14392 SW 88TH AVENUE w �
i.
1' r
i
A
VEN UEr
r
« r
r �
r lAreco III • • •i rig
0
d
CITY' OF TIGARD CERTIFICATE ��
OI:CUF�A>`It.Y
COMMUNITY DEVELOPMENT DEPARTMENT PERM T #. . . . . . . : MGT95--01,i�'
13125 SW Hall Blvd.Tigard,Oregon 97223*6199 (503)639.4171 DATE ISSUED: 11/ 13/S,5
PARC'.E'L o 2.711 1AA- UP �,7
`51TE ADDRESS—'— '"DW 88TI-4 AVE
r GUBUIVIS;0N. . . . : GREFNz*.�WARD PARK NO. 2' ZONING sR-4. 5
BLOCK. . . . . . . . . . : LOT. . . . . . . . . . . . . .037
CLASS OF WOF'Ii. :NEW
TYPE OF UaE. . . :SF
OC.:CUPANC'r GRP. :5N
OCCUPANCY I C)AD t 2
Remar k�i : 10111 7
owner
POUR D CONSTRUCTION
I~' C BOX 157 r
BEAVEPTON OR 4707'
Phone #: 641-0935
Contrarc:t cwa -•___. __.._._._....... ._._..__._.____._.__._.____.__
FOUR D CONSTRUCTION
PO BOX 1577
BEAVERTON OR 97075
Phone #: 641-0935
fieg #. . s 71037
Chis L'ort i fic at:N grants oc c,glAmcy of the Abovc refer erwecl building or portion
thereof and confirms that the building has i.nppected for compliance with
the Stat•F of Ot-eLlon Sperrialty COEJeS for the yroi..rp ner iInCy, .rr�d LISP 1.tncle�r
which the r,efer'A ,cr:d Permit v4as issued.'BUILDINGINSPECTI]RC:BUILDING Ufr11AI.. _ __..... ._...__ ...... .... _ _.
POST IN CONSPICUOUS PLACE
cn
v
cr
c.�
�1
.J
r
WASHINGTON COUNTY E LECT R I CAL PERMIT
Department of Land Use&Transportation
Electrical Inspection Sect!- i
APPLICATION
155 North First Avestue,#350-12
Hillsboro,Oregon 97124
information: (503) 640-3470 Fax: (503) 693-4412
PRINT Permit
•leasip IF e e lete all sections, 1 e Number E L J_( �f �I: .__ Data r!r 13I'T5
1. Location ofc,installation_ 4. Complete Fee Schedule below
Address r r �� Q� Number 0inspections per permit allowed
wilding Service includes _--
Cit;— , eA. Suite No. Iten;s Cost(ea.) Surn
Tenant Name A. Residential-per unit
(if commercial) _ 0 c�
1000 s9.ft.or less —� $110.00 � 4
Ma N - Tax Lot Each additional 500 sq.ft dr^
Map - - - -- or portion thereof $25.00 —5
Limited Energy _ $25.00 - - - I
Thomas Map Bonk: Page: -___- Section: ,ch Manuf'd Home or Modular
Directions.
---- -- ---_---- ` Dwelling Service or Feeder $6e.00
Commercial❑ installation,alterations or relocation
200 amps or less ----- $60.00
2a. Contractor ine,01lation only: 201 amps to 400 amps $80.00 -- - -.
Electrical Contractors f.CT--� LacT2/c 401 ams to 600 amamps
to 1000 s $12n.o0 2
601 amamps _ $160.00 2
Address _ GtJ tea' Nv-�- Over 1000 amps or volts $340.00 2
City � Jn N _ Stated ZIP '_ R,-:onnectonly __._ $50.00
Date /_.- (- S Job Nu er
'3roperty Owner - _&r- C. Temporary Services or Feeders
Contractor's License No. - C InnLallation,alteratior,or relocation
r200 nmps or less $50.00 2
Contractors Board Reg, No. .-'IS� _ --
201 amps to 400 amps $75,00
i 401 amps to _00 amps __� $100 00
Linature of Su r. Elec'n 1� '�lc Z�4 -
Signature p O'^ 600 amps to 1000 volts see"B"above
License No. ,`' S_- Phone No. 0 775
D. Branch Circuits
2b. For owner installations: New,alteraticr or extension per panel
a) The fee fc(branch circuits with
Print Owner's Name purchase or'servlce or feeder fee.
Each branch circuit $5.00 _ ._
Addrers b) The fee for branch circuits without
_ purchose of service or feeder fee.
ity State __7P_ First branch circuit -- $35.00
Each add'nl branch circuit $5.00
The ;Installation is being made on property I own E. Miscellaneous (Service or Feeder not included)
which is not intended for sale, lease or rent. ( Each pump or irrigation circle $40.00 _- _-_ 2
Each sign or outline lighting $40.00
Owner's Signature —__ Signal circult(s)or a limited
energy panel,akeraticn
3. Plan Review section if required) or extension -- $4000
F Please check approprialu It—. and enter fee In section 5B. F. Each additional Inspection over the allowable
V
4 or more residential units in one structure in any of the above
Service and feeder, 800 amps or more Per inspection - $35.00
_ p Per Hour - $55.00 _
-� _System over 600 volts nominal in Plant $55.00
cz Classified area or structure containing special
LD u occupancy as described in N.E.C. Chapter 5 5. Fe.es <<�
Sul.mit 2 sets of plans with application where any of the A. Enter total of above fees $
above apple. Not required for temporary -unstructlon 5% :Surcharge (.05 X total fees) $
services. SUL total $ 194. 2 5110
I
This permit becomes null and void If the work authorized by the permit la B. Erter 25% of line A for
not commenced within 190 days from date of Issuance of such permit or Plan Review if required (Section 3) $
if the work authorized is suspended or abandoned at any time after work Subtotal $ T
1�commenced for a period of Iso days. Electrical Permits are non" f I $
refundable and nontransferable. TnISt Arr rrilnl
13
For Inspections call Balance Vue $ rr� 1 5 0-
24-hour Iecorder, cne working day In advance of need
_ W 7-S BL28 3)95
CITY CSF T I GARS► MASTER PE . I T
,=ERr�ezT ir. . . . . . : MST95--01
COMMUNITY DEVELOPMENT DEPARTMENT DATE ISSUED: 05/19/95
13125 8W Hall Blvd Tigard,Oregon 97223.8199 (503)039.4171
PAK ;i_ : 2 1 1 1 A0--GP03,,7
SITE ADDRESS— : 1439 GW 8 TH AVE
SUBDIVISIpN. . . . : ORCE:NSWARD PARK NO. 2 ZONING. R-4. 5
DLOCK.. . . . . . . . . . . LOT. . . . . . . . . . . . . 037
BUILDING _____________________._._.-_
REI.3GUE.hriST'34-01,_.6 DWELLING UNITS: 1 SA5rMENT. . . . . . . . :0 sf
CLASS OF WORK—NEW BEDRMS:4 BATHS:3 GARAGE. . . . . . . . . . :490 S
TYPE CIF- USE. . . :Sif= FLOOR AR17AS----------- --._ REOU IRED 5ETBACI; --._._.-___-.__._....
TYPE: (IF ,70NST. :5N F IRST. . . . : 1013 sf LEFT. . : 10 ft RIGHT. :8 ft
OM-,UPANCY GRP. . 0i3 SECOND. . . s 1090. sf FR0NT. :201 ft: REAR. . iG2 ft
STORIES. . . . . . . :2 F'INBSIIENT:O sf REGIUIRED-----
HEIGHT. . . . . . . . :
ED____HE IGHT. . . . . . . . : 7 ft TOTAL_ s. 0'39 Sr SM014E DETECTORS. :Y
FLOOR LOAD. . . . :40 p s f VALUE:. . . . . $ s 143693 PARKING SPACES. . . 1
Rewarks : PAT14 I
PLUMBING
INI�a, . . . . . . . . .. : 1 FLOOR VR'ATh,'a. . . . : .r BFICKFLOW PREJNTRS. . : 1
'_A 1ATORIES. . . . WATER HCo-JERS. . . : .F TRAPS. . . a . . . . . . . . . . :0
I_il3/91.10WEIRS. . . . :. LAUNDRY TrAYS. . . :0 GATE A IDAG I NS. . . . . . . -.0
WATER CLOI'�ETO. . :3 SEWER LINE_ (ft ) , :0 GREPi3E TRAPS. . . . . . . :O
PISIAWA Hrps. . . . 11. WATER LINE (ft ) . : 10.0 CITilE"7 FIXTURCJ. . . . . :0
GARBAGE DIcSP. . . : 1 RAIN DRAIN (ft) . :O
Wn'7; ITI`A..a MACH. . . : i rr' RAIN DF AING. . : 1
MECHANICAL Z __..._, _.....-._._. .... r_ .w._..___._._...._._.__... _. E�
f[ ... .__.._.__. .,_._._._._
-L17-L TYPIE57. ..�_,.,.____...__... UNIT T r T-IR^. . to type �amol_rrit by date v,ecpt
/GAS/ / / VENTS . . . . , :0 TIF- f 1.550. 00 JD 05/19/g9 95-•G65658
AX TIJPIJT :171 IIT!j VENT 17ANS. . :4 Sn,PT s J43. 00 JD 03/19/95 95 t Ca':5(+m
TURN ( 10v.'K . . :0 H00DO. . . . . . : 1 PPLC f 50. 00 JD 05/19/95 95-265658
1".SRN ) :=1001< , _ : i WOODt3TOVES. :0 LTPC 1. 27. 15 JD M5/19/95 15--26565101
7LOOR r"UP,q. . . . :0 CLO DRYERS. s 1 PARI! !9 500. 00 JL1 05/19/95 95 r'651656
13E)II..,''CMF ( UiIp:Q OT11CM UNIT.,cl MPRT f 4J. 00 JD 05/19/^5 13-
GAS
5 GAS OUTLG TS t 1 MPLC $ 11. .:5 JD 05/19/95 ^5-265658
fWIIElt' : _ - _. .-. .._. .1...._- ..__..
M '-.--___ .—.."'__...M7 'C. 5 9' . : r � 121!30/19/9
1=4
D C0NG1'RJC'fIt1N 3BTH $ 2L-15.
O1"'I JD 0'°x./19/95 9r.,;-.E,nhr_r
17, 0 LOX 1�i77 p5PC 4 1 1. _'S JO 03/V)/95 95 76"'5'(,3-J8
SWM $ 180. 00 JD 05/19/95 95-26~658
1_r7AVErRT0N OR 97 "! WM 11 14'.10. 1't0 JE) 41 /19/'3"5 SS-
t�hone! #s 641 171035-, ERUS 64. 00 JD 05/19/95 95-265F.58
C ,t,i;1.s "t o.- : ... 11 _ . .. _ _ ....._. w..._,.. _,_....:..__.ERPr 1 L:. Gr7r JD 005/19/95 9.^y.
'_0'JR U Cott/^'rRUCT I OhN r.ripc 20- 80 in OS/19/95 95-C:'F v6
SOX I177
MAMRTON OR 97075-
hone 'I#., r.,41 - 0935
CC
leg ##. . : 71037
T .i:50. "0 TOTAL.
i- This perait is iisued subject to the regu:ations contr!.i-ed in the _._..__.._. ._. RSQUIR::D IN,)PECTII"JI'4S ---
7igard *.nicipal Codo, State 0 Dre. Specialty Cedes and all Other 1 ooting Insp Plumb Top CLtt
�? pplicable laws, nll work will be dosre :u accordance with Approved Fo:.mdat i.jn Insp F"r^atming Insp
J .dans. Tris pe r:t hill ex;'re if work is rat started within A POE.t/neazm rtruc t 'irepalac•e Insp
-� =. y Cf isiur'l , 3r• if work is suspe'. ' f_. ao P'os't/Peiffi Mechtan Gats Line Ina.p
Crawl ot'aJin Insuletion Inst
s .;a aCIVI C� p G`l.ro/F.drlCj!i1. :111 In.."'If9 Gyp D(7ie' ". d Insp
PLM/Underflcnr Rain dr-ain Inap
I,.i.n e: Insp
Czar] 3 Fclr irrspvc:t ion 639-417:
CITY OF TIGARD BUILDING INSPECTION NOTICE
Inspection Line (Rec-v-Phone): 639-4175 Business Phone: 6 9�a1'!1
Inspection:
Footing Susp. Cel ng Sprink. Rough-in Appr/Sdwlk
Foundation Plbg. Unders;ab Mech. Rough-in Fireplace
Post/Beam Struct. Plbg. Top Out Elec. Rough-in FINAL:
Post/Beam Mech. San. Sewer Gas Line E�d �
Plbg. Underfioor Rain Drain Framing lumb
Alarm Water Line Insulation ec .
Undertlr. Insui, Shear Wall/ Gyp. Bd. -Elect.
Date Requested: ( � S` Time: _AM PM
Address:_
Builder: Permit #:
THE FOLLOWING CORRECTIONS ARE REQUIRED:
111
-J
'J
tor: — Date:
APPROVED `DISAPPROVED `APPROVED SUBJECT TO ABOVE
_Call For RP' sp
CITY OF TIGARD BUILDING INSPECTION NOTICE
m.pection Line (Rai-.-O-PhonJe'):639-4175 Business Phone: 639.4171 >�
Inspection:—
Footing Susp. Cciling Sprink. Rough-in ppr/Sdwl
Foundation Plbg. Underslab Mech. Rough-in Fireplace
Post/Beam Struct. Plbg, Top Out Elec. Rough-in FINAL:
Post/Beam Mech. San. Sewer Gas Line -Bldg.
Plbg. Underfloor Rain Drain Framing -Plumb.
Alarm Water Line Insulation -Mech.
Underflr. Insul. Shear Wall Gyp. Bd. -Elect.
Date Requested: � _Time: AM --PM
Address: I `Z —?—) c �4—t`-
Builder: _ _Permit t1: _
THE FOLLOWING CORRECTIONS ARE REQUIRED:
n.
J
G]
�1
J
Inspector �li�e _ Date:
—XAprROVED _—DISAPPROVED ____APPROVED SUBJECT TO ABOVE
lll`��� Cc11 For Reinsp.
CITY OF TIGARD BUILDING INSPECTION NOTICE
Inspection Line (Rec.-O-Phone): 639-4175 Business Phone- 639-4171
Inspection:
;r Footing Susp. Coiling Sprink. Rough-in Appr/Sdwlk
Foundation Plbg. Underslab Mach. Rough-in Fireplace
Post/Beam Struct. Plbg. Top Out Elec. Rough-in - FINAL:
Post/Beam Mech, San. Sewer Gas Line -Bldg.
Plbg. Underfloor Rain Dain Framing -Plumb.
Alarm Water Linj Insulation -Mech.
Undc,tlr. Insul. Shear Wall Gyp. Bd. elect
Date Requested: '71 �7S Time: AM PM
Address: L/ L -
Buildef, t_&�)-t 0_� VL( -] Z> Permit
THE FOLLOWING; CORRECT;ONS ARE REQUIRED:
jap c=)� e� —
H
�1
J
Inspector: i�(��. Dater
APPROVED ,DISAPPROVED APPROVED SUBJECT TO ABOVE
Call For Reinsp. _
CJrf
1
CITY OF TIGARD BUILDING INSPECTION NOTICE
Inspection Line (Rec-O-Phone): 639-4175 Business Phone: 639-4171
Inspection.
Footing Susp. Ceiling Sprink. Rough-ir, Appr/Sdwlk
Foundation Plbg. Underslab I`tech. Rough-in Fireplace
Post/Beam Struct. Plbg. Top Out Elec. Rough-in FINAL:
Post/Beam Mech. San. Sewer Gas Line -Bldg.
Plbg. Underfloor Rain Drain Framing -PiUmb.
Alarm Water line Insulation -Mech.
Underflr. Insul. Shear Wall Gyp. Bd. -Elect.
Date Requested: �'� � Tine* AM PM
Address:
Builder- Permit #:
THE FOLLOWING CORRECTIONS ARE REQUIRED:
SQ
1--
L
Fti
.J
LD
LLl
Inspector:�/1 C — U LiC_-- Dater
__APPROVED ADISAPPROVED __APPR.)VED SUBJECT TO ABOVE
Call For Reinsp. T1
CITY OF TIGARD BUILDING INSPECTION NOTICE
Inspection tine (Rec-O-Phone): 639-4175 Business Phone: ^ 71
Inspection:
Footing Susp. Ceiling Sprink. Rough-in opr/Sdwlk
Foundation Plbg, Underslab Mech. Rough-in Fireplace
Post/Beam Struct. Plbg. Top Out Elec. Rough-in FINAL:
Post/Beam Mech. San. Sewer Gas Line -Bldg.
Plbg. Underfloor Pain Drain Framing -Plumb.
Alarm Water I-ine Insulation -Mech.
Underflr. Insul. Shear Wall 134— -Elect.
Date Requested: �1`� Time: )�kM PM
Address:
Builder:-- Permit
THE FOLLOWING CORRECTIONS ARE REQUIRED: r�si�S� Uly7
rA
J
C!1
1
Inspector:_ _ Date:��
VEO DISAPPROVED APPROVED SUBJECT TO ABOVE
_Call For Reinsp.
CITY OF TIGARD BUILDING INSPECTION NOTICE
Inspection Line (Rec-O-Phone)• 639-4175 Business Phone: 9-4171
Inspection: _
Footing Susp. Ceiling Sprink. Rough-in U��rlsclwlk
Foundation Plbg. Underslab Mech. Rough-in Fireplace
Post/Beam Struct. Plbg. Top Out Elec. Rough-in FINAL:
Post/Beam Mech. San. Sewer Gas Line -Bldg.
Plbg. Underfloor Rain Drain Framing -Plumb.
Alarm Water Line Psul� -Mech.
Underflr. Insul. Shear Wall Gyp. Bd. -Elect
Date Requested: �� 5� Time:--AM PM
Address: �t'•�--
Builder: Permit
THF FOLLOWING CORRECTIONS ARE REQUIRED: 01g7
Ins Pct Date:
LA�F�OVED DISAPPROVED APPROVED SUBJECT f ABO-,/E(
_Call For 113insp.
CITY OF TIGARD BUILDING INSPECTION NOTICE
Inspection Line (Rec-O-Phone): 639-4175 Business Phone: 639 .1 '1
Inspection:
Footing Susp. Ceiling Sprink. Rough-in Ap 'd Ik
Foundation Plbg. Underslab M c . Rough Fire e
Post/Beam Sti,uct. Plbg. Top Out Elec. Rough-in l FINAL:
Post/Beam Mech. San. Sewer Gas Lin l Bldg.
Plbg. Underfloor Rain Drain ramiW Plumb.
Alarm Water Line Insulation -Mech.
Undertlr. Insul. Shear Wall Gyp. Bd. -Elect.
Date Requpsted: 31 Time^_AM PM
r.
Address:
NEW J9 W.
Cic
Builder: 7 LILA S _Permit "t
THE FOLLOWING CORRECTIONS ARE REQUIRED:
�?Cct ►l_; �L L.c.. y ,' a�c_ -kms
J
7
�1
J
In ector: Date:_ 6)"1
PPROVED DISAPPROVED _APPROVED SUBJECT TO ABOVE
_Call For Reinsp.
CITY OF TIGARD BUILDING INSPECTION NOTICE
' Inspection Line (Rec-O-Phone): 639-4175 Business Phone: 639-4171
Inspection:
Footing Susp. Ceiling Sprink. Rough-in Appr/Sdwlk
Foundation Plbg. Underslab Mech. Rough-in Fireplace
Post/Beam Struct. Plbg. Top Out Elec. Rough-in FINAL-
Post/Beam Mech. San. Sewer Gas Line -Bldg.
Plbg. Underfloor Rain Drain Framing -Plumb.
Alarm Wats+r Line Insulation / -Mech.
Underflr. Insul. Shear Wall Gyp. Bd. -Elect.
Date Requested: � '_yTime: ItN PM
Address:_
Builder: d- Y I :2 J Permit #:
THE FOLLOWING CORRECTIONS ARE REQUIRED:
77
cn
J
J
LL:
J
Inspector: ', � +rr f 1� Dater ,2
APPROVED _DISAPPROVED _APPROVED SUBJECT TO ABOVE
Call For Reinsp. FA��
CITY OF TIGARD BUILDING INSPECTION NOTICE
Inspection Line (Rec-O-Phone): 639-4175 Business Phone: 639.4171
Inspection;
Footing Susp. Ceiling Sprink. Rough-in A pr wl/
Foundation Plbg. Unders(ab Mech. Rough-in Fire act/
Post/Beam Struct. Plbg. Top Out Elec. Rough-in FINAL:
Post/Beam Mech. San. Sewer Gas Lin- -Bldg.
Plbg. Underfloor Rain Drain Framing Plumb.
Alarm Water Line Insulation -Mech.
Undertlr. Insul. ear W lV Gyp. Bd. -Elect.
Date Requested: w 1 3 C) cl S TimeKAM PM
Address:. c�
Builder- Permit
THE FOLLOWING CORRECTIONS ARE REQUIRED:
Inspector:
tAP-QftOVED DISAPPROVED APPROVED SUB.'ECT TO ABOVE
_Call For Relnsp.
CITY OF TIGARD BUILDING INSPECTION NOTICE
Inspection Line (Rec-O-Phone): 639-4175 Business Phone: 6r 1
Inspection: _
Footing Susp. Ceiling Sprink. Rough-in &/ wlk
Foundation Plbg. Underslab Mech. Rough-in ireplace
Post/Beam Struct. ---Plb . Top t Elec. Rough-in FINAL:
Posi tam Mech. San. Sewer Gas Line -Bldg.
P � J Rain Drain Framing -Plumb.
Alarm Water Line Insulation -Mech.
Underilr. Insul. Sheat Wall Gyp. Bd. -Elect.
Date Requested:_ �� Timp:� PM
Address:
Builder: Permit
THE FOLLOWING CORRECTIONS ARE REQUIRED: ���— viy7
en, c.���/ t' /7&Ld- ,_<
Inspector: Date:
__.. PPROVED _DISAPPROVED —APPROVED SUBJECT TO ABOVE
„Call For Reinsp.
CITY OF TIGARD BUILDING INSPECTION NOTICE
Inspection Lino (Roc-O-Phonp): 633-4175 Business Phone: 6 -4 7L____/
Inspection:
Footing SusN. .,piling Sprink. Rough-in Appr/Sdwlk
Foundation Plbg. Underslab Mech. Rough-in Fireplace
Post/Beam Struct. Plb . To Out Elec. Rough-in FINAL:
Post/Beam Mech. San. Sewer Gas Line Bldg.
Plbg. Underfloor Rain Dr:;n_�> Framing -Plumb.
Alarm ter LIQ*` Insulation -Mech.
Underflr. Insul. Shear Wall Gyp. Bd. -Elect.
Date Requested: Time: AM ___PSI
Address. ?>9 v, ;TS'
Builder. G(., 4v,.L' _Permit #: , F 01 y7
THE FOL OWING CORRECTIONS ARE REQUIRED:
r
J _
tl
J
Inspector: ------__ Date:
L,,4PPROVED _DISAPPROVED _APPROVED SUBJECT TO ABOVE
_Call For Reinsp.
CITY OF TIGARD BUILDING INSPECTION NOTIC
Inspection Line (Rec-O-Phone): 639-4175 Business Phon 63 -4171
Inspection:
Footing Susp. Ceiling Sprink. Rough-in Appr/Sdwlk
Foundation Plbg. Underslab Mech. Rough-in Fireplace
Post/Beam Struct. Plbg. Top - Elec. Rough-in FINAL:
Post/Beam Mech. Gas Line -Bldg.
r\bg. Underilin Framing -Plumb.
Alarm .� ate Insulation -Mach.
Under-11r. Insul. hear Wall G . Bd, lect.
Date Requested: +" ? f_� Time: AM PM
Address: CI-
c–
Builder: Permit #:
THE FOLLOWINC CORRECTIONS ARE REOUiRED: b (If
Inspect Date_14
PROVED —DISAPPROVED `APPROVED SUBJECT TO ABOVE
`Call For Reinsp.
CITY OF TIGARD BUILDING INSPECTION NOTICE
Inspection Line (Rec-O-Phone): 639-4175 Business Phone: 639-417
Inspection:
Footing Susp. Ceiling Sprink. Rough-in Appr/Sdwlk
Foundation Plbg. Underslab Mech. Rough-in Fireplace
Post/Bee—imam Str—^ Plbg. Top Out Elec. Rough-in FINAL:
ost/Beam Mech, San. Sewer Gas Line Bldg.
Plbg. Underfloor Rain Drain Framing -Plumb.
Alarm Water Line Insulation -Mech.
Underflr. Insul. Shear Wall Gyp. Bd. -Elect.
Date Requested: — L �LJ--� Time: AM PM
Address: �L--
Buiider: Permit #: J ) 2
THE FOLLOWING CORRECTIONS ARE REQUIRED:
c�
rL
C7
117
Vp
torDate:PROVED DISAPPROVED APPROVED SUBJE T TO ABOVE
—Call For Reinsp.
CITY OF TIGARD BUILDING INSPECTION NOTICE
Inspection Line (Rec O-Phone): 639-4175 Business Phone: §39.4171
Inspection:
Footing Susp. Ceiling Sprink. Rough-in 4ppr/Sdwlk
F ndatio Plbg. Underslab Mech. Rough-in Fireplace
Post/Beam Struct. Plbg. Top Out Elec. Rough-in FINAL:
Post/Beam Mech. San. Sewer Gas Line -Bldg.
Plbg. Underfloor Rain Drain Framing -Plumb.
Alarm Water Line Insulation -Mech.
Underflr. Insul. Shear Wall Gyp. Bd. -Elect.
Date Requested:_ S ^? ( j Time: l ) _PM
Address: l �. Z e v-(t_
Builder: _ Permitff 7,11
THE FOLLOWING CORRECTIONS ARE REQUIRED: ]
J
Ca]
C.7
LLI
insf tor:_ Date:
_APPROVED `DISAPPROVED __APPROVED SUBJECT TO ABOVE
_Call For Reinsp.
CITY OF TIGARD BUILDING INSPECTION NOTICE
Inspection Line (Rec-O-Phone): 639-4175 Business Phone 639-4171
Inspection: _
Footing Susp. Ceil'ng Sprink. Rough-in Appr
Foundation Plbg. Underslab Mech. Rough-in Fireplace
Post/Beam Struct. Plbg. Top Out Elcc. Rough-in FINAL.:
Post/Beam Mech. San. Sewer Gas Line -Bldg.
Plbg. Underfloor Rain Drain Framing -Plumb.
Alarm Water Line Insulation -Mech.
Underfir. Insul. Shear Wall Gyp. Bd. -Elect.
- S
Date Requested: ~_1 Time: AM PM
1
Address:
Builder: Permit #:
THE FOLLr7WING CORRECTIONS ARE REQUIRED: 9'7
11,CWI-ys
_— 1uj► �-- _ cf1vk I;A-a-
�- 1
✓ e, w arc cel
ll;
.J
a
Inspector:_'& p, Dater_
_APPROVED DISAPPROVED —APPROVED SUBJECT TO ABOVE
Call For Reinsp.
CITY OF TIGARD BUILDING INSPECTION NOTICE
Inspection Line (Rec-O-Phone): 639-4175 Business Phone: 6 41 1
Inspection:
2
(1-9-gliuir-1 Susp. Ceiling Sprink. Rough-in Appr/Sdw!k
oundatio Plbg. Underslab Mach. Rough-in F=ireplace
Post/Beam Struct. Plbg. Trp Out Elec. Rough-in FINAL:
Post/Beam Mech. San. Sewer Gas Line -Bldg.
Plbg. Underflow Rain Drain Framing -Plumb.
Alai Water Line Insulation -Mech.
Underflr. Insul. Shear Wall Gyp. Bd. -Elect.
X
Date Requested: _ _ /� Z �/� Time PM
Address:
Builder: Permit #:
THE FOLLOWING CORRECTIONS ARE REQUIRED:
a
rr
F-
J
G7 -
LL)
.J
r
Insp ctor: Date: Z /
_QED —DISAPPROVED APPROVED SUBJECT TO ABOVE
_Call For Reinsp.
CITY OF T I r\ARD SEWER CONNECTION
PERMIT
COMMUNITY DEVELOPMENT DEPARTMENT PERA I T #. . . . . . . : SWR95---0139
13126 BW Nall Blvd.Tigard,Oregon 97223.8109 (603)639+4171 DATE ISSUED: 05/19/95
PARCEL . S111AA—GPO37
S 1`-E ADDRESS. „ . 14391: SW 88TH AVE
SUBDIVISION. . . . : GREENSWARD PARK NO. 2 ZONING: R--4. 5
VL0CK. . . . . . . . . . + LOT. . . . . . . . . . . . . :037
TENANT NAME. . . . . ;
U A NO. . . . . . . . . . : FIXTURE UNITS. . . s
CLASS ,OF WOnK. . . -144-W DWELLING UNIT3. . : 1
TYPE OF USE. . . . . :SF NO. OF HU I LD I NGS: 1
II\I1TALLTYPE. . . . :DLJS'.Jr. IMPERV SURFACE. . : : s°
P.emarks : PATH I
Owners FEES
rouR D CONSTRUCTION type amount bj date rec.pt
P O BOX 1577 PAMT f 2200. 00 JD 05/19/95 95-265658
INSP $ 35. 013 JD i�ul3.91r35 35_265658 �
BEAVERTON OR 0707-
Phone #: 641--0935
Contractor- .
"is,rrRACTOR NOT ON F-I LE
0: L 235. 00 TOTAL
Re(l #. • +
---- -- REQUIRED INSPECTIONS _... .. _.. .
Tris ?pplic&nt agrees to cceply with all the rules and regulations Sewer Inspection
of the Unified Sewage Agency. Thi pewit expires 180 days from
the date issued. The total amount paii will be forfeited if the _..._ �— �_._.._......
;-s. ;:t ehpires. The Agency does rot guarantee the accuracy of the
side sewer laterals, If the sewer is not located at the measurement
yi�hn, the installer shall prospect 3 feet in all directions from
the distance given. If rot so located. the installer shall purchase
a "Tap and Side Sewer" rersit and the Agenc,i . :'; install a lateral.
x r�r.eat
a
rL CaI1 for^ inspection — 639--417;
Ln
F—
J
G1
W
�S
� 1Lps 8�
Residential Building Permit Application 603
City of Tigard
13125 SW Hall Blvd.
Tigard, OR 97223
(503) 639-4171
Jobsite Address: %c/3 22 2,
Subdivision: (.. i�r.r., P�of# Office Use Only
f— Contact Date / / Initials
Valuation: f �� Result
Planck/Rec # '' C / Q _
New Construction Only: (Square Footage) Permit # n75 ,-E- 0101
House: _ ' Garage: _ 1 ---OL Reissue of_^� ' -o I-34,
G,Po34 Map & TL#_ i i ,4n - 6'id)3 )
Zone_ r?- 4/•s
Corner Lot? Y ® Flag Lot? Y N Plat # l T I, j r
Owner: v it :y ,� . Cam _ Approvals Required �<<i "C', I S
�rt--T990., S'
Planning Setbacks Sol
Address: Engineering
Other_
Phone: ( D2 ) 4 42- y e; `7 Items Required
Subcontractors _
Contractor: Truss Details
Other
Address:
Notes _
Phone: ( )
Contractor's License #
(attach copy of current Oregon license)
Contact Name: �; �; +lG ,j // JA_!L?"`
Contact Phone: ( ;v�. ) 72-d 74-22"
t//V
- Subcontractors: Arch itect/Engineer: _LILA eJ &&gf CA.c,i'
v r'
Plumbing: d /� �7 v r,.16 i d4k Address:
J Mechanical
(attach copy of current OR Contractor's License)
Phone: ( 1;6 21 e
J
,i08 DESCRIPTION: c
Applicant Signature r Applicant Phone number
Received by: '' Date Received. 3
H'M7nd.`l l.yq
1,
i-�1�.
Permit * Account Description Amount Amt. Pd. Bal. Due ` '• -
/r)�t y 7 Bldg. Permit (BUILD) S j -�-
Plumb. Permit (PLUMB) 2 Z Z Z Sl ✓
Mech. Permit (MECH) i _U )--
State
-"State Tax (TAX) 41 C)'6,
Bldg:
Plumb: // L '/
Mech:
Plan Check (PLANCK) �� Z ► -� �' '�
Bldg: S c�
Plumb:
Mech: L
Sewer Connection (SWUSA) 2 2 u
� f �
Sewer Inspection (SWINSP)
Parks Dev Charge (PKSDC) `' S
Residential TIF (TIF-R) ell3 J _Z__,4.3 L,
Mass Transit TIF (TIF-MT) r / Z:' 1 ze,
Commercial TIF (TIF-C) —
Industrial TIF (TIF-1)
Institutional TIF (TIF-IS)
Office TIF (TIF-0) _
Water Quality (WQUAL)
Water Quantity (WQUANT) _, �' v.- ✓
Fire Life Safety (FLS)
Erosion Cntrl Permit (ERPRMT) v
Erosion Planck/USA (ERPLAN) ,�,y 0v ✓
Erosion Planck/COT (EROSN)
TOTALS:
FOUR D CONSTRUCTION CO.
BillPOST OFF,CE BCx 1577 ■ BEAvERTON. CREGON. 97C75 ■ PHONE (503)641-CQ35
20/
For
a
s
!�'7b \
N
u 7
_T I Z•w4c1 M�$ \ O
! _
c�
J
Solar Balance Workst
Address
Box A calculations : North-South dimension for the lot . Box A.-
This
:This dimension is determined by finding the midpoint of the
North lot line and drawing an intersecting line perpendicular
to that point . Measure the distance from the midpoint of the
North lot line to the South lot line along the described line .
ft
Box B calculations : Shade point height from your. structure . Box B :
1 . Determine whether measurements will be based on the peak
or eave of your structure. The orientation of the ridge
is also important . Which
la: If the roof line runs North-, .ith, measurements will be describes
based on the peak of the roof your lot?
1b: If the roof line runs East-West and the roof pitch is less (Circle one)
than 5/12, measurements will be based on the eave .
] c : If the roof line runs East-West and the roof pitch is 5/12 la lb lc
or steeper, measurements will be based on the peak.
2 . Measure change in elevation from front property line to
finished floor elevation. � ` ft
3 . Measure distance from finished floor elevation to the
affected peak/eave . + X ft
'4 . If the roof line runs North-Suuth, deduct three feet .
If the roof line runs East-West, deduct nothing.
S ft
Subtract one foot for each foot of difference in elevation
from the front property line to the rear property line, if
the lot slopes up from the front to the rear. If the lot
has no slope or slopes up from the rear to the front, - ft
deduct nothing.
Total figure for box R :
G ft
Box C. Distance to the shade reduction line . Box C:
I. . Measure the distance from the North property line to the
foundation. ft.
2 . Measure the distance from the foundation to the affected + f_r
peak or eave .
LD
3 . Total figure for b-x C: ------�----
ZS•S ft
(e co f
0
Solar Balance Point Standard
BoxA. North-South dimension for the lot Box B. Shade point height from your structure:
measured perpendicular to the midpoint of the Change in elevation from front property line to
north lot line the finished floor elevation added to the height
of the building 'rom finished floor elevation to
LO the affected peakeave. If the line runs
(/` feet NIS, subtract 3 feet from the figure.
. Subtract
one foot for each foot of differ!nce in elevation
from the front property line to 1.he rear property
line.
�— feet
Box C. Distance to the shade reduction line
Distance from North property line to
foundation added to the dis`ance from the
foundation to the affected roof peak/eave.
Feet
The following helps explain the graph below:
The horizontal axis (:rows) represents box "C" figures.
The vertical axis (columns) represents box "A" figures.
It is most useful to draw a vertical line to represent the appropriate figure
found in box "A" and a horizontal line to represent the appropriate figure found
in box "C" . The intersection of the vertical and horizontal lines determines the
value found in box "D" . The value in box "D" should be compared to the value in
box "B" ; if the value in box "B" is less than or equal to the value found in box
"D" , the building is in compliance with the sola. balance code .
Distance to J
shade 100+ 95 90 85 80 75 '10 65 60 55 50 45 40
reduction line
from northern
lot line in Eeet
70 40 40 40 41 42 43 44
65 38 38 38 39 40 41 42 43
60 36 36 36 37 38 39 40 41 42
55 34 34 34 35 36 37 38 39 40 41
50 32 32 32 33 34 35 36 37 36 39 40 41 42
45 30 30 30 31. 32 33 34 35 36 37 38 39 40
40 28 28 28 29 30 31 32 33 34 35 36 37 38
N 35 26 26 26 27 28 29 30 31 32 33 34 35 36
30 24 24 24 25 26 27 28 29 30 31 32 33 �j4
25 22 22 22 23 24 25 26 27 28 29 JO 31 32
20 20 20 20 21. 22 23 24 25 26 27 28 29 30
�? 15 18 18 18 19 20 21 22 23 24 25 26 27 28
LL) 10 16 16 16 17 18 19 20 21 22 23 24 25 26
__j 5 14 14 14 15 16 17 18 119 20 21 22 23 24
't' (,
Box "D" Maximum allowed shade point height _ _ feet
N 1 Qj z7,
�-
C I i Y OF T 1 BARD - RECF IPT OF f''AYME 1\11* RFCFI F,T No. a 95-r 65W58
CHECK AMOUNT 5535. 50
NnME a FOUR 1) CCINSITRUC 1 I(IN CO CPi aH AMOUNT a W. 00
ADDRF*SEF PAYMENT DATC t 05/19/95
PfJ BOX 1577 SUB 1)I U I5I ON
BE='AVERTON OR 97075
PURE- OSE M POYME N'T AMOUNT PAID PURPOSE OF PAYMENT AMOUNT PAID
a
...... _.._.....
BUILDING PERM MST95-01 47 54.3. CAO PL.I_IMF.I E NCS PF RM 225. 00
N MECHANICAL PE 4',.-,. 00 3T'. 13l_IIi_0 E'ER 40. 65
PLAN CHECK. t.-F 11. 25 SE:WR URA SWR95-01:39 *00. 00
•• SE.Wk R INSE''CCT 35. 00 PORKS SDC 1500. lbo
J
m RESIDENTIAL- TRAFFIC: FEE'S 14310. 00 1407iq �RAN J I T TIF FE VS 1 00
Hc0 oust_i-rY FAC I L_I TY FVF 11.10. 00 Hct] 00ANT I 1 Y FAQ.I L I'TY FEI. 1011. 00
un
'i 1".ROSION CONTROL PERMITFEF" (11,1100 EF40SION r,nNTFittL. Po. so
J
FRn,IE.IN CONTRE]L. PL.ON CK 2A. 80
143t�<' SW 118TH AWE
6M. 14SWARD PURE'. E L.01 .7-7
TOTAL AMOUNT Pf)I D - - -> 5535. 5-0
TICARD PRMTNG PERMIT
�f� OF
PECRMIT #. . . . . . . : MaT95 '.Qt1/�"
DATE ISSUED: 05/19/95
COMMUNITY DEVELOPMENT DEPARTMENT
19125 8W Mall Blvd.Tigard,Oregon 97229.8199 (503)099.4171 PARCEL: 1 1 AA -GPLA 37
ITL-- ADDRESS. . . : 14272 SW 88TH A':E
SUBDIVISION. . . . : GREENSWARD PARK NO. 2 ZONING. R-4. 0
BLOCK.. . . . . . . . . . LOT. . . . . . . . . . . . . .037
CLASS-or WORK.. . :NrWGARBAGE DISPOSALS. . : 1
TYPE OF USE. . . . :SF WASHING MAC14. . . . . . . ii BACKFLOW PREVNTRS. . : 1
OCCUPANCY GRP. . :R:3 FLOOR DRAINS. . . . . . . :0 TRAPS. . . . . . . . . . . . . :0
�ITORIES. . . . . . . . :2 WATER HEATERS. . . . . . : 1 CATCH BASINS. . . . . . . :0
LAUNDRY TRAYS. . . . . . .0 OF RAIN DRAINS. . . . . : 1
INKS. . . . . . . . . . : 1 GREASE TRAPS. . . . . . . :0
'-.AVATAR I1:S'. . . . . :5 OTI IC_R F I XTURES. . . . - :0
UB/Coll 10WERS. . . . r SEWER LINE (ft) . - :0
WAT[tR CLOSETS. . :C WATER LINE (ft) . . . . : 100
DISHWASHERS. . . 4 : 1 RAIN DRAIN (ft ) . . . . 80
ReQl+t•?rrk!F. : PnTll I
OWNER:
OUR D CONSTRUCTION TIF s 1550. 00 ,10 05/19/9 5 95-265058
O POM 1;:;77 SPRT t 543. 00 JD 05/19/95 95- -65656
BPLC t 50. 00 JD 05/19;9`' 7)3-263656
DEAVE:RTON OR 07077: BSPC it 07. 15 JD 05/19/95 95-265658
-'hone #: 641--0935 PARK $ `300. 00 JI) 05/19/ 3 9S-20:565+
MPRT $ 4S. 00 JD 05/19/95 95-265651
'IumbingI.ontr,ar.t;u : __,...- MPLC $ 11. 25 JD rD5117lr35 95• w65C�5D
M5PC $ 2085 JD 05/19/95 9n �,65C 5&
l IV,C'..., ISTI1 $ 225. 00 JD 05/19/')5 "-r C 3f.50
cadre _? bav ld�a� _..._.__�_ P5PC $ 11. 25 JD 05/19/h w X15 cG:;C•5 ',
i t y: N►1lSkbrO (5T'� SWM I Ino. 00 JD, 07/19/95 9
__ _
ipeUr,L.'#1 , GRO ON311 -.-- 5 W M $ 100. 0rel JD 0-9/19/95 95-c'C•�`iC ""'.
ug :1'r . - LCR 0-7 mwitional roes riot shown here. . . . . .
REQUIRED I NSPf:CT I ONS ------
,is per mil, ir., issued subject "a the rag -
ations containecr in the Tiga;-d Municipal rooting Insp Insulation Insp
,de. State of Cct . Specialty Codes and all ror_tndation Insp Gyp Board Insp
her I- applicable laws. All work will be done Post/Beam Struct Rain drain Insp
rdarrc r witi., +t:rc:i,aved F;IAns. Thi -t, Post/Beam Mechan Water Line Insp
* mit v, ill expire if work is not started Cryawl Drain Water- Servica In
th7 ,r ir3�i days : tr . , Plm/undslab Insp Iispt
2 spended for more than 130 days. PLM/Underfloor- Mechanical Final
Mechanical Insp Plvmb Find
Plumb Top Out Building Pinal
Framing Irr::p Erosion Control
11r�JN�/ V*i.r e p t a c e Insp
L
� laa6 Line Insp
co hrwtzaz I .iniair,q Cr..ntrac_tur ri )rrature
e`p
11;�11 for, i.wsprr�tiun 630 _4175
w
J tr-,iA tU'+ Not