
4
IVW4".. 1
'Q
v,
M
1994
• Material Symbols .fob Directory Revision Data �e
Parking Analysis Vicinity Map y
CO
o MEAcoustical Tile Gypsum Board Job Address
Parking Required: °� P°° �t - ' Washington Circle Plaza
Total Spaces 75218 sq. ft. -* 400 = 188 �� �s WaS g
Full Size Spaces 188x60°0 = 113 ���Q° 5� Brick or Conc. Insulation -- 9009 S.W. Hall Boulevard
Q S�>, vffzm Block Rigid Tigard OR 97223
Handicap Spaces 6 4�Q ti �a-, •
SITE ° Q
CoCarpet Pad Insulation — Balt
Parking Provided: Tenant I
Site Plan �5 Plaster, Grout or the good guys
Full Size Spaces 171 �� Metal " Sand 7000 Marina Boulevard
Compact Spaces 123 Brisbane CA 94005
� p 210 217 - '
Handicap Spaces a Ceramic cr Clay � Porous Fill
��'� Tile ,� (Gravel) 415-615-5000
FullkS ze Spaces Level lan 48 QP \c' — Fax 415-615-6288
Compact Spaces 14 Earth Plywood
Q
Handicap Spaces —2 Landlord
i Total Spaces 362 Stone (incl.
C<<1L1� Finish Wood - � Marble) The Cafaro Company I
T i g a r d 3500 South Meridian, Unit #755
---- ----- Wood -- Puyallup WA 98373
,.,.� Concrete _ Continuous
99W 5 206-840-4349
l-
Glass (large scale) -- i Wood -- Fax 206-845-2245
I, Plastic Laminate ---1 Interruptou
Site Plan ,"=50' Symbols
Code Data Sheet Index
Code: Uniform Building Code T1 Title Sheet
P Column Lines Building Type: V-N Fully Sprinkiered AO 1st Floor Demolition Plan
R 1 et.sa9' anC
OccUp y Group:: B-2 Al 1 st Floor Plan '
`. = �
L.C.=N.16°18'03•E\ A2 1 st Floor Reflected Ceiling Plan 106.3r A3 Enlarged Plans
1 st Floor Occupant Load: A4 Partial Site Pian
1 i st Floor A5 Exterior Elevations
6 Detail (Detail 1 on Sheet 6) Sales 15350 - 30 = 512 A6 Main Entry
Stockroom 47105 - 300 = 16 A7 Audio Elevations
I _ Locker Room 330 - 5C = 7 A8 Video Elevations
Detail (Detail 2 on Sheet 6) Training 180 -- 20 = 9 A9 Demonstration Room Elevations
Office 175 - 100 _� A10 Parking Level Floor Plan
IF 546 All Parking Level Reflected Ceiling Plan
1 r � Ac S, 2 Detail (Detail 2 on same sheet) Al2 2nd Floor Demolition Plan ---
bbToe, . • lyq� 1 st Floor Exit Capacities Provided: A13 2nd Floor Plan C -
Entry Doors 3 x 65" � .2 - 975 A14 . 2nd Floor Reflected Ceiling Plan
'—' VQ Doors 19, 20, 23 34" - .2 = 170 Stair 1 84" .3 = 280 A15 2nd Floor Entry
1 / D B Elevation Group Doors 2.6, 29 34' .2 = 17 Stair 2 60' = .3 = 200 A16 Stair Sections _
N.87'2736"W. — 1315
-� F1 Fixture Plan
F2 Finish Plans
(6 Elevation —
2nd Floor Occ,u ppant Load: D1 Door Schedule _
_ 1 I Sales 20724 = 30 = 691 D2 Wall Details — -
e o o is -- . \ (11) u s' r4�' B Storage 1025 300 = 3
N i _ _ _ _ _ - ®9. 3 l Stiction Locker Room 329 EO = 7 S1 Standard Details of Construction
(12)COMPACT®9'
�. ® l 1 Office 11 b 1 u0 = --1 S2 Foundation Plan
i ~ - � I 702 S3 1st Floor Plan •
__ t -1-11-1-t { -}
t _ 1 t 111 I i ,
- i 4 Door Number _ � S4 2nd Floor Plan ,• a�������,�/ �`�,r' /��
(13)COMPACT®9' I 2l11d Floor Exit Capacities, Provided: S5 Details 'J
W'Lllh N�KENS �
• -- it I -- E Wall Type Door T1 56" - .2 = 280 Stair 1 56"` " = .3 = 187 S6 Details '�`'
Door T2 342 S7 Details 170 Stair 2 51" .3 = 170 y '-1
R
, .. Door T3 56" = .= = 280 Stair 3 56" �- .3 = 187 9
Window Type
Entry Doors (®1st) 2 x 65" - .2 = 650 Stair 4 60" - .3 = 2S�Q EO Floor Box Plan VO
744 El Power Plan
TART � SH4Ps — — — — — — — — 2 - -- ; •�oo, Sul /7�� �G��. -
E2 Lighting Plan
25,350 S.F. - _ - 5 Louver - E3 DATS Plan h"g �'-'� y
A4
__ E4 Parking Level Power Plan f� 1 T•
Notation (to Area) Insulation—
z the>ff�iUYSt --� --- �I0 E5 Roof Power Plan
--O q_,__ a --- Notation (to Face) A01aintain existing thermal insulation at exterior walls and roof.
24,934 S.F. a .1 Eh Legends & Details
N.87"7l'38'W. 1 I Dimension Liile Insulate Toilet Rooms, Sound Rooms, Car Stereo Rooms. with R-11 for sound. g
6.50 i i I 111 Fire Protection— E7 Panels & Single Line
1, Subcontractor to provide shop drawings for sprinkler system. These are to bo submitted
- �— 8 approved by the local authority prior to installation.
Discontinuity Signage— M1 Parking Level Mechanical Plan
(17)COMPACT O 8 - _ ty 9 Se—
` 1 f--- M2 1st Floor Mechanical Plan
Under separate permit
_� SEE PARKING LEVEL.PLAN SHEET A10
FOR PARKING UNDER BUILDING ( •
�,..... M I Match Line P1 Parking Level Plumbing Plan
y (17)COMPACT O a' P2 1st Floor Plumbing Plan
(5)O 9' (17)O W' (25) a 9'
North Arrow MPI 2nd Floor Mechanical & Plumbing Plan
N.07°2.7'35" W.O. _ _
_ ---.--- – ------- – – --- – – - --.---- Work, Control, or Datum Point .
HALL BLVD.,9009 475.80'
4-0912
I OF 4
,
I[ THIS DOCUMENT IS LESS �r 1 --=-� - -- �. I I 41I �, 11, J AUGUST' 30 1995 I
LEGIBLE THAN THIS NOTATION, (fes ' � e�w
IT IS DUE TO THE QUALI'T'Y OF Nom_ _
,rHE ORIGINAL DOCUMENT. � � IIl � i � L 9 Z 8L LZ [ �1S � i►�►Ju�1i�11 il(III111�111II1ill lilllZ I �IlI11� h111111lll6 1llluli�iui S Z li M
It 1�1JII►II1�tli Itll�lllilll►i�Ni►
CB) A
D
LIGHTING IN STAIRS TO REMAIN, TYPICAL
--------------------------- ------------------------ ----------------- --------------------------------------------------------------- P------
UNA
DN
,1110
JfF
__ft=
1"1%
%
-.1
___05
.40
Z.,
r-------- ------- vt
Io 1%
----------------------- 4t
z110
-------------------
7:::------------- ---------- 1994
-------r---------- REMOVE ESCALATORS&
RELOCATE PER FLOOR
PLAN
-------- -
------------------------------------------------- ------
---------------------------------------------
%0%
d.x
4 Ra
---------- - ---0
01
I
L......
I 4^ r e4
-------------
---------------I 1 -------11 -
f.
11
11
REMOVE FLOOR
FINISHES& CEILIN(7-!S,
II
EXCEPT AT STAIR.,;,
ELEVATORS & EN",'RY
j
LOBBY
------— REMOVE (2) WINDOWS
I
REMOVE CIP STRUTS AT \N
DOUBLE Ti:ES ABOVE TO
ALLOW FC-: KOLL-DOWN
GRILLE
------- FIRE SPINKLER RISER &
tWADER MAIN TO REMAIN
% r-------------1
A'
Z%, NO DEMOLITION IN LOBBY
EXCEPT AS NOTED ov
4R_ Z\ r-------------
UP- I ol
------------ - ----------------- ------ --------- 71 ---------------------------
% ILL--- ----- L--------- L-----------
1 J,.......
-
----------------
-------------
27'-0"
1/8
First Floor Demolition Plan---- 01 4 8 =1 -0
Demolition Plan Notes Demolition Plan Legend
I• COMPLETE REMOVAL OF EXISTING PARTITIONS, FINISHES, FIXTURES & EXISTING CONSTRUCTION TO REMAIN
EQUIPMENT AS SHOWN ON PLAN.
Demolition c
M
OM'
COMPLETE
E
voo
QU I F WILL B. KENS
r2- REMOVE ALL EXISTING ELECTRICAL EQUIPMENT, OUTLETS, CONDUIT & - ----- CONSTRUCTION TO BE REMOVED WILL B. KENS
WIRING NOT DEEMED USEFUL BY thegoodguys!, THE ARCHITECT, OR N 6
THEIRI EXISTING GLASS FRAMES& MULLIONS TO REMAIN
HEIR AGENT. ALL LIGHT FIXTURES IN GOOD CONDITION, EXCEPT THOSE S L,CA,
q
TO REMAIN IN PLACE, SHALL BE CAREFULLY REMOVED, DELIVERED TO
"" I N EXISTING COLUMN TO REMAIN
THE SECOND FLOOR & CAREFULLY STORED FOR REUSE.
3. REMOVE ALL DUCTWORK, PLUMBING FIXTURES, HOT& COLD WATER (E) EXISTING OF fivy
LINES, WASTE LINES, ABOVE FLOOR CLEAN-OUTS, & GAS LINES NOT (N) NEW
DEEMED USEFUL BY the good guys!, THE ARCHITECT, OR THEIR AGENT.
U REMOVE ALL ABANDONED GAS LINESNATER LINES, ETC. TO OUTSIDE (R) REMOVE -Fest HOW
EXTERIOR WALL& CAP BELOW SURFACE OF SLAB.
DemoRfim..Ptan
4. COMPLETE REMOVAL OF ALL DEBRIS FROM THE SI TE IS THE
RESPONSIBILITY OF CENtRAL CONTRACTOR. NO STORAGE OF DEBRIS AT
THE SITE SHALL BE ALLOWED.
5. PLACE PUBLIC BARRI*:RS AS NECESSARY DURING ALL PHASES OF
DEMOLITION IN ORDER TO ASSURE COMPLETE SAFETY
6. GENERAL CONTRACTOR SHALL PERFORM ALL DEMOLITION WORK IN
COMPLIANCE WITH T1jE PROVISIONS OF THE TENANT LEASE & THE RULES
OF THE SHOPPING Cf_NTER FOR TENANT CONTRACTORS
7. SEE PROJECT MANI JAL SPECIFICATIONS FOR REMOVAL.OF ALL.
HAZARDOUS MATEI`flALS ENCOUNTERED DURING DEMOLITION
OPERATIONS.
HALL BLVD.,goog
13UP 04-0312
2 OF 4
sow",
IF THIS DocUMFNT IS Eiis 1111T i 9-6
It LEGIBLE THAN THIS NOTATION, N71775 AUGUST 30 5 f
IT IS DUE TO THE QUALITY OF
THE ORIGINAL DOCUMENT.
slll t
91 z z s HIL9
111101111111111119111 11111til IIull 111 a iuI lul ,111-1;111
�• �,'Y
I/2"MI10[OAF 12 'w10E FELT UNDER JOINT
'�• :., .. ��) 4 fV od&T up 900FING •mNeENP+ECEs ' ETiNEUL-RR A'TOa WIDE
16'MAXNA#A L"rM---�
- --- (N) Ile go IpVwp o►J EACH PIECE T �:� •� `►
i•'J �► G.l.M PAIN I:D� � . ti�
�40f ��lINC7" b•$.D.
PARAPET CAP
-�N� lyl► ILE
LAT
��� ��\\ • --- PAINT SUBSTRATE RED TO / r
-- }'INCI f`('JTiM ON �'. L\ o,. ~ ��� �:w" i j - STRUCTURE TO MATCH"Ihe good - ------ / \
t V \ _ • . guys"RED SIGNAGE ' , v
r_ I�i�pIQ IIJ4SUL.• F �> I l • - - - - EXISTING PLANTER TO REMAIN .,
SOFFIT BRACING STUD 0 24"0 C
0 HORIZONTAL REVEALS --- - -- ---- - RESTRIPE PARKING AS SHOWN(W/ , C
Y•:1,G - sc CCAr 2— _-FASTENERS HC SPACES PER CODE&ADA)
1,6I A' .1�]SDF OF kWS \ '' APPAOx 4 0 C – —— ` d
45 SOFFIT BRACING STUD
[t.i.s. Air - - N a ��TAPEREDGLOCkNG"0 --- 3/8" PARTICLE BD PANEL W/ f:
PROVIDE SLOPS
URETHANE FINISH,CONTACT
o�oa Oa 00 Q p D G ! J C"; --- CONTINENTAL HARDWOOD CO
i��D 0 �C 4 - I •�� 6 DAVID HODGES(916)553-3100
TO
S/AAAA TION BOAL70
;-
- 1/4"MASONITE BACKER +r•
_ 12 SPACES 0 9'= 108'-0"
P _ - - --- - -- - -- - - ------ - -
a a d ♦ ♦ o r+�51EfiL �T�C1;•a.5.p. -- -• I P,ARAFTT CAP - _
.. _ FAS-e,4E.S I\
` APPgCk ,. - #200 SERIES METAL.TRIM PAINT Q .a.,.. ,,...,, , . .�. „ ,,. .�..,I . . ., ...�,> .:.,,,, .a„ ;mL4
FE
I IIDII r TAE 1 � PROVIDE N6oFREN[ RED WHERE EXPOSED -- --- b
O,�' WAS M INS OK 7
p/IIN• '� 3M A, / \ SEALANT Af -
' - --_ - - ----------- 5/8"GYP BU PAINT RED TO �._ __ _ 4 m -40
1*4
h13F� C,.IWt PtN!TMt10N5 MATCH"the good guys"HED
-----CIO ft6VL-4AW ePTKIF SIGNAGE -----------(� _-_
�,'( IhI (71"(1Ji�11>R.IJ SET V �ITLJf'LV -- FL`s.awt o L-J ---- - - Q -- --- X
--- - LAY-IN CEILING
NOTE. SEE SHEET D3 FOR ADDITIONAL FRAMING DETAILS
(D LIiACr .]OVAC7 CgVA[r 00•/AC• 7+11"Y:T .••-r ODIIACT C41rACi c'nY►•cr w.,rAcr rxH,►•cl pOVM:r 7ow•cr 1 '
n = " 9 t Ca 5 Lar a Curved Soffit Section •" =•s"••" _=__•_ •-- I•
1rz 1 -� Section harape p 1 1/2��=��-��� I' t' - -- CUT BACK PLANTERS 30'
`
�fi � hm WtaiI N.T.S. LANE, TO MAINTAIN 30'FIRE \II�
W I w LANE. RELOCATE EXIST
o g o TREES AS REO-D.MATCH ao
994
EXIST CURBS - - ---- - -- --�
ETy q:
LL 1 0 4I I I I�- U.
Cd Cr
1 t----GYP BD ON 4"STUDS 0 24"
; o o u
OC ,Q o
E
--------------
II
e"
- - \ �EXTERIOR PLYWCDD IE I i e.a 6'0"O C If- _ FG REMOVE ISTS' EXIST CURB,WIDEN
SUBST?ATE I I EXIST 5'SIDEWALK TO 11', TO
-�^- - -- fi! MATCH EXIST .
I
ACHE.,7E ME?S TG I I I I - FACE OF BUILDING NEW ENTRY COLUMN,TYP
r\ SUBS71ATE YVI7H I I I I OF 4
ADHESIVE PER RELOCATE PLANTER TO MAINTAIN
MGG. R13QUIREMENTt 30'FIRE LANE, RELOCATE EXIST REPAINT EXIST PAINTED -- -_
- --
MCEC e.<PANCEC - 45 BRACING STUD TO ROOF TREES,OTHER LANDSCAPING S CROSSWALK
POLYSTYRENE MEMS) STRUCTURE IRRIGATION SYSTEM.MATCH EXIST O
CURBS
Jv541.A 70N EOr,?O I -- 4"HORIZONTAL BRACING W
`�'� \ - ^- -- ------ PAINT NEW CROSSWALK TO MATCH
- E.I.F.S.RENFIN
JRCG STUD
\ TH VEE•CCEC EXIST
ME
IN ?ASE COAT --------- MAINTAIN 5'CLEAR, MIN
E.I.F.5.RASE COAT - - -- E
� NEW HC RAMP PER CODE 8 ADA II
�.I.P.S, F'rrJSH 6"FLAT FRAMED STUDS 0 2" ------ - EXIST HC RAMP
0 C (BRACE TO STRUCTURE
TO AVOID STRAIGHTENING
FORCES OF PARTICLE BD
MASONITE&GYP RD)
STAGGER MASONITE JOINTS
FROM PARTICLE RD REVEALS
NOTE- SOFFIT CURVATURE I
NOT SHOWN
10 Ext. Insul. & Finish System N.T.S. 6 Large Curved Soffit Plan > 1i2"=�'-�" 2 Partial Site Plan 0 5 10-0 '"=20'-°"
12'x 12'x 112' OR 18'x 2d'x 112"
SEE PLAN PLYWOOD PANEL w/PL-2 PER INTERIOR
23, 11 YP aJ ELEVATIONS SUPPLIED BY,FIXT.MFR.8
�- --- '/ INSTALLED BY THE GOOD GUYS'
5 --GENERAL CONTRACTOR SHALL
ACQUIRE 8 BLANK PANELS FROM FIXT ,
6.- r A7 / MFR TO VERIFY EXACT DIMENSIONS 8
^^.^ -_ ADJUST FRAMING 8 SUBPANEL AS
'� r^_ .. 'J-^^ - - ------ --- - - REQUIRED FOR TIGHT SEAMS _
3 3/4' 1' 23'
ADHEJ?E $ TO .,-c-{ -� 0 - ---PRECAST CONCRETE q
SUSSTR�'TE WITH ADHESIVE - 3 5/8' x 16 GA M i L STUDS 4f 24'O C. 1
AS APWK)PR1ATE -_-_ I EL I EO _ -- -� TYP-SEE FLOOR PLAN - I .I BOLLARD, SMOOTH
. I MA1� %"I I.v WA
ME?S r15ULATION BOApC _^� -~ B -- 3/4'PLYWOOD SUBPANEL w/PL-2 Q 72
�. 1 1/2"I ♦ - PARTICLE BD PANEL W/EDGES '
L1.F.s, wt*op(:r G =� ( I SANDED SMOOTH 3'-10 1/2"x \ SUPPLIED BY FIXT MFR 8 INSTALLED N
- U BY GEN CONTR
'N 1 ---_'+ 3' 10 1/2"PANEL SIZE \
IN BASc COAs - I W 1 2 `-112'x 1'2'MIL ANGLE-'PAINT FLAT 1 I
- I I BLACK PANHEAD SCREWS W/ 112 BLACK
E.Lr.S, r.vLSri .t��=____ L'; O C+--- O O WASHERS, SCREW TO STUDS
5/8'TYPE'X'GYP BD
1--- - ' MASONITE PAINTED RED }
C1 ------J —FIN. GRADE CONC. WALKWAY
-_-_-_
-_ _-_: ♦- --- ----- 3 5/8' x 16 GA MTL.BOTTOM TRACK W:
-_-_ 6 POWDER DRIVEN ANCHORS 4 24"0 C Q � ,a - , ------ 15-58p�
OC �- TYP _..�' • o • �., I•.
W --- 4 BLACK SECURITY SCREWS 4`l EACH zr D• •. a o
-`-__ -- �4 --- 12'x 12'PANEL 8 0 EACH 18'x 24' 0
PANEL,SUPPLIED dINSTALLED BYTHE DIAM. CONC. FOOTING - - - - `-
--r--- - --- ---{�r II0 C�-- O O O
6/f+ MIN. 2,7 GOOD GUYS'
H� -, -�rI----•; -_-� D -- CONTINUOUS VIBRATION GASKET BY 0. o 'L' 1
-• FIXT MFR.ALL SIDES OF EACH -- 4" DIAM. DOUBLE-EXTRA
t I MESS NSULA icN BCA1:- c, E
/y EIITERfOR PLYWOOD _ _ I . �� ------- - - -- -- --- OPENING IN SUB PANEL 8 BETWEEN ° _ STRONG PIPE WITH CONC. ----- -
J - P
- - - �_--.-_-_ --E.I.F-5. Fn�tSH SUBPANEL 8 MTL STUDS,TYP
ADHErE MF?S TO SUBSTRAT►_ -\ �-_--i _ .' FILL
°►' MESr . e �T
WITH ADHESIVE AS - �___..__ _. _.--_-- _- - E.I.P.S. (%��1FCf7CNG
EMBECCEI'�IN BA " OA-
APPI?OPRIA;c ----- ------
11 E.I.F.S. Accent Band N.T.S. 7 Large Curved Soffit Elevation NO SCALE 3 Car Stereo Wall Detail 112"=1'-0" 1 Bollards
TUDS 18'O.0
BLACK PLASTIC FLEXIBLE TEE -- - TO ROOF STRUCTURE
- I f MOULDING AROUND PLYWOOD
DISK \ -- -- 3 5/8' x 20 GA MTL BRACES AT 36'
O.0 TYP. W 20 GA.CONT,MTL.TRACK
TYP f
WILLIAM P,. KPIS
f.\ ------------ -- 3 5/8' x 20 GA METAL STUDS 0 16'
a*Ru_TURAL STEEL -mil � II 1-� MEDS INSU_,T�ON 90ARC I + OC
\ .rRUr I J I I -2 x 4 FRAME �\ i/
_ \ / 20 GA CONT TRACK AS SHOWN5TUD ♦ 1Y
7(")
E I.F.S. FNVISH p 1/4" x 1/4" ROUTERED REVEALS
CONTINUOUS BRAKEIi - � �-' METAL STUDS 18 HUS 600FOP ED A\4GLc i _ I� I E LEX LETTERS SHOWN DASHED - � 1�
E.I.P.S. ?P_NPO MESH I I 1'2"THICK
r -------1. III --_ II EMBECU�IN BA E .OAT
h EXTERIOR PLYWOOD
II �,
ADHEFE ,' ?S 70 SUBS -"IF
VAP_arfial.. Plal`i
T', A t,IvE AS
APPROPRIATE II r -_-
I I ----- 19'-3'CEILING _-
r
,.. � � >1-'' >✓ r- �`' _-II 3/4•MIN, CURVED SOFFIT 6'CLR -_--- #8 SCREWS®6'O C ALONG CONT
. �• i j ` J�� � - Ji I -- TRACK AS SHOWN
TV BY 01 HERS PROVIDE A 80'x 7'x 6'
`- ROUTER CUT Dkv OR. - -- - VARIES RASED ON CURVATURE OF POCKET CENTERED IN FOCAL CO
AESTHFTIC JOINT IN V1c?` I I SOFFIT I ORDINATE CONST WITH TV INSTALLER
may' g,ld F r
40
n
42' NOTE: ALL SCREWS TO BE#B AT AIA.
yp
Y,w CONNECTIONS TYP
12 E.I.F.S. Drip Reglet N.T.S. 8 Curved Soffit Section @ Sign NO SCALE 4 Home Theater Soffi'c
HALL BLVD.,9009
BLIP 94.0312
3OF4
I F THIS DOCUMENT I S LESS 1 I � T3T � 1 h ..,...•, ::. �::� .. ,�.,.....•.....,•..,.,.,.......,.•....-,..•-_.___... ..,
'� I 19 9 5
1 � 4 -I �L ! - 1 8 - . ' 1 -- 11, AUGUST 30 j
(• � � LEGIBLE THAN THIS NOTATION,
IT IS DUE TO THE QUALI'T'Y OF' NP.36
THE ORIGINAL DOCUMENT.
lil
E ZB��L LL 9 I I I L L 11
��L T,I,,,
[ 8�I 99T .I� T �IST LT �I TT i L 9 �9, ^�S L �T�o �IIIIIII�IIIA1IIIIIIIII�IIL DTII IIIIIIII IIII1IiII IIII�IIIIIIIII �IIIII�IIII IIII�IIIIIIIII�III 111111111 lllllllll 1111)�III�Wlllllllllll All 111)111 IIID ►II ull��lu u ►II II IIIIIIIIIIIII�IIIIIIIII�illl IIII�IIIIIIIIIINIII
II I�
I 71v
s... ..... ' � _ ..,, �� ' �'�� �•
R;'
• I � I I "
I - -------------------- -- 6
+k REMOVE EXISTING SLAB & ,
xSTRUCTURAL CONCRETE
.----- - -- - -
--------
TEES PER STRUCTURAL , R
PLANS
�4
;Z4
a
.------- --- -- - - - -- 5
••1
•ts.ueur•aasrru.aar.uuu.aa.•••.uaaus•...uauuaraa•.I• •••• •-• •�•• �-•�
1 ••• 1
1 REMOVE EXISTING FLOOR
STRUCTURE IN BAY -- -
-_ _s-----z___s-----------------=ssic_----- --- Sias
_ _ ---iaiII-zzasz : SURROUNDING EXISTING
1
I ;
ESCALATOR
. ; '-�--f---—-__e:--------:e -:----isas?----------------- ----------------- -=3}. �i
1 . / 1994 °° I
i------:_-c ----- --- -i -i i-3 z a ---------
1 r 1 1
1 I-- -iaS:Sa:AaC6:3i:i=3:iII=3/�-II==--a-3: iii6== =1-7-7Cii I:IIi=5
i 1 •., ; 1
MIN. /• •.
1 1 "
....................:................................. ...........................:.....
q
1---:;
- - -
REMOVE & RELOCATE I71
1 NEW 40 x40 CLEAR DUCT
OPENINGS — REMOVE EXISTING ESCALATOR ,
q '•:.
�n EXISTING SLAB &
X STRUCTURAL CONCRETE
1 1
TEES PER STRUCTURAL `
PLANS ----------------;.
1
----------------
1 1
1 1
1 / ,
1 , 1
1 ,
1 1 �
I I
1 1
1
REMOVE EXISTING SLAB & �
STRUCTURAL CONCRETE �� I w
3
TEES PER STRUCTURAL
• PLANS - --
1 1
I
1
y------------------- - ------------
1
Ivy
,
„
•
1
DN 'ST
oil
Second Floor Demolition Plan 01 ..4-8
Demolition .Plan Notes Demolition Plan Legend -
1. ALL IMPROVEMENTS IN GOOD CONDITION,WHICH ARE NOT IN THE WAY OF NEW EXISTING CONSTRUCTION TO REMAIN
WORK&WHICH MAY BE OF USE TO A FUTURE TENANT SHALL REMAIN.
1 1 2. COMPLETELY REMOVE EXISTING PARTITIONS, FINISHES, FIXTURES& CONSTRUCTION TO BE REMOVED U Mlllll IC r.
EQUIPMENT AS SHOWN ON PLAN TO BE REMOVED.
■ eye
n� 3. REMOVE ALL EXISI';NG ELECTRICAL EQUIPMENT,OUTLETS, EXISTING COLUMN TO REMAIN CONDUIT 8 WIRING �
NOT DEEMED USEFU,_BY the good guyst, THE ARCHITECT,OR THEIR AGENT. (E)) EXISTING SM RAF A
4. REMOVE ALL DUCTW09K, PLUMBING FIXTURES, HOT 6 COLD WATER LINES,
y' WASTE LINES,ABOVE FLOOR CLEAN-OUTS,A GAS LINES NOT DEEMED USEFUL (N) NEW {' ♦`r
t BY the good guyst, THE ARCHITECT,OR THEIR AGENT. REMOVE ALL ABANDONED
GAS LINES,WATER LINES, ETC,TO OUTSIDE EXTERIOR WALL&CAP BELOW (R) REMOVE
SURFACE OF SLAB.
5. COMPLETE REMOVAL OF ALL DEBRIS FROM THE SITE IS THE RESPONSIBILITY OF
GENERAL CONTRACTOR. NO STORAGE OF DEBRIS AT THE SITE SHALL BE
ALLOWED. � ±UILp__�8Q
6. PLACE PUBLIC BARRIERS AS NECESSARY DURING ALL PHASES OF DEMOLITION
IN ORDER TO ASSURE COMPLETE SAFETY.
• 7. GENERAL CONTRACTOR SHALL PERFORM ALL DEMOLITION WORK IN
COMPLIANCE WITH THE PROVISIONS OF THE TENANT LEASE&THE RULES OF
THE SHOPPING CENTER FOR TENANT CONTRACTORS.
8. SEE PROJECT MANUAL SPECIFICATIONS FOR REMOVAL OF ALL HAZARDOUS
MATERIALS ENCOUNTERED DURING DEMOLITION OPERATIONS.
HALL BLVD.,90og
BUP 94-0312
4OF4
i T I T 1 T LrjT = a�-, T 1 1 i....,„.1,
�• __._. IF THIS DOCUMENT IS LESS l i I.fi� 4 J fi T�1171' TJ I T P171 I I'�ITTjT� lU 11 —r1 995 '
LI j 12 1 AUGUST 30
LEGIBLE 1'IiAN THIS NOTATION, '_—� gL _ — p
IT 1S DUE TO THE QUALITY OF' Nose jb'=�r„-"
( E '8Z 9Z LZ 9�Z �13 3 �8 Z �IZ �Z 3�T BT l.i 91 �aT I6I EI Z[ TT i 6—i—T L 9 9 �;
THE ORIGINAL DOCUMENT. S Z loeu�
� ilil�lllf�lill llll�llll lllf�l1111111�i11111111�111f lil1�11111111�i11111111�1111�111111111�11i111111�11111f111�1f1�11111111�1111 flll�l LII1llllll�llJl�llll Illl�llll�ll)fllllllllfl111IIfIll;lll�1�►II►��IIIIu►IIIIIIII IIItI II IIIII►11111►1111���I�I►�1IIIlu�ll '