Loading...
11710 SW 121ST AVENUE a V G :n tom: n 3MSAV SSTZT DSS OUTT — ELGCI''ICALPERMif CITY OF TIGARD DEVELOPMENT SERVICES DATE ISSUED:PERMIT 4/28?0 00-007.09 13125 b W Hall Blvd.,Tigard, OR 97223 (503) 639-4171 PARCEL: 1 S134CD-04200 SITE ADDRESS: 11710 SW 121ST AVE SUBDIVISION- BURLWOOD ZONING: R-4 5 BI SLK: LOT : 002 JURISDICTION: TIG Project Description: Reconnect only RESIDENTIAL UNIT TER IP SRVC/FEEDERS MISCELLANEOUS --��3`iraRTS- 0 - 200 amp: PUMP/IRRIGATION: EACH AUDI. 500SF: 201 - 400 amp: SIGN/OUT LINE LTG: LIMITED ENERGY: 401 - 600 amp: SIGNAL/PANEL: MANF HIiAI SVC/ FDR: 601+amps - 1000 volts: MINOR LABEL. (10): SERVICE/FEEDER BRANCH CIRCUITS ADD'L INSPECTIONS 7 - 200 amp: W/SEkVICE OR FEEDER: - ITRI ITPECTION: Zvi - 4G0 amp: 1st W/O SRVC OR FDR: PER HOUR: 40.1 - 600 amp: EA ADD'L BRNCH CIRC: IN PLANT: 601 - 1000 amp: PLAN REVIEW SECTION L1000+ amploolt: >=4 :_ --..-- - > 600 VOLT . -- Reconnec.( only: 1 SVC/FDR>= 225 .'aMPS: _ _ CLASS ARE a/SPEC OCC: Owner: Contractor: BETTY API_ING GALLAGHER ELECTRIC 13208 SW'JVELLINGTON PI_ 2895 NE DIVISION TIGARD, OR 97223 PO BOX 70 GRESHAM, OR 97030 Phone: Phone: 666-8u iv Reg #: LIC: 13536 SUP 6345 El_E 26-533C _ FEES Required Inspections Type By Date Amount Receipt Elect'I Service PRMT BON 4/28/00 $53 50 0001772 Elect'I Final 5P('J BON 4/28/00 $4.28 0001 772 Total $57.7$ This Permit is Issued subject to the regulations contained in the Tigard Municipal Cude,State of OR. Specialty Codes and all other app11.3ble laws All work will be done In accordenon with approved plans. This permit will expire if work is not started within 180 days of issuance,or If work is suspended for more than 180 days. ATTENTION: Oregon law requires you to follow rules adopted by the Oregon Utility Notification Center. Those rules are set forth In OAR 952-001-0010 through OAR 952-001-0080 You may obtain copies of these rules or direct questions to OUNC at(.503)246-1987 PERMITTEE'S SIGNATURE ISSUED BY OWNER INSTALLATION ONLY _ The installation is being made on property I own which is not inten ed for sale, lease, or rent _ OWNER'S SIGNATURE: CONTRACTOR INSTALLATION ONLY SIGNATURE OF SUPR. ELEC'N: _ _ DATE:-- LICENSE NO: "all 6394176 by 7:00pm for an Inspection the next business day BUP - Building Permit ELC - Electrical Permit Inspection Descri tion Date Passed BY 4 Inspection Description Date Passed B Footing/SetbackUnder round cover Foundation wallsWall cov,;r Footing drain — Ceiling cover Waterproof bsmt walls Electrical rou h-in _ Slab Electrical service _ Crawl drain Electrical final Underfloor insulation _ — Post/beam structural Shear walls/anchors ELTt - Restricted Energy Permit Roof nailin Inspection Descri tion Date Passed Firewall Low voltage Tilt-up anel Y Electrical final Mason /Reinforcement Frami_ng�_ MFG-Structure set-up MEC - Mechanical Permit Insulation _ ____ Ins tion Description Date Passed B U wall nailing Post/beam mechanical Suspended ceiling _ _ Gas line Engineered soils Mechanical rough-in Welding Lab Final Fire damper Concrete Lab Final Duct work- Bolting Lab Final Smoke detector Fireproofing Lab Final Mechanical final Structural observation _. Final ins ecf, PLM - Plumbing Permit _ Ins tion 1Descrl tion Date Passed B BUP - Fire Protection System Permit Plumbin underslab Inspection Description Pate Passed By Crawl drain _ S rinkler underfloor/slab _ Post/beam plumbing _ Sprinkler rough-in _ Plumbing top-out Sprinkler final — RP/backflow preventer Fire_alarm final Rain drain _ _ Storm drain Water service SIT - Site Permit Sanitar sewer inspection Description Date Passed B Culvert/,etch basin _ Footings Pum /fill .,e tic tank Foundation walls Plumbing final _ Sprinkler supply lines Sprinkler underfloor/slab Catch basin/Manhole _ SWR - Sewer Permit Engineered ils Inspecilon Descri tion Date Passed B Engineering acSe tance Sanita sry ewer _ Final inspection Final inspection INSPECTION RECORD - I111P, PLNI, SWR, EI,C, ELR, MEC, SIT PERMITS