13335 SW 107TH COURT 13335 SCJ 107TH COURT
N
h
V
L
0
r-1
3
N
Lr)
M
M
M
'-1
i
INSPECT rON' NC'ITICE
laity of Tigard building Deparlmr3n' h
P O Box. 23397 1�,J
Tigard, Oregon 97223
Phone:
639-4175
/
Type of Inspection __ r VC
Date Requested ._ �� Time A.W_ _P.M.
Address Permit #-KZ_17- 3c,,
Owner ,L� Lot #
Builder
The following f'uildinq Code deficiencies are required to be corrected:
r 77—
j u.
Presented to
- ❑ Approved
Inspector _ r Disapproved
Date "
CALL POR REINSPECTION
21t-YES EJ No
W W w wa! trip
CITY OF
-BUILDING PLERMIT APPLICATION TIGARD DATE M' _ IrtN° 1) 4 91
THE UNDERSIGNED InEREBY APPLIES FOR A PERMIT FOR THE WORK HEREIN INDICATED
OR AS SHOWN AND AF"ROVED IN THE ACCOMPANYING PLANS AND SPECIFICATIONS. u;NNERPHONE _____
OWNER _— ADDRESS 1.3333 : .L. L07t1 BUILDER PHONE
ENGINEER
BUILDER 'IKII� ARCHITECT _ DESIGNER
STRUCTURE 1:1 NEW ❑REMODEL ❑ADDI(ION ❑REPAIR DRENEWAL [:)FIRE DAMAGE [:]DEMOLITION
❑ RESIDENCE ❑COMM ❑EDUCATIONAL_ ❑GO% T ❑RELIGIONS❑PATIO ❑CAR PORT ❑GARAGE ❑STORAGE❑SLAB [:IFENCE
_❑BOND ❑MOVING ❑CONDITIONAL USE ❑DESIGN REVIEW ❑COUNCIL APPROVED ❑SIGNS
OCCUPANCY LAND USE ZONE__ BLDG TYPE FIRE ZONE_ PLAN CHECK BY—__. HEAT
-- xtL-4IIL.LuI: p".crI.& ; raruof dwall, ng, rcamuoul front parch
q eeioed dwollinW, now zalumin. window to rumudul kitc;he
r
LOAD FLUOR LOAD HEIGHT NO.STORIES AREA VALUE
BUILDING DEPARTMENT SET BACKS FRONT REAR LEFT SIDE RIGHT SIDE
Permit — — �- - — _----
THIS PERMIT IS ISSUED SUBJFCT TO THE REGULATIONS CONTAINVD IN ]HE BUILDING CODE, ZONING
Plan Check REGULATIONS AND ALL APPLICABLE CODES AND ORDINANCES, AND IT IS HEREBY AGREED THAT THE
—� —" WORK WILL BE DONE IN ACCORDANCE WITH THE PLANS ANDSPF:JFICATIONS AND IN COMPLIANCE WITH
Recoro.ng ALL APPLICABLE CODES AND ORDINANCES. THF ISSUANCE OF THIS PERMIT DOTS NOT WAIVE
RESTRICTIVE COVENANTS, CONTRACTOR AND SUB CONTRIXTORS TO tIAVE CURRENT CITY BUSINFSS
ItState yj LICENSE SEPARATE PERMITS REQUIRED FOR SEWER, PLUMBING AND 1IFATING.
Total
Fy'-p-1
APPI_ CANT OR AGENTl Receipt No.
ADDRESS PHONE
I
I
i
FIWIWI
DATEJNSP. TYPE INSPECTION REMARKS PLUMBING DAi
Contractor
Permit No.
Rough-in
Fixture
Final
HEATING
Contractor
Permit No.
Gas or Oil
Final
SEWER
Final _
DRIVEWAY
Final
Storm Draina
(Rain Drain) Final
Sidewalk
Curb&Street Final
Approach__
BLDG DEPT. FINAL TEMPORARY CERTIFICATE OCCUPANCY
L CERTIFICATE OCCUPANCY Final
Z �v Landscaping
Zoning Final
CITY OF
-BUILDING PERMIT APPLICATION TIGARD DATE_ __.-T_, 19 N° 0428
THE UNDERSIGNED hEREBY APPLIES FOR "PERMIT FOR THE WORK HEREIN INDICATED OWNER PHONE_. --
OR AS SHOWN AND APPROVED IN THE ACCOMPANYING PLANS AND SPECIFICATIONS.
OWNER t,aII,,EJl h 1� ,f t_1 —� ADDRESS
13335 S,W- 107th 4$1L642-2111
BUILDER PHONE
ENGINEER
Rini DER Irr9)nk in H'?mE1E! ARCHITECT _ rt DESIGNER
STRUCTURE ❑NEW ❑REMODEL_��--11 CADDITION (:1 REPAIR `]RENEWAL ❑FIRE DAMAGE []DEMOLITION❑ RESIDENCE CJCOMM []EDUCATIONAL IUOV'T CIRELIGIOUS❑PATIO ❑CARPORT ❑GARAGE ❑STORAGE❑SLAB ❑FENCE
❑LIOND ❑MOVING ❑CONDITIONAL USE ❑DESIGN REVIEW [:]COUNCIL APPROVED ❑SIGNS_
OCCUPANCY-----LAND USE ZONE BLDG.TYPE,— FIRE ZONE_ PLAN CHECK BY HEAT
301 x 20 addition Ione raf,turti;Eyse t(., be a cafl'.Lclu�lsa tom,► -
--- --
m q!I h �vm e-ontinunuo run with 3/81, plywood both sides* --
qnn
CO C. LU_AD — FLOOR LOAD __ HEIGHT _ NO.STORIES AREA f VALUE 11 R ply
-_ —
BUILDING DEPARTMENT SE'r BACKS FRONT REAR LEFT SIDE w RIGHT SIDE _ —
Permit J1,.
THIS PERMIT IS ISSUED SUBJECT TO THE ?EGULATIONS CONTAINED IN THE BUILDING CODE, ZONING
Plan Check REGULATIONS AND AI.L APPLICABLE COD@! AND ORDINANCES, AND IT IS HEREBY AGREED THAI THE
WORK WILL BE DONE IN ACCORDANCE WITH 1 HE PLANS AND SPECIFICATIONS AND IN COMPLIANCE WITH
Recording ALL APPLICABLE CODES AND ORDINANCES. THE IiSUANCE OF THIS PERMIT DOES N(+T WAIVE
-- RESTRICTIVE COVENANTS. CONTRACTOR AND SUB CONTRACTORS TO HAVE CURRENT CITY BUSINESS
1%State " 3 LICENSE. SEPARATE PERMITS REQUIRED FOR .,EWER, PLUMBING 4ND HEATING.
TotalBy
"7
Approved Receipt No
DATE INSP. TYPE INSPECTION REMARKS PLUMBING DAYS
i b OK i Contractors n, z
/ � rr _ Permit No. /FO _ 3
rAly -le 4 Rough-in
Fixture
/ `7� !�✓!'/Z� Q�"� — —��.� Final
HEATING
Contractor
Permit No.
Gas or Oil
Rough-in
Final
SEWER
Final
DRIVEWAY
Final
Storm Drainage
(Rain Drain) Final
Sidewalk
Curb&Street Final
Approach
SLOG.DEPT.FINAL TEMPORARY CERTIFICATE OCCUPANCY
/ CERTIFICATE OCCUPANCY Final
2 7v Landscaping
Zoning Final