Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
15085 SW HALL BLVD-1
� MVA 0 0 un t 15085 SW HALL BOULMARD INSPECTION NOTICE City of Tigard Building Department 12420 S.W.Main St, it Tigard,Oregon 97223 Phone: 639-4171 Type of Inspection Date Requested me A.M. P.M. AddressPermit Owner Lot Builder The following Building Code deficiencies are required to be corrected: er L 1;70 Presented to �'�Approvedl Inspector Disapproved Date CALL FOR REINSPE CTION 0 YES 211NO INSPECTION NOTICE City of Tigard Building Department 12420 S.W. Main St. Tigard,Oregon 97223 Phone: 639.4171 f Type of inspection Dete Requested���rL`_�--'=Q� __ Time A.M._.._ P.M. Address �[[i''L3�1 rS�.— -- Permit #_ OLot #—.271j!7 Builder The following Building Code deficiencies are required to be corrected: Fir r-h XV Z .RA ;rZ-11 �- - F g rA/.Si' Q LTG IF C 2enC� i Presented to — c._- _ Approved Inspector C -- ❑ Disapproved Date CALL FOR REINSPECTION ! ] YES L] NO SEWERPERMIT ,: 2"1999Unified Sewerage Agency of Washington County CITY OF �s ��7„_ DAT[:. /1,i�/_,l'���! - OWNER: L& t'H0NE i.; OWNER' S ADDRESS, /-Sy�rF = ��•�_�'��s. .__._��::.�2�__�__ __ ___. TYPE OF INSTALLATION, BUILDING SEWER ❑ LINE TAP AND BUILDING SEWER [ � I. ] !"I IAl' FYPE OF OCCUPANCY : ❑ NEW © EXISTING ® SINGLE FAMILY ❑ COMM[ KlAi ❑ MULT. RES. ❑ INDUSTRIA( FIXTURE UNITS DWELLING UNITS / ADDRESS OF STRUCTURE , Permit Conditions: The applicant agrees to comply with all rules and regulations of the Unified Sewerage Agency. When calling for an inspection, please refer to the Permit Number. The Permit expires one hundred twenty (120) days from the date of issuance. The total amount paid (permit fee, connection charge, line tap fee and/or other charge) will be Forfeited if the permit expires. The Agency does not guarantee the accuracy of the location of side sewer laterals. If the sewer is not located at the measurement given, the installer shall prospect three feet in all direction% from the distance given. If not so located, the installer shall purchase a "Tap and Side Sewer” Permit at the current charge and the Agency will install a lateral. R=EFS: PERMIT FEF' $ i CONNECTION CHARGE ; LINE TAP INSTALLATION _ _ _ ISSUED BY ~- OTHER TOTAL APPLICANT !� BATE SEWER PERMIT Nti, ADDRESS OF STRUCTURE / " "'� =—'` �•_- _,t� �- -� QUARTH 'TAX MAF' ' ` / - /•' rJ TAX L 0 T _ __ E C T 1(1 N LOT � .�® BLOCK OF ?� APrROVE D BY 'DATE ISSUED BY I)AII 0 1 D . U. ' S / - REMARK; _`,_�{f� f'►C s..fa Nk _L`f�.�; Ir z I.Z__ EV ,,1 f"l-'"r.) _ i CITYOF TIGARD No. 0770 j 12755 S.W. ASH P.O.BCX 23397 pate TIGARD OR 97223 { CL Name Address Lot BIouklMap Su divisionlAddreas i Permit M's Bldg. Plumb Cash Check Sewer rff�9 Other Other Rec. Acct. No. Description Amount 10-432 Building Permit Fees _ 10.431.600 Plumbing Permit Fees A _ 10.43_1.601 Mechanical Permit Fees 10.230.501 State Bid g_Tax 10-433 Plans Check Fee _ 10.435 Other Licenses & Permits 30.443 Sewer Connection 30.444 Sewer Inspection � �,� 24.448 Street Syst. Dev. Charge _ _ 25.449.610 Parks I Syst. Dev. Charge 25-449-620— Parks II Syst. Dev. Charge 31.450 J Storm Drainage Syst. Dev. Charge _ 10-430 Business Tax 10.434 Alarm Permit_ _ 10-:27 Bail 10-455- _Fines - TrafficlMisdlParking 10.230 CPTA TrafflclMiadlVic. Aset. 10.458 Indigent Defense 30-446.401 Sewer Service/USA 30.446.402 Sewer Service/City 1 31.447 Storm Drainage _ 40.475 Bancroft Prin. Pymt. { 40.471 Bancroft Int, Pymt. 10.451 Other Charges for Services 3,337 70-01 DIM �`• 1.5085 SW Vial.]. Blvd. Tigard, Oregon 97223 November 6, 1.984 Mr. Gary Kramer Unified Sewerage Agency 150 N. 1st Hi.1.lsboro, Oregon 9712.3 Dear Mr. Kramer, Recently I visited the City of Tigard Building Department to determine the cost of tieing into the sewer line near my property at 15085 SW Hall 81vd. I have owned this property for years and my home existed before 1970. The sewer line was installed . . . . . . . . , 198 and became operative on 1.98 I was told that the cost would be $ 92.5.00 because 7 did not tie in within three years of construction of the sewer line. The line was installed about four years ago, however, I did not receive notice that 1had three years to tie in or be forced to pay a higher foe. I would v..ppreciate your consi.der-ation of my request to be relieved of the obligation to pay a fee of $ 925.00 but instead to pay the fee which was in effect, $ 300.00. Your prompt attention to this matter would be appreciated and must tie in shortly due to the failure of my septic system. Thank you for your consideration. Sincerely, - 1 Francis J. Scheckla t � J 1 /2� CITY OF TIGARD, OkEGON COUNCIL. AGENDA ITEM SUMMARY AGENDA OF: 10/10/83 _ AGENDA ITEM N : DATE SUBMITTED: 9/22/83 PREVIOUS ACTION: 4/ 12/81 ISSUE/AGENDA TITLE: Resolution of Placement on Maintenance Period (Res. 1182-32) Final Acceptance - Scheekla Park Estates REQUESTED BY: I. subdivision - Subject to specific Conditions _ DEPARTMENT HEAD OK: CITY ADMINISTRATOR: ac-»=c»:aeicsraeac.e-c-rr_sr:acsss»-==:-sasc»»_ss^_=»-s»_»--aa_:e_=_-___-•=_xc=»®venz.cac_.- INFORMATION SUMMARY I . This subdivision's Subdivision Compliance Agreement and Performance Bond were approved by Council on 9/27/78, to :99ure development of said subdivision to City approved standards and to'set a completion deadline for all public improve- ment work therein. 2. The subdivision was placed on its Maintenance Period on 4/ 12/82 (a copy of Resolution 1182-32 which facilitated that. action is attached hereto) . 3. All required work, except sidewalk installation, has been completed. 4. The developer is requesting, of the City, final acceptance of the subdivision prior to total completion of all of the required public improvement work therein; and, is proposing to submit a one year performance bond to assure completion of the"Fidewalk net" at a later date. won="t.. ...e. ....w....... r..ncr,vv.¢s.ss eragss=-i.-.eca»aaaCs r_a:r ease.--sr_cau c'-crwvnr.....e.e ss ALTERNATIVES CONSIDERED I . Require immediate completion of the sidewalk net within the subdivision, in accord with th- original agreement terms, to facilitate uninterrupted pedestrian travel in a timely manner. 2. Approve the applicant's request; and, pass the attached Resolution. rrnrvrsere.s meerrwz�c.arra......--1 v..zac<ca-acarc..r. ......r. ..rrr. SUGGESTED ACTION considering that the Council need make a policy decision relative to: I . Timely completio,-, Lf sidewalk networks within new subdivision projects; and 2. Whether or not staff should insist on adherence to the timely completion terms of executed subdivision developments, without exception. . . . . . no recommendation is herewith proposed> i(. t ( �. 1 .•.� �. �i, t Address C j-'e- r Permit No. Name of OccupantL Permit charge Paid — Date connected Type of Building ( D 7—Y Inspection fee Service Rate D d Paid by Date Contractor �� d� •_1�T' Assessment Size of connection---4