INSPECTION NOTICE
City of Tigard Building Department
12420 S.W. Main St.
Tigard,Oregon 97223
Phone: 639.4171
Type of Inspection
Date Requested___ 7-3c - 6'i Time _ A.M. -e P.M.
Address �-�y �S /�4- �� ==� Permit
Owner
c�.r -��-� t.ot #-.
?�� _ ---
BuilderThe following Building Code deficiencies are required to be corrected:
Yom'
1
Presented to _ _— ___ — _ Approved
Inspector - - Z Disapproved
Date
CALL FOR REINSPECTION
Y88 Ik NO
t
6U'LfJING PERMIT APPL_ICArION TIGAR[3 DATE ;1y 30, 82 4154
t8_ _
THE UNDERSIGNED HERL BY APPLILS r UH A PFFIMIT FOR THE WORK HEREIN INDICATED D!—.
-I,IE Cy y«i2Gf)
OR AS SHOWN AND APPROVED IN THE ACCOMPANYING PLANS AND SPECIFICATIONS OWNER PHONE 620—-
OWNER '.I'Arto Louie JOB ADDHESS 12925 `a.rf. Pacific "Ivy. LOrNO.
_.. ._
ARCHITECT
O i8*=" 1,2545 S.'.7. "fit antic in. ENGINEER
BUILDER — ADDRESS DESIGNER
STRUCTURE ❑ NEW ❑ REMODE_ _ 0 ADDITION ir] REPAIR ❑ RENEWAL ❑ FIRE DAMAGE ❑ DEMOLITION
❑ RESIDENCE: M COMM ❑ EDUCATIONAL 11 GOVT ❑ RELIGIOUS ❑ PATIO ❑ CARPORT ❑ GARAGE ❑ STORAGE ❑ SLAB❑ FENCE
OCCUPANCY ;l"'?—LAND USE ZONE —v BLDG.TYPE l—' —FIRE ZONE___.- PLAN CHECK BY —HEAT---,.
TIM--roor exi9tin Structure repair ---
____ s+cnm rv)f s Cxuc C sir c --- --- -- —� -- --
SEWER PERMIT#
OCC.LOAD FLOOR LOAD —_HEIGHT NO.STORIES 2 _ AREA NO.BEDROOMS_ VALUE
BUILDING DEPARTMENT SET BACKS F FIONT REAR LEFT SIDE` RIGHT SIDE
Permit _ THIS PFRMIT IS ISSUED SUBJECT TO THE 9EGULATIONS CONTAINED IN THE RIIIL.DING CODE, ZONING
REGULATIONS AND ALL APPLICABLE CODES AND ORDINANCES, AND IT IS HEREBY AGREED THAT THE
Plan Check WORK. WILL BE DONE IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS AND IN COMPLIANCE
25.00 WITH ALL APPLICABLE CODTS AND ORDINANCES. THE ISSUANCE OF THIS PERMIT DOES NOT WAIVE
Sub-total RESTRICTIVE COVENANTS. CONTRACTOR AND SUB CONTRACTORS TO HAVE CURRENT CITY BUSINESS
State Tax
.60 LICENSE.SEPARATE PFRMIT$1 F_ouiRED FOR SEWER,PLUMBING AND HEATINL;.
_ IV' 4
Total 1Kiwlil,l� SDG— /\( d ✓�/�"i�"
PDC# APPLICANT OR AGENT
By 1-haj
Approved T;,. Recelpl Na ADDRESS
ONEw
6
DATE' INSP. TYPE INSPECTION REMARKS PLUMBING DATE
Contractor
Permit No.
-- —--
Rough-in ---- ,
._—_._ ---------- Fixture
i Final
HEATING —�
Contractor
Permit No.
_ lies or Oil
Rjugh•in
Final
SEWER
Final
DRIVEWAY
Final� A
Storm Drainepa
(Rain Drain)Final
Sideveik
Curb&Street Final
Approach
BLDG.DEPT.FINAL TEMPORARY CERTIFICATE OCCUPANCY
CERTIFICATE OCCUPANCY final
Landscaping
Zoning Final
I
,2.
s �
CITY TIGARD GATE 7- -30 Q
F�IJILDIi�ta PERMIT APPLICATION
I PLIC,ATIOIa
N of
THE UNDERSIGNED HERES) APPLIES FOR APERMIT FOR THE WORK HEREIN INDICATED � BIdIZOEftPyONF✓�'9'"'�zlo
OR AS SHOWN AND APPROVED IN 'f FIE ACCOMPANYING PLANS AND SPECIFICATIONS, Ov/rIEFrPeormi:!��
LOT NO_
7'.VfJEPwl�i�..-_ii •���t...i JOB ADURESS _
;KfFCHITECT —
iUlf`Oc'� J v ADURES^
' ENGINEER
_.�� - —_��•''�j�'�f»u.s��/t s �!�C.ss�Q�SIG'VER
STRUC,TLIRE IDNEW ❑RE%inCEL ❑ADDITION RcP:.IR CRE`JEI;IAL �DFIREDA.MAGE L_.1DEMOLITI.
❑ nESILIENCE Q COM.,14 ❑EDUCATIONAL CGOV'T OFIELIGIOUSDPATIO ❑CARPORT– ❑GARAGE ❑STGrIAGE[JSLAB - FEN
USE ZONE___CLOG. TYPEIRE ZONE A,:::� PLAN CHECK BY_ HEAT_
S E LL
E R -€ T9 f_ _----- -
^SS_LO.LP FLQQ31.:i:,'.f i HEI HT ��0.STORIES :� AREA NO.�EQR Oki�y�f VA IIF.:: c
Bf11L01N DEPAR TNIENT SETBACKS FRONT – REAR LEFT SIDE RIGHT SIDE
1 THIS PERMIT IS ISSUED SUBJECT TO THE REGULATIONS CONTAINED IN THE BUILDING CODE, ZONI.
I I 3^ Check REGULATIONS AND ASL APPLICABLE CODES AND ORDINANCES, AND IT IS HEREBY AGP,EED THAT
)RK WILL BE GONE IN ACCORDANCE WITH THE PIANS AND SPECIFICATIONS ANTI IN COMPLIANCE VA;
5:17.20Id1 II �� ALL APPLICABLE CCDES ANO ORDINANCES. THE ISSUANCE OF THIS PERMIT DOES NOT WAF
RESTRICTfVE COVENT NTS. CONTRACTOR AND SUB CONTRACTORS TO HAVE CURRENT CITY BUSIPIE
C:efR Tac 1`L' LICENSE SEPARATE. PcRWTS REOUIRED FCR SEWER, PLUMBING AND HEATING.
Total ' SOL' -
PDC#
APPLICAN1 OR AGENT
Approved Receipt No --------v`�.—_Y�
S D I: - � 7�—
PDC -
i
SEWER CONNECTIDl( $
SEWER INSPECTION
SEWER SURCHARGE
Comments .
WjW
VENDOR
ADI)IlESS
CITY, STATE, ZIP _ CITY OF TIVARD
DATE 1 , ] 1 P.O. # WASHINGTON COUNIY,OREGON
CHECK ONE: I have received the following. Please make REQUISITION
payment. (Forward to Accounting.)
Received: !
Date Initials
QI have ordered the following. Please issue OTHER INFORMATION:
a confirming purchase order. (Forward to
Administrative Secretary.) --
I have researched the following. Please
issue a Purchase Order. (Forward to
Administrative Secretary.) —�
I want to buy the following. Please research.
Return price information to this office.
(Forward to Administrative Secretary.)
ACCOUNT QUANTITY ( DESCRIPTION (Please explain thoroughly) UNIT PRICE TOTAL PRICE
- -
TOTAL AMOUNT DUE $ _
DEPARTMENT HEAD APPROVAL: f "'
FINANCE DIRECTOR APPROVAL:
( for 600 Accounts over $2,500, and all 700 arcounte
DISTRIBUTION: White - Pur. Coord. or Accounting
Yellow- Department Copy
� _ 871 ;
BUILQlNG PERMIT APPLI8ATMN TIGARO DATE--__
T,'*'.UNDERSIGNED HEREBY APPLIES FOR A PERMI f FOH , iE VJORK HEREIN INDICATED BUILDER PHONE 62t3n16V .1
OR AS SHOWN AND APPROVED IN I HE ACCOMPANYING PLANS AND SPECIFICATIONS. OWNER PHONE
tax LOT N0. 2 6 l 1 p '223-M)
OWNER slc? T<<1ltf � JOB ADDRESS 12925 cit Pacific t`righwa�V
— ARCHI'rCT
5dS �"SENGINEER
BUILDER hdrl
Cer _ ADDRESS 11iy flaiea$tic LarwESIGNER
STRUCTURE ❑ NEW_ ❑ REMODEL _❑ A' DITION ❑ REPAIR _❑ RENEWAL __l-1 FIRE DAMAGE ❑'DEMOLITION
M RESIDENCE ❑ COMM ❑ EDUCATIONAL ❑ GOV'T ❑ RELIGIOUS ❑ PATIO ❑ CARPORT ❑ GARAGE ❑ STORAGE ❑_SLAB❑ FENCE
OCCUPANCY "' LAND USE ZONE _ �'"5 BLDG.TYPE StI FI ONE__-PLAN CHECK BY��ltn► HEAT=^
e7r ncr ho rla, r7arage t, Whed.
a in
SEWER PERMIT# -
OCC.LOAD FLOOR LOAD _HEIGHT NO.STORIES AREA NO.BEDROOMB� VALUE
BUILDIN!Z=�
_ SET BACKS FRONT REAR LEFT SIDE RIGHT SIDE
I - -_.:-_—..-------
Permit J THIS PERMIT IS ISSUED SUBJECT TO THE REGULATIONS CONTAINED IN THF. RUILDING CODE,ZONING
REGULATIONS AND ALL. APPLICABLE CODES AND ORDINANCES, AND IT IS HEREBY AGREED THAT THE
Plan Check WORK WILL RE DONE IN ACCORDANCE WITH TILE PLANS AND SPECIFICATIONS AND IN COMPLIANCE
WITH ALL APP' ICABLE CODES AND ORDINANCES. THE ISSUANCE OF THIS PERMIT DOES NOT WAIVE
Subtotal RESTRICTIVE COVENANTS. CONTRACTOR AND SUEZ CONTRACTORS TO HAVE CURRENT CITY BUSINESS
/ LICENSE.SEPARP,TE PERMITS REQUIRED FOR SEWER.PLUMBING AND HEATING.
State Tax 40
(11.4 f1 SDC-
Total -- --F
PC',# APPLICANT OR AGENT
BY �'.( r ( ,
Receipt A DR 3S HONE
Approved
S
BUILDING PERMIT APPLICATION TIGARD DATE � ` __,�a_81 3880
Tt-IE UNDERSIGNED HEREBY APPLIES FOR A PERMIT FOR THE WORK HEREIN INDICATED BUILDER PHONE 62.E-603'7
OR AS SHOWN AND APPROVED IN THE ACCOMPANYING PLANS AND SPECIFICATIONS. OWNER PHONE _
taX LOTNO..__24 `--v-2T2
OWNER .,;arie Louis JOBADDRESS 12,925 ru Pacific Ni.3t1tTa y_
ARCHITECT Thospas Consitiltinq
ENGINEER
BUILDER owner ADDRES41545 SIV7 "a"sinstiC Lane DESIGNER 245-7746
STRUCTURE E NEW ❑ REMODEL L7 ADDITION ❑ REPAIR ❑ RENEWAL ❑ FIRE DAMAGE ❑ DEMOLITION
Cl RESIDENCE D1 COMM ❑ EDUCATIONAL ❑ GOV'T ❑ RELIGIOUS ❑ PATIO ❑ CARPORT ❑ GARAGE ❑ STORAGE ❑ BLASE] FENCE
OCCUPANCY LAND USE ZONE _f_-_3.C)8LDG.TYPE =t., FIRE ZONE PLAN CHECK BY 3' j HEAT
Construct office^hs. single ,:story, per plans and specs.
�',ni•n.resr0 PluTbing a N!echarictal Permits Required. 4
SEWER PERMIT#
OCC.LOAF FLOOR LOAD _ HEIGHT 17 NO.STORIES 1 AREA 5000 NO.BEDROOMS VALLSI;4,2 S 0 w
BUIi SING PfPARLUgnft., SETBACKS FRONT F 2 REAR ^ ? LEFT SIDE 16.5 RIGHTSIDE _
Permit 2 / THIS PERMIT IS ISSUED SUBJECT TO THE REGULATIONS CONTAINED IN THE BUILDING CODE. ZONING
REGULATIONS AND ALL APPLICABLE CODES AND ORDINANCES, AND IT IS HEREBY AGnEED THAT THE
Plan Check ''r'+r l� WORK WILL BE DOk.E IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS AND IN COMPLIANCE
WITH ALL APPLICABLE CODES AND ORDINANCES. THE ISSUANCE OF THIS PERMIT DOES NOT WAIVE
Sub-total _ 411' `,0 RESTRICTIVE COVENANTS. CONTRACTOR AND SUB CONTRACTORS TO HAVE CURRENT CITY BUSINESS
11U. LICENSE.SEPARATE PERMITS REQUIRED FOn SEWER,PLUMBING AND HEATING.
Blete TSR
SDC—
PDC# APICAJT OR A� -----Bpi
y !L
Approved d W Receipt No. L -
A'L�DRE98---- - --- __ -- ---PHONE
i.im an I
DATE INSP. TYPE INSPECTION REMARKS PLUMBING r DATE
Contractor +
Permit No.
rinuph•in
Fixture
_-- Final — --_�
HEATING
Contractor
Permit No.
Gas or Oil
Rough-in
Final
$f_WER
Final -Y
DRIVEWAY
Final
_. kL
Storm Drainage
VI/
_ (Rain Drain)Final
Sidewalk
Curb&Street Final
Approach
BLDG.DEPT.FINAL TEMPORARY CERTIFICATE OCCUPANCY
CERTIFICATE OCCUPANCY Final
Landscaping
Zonina Final
�p iw rrt0 A-cgrto. JtJ m,L Y z//fir/ ax^_I�✓ d�3f'i`�, 3S'Sr>, f3F / –/ d ,'�
i
;i
SITE, WOR.1�- " y�
13UILDING PEHnAITAPPLICATICN TIGARD DATE-- —. /- ' -'19 3881
T•`iE UNOF.RSIGNED HEREBY APPLIES FOR A PERMIT FOP T HE WORK HEREIN INDICATED RUILDER PHONE C 2Q-•FE137
OR AS SHOVJN AND APPROVED IN THE ACCOMPANYING PLANS AND SPECIFICATIONS, (-)WNER PHONE
taX I OT NO. e " + �
OWNER ''1aL'lc ar.�guiS JOBADDRESS_ sy,, 1.>ac iiq s gjiFl�
ARCHITECT 'Thomases Con:su l ting. L
ENGINEER
h�npr 1545 SW ,'1A until^ I,AnEN DESIGNER 245-7746
BUILDER (
ADDRES� _ � _Y
STRUCTURE U NEW ❑ REMODEL ❑ ADDITION ❑ REPAIR U RENEWA . ❑ FIRE DAMAGE ❑ DEMOLITION
❑ RESIDENCE XXCOMM_❑_EDUCATIONAL O GOVT ❑ RELIGIOUS ❑ PATIO ❑ CARPORT ❑ GARAGE ❑ STORAGE ❑ SLABO FENCE
OCCUPANCY _2-2 LAND USE ZONE _ C-5 BLDG.TYPE — FIREZONE "" PLAN CHECK BY_ 4W±'. HEAT
Site Work -- Includes ara Sinn# pavinop concrete work, manitAry t
stitorn sewers, irr.iq.itif)n syetem and landscapis1n.
SEWER Pl 1W;YrF'.4T,Tt I3',`•>Frr-T'IOTi MUN IA 5.no
OCC.LOAD FLOOR LOAD HEIGHT__ NO.STORIES AREA r o.BEDROOMS VALU12D,RP
BUILDING DEPA SET BACKS FRONT T T•',"'REAR LEFT SIDE RIGHT SIDE
Permit _ $ ? THIS PERMIT IS ISSUED SUBJECT TO THE REGULATIONS CONTAINED IN THE BUILDING CODE, ZONING
REGULATIONS AND ALL APPLICABLE CODES AND ORDINANCES, AND IT IS HEREBY AGREED THAT THG
Plan Check 4y Cf CN WORK WILL BE DONE: RJ ACCORDANCE WITH THE PLANS AND SPECIFICATIO14S AND IN COMPLIANCE
WITH ALL APPLICABLE CODES AND ORDINANCES. THE ISSUANCE OF THIS PERMIT DOES NOT WAIVE
Subtotal RESTRICTIVE COVENANTS. CONTRACTOVI AND SUB CONTRACTORS TO HAVE CURRENT CIT" BUSINESS
LICENSE.SE ERMITS REQUIRED FOR SEWER,PLUMBING AND HEATING.
State Tax
SDC—
Total 141 .E _s
PDCN APPLICANT OR AGEN1
By 1,1
Approved
c)W�1 Receipt No. J 1f F ADDRE98{ PHONE
BUILDING PERMIT APPLICATION COF TIGARD ,AT'E�' '��` t9.�
THL UNDERSIGNED HEREBY APPLIES FOR APERMIT FOR THE WORK HEREIN INDICATED BUILDERPyori '6p
OR AS SHOWN AND APPROVED IN THE ACCOMPANYING PLANS AND SPECIFICATIONS OWNEPPw0Nr•
T.I<LOT NO
OWfVEP ►rej n{{/� ORE53
JOB AOI/"t.�,Ls" ✓KJ � ��/
ARZ11-1ITECT
uy� ENGINEER
H .,UI�_ 'l _(��h ADORE ��/�ar� 1�1Me, DESIGNER
STfiUCTURF_ — ONEW Q REMn0EL ❑ADDITION— Q_ R_EPAIR� ❑RENEWAL ❑FIRE OAPAAGE DEMOLITIJP
fiE51LiENCE ❑COMM ❑EDUCATIONAL ❑GOV'T L.rRE!_IGIOUS PATIO L�CAR PORT ❑GAFAGE S7pRAGE❑SLAB ❑FENC
OC4UPANCv-9-'3,LAND USE ZONE l.ef-CfTYPE `, .FIRE ZONE-.!'—' PLAN CHECK BY— HEkN
AT
.SEWEP PEPMTT #
� OAD _--HEIGHT NO.STORIES— AREA NO �F,_QR_QQMS VALUE _
81JIL41NG DEPARTMENT SET BACKS FRONT REAR LEFT SIDE RIGHT SIDE
�o„rrn I t 0,170 -- - =--- - --THIS PERMIT IS ISSUED SUBJEr'T TO THE REGULATIONS CONTAIVEO IN THE BUILDING CODE, ZONIN
j
i-:.-in Check REGULATIONS AND ALL APPLICABLE CODES AND ORDINANCES, AND IT IS HEREBY AGREED THAT TH
WORK WILL BE DONE IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS AND IN COMPLIANCE WIT
Sm—total 01D ALL APPLICABLE CODES ANO ORDINANCES. THE ISSUANCE OF THIS PERMIT DOES NOT WAIV
i
�; RESTRICTIVE COVENANTS. CONTRACTOR AND SUB CONTRACTORS TO HAVE CURRENT CITY BUSINES
.
i
ate Tax � LICENSE.. SEPARATE PERMITS REQUIRED FOR SEWER, PLUMBING AND F:EATINC
Tota! D� SDC —
I'a,
PDC#
-- APPLICANT OR AGENT
I Approved Receipt No
l._ AnnRE55 HONE
3DC -
PDC: - _ #
SEWER CONNECTION $
SEWER INSPECTION $
SEWER SIIF" HARGE
Comments ;
- - L7f4-• �hl�AGI�14 '�1.DG�
BOLDING PERMIT APPLICATION c0 FY TI" ,.RD DATE_SL_iG52 19� �° � FED
THE UNDERSIGNED HEREBY APPLIES FOR APERMIT FOR THt WORK HEREIN INDICATED BUILDERPHON
OR AS SHOWN AND APPROVED 'N THE ACCOMPANYING PLANS AND SPECIFICATIONSoUINEPP r-fl- �y �
rwY LOT NO �!� .F/� K�
_7WNEP JOR ADDRESS
��}.� a•'CARCHITECT �- y�
;3U1�_D:3 a te.-mac_ 'I�. a C.►. ���} /_ M •�',NGINEER 11ION1111119Cl — ADDRESS l��L + y "•,��,11M'w�_ 1PESIGNER �r---T
STRUCTURE rRjEW REmno-L OAODITION Cl REPAIR ORENEWAL ❑FIRE DA?RAGE ClDEMOLITI JN
GESIDENCE Ly COMM ❑EDUCATIONAL CJGOV'T ORELIGIOUSOPATIO OCARPORT ❑GARAGE ❑STORAGEL�S AB ❑FEN;E
/V
O7CUPAf Z LAND USE ZINE -is QL.OG TYPE _FIRE ZONE PLAN CHECK BY_ HEAT
�_ ��AIV.� wlva)���►tQS. Z�, _ �L✓M� MECit/ DI[Slt�ii
SEWER_ P01
ERMIT _
J�C_LQ �._ F957�4,�PQ Hl !SNS__. N ,3T08IES APEASp 0 F
_ 9�OROOMS � VA iIF�T�a
81JILn11'j, DEPARTMENT SETBACKS FRONT b
��-------- __ _ _ REAR-+#L_ LEFT SIDE A..f RIGHT SIDE
I THIS PERMIT IS ISSUED SUBJECT TO THE REGULATIONS CONTAINED IN THE BUILOING CODE, ZONING
11-;an Check REGULATIONS AND ALL APPLICABLE CODES AND ORDINANCES, AND IT IS HEREBY AGREED THAT THE
WJRh WILL BE DONE IN ACCORDANCE WITH THE PLANS A'YD SPECIFICATIONS AND RJ COMPLIANCE 1h'ITI.ALL APPLICABLE CODES AND ORDINANCES. THE ISSUANCE OF THIS PERMIT DOES NOT WAIVE
y RESTRICTIVE COVENANTS. CONTPACTOR AND SUB CONTRACTORS TO HAVE CURRENT CITY BUSINES°
I
1,a- Tax O V LICENSE. SEPARATE PERMITS REQUIRED FOR E PLUMBING AND HEATING.
Total SDC - ki
POC#
of ?. 3g4 �� _ owa�
APPLICANT OR AGENT—� -��'----- -`--"—"f�
+Approvpd Receipt No II'.� /7#6
T T
ArynRp;S -«T PHC)—NE
SDC - $
PDC
S Sit Peft-
SEWER CONNEC "ION
SEWER INSPECTION S •g, ,
SEWER SURCHARGE
Comments : -/s%'Ot 44 R C ;S.
_� V•�CcP� 'gyp k �r►„a.l. rvk sr°°fie.) PC kaa,t ' ..,c� V .
�•I.81I•tJM F� wimaA"dA a O,AIS•fvft 4&Q -to.R 4e l l( a".
�•1) �tc'(�R_�!9�
AW I( i oC Aeth =ok%i at I�lvf�l�fRN ►+Ith�'T�•wy�.
JI
141.
p
Pa .
7-fD /000
i
�a
..ADING PERMIT APPLICATION CiOFT
Y TRG,ARD DATE •lam 19
THE UNUER;'-GNED HEREBY APPLIE5 FOR APERMIT FOR THE WORK HEREIN INDICATED BUILDER P!-lONF 6-Zq�G0i7
OR AS SHOWN AND AP"ROVE.D IN THE ACCOMPANYING PLANS AND SPECIFICATION OVJNERPHGr1F _
Loos 1, ... 1l' D G/1� LOT NO. G 00 1 S f-, -SQ:_
eVr.lEp �f�, �Oli(S JOB ADDRESS I Q' �.r �S Q�_1�-�.01t-E I�
.� O 1RCHITECT OIMA�J
/_''1-, / , ENGINEER
ADDRESS I_yJ �{J�/�_CZ,�e��G �tA_�r OESIGNER
i}il�ruHS IENI �FlF.'Mf10EL ❑ADUIIIt;`! ❑FiiEQ-A1-R LIRENE444L ❑FIRE DAA �} r
-�_��'''11 _R��_-�_11 L_J_D_ 10LIT1.)N
r `iE_iDENCE COMM ❑EDUCATIONAL LJGOV'T ❑RELIGIOUSL.JPHTIO L_ICARPORT GARAGE ❑570R.4GEQSl 8 FENCE
u�.l;l v.tinl;:YstScLANO USE ZONE C--y BLDG TYPE__. ..FIRE ZONE PLAN CHECK
Fog AL04,
L.OAU "••°��IEIGHT __NSL,STO.RAE _ A
99 NO.BEDROOWi VgU;I_� I�
dIJILRIN, DEPARTMENT SET 8ACK5 FRONT ROAR I.EFT SIDE RIGHT SIDE
doll, "- THIS PERMIT IS ISSUED SUBJECT TO THE REGULATIONS CONTAINED IPI THE BUILDING CODE. ZONING
. LICABLE CODES AND ORDINANCES, AND IT IS FI@RE9Y AGREED THAT THE
-,- u REGULATIONS AND ALL Aoo
JrORK WILL BE DONE IN ACCORDANCE WITH THE PLANS ANDSPECIVU ATION; AND IN COM-PL1A.NCCE WIT
l.
':�^TL')I-il _ ,��•a'Q ALL APPLICABLE CODES AND ORDINANCES. THE ISSUANCE t,= THIS PERMIT DOES NOT WAIVE
RF,STRICTIVE COVENANTS, CONTRACTOR AND SUB CONTRACTORS TO HAVE CURt1ENT CITY SUSINES._
TAk LICENSE. SEPARATE PERMITS RFOUIRED FOR SEWER, PLUMBING AND HEATING.
�Ji yam- DC
I
(2+6
- - - ----AC�uPPLICANt OP AEt
.- - R�re�pt Pb)PLCNr[7��• / /
soc - $ l/f�lL` S 0
Ptic — $
SEWER CONNECTION . 8I �hf, 31)U . 31U;
SEWER INSPECTION
SEWER SURCHARGE $.
Comments:
a )
O` �� 6� � Qin � e� �0 ( W
koo '8P K) m
O SII' s
o to 4,
r 7
/ � _ � Ili-� ' � qy%i �1 ` •�b
tt1
r �^ tiJ�'= � � I�ph � LL_ 6►rt�
tL10
W• q- � � a�ON Q,vi�. oT •y�, w
'•; O ) _- U
P 7
sm
•rSsR .� t�Ob` Mry era
,o
1 Ktli
n.
IV
o^ Boa a� ��� 11
r X01 \� e� c� '� s w
1' cwn
��
cv M
C—)
OWL
V •—� t�
t '7i
t OB -moi
\ M t0 Z W)
=
Ln
pO'A t
�
\v' O L 9 ())`v �
di yay
�^ O �'• N M
a N .�� oda r i O +,
o a O
^
Y,
/
14
O �
s'x •yyti O Q
6
0 4b
a~ r�° v yyb
� ti 1 a� 1`N t7 to •til, r •:
� F
\oa ,a.
a m
y
i
CITY®I" TIGARD
STAFF RETORT WASHINGTON COUNTY,OREGON
SITE DESIGN REVIEW
TIGARD PLANNING DEPARTMENT
12420 S.W. 14AIN STRF,ET
August 24, 1981
DOCKET: Si'e Design Review (SDR 20-81)
Marie Louis
APPLICANT: Marie Louis (V 7-81)
11545 Majestic Lane
Tigard, Oregon 97223
IOCATION: 12925 S.W. Pacific Highway
Washington Co. Tax Map 2SI 2BD
Tax I.ot 2600
PRESENT ZONE: Designation C-5 Highwey Commercial
REQUEST: Site Plan and Design Review for a commercial structure
PREVIOUS ACTION: Referance File: 7.0 21-81 and V 7-81
SITE F_-AN AND DESIGN REVIEW:
The applicant is proposing to construct a 4,300 square foot commercial
structure. This is an on site addition to an (.xi.sti.ng structure.
Adequate parking can be provided on Bite. The existing old house and
two sheds will be removed. On site drainage facilities exist and
can accomodate additional run-off.
i
STAFF ACTION: Staff approves this site design. review application.
Development may take place subject to the following conditions:
1, 1n eight (8) foot, concrete sidewalk should be installed' alcng
tine entire 99W R.O.W. All work in this area shall be npproved
by Mr. William Giebel of the Oregon Department of Transportation 229-5002)
prior to the ibsuance of a Building Permit. '.y the Building Official.
2. A sign permit shall be attained from the City prior to the
installation :)f a new sign or remodeling of the exi.s'_i.ng sign.
3. A detailed plan af the existing parking lot shall be! submitted
showing the parking confiquration as it will be following the
sidewalk installation. An effort will be made to add landscLping in the
area (see site plan) . An irrigation plan shall be superimposed on this
plan.
4. No Occupanc.,; Permits shall Lc issued until all conditions
placed upon this development by the City of Tigard have been
12420 S.W. MAIN P.O. BOX 23397 TIGARD, OREGON 97223 1'H: 639-411'
STAFF REPORT
SI'T'E DESIGN REVIEW - MARIE LOUIS
Page 2
j
satisfied and inspections verifying this have been carried out by the
appropriate department.
5. No changes will be made to approved plans or specifications
unlesp formal application is made to the appropriate City
Department and changes are approved by that department. Application
for changes will be made in writing and shall include applicable drawings.
6. Grading and construction plans for all work in public rights-
of-way and all other public_ improvements shall. be prepared
by a registered professional engineer in accordance with City standards,
and shall be submitted to the Public Works Department for review.
7. All proposcl utilities shall be placed underground. Street
I lighting installations shall be approved by the Public Works
Department.
I
8. All street and parking area shall be concrete or asphalt. All
sidewalks shall be concrete.
9. No minor land partitions shall be made in reference to this
j project unless formal application is made to the City of
Tigard Planning Department and the minor land partition is approved
and recorded.
10. All Structure developed must meet minimum requirements for Fire
and Life Safety, and Structure Safety Code requirements of
the City of Tigard.
Aldie H
ening Department
NOTE: Sign below to acknowledge conditions set furth f.)r this project
and return to the City of Tigard Planning Department. Failure
to acknowledge will result in no further action on this project
with regards to issuance of Building Permits or engineering
approval .
Signature Property wner) u -��f- - -----
D
Siturpict if different) Date
gna e( plan —
STAFF REPORT t.
M.
FINAL ACTION/SITE DESIGN REVIEW
TIGARD PLANNING DIRECTOR
September 30, 1980 CITYOF TKA RD
WASHINGTON COUNTY,OREGON
DOCKET: SITE DESIGN REVIEW, SUR 24-80 (Lasal. Land Co./14arine Lumber
property on 99th & P_ ITT '
APPLICANT: William C. Floberg OWNER: Same
c/o Bullier & Bullier
707 Washington Street
Portland, Oregon 97205
SITE LOCATION: 11675 SW Pacific Highway (Wash. Co. Tax Map 1S1 36CD
Tax Lots 1_00, 200, 300, and 1: 00)
�a *l ^
SITE DESIGNATION: C-5 Highway Commercial (ZC 22-80 ref.) r• ,
SITE PLAN/DESIGN REVIEW COMMENTS:
The primary concern of the City relative to development on this property
i.s the alignment of the extension of Dartmouth at the I-5/Haines Road
interchange to 99W and 78th Avenue. This alignment has been approved
by NPO #4, and is the only alignment pattern left _do, to development on
the South side of 99W. We have verbal assurances from Mr. Finke, Mr. Hale,
and Mr. Alexander that they will cooperate in the future as they develop
relative to this realignment proposal.
Pfaffle Street represents another area of concern. With the installation
of a four-way intersection 99W it seems appropriate to make Pfaffle a
one-way off 99W going West. Entry from the West to the bonk would be
changed and protected. We might eliminate a portion of the tnick traffic
now using Pfaffle. All of these (traffic) plans have been discussed
with the applicant, and to some degree w.itlt the Oregon Department of
Transportation. The Public Works Director has prepared a sketch of this
proposal for review by the applicant,
STAFF RECOMMENDATIONS:
Staff recommends approval subject to the following conditions:
1. All conditions of ZC 22-80 shall be met. .
2. Sidewalks: 99W frontage shall be eight (8) feet wi.cle. Existing
sidewalks shall be removed. Dartmouth •• five (5) feet both sides.
Pfaffle to the North of Parcel B - .five (5) foot sidewalks full length
of property. Pfaffle to the North of Parcel A - five (5) foot along
North side of Pfaffle from corner of 78th East to connect to existing
sidewalk in front of bank.
3. Setbacks_ - A ten (10) foot rear setback shall be allowed along Pfaffle
provided that heavy landscaping be installed. Applicant to retakn
as many existing site trees on Pfaffle and 9914 as possible. These
�---- 12420 S.W. MAIN P.O. BOX 23397 TIGARD, OREGON 97223 PH 639-4171
STAFF REPORT/FINAL ACTION
SITE DESIGN REVIEW/SDR 24-80
TIGARD PLANNING DIRECTOR
September 30, 1980
Page 2
trees provide good screening now and will be difficult to replace.
Protection during construction shall be provided.
4. Parking areas - The entrance to the parking area for Parcel A shall.
be shifted to the North as far as possible so as not to restrict
the traffic flow off 99W making a right turn (Revised plans to be
submitted to Public Works for approval) .
S. The parking spaces on Parcel P. shall be changed by the addition of
landscaped areas as shown on plan in red. Five (5) spaces will be
eliminated.
6. Applicant, Public Works, and Oregon Department of Transportation
shall agree on traffic configurations and traffic signal intersection
design. Necessary improvements and dedications shall be made to
the satisfa-tion of the Public Works Dire-!tor.
7. No Occupancy Permits shall be issued until all conditions placed
upon this development by the City of Tigard have been satisfied and
inspections verifying this have been carried out by the appropriate
department.
8. No changes will be made to approved plans of specifications unless
formal application is made to the appropriate City department, and
changes are approved by that department. Application for changes
will be made in writing and shall include applicable drawings.
/ 9. Grading and construction plans for all work in public rights-of-way
V and all other public improvements shall he prepared by a registered,
professional engineer in accordance with City standards, and shall
be submitted to the Public Works Director for review.
All public improvements will require a Compliance Agreement and must
be (design) approved by the Public Works Director, and must be either
fully and satisfactorily constructed prior to the recording of any
minor land partition, public dedication, final plat or issuance of
(i.e. , more than one) Building Permits; or bonded to the City for
100% of the estimated cost thereof prior to the recording of any
minor land partition, public dedicatioti , final plat or .issuance of
Building Permits.
10. All existing and proposed utilities shall be placed underground.
Street lighting installations shall be approved by the Public Works
Director.
11. A metes and bounds legal description and map shall accompany a dedir_at?on
of public rights-of-way, parks, open space or floodplain areas and
shall be prepared by a registered engineer of land surveyorer.
t
$-NFF REPORT/FINAL h-TION
SITE DESIGN REVIEW;/SDR 24-80
TIGARD PLANNING D'IFECTOR
September 30, 1980
Page 3
12. All roadways and parking areas shall be concrete or asphalt. All
sidewalks shall be concrete.
13. No minor land partitions shall be made .in reference to this project
unless formal application is made to the City of Tigazd Planning
Department and the minor land partition is approved and recorded.
Al.die Howar ��-
Planning D or
NOTE: This acknowledgement must be signed and returned to the City of
Tigard, Planning Department. Failure to return this acknowledgement will
result in no further action on this project with regards to issuance of.
Building Permits or engineering approval.
( -.- -
', i /(-) Z " l
Signa ure Date �y
t
PROJECT
SPECIFICATIONS
FOR
THE PACIFIC BUILDING
BY MARIE LOUIS
THOMAS CONSULTING ENGINFFRS, INC .
10157 S W. Barhur Bled. Sulte IORC
Portland , Oregon 97219
Phone. (503) 245 -7746
Project Specifications # 81-017
TABLE OF CONTENTS
1. 0 GENERAL REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 1
1.1 General Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 1
1, 2 Special Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 2
1.3 Permits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 3
2.0 SITE WORK . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 3
2.1 Lines and Grades . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 3
2. 2 Site Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 4
2. 3 Asphaltic Paving . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 5
2.4 Sidewalks and Driveways . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 5
2. 5 Site Drainage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 5
2.6 Building Sewer Service . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 6
2. 7 Water Services . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 6
2.8 Extruded Curb . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 6
2.9 Landscaping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 7
2.10 Damage to Existing Structure and Adjacent Property . . . . . . . . . . . . . Page 7
3. 0 CONCRETE. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 7
3.1 Building Foundations , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , Page 7
3. 2 Floor Slabs on Grade . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 8
4 . 0 MASONARY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 9
4 .1 Block Walls . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 9
5. [i METALS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 10
5. 1 Reinforcing Steel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 10
5. 2 Structural, Miscellaneous , and Embedded Steel . . . . . . . . . . . . . . . . Page 10
5. 3 Bolts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 10
5.4 Welding . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 10
5. 5 MetalBuildiny . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 11
0. 0 WOOD AND PLASTICS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 12
6 . 1 Wood Framing . . . . . . . . . . . . . . . . . . . . I . . . . . . . . . . . . . . . . . . . . . . . . Page 12
6. 2 Wainscots and Splashes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 12
7. U THERDAAL ANI) MOISTURE PROTECTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 13
7.1 Sealants . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 13
7. 2 Roofing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 13
7. 3 flashings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 13
7.4 Roof Insulation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 13
7. 5 Interior Insulation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. Page 14
7.6 Interior Block Wall Insulation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. Page 14
7. 7 Exterior Block Wall Insulation . . . . . , . . . . . . . . . . . . . . . . . . . . . . . . . Page 14
wrw rw
TABLE OF CONTENTS (CONT.)
8. 0 DOORS AND WINDOWS . . . . . . , . . 000000000 . . . . . . . .
8.1 Metal Walk Doors ' " " ' • • • • • • • • • • Page 16
Page 16
8.2 Wood Walk Doors . . . . . . . . . . .'0 0000 . . . . . . . 0000 . . . . . . . . . . Page 16
8. 3 0000 0000 . . .
Glass Doors . . . • . . r • . r • . • . • • . . . • . . • . . . • • , , , • .011 . 0 • . . .
8.4 Overhead Doors , • . . Page 16
. . . . . . .. . . . . . . . . . . . . . . . . . . . . . . .. .... . . . . Page 17
8.5 Finish Door Hardware . . . . . . • , . • . . . . . , , • . . . . . . . . .. / • •0000 . .
8.6 Store Front Windows • • Page 17
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . .. . . . . . Page 19
9. 0 FINISHES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
9.1 Painting . . . Page 20
. . . . . . . . . . . . . r . . . . • . . . . . • . . . . . . . . . . . . . . . . . . . Page 20
9.2 Suspended Ceilings . • , 0 , „ 0000060000000000t010 . . . . . .. . Page 21
9. 3 Resilent Flooring . . . . . . . . . . . . . 01 . . . . . . . . . . . . . . . 110. . 1 . . . 0. . Page 21
9.4 Gypsum Drywall . . . . ! . . . . . . • • • • . • . . • • • . . • • • • • . • •• • •. • •• . n . Page 22
10. 0 SPECIALTIES . . . . . . . . 0 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
10.1 Toilet and Bath Accessories ' ' • • • • • • • • • Page 3
. . . . • . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 23
11. 0 EQUIPMENT (NOT USED) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 24
12. 0 FURNISHINGS (NOT USED) . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . Page 24
13. 0 SPECIAL CONDITIONS (NOT USED) . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . Page 24
14 . 0 CONVEYING SYSTEMS (NOT USED) . . . , , . , . .
e 24
15. 0 GENEkrtL MECHANICAL AND PLUM Bf NG . . . . . . . . . . Page 25
15.1 Mechanical (Not Used) , . , 000000010000000 , , ,
15, 2 Plumbing Page 25
. . . . . . , • • . . • • . . . • • • , . . Page25
16. 0 ELEC`T'RICAL (NOT USED) . . . . . . 11 , , , , , . . . . . . . . . . 0 0 0 0 0 0 0 0 0 , 0 . Page 26
r r r r r rw r r r r
1. 0 GENERAL, REQUIREMENTS
1.1 General Conditions
1.1-1 ^Contractors
The owner (Marie Louis) "hall act as General Contractor
for the project, and lienc,eforth referred to as General
Contractor in this document.
Sub-Contractors shall be selected on the basis of
experience and lowest bid.
1. 1-2 Contracts
All contractural agreements between The General Contractor
and the Sub-Contractor shall be in writing. Any deviations
from the original contract which incur additional costs
shall be given only upon receipt of written explanation of
work to be cone and a cost established.
1. 1-3 Supervision
1. 1-3. 1 The Engineer will not have continuous
inspection of this project, but will be called
on occasion by the General Contractor as needed.
1. 1-3. 2 The Sub-Contractor shall have his representative
on the job site for continuous inspection.
1. 1-3 . 3 The Engineer shall have a final Inspection prior
to acceptance by the General Contractor. Any
discrepancies, deficiencies, or poor workman-
ship will. be rioted at that time, and must be
corrected prior to acceptance. Should more
than one final inspection trip be required, the
Sub-Contractor will reimburse the General
Contractor for all expenses incurred for such
trips.
1.1-4 Materials
When reference is made in the speclficat!ons and drawings
to trade names or to the names of manufacturers, such
references are made solely to designate and identify
quality of material or equipment. In the event the Sub-
Contractor wishes to substitute materials or equipment
different from the specified or shown on the drawings,
prior written approval from the General Contractor and the
Engineer must he obtained. The C3eneral Contractor and
the Engineer will approve such material if they are
considered equal to those specified. Any additional
Engineering costs incurred to modify the structure to
receive substituted materials will be home by the
.Sub-Con' actor.
(j)
1. 1-5 Protection
The Sub-Contractor shall provide protection agi,!. -it
weather, wind storms, frost or heat, so as to nLintain
his trade work, materials iixtures, and interface with
other trades, free from Injury or damage. At the end of
the days work, all new work likely to be damaged shall
be covered. If low temperatures make it impossible to
continue work, the Sub-Contractor shall cease work and
notify the General Contractor. Any work damaged by
failure to provide protection as above required, s- : 1 be
.removed and replaced with new work at the Sub-Co,.cractor's
expense.
1.1-F _Manufacturer: Directions
All manufactured articles, materials, and equipment shall
be applied, Installed, connected, erected, used, cleaned,
and conditioned as diredted by the manufacturers.
1.1-7 Work and Material Not Covered in Specifications
Any item of work nece-sary to the proper completion of
construction under this contract which is not specifically
covered in the drawings and specifications shall be
performed in a manner deemed good practice of the trade
involved. Materials and equipment not specifically
covered by the drawings and specifications shall be of a
standard equal to good practice ccmmensurated with the
class of structure being constructed.
1.2 Skecial Conditions
1. 2-1 Scope of Work
The Sub-Contractor shall furnish and Install all materials
and equipment for his specific trade as shown, listed, or
described on the drawings or in these specifications,
subject io qualifications, conditions, or exception as
noted. Sub-Contractors also shall furnish all labor,
scaffolding, and tools necessary to complete the work of
his trade.
1. 2-2 _Measurements and Dimensions
Before r,rdering materils or commencing work which is
depenaent for its proper size and Installation upon
coordination with build.'.ng conditions , Sub-Contractor
shall verify all dime,isions by taking measurements at
building site and shall be responsible for their correctness.
Any discrepancies between drawings and/or specifications
and existir)c1 condition shall be referred to the Engineer for
adjustment before any work affected thereby is begun.
1. 2-3 Tempore Provisions
The General Contractor shall be responsible for
providing and maintaining the following temporary
provisions.
1.. Temporary toilet
2. Temporary water supply
3 . Temporary light and power
1. 2-4 Sub-Contractor's Insurance
Each Sub-Contractor will maintain such insurance as will
protect him from claims under Workman's Compensation
Acts and other employee benefits from claims for damage
because of bodily Injury, including death, and for claims
for damages to property which may arise out of and during
operations under this contract whither such operations be
by himself or by anyone directly or indirectly employed by
him.
1.3 Permits
1.3-1 Scope of Work
Permits shall be obtained by the General Contractor or by 1
the Sub-Contractor delegated to do so by the General
Contractor,
1.3-2 Compliance to Cedes
The Sub-Contractor shall construct all materials in
compliance with the drawings, the,-;P specifications and
L,)cal Building Codes; and in such a manner as acceptable
to the Local Building Official. Any discrepancies shall be
called to the attention of the Engineer in writing.
2 . U SITE WORM.
2.0-1 Scope
Furnish labor and materials to complete the work which consists of
clearing , grubbing , demolition, trenching , evacuation, backfilling ,
and building sewer srte drainage. Landscaping and water service
as shown an the drawings or as specified herein.
2.1 Lines and Grades
2 .1-1 _ s Scope of Work
The corners of all new buildings shall be staked ir.
accordance with the drawings. Staking shall be done by a
Registered Surveyor as selected by the General Contractor.
Grades shall be as shown on the drawings using the bench
mark established on the property as shown on the drawing: .
2 .1-2 Staking Bullding Corners
Stakes shall be located and of a meterial that will not he
destroyed during construction.
(3)
2. 2 Site Preparation
Scot of Work
Furnish materials and labor to excavate, demolish, back-
fill, and remove existing wood frame structures, foundations,
concrete retaining walls, curbing , walkways, pavement, soil,
vegltation, trees, or any additional required items not shown
or specified herein necessary for the construction or erection
of the site work or building, Sub-Contractor shall notify
Engineer if underground structures other than shown or
indicated herein are found.
2.2-2 Demolition
Demol'tion and removal of existing structures, retaining
walls, foundations , walkways, curbing, and pavement
shall be done in such a manor as to prevent any damage to
existing building or facilities. Limits of evacuation of
curbing, retaining walls, walkways , and foundations shall
be their out to out dimension plus 1'0" each side. Sub-
Contractor shall repair or replace or otherwise compensate
for damaged or destroyed items to the owners satisfaction.
2. . 3 Basement Removal or i'illinM
Existing full basement shall be removed or filled with sand .,)'r
3/4" minus crushed rock and compacted to 90% of "maximum
density" when tested according to AASHO standard method
A. The last 2'-6" to finish grade shall be 95% of "maximum
density" . Basement walls or other protruding facilities
shall be removed to a depth of not less than 18 itches below
finish grade in areas under proposed building slab, or 12"
for all others.
2 . 2-4 Clearing and Grubbing
Clearing and grubbing shall consist of the removal of trees ,
roots , stumps , debris , plant materials, miscellaneous
concrete:, or asphaltic pavement, or rubble. Depth of
removal for all miscellaneous plant material shall be to a
minimu-n depth of 6" below subgrade outside of building pad
and 12" under building pad. All other materials (ie tree
stumps , roots , concrete or asphalt rubble) shall be removed
to a minimum depth of 12" outside building pad and 18"
under hui'ding pact below finish grade elevation. Backfill
these areas to required subgrade with 90% compacted sand
or gravel unless otherwise directed ty the Engineer.
2 .2-5 Excavation
Excavate for the structure and contour lot to finish grades
shown on the drawings
(y�
2 . 2-6 Sub-Base Pill
In areas where fill is required, provide 3" Pit Run
aggregate, or other material as approved by the Engineer.
Place and compact in layer of 8" lifts. Compact to 95%
of Standard AASHO.
2. 2-7 Base rill Under Asphalt Pavement
Provide 5" of 3/4" minds clean select aggregate. Place
and compact in layers of 8" maximum lifts. Compact to
95% of Standard AASHO.
2 . 2-8 Base Pill Under Buildings
Provide 5" minimum of 3/4" minus clean select aggregate,
Place and compact in layers of 8" maximum lifts. Compact
to 95% of Standard AASHO.
Provide I" of sand on vapor barrier over base fill. The
sand is to be wetted immediately prior to placement of
concrete slat.
2. 3 Asphaltic Paving
2 . 3-1 Scope of Worl:
Furnish materials and labor to place the asphaltic concrete
pavement as shown on drawings.
2 . 3-2 The hot mix asphaltic concrete surface shall be 2" thick.
The mix design shall be as required by Local Codes, o:
Building Official requirements.
Existing asphalt shall be saw cut in such a manor to insure
a straight and true edge. Edges of existing asphalt shall
be treated with liquid asphalt tack coat prior to placing of
new pavement.
2 .4 Sidewalks and Driveways
2.4-1 Scope of Work
Furnish ►naLerials and labor to place the sidewalks as
shown on drawings.
2. 5 Site_Drainage
T5- J Scope of Word
Furnish materials and labor to con.,truct and install a storm
water system . Said system stall consist of a catch basin,
piping, trench, backfilling, and making connection to existing
facilities as shown on the plans and as specified herein.
2 . 5-2 Concrete pipe shall conform to ASTM C-1475.
LS)
2.6 Builaing Sewer Service
2.6--1 Scope of Work
Provide materials and labor to construct a new and
abandon and cap existing building sewer service. Such
work shall include trenching, backfilling, asphaltic patching,
and connecting to existing main as shown on plans and as
specified herein.
2 .6-2 _Materials
Server pipe on site shall be sch. 40 PVC size as shown on
plans. Sewer pipe in the public right-of--way shall be
class 2 concrete coforming to ASTM C-14 with Bell and
Spigot rubber gasket joints.
2 .6-3 Workmanship
All work in the public right--of-way shall be in strict
accordance with the State of Oregon or the City of Tigard
standard specifications.
Existing pa,iements shall be saw c.-it in order that a straight
and true edge is obtaining pavement shal'. be removed in
such a manner to insure a straight and true edge with mini-
mal damage. Edges cf existing pavement shall have a
coat of liquid asphalt tack coat applied prior to new paving
Installation.
2. 7 _Water Service
2. 7-1 Scope of Work
Furnish materials and labor to remove, replace, and connect
new water service of the size and location as shown on the
drawings.
2 . 7-2 Materials
Water service line shall be of the type as required by the
Tigard Water Service District.
2 .7-3 _Workmanship
Trench backfill shall be as detailed on the drawings.
Pavement shall be saw cut and removed in such a manner
to insure a straight and true edge with minimal damage to
remaining pave gent. Edge of existing asphalt shall recei,.e
a coat of liquid asphalt tack coat prior to placement of new
pavement.
2.8 Extruded Curb
2. 8-1 Scope of Work_
Furnish materials and labor to provide concrete extruded
curb at location ai.d as detailed on the drawings.
f
2,9 Landsrapir,
2.9-1 Sco,Pe of Work
Provide materials and 13bor to do required landscaping as
shown and detailed on drawings.
2.9-2 Materials
Plants - As shown on drawings
Rock - Bolder size (ie 3 manrock)
2 .9-3 Workmanship
Grading shall be done in such a manner to insure a uniform
free draining surface to with 1/2" of top of curb.
2.10 Damage to Existircc�Structures and Adjacent Proper
The Sub-Contractor shall perform all work and take adequate pre -
cautions to insure that :-,o damage occurs to surrounding facilities
or property. Sub-Contractor shall replace, repair, or otherwise
compensate owner to owners satisfaction for any damage incurred
during construction of said project.
3. 0 CONCRETE
3. 1 1u_ildin_Pounda_tions
3. 1-1 Scope of Work
Furnish materials and labor to construct building foundations.
3 .1 -2 Materials
F uundatlons are to be constructed of stone concrete
f'c=3000 psi at 28 days plus 1200 psi for mix design
cylinders.
3 . 1-3 In S tallatior.
All exterior foundations are to be placed 1'-0" minimum
below finished grade. Elevations shown on plans are
maximum elevations to top of footings.
Footings are to rest on firm natural undisturbed soil. Notify
Engineer if ot-ier conditions are found.
No excavation shall be made below any footings c'nscr
than a one to one slope to the bottom of same,
Backfill all pipe trench excavation bele footings with
lean concrete to bottom of same.
Cl)
� .
3. 2 Floor SliAbs on Grade
3 . 2-1 Scope of Work
furnish labor and materials to construct the
building floor slabs on grade .
3 .2-2 Nlatcriols
Floor slabs are to be constructed of stone concrete
Uc=3000 psi at. 28 days plus 1200 psi for mix
design test cylinders.
3 . 2-3 InstaIlation
Slab base to be priced In the following manner.
a) 3/4 inch minus aggregate compacted and to the
thickness specified on the drawings.
b) 5 mil vinyl vapor barrier placed over the aggregate.
c) I inch sand Oaced Dver the vapor barrier.
Slabs are to be placed in rectangles not to
exceed 500 square feet and length not to exceed
twice the width.
Slabs to be s^reed, jitterbugged , and troweled to
a smooth surface.
Slabs to be sealed immediately after machine
trowling with "Burke Cure" seal and hardner.
Concrete floors are to remain natural with just
Sealer coats (not paint). Protect floors from
foreign materials which will dlscolo, the surface.
Place concrete as indicated and specified on
drawings.
Steel trowel slabs true to line and grade with e
maximum variation tolerance of 1/8" in 10 feet.
Placing, finishing and curing methods follow
standard good practice procedures as recommended
by the Portland Cement A(-,sociatton.
C8�
4 . 0 MASONARY
4 .1 Block Walls
4 .1-1 Scope of Work
Furnish materials and labor to construct a masonaxy
block building as shown on the plans and specified
herein.
4 . 1-2 Materials
Co,icrete mason iry units shall be 8" x 8" x 16" or
8" x 4" x 16" w!iore iu,icessary. Blocks shall be light
weight units confor,ning to ASTM 0-90. Mortor shall
be type S co3forming io the current edition of the Uniform
Building Costo. Grout sha)i be 2006 psi concrete with
3/8" pea grave:
Reinforcing shall be 40 ksi deformed bars.
4 .1-3 Workmanship_
Blocks shall be placed in a running bond pattern with
concave joints.
Cutting shall be done with a powe, saw. No breaking
with hammer chissels or other hand Looas -.,,ill be allowed.
All blocks shall be laid true and plumb. Alignment verti-
cally shall not exceed 1/2" from top to bottom or 1/4" per
10 feet of wall length hcri7ontally.
Splices in reinforcing shall be minimum of 24" or 4U'bar
diameter whichever is greater.
Block shall be washed and brushed upan c-)mpletion of work
such that they may receive blockfiller ; to painting.
Blocks to be backfillea against shall be c._ ted with hot
mop asphalt prior to backfill being placed.
I
5. 0 METALS
5.1 Reinforcing Steel
5. 1-1 Scope or Work
Furnish material and labor for all concrete construction.
5.1-2 Materials
All reinforcing steel to be ASTM A-615, 40,000 psi yield
point.
5.1-3 Placement
a) Provide reinforcing steel as shown on drawings.
b) Splices shall be lapped 40 bar diameters 2'0" minimum
unless otherwise noted on drawings.
c) Set main reinforcing steel 2" from forms for piers or
formed surfaces exposed to weather, 3" for footings
and other concrete poured against earth.
5. 2 Structural Miscellaneous, and Embedded Steel
5. 2-1 Scope of Work
Furnish material and labor for all structural and mise. and
embedded steel shown an drawings not supplied by metal
building manufacturer.
5. 2-2 _Material
a) All structural, miscellaneous, and embedded steel
shall be ASTM A36 , fy-36000 psi yield point.
b) Detail , fabricate, and weld in accordance with AISC
Soecifi.cations.
5. 3 Bolts
5. 3-1 FuScope_. of Work
rnish materials and labor for all bolts shown on drawings:
not supplied by metal building manufac`urer.
5. 3-2 Materials
All bolts shell be ASTM A-325N and diameter shown on
drawinjs.
5. 3-,' Installation
Bolts shall be installed in locations shown on drawings
and in a mE r,Der as described in the latest AISC manual.
5.4 Weldinq
5 .4-1 Scope of Work
Furnish materials sand labor for all welding shown on
drawin3s.
5. 4-2 Materials
Welding shall be the shielded metal-arc E70XX process
In accordance with AISC and "'%WS Specifications.
Cion
5.4-3 Installation_
Welded construction shall be in accordance with AISC
Specifications Section 1, 23 .6.
5. 5 Metal Buildino
5. 5-1 Scope of Work
Furnish material and labor fm,- structural frame and roof
as shown on drawing and as specified herein.
5. 5-2 _Mat_erial_s
The metal building shall be designed , supplied, and
erected in the configureation shown on the drawings.
The building structure shall be clear span rigid frame
designed to resist all live, dead , and lateral loads
applicable to the area the building is to be erected.
The main freme members shall constructed of ASTM A-36,
42 ksi yield steel,
5 . 5 -3 Design Criteria
1) Wind Loading = 20 psf
2) Roof Live Loadinq = 25 psf
5. 5-4 Approvals
The steel building design and drawings are to ae certified /
by a Registered Engineer and submitted to Engineer
prior to commencing fabrication.
5. 5-5 Installation
The building frame and roofing system shall be erected in
strict compliance with metal building manufacturers erection
manual.
CI I�
W-1 VWc■t u W RN
i
WOOD AND PLASTICS
6. 1 Wood Framing
6. 1-1 Scope of Work
Furnish materials and labor to construe' interior framing
as shown on the plans and as specified herein.
6.1-2 Materials
a) Deliver lumber and carpentry material in a dry condition.
Store lumber In such a, manner as to Insure proper vent•-
ila tion and drainage.
b) Framing lumber not to exceed 19% and finish lumber and
millwork not to exceed 12% moisture content.
c) Lumber is to be graded in accordance with the latest
grading rules of UBC Standards 25-4 and 25-9.
d) Pressure treated lumbar shall be used where in contact
with concrete. Pressure treatment shall be in accordance
with IJBC Standard 25-12.
e) Grades and species of lumber:
Studs: Douglas Fir-Larch Construction Grade.
.foists: Douglas Fir-Larch No. 2.
Headers: )ouglas Fir-Larch No. 2.
f) Plywood to bear the APA Grade Trademark.
6. 2 Wainscots and Slashes
6. 2-1 Scope of Work
Furnish materials and labor for all wainscots and splashes
In re�,trooms as indicated on drawings and as specified
herein.
a
6 . 2-2 Material
t Wainscots and Splashes shall be "Formica" or "Masonite" .
i, . 2-3 Installation
Wainscots and Splashes shall be continuously glued to walls
a with Water resistant glue.
All edges and corners to be finished with formed meatal trim .
f
��JJ
7 . 0 THERMAL AND MOISTURE PRQTECTIQN
7.1 Uealants
7.1-1 Scope of Work
Provide labor and materials to seal around all openings
In block walls,
7.1-2 Materials
Material to be equal to Sonneborn "Butakauk" pure
butyl. Caulking, gun, and grade in standard color to
suit job requirements.
7.1-3 Installation
install sealant around perimeter of all open;_►gs, between
dissimilar materials, and elsewhere as indicated. Com-
pletely fill all joints and leave a smooth continuous bead.
If necessary, tool joint immediately.
7 .2 Roofing
7. 2-1 Scope of Wcrk
Furnish materials and labor for a high-rib type metal roof
complete and ready for erection.
7.2-2 Materials
The metal roof panels shall be 26 gauge galvanized
80, 000 psi steel precision roll formed with factory baked
on paint and required fasteners.
7. 2-3 Installation
The roof shall be installed in sU icc accordance with
me-cal building manufacturers design and erection manuals.
V. 3 Flashings
7.3--1 Scope of Ve-)rk
Furnish mat(i.'uis and labor for flashings for building as
shown on drawing and detailed herein.
7. 3-2 Materials
Flashings and gutters shall be minimum 24 gauge galvanized
steel and factory painted. Mansard with soffit shall be
26 gauge ste'l with factory baked on paint.
7. 3-3 Installation_
Flashings and gutters in such a manner as to avoid dents,
scratches, and misalignment. All scratches and fastener
heads shall be repaired with matching paint.
7.4 Roof Insulation
7 .4-1 Scopa of Work
Furnish materials and labor to insulate building roof.
Ci3)
7.4-2 Materials
Fiberglass blanket insulation 4" thick, faced with white
. 004 mil vinyl having (2) two inch tabs folded and stapled
on G" centers.
Insulation to carry a UL 25 label.
7.4-•3 Installation
The insulation is to be installed in such a manner that
sagging between purlins does not occur. Joints are to
be tight and neatly rucked and rolled.
7. 5 interior Insulation Offi'-c.
ScoFe of Work
Furnish material and labor for insulating stud walls and
ceilings indicated on drawings.
7. 5-2 Materials
Ceilings and walls shall he f.nsulated, with fire retardant
material, Providing a minimum of R-11 Rating for the walls
and R-3()�or the ceilings. All insulation shall comply with
Federal Specifications HH-1-5ZIE Type 11.
7. 5-3 Installation
All Insulation shall be Installed with Kraft paper or Foil
Back toward the heated area.
The insulation shall be glued or stapled in place.
7 . 5-4 QUEintity
1 Lot
7 . (; Interior Block Wall Insulation
7. ()-1 Scope o1 Work,_��
Furnish materials and labor to Insulate Interior block walls
in office area as shown on drawings and as specified herein,
7.E-2 Materials
Insulation shall be "Zonolite" 2" thermostud system as
manufacturers for use with concrete masonary block walls.
7.6-3 Installation
Insulation shall he installed in accordance with manufac-
turers recommended specifications.
7. 7 Extorior Block Will WEather Proofing
7. 7--1 Scope of Werk
Furnish labor and material to weather proof the e,cterior
surface of the masonary block walls,
7. 7-2 Materials
Use "Rain Guard" clear weather proofing sealer as
manufactured by "Rain Guard" .
7. 7-3 Installation
Sealer shall be applied to the block wall at a rate of
70 sq. ft. per gallon. Sealer shall be applied on dry
s.irface as per manufacturers recommended specifications.
8, 0 DOORS AND WINDOWS
8
. 1
—8-----
MF:tal Walk Doors
8_1-1 r Scope of Work
Furnish materials and labor for exterior Metal Walk Doors
as scheduled on drawings.
8 .1-2 Materials
Metal walk doors shall be 3'-0" x 7'-0" x 1-3/4" single
swing , flush type, 18 gauge steel face sheet, "Coco
Regent" doors, or equal.
Door frames shall be 2" x 7-5/8" Double Rabbit Profiles,
16 gauge cold rolled steel, "Ceco" series SF Frames, or
equal.
Doors and frames shall have:
a) Full Mortise 1-1/2 pairs of hinges as scheduled on
drawings and specified in hardware sets below.
b) Drilled for latch and locksets as specified in hardware
sets below.
8.1-3 Installation
501crs and frames are to be installed in such a manner as
to insure weathertightness, free operation, and durability.
8. 2 Wood Walk Doors
Scope of_Worx
Furnish materials and labor for wood walk doors as
scheduled on drawings.
8 . 2-2 Materials
Wood doors shall he flush panel type hollow o- solid core ,
with thicknesses and fire ratings as scheduled on drawings.
Door frames shall be wood with frame widths and thicknesses
as raquired for wall and door thickness.
Doors and frames shall have:
a) Fell Mortise for 1-1/2 pairs of hinges as scheduled on
drawings and as specified in hardware sets below.
b) Drilled for locksets as scheduled on drawings and as
specified in hardware sets below.
8 .2-3 Installation
FO--Ors and frame.3 are to be installed in such a manner as to
Insure weathertightness , free operation, and durability.
8. 3 Glass Doors
s1 . 3-1 Scope of Work
Furnish materials and labor for glass walk doors as
scheduled on drawings.
C(0)
8 .3-2 Materials
Glass doors shall be single swing, Kawn3er Series 190
Narrow Style Doers with 0,081 kickplates and reinforcing
*op rail. V/
Doors shall have tempered glass as scheduled on drawings.
Doors and frames shall have:
a) Full Mortise for 1-1/2 pairs of hinges as scheduled on
drawings and as specified in hardware sets below.
b) Drilled for to(-ksetgas scheduled on drawings and as
specified in harp mare sets below.
8 . 3-3 Installation
Doors and frames are to be installed In such a manner as
to insure weathertightnE ss, free operation, and durability.
8.4 Overhead Doors
8 .4-1 Scope of Work
Furnish materials and labor for overhead doors as scheduled
on drawings.
8 .4-2 Materials
Overhead doors shall be upward acting, sectional aluminum
panel doors , The doors shall be "Overhead Doers" series
120 Commercial heavy-duty aluminum doors.
8. 5 finish Door Hardware
S. 5-1 Scope of Work
Furnish material and labor to check and service all items of
finish hardware as scheduled on drawings and described
herein.
8 . 5-2 Hardware Sets
HW #1
1-1/2 pair of full Mortise Butt hinges 4-1/2" x 4-1/2" x
0.13'," with non-removable pins, conforming to ANST A-156 ,7-
1972.
1 kickplate each side of door
1 each deadbolt locks , Adams Rite MS 1850A
1 each lock cycltnrlers and cylinder quards, Adam,3 Rite
MS 4043
1 each thumbturn, .Adams Rite
2 each strikers
1 each door stop
HW #1 cont.
1 each closer, Norton 1605
1 each Weatherstrip
1 each aluminum threshold
HW #2
1-1/2 pair of full Mortise Butt hinges, 4-1/2" x 4•-1/2" x
x. 134" with non-removable pins , conforming to ANSI
A 156. 7-197'2.
1 each cyclindrtcal lo:-kset (2-•3/4 backset) corforming to
FE�deral Spec, rr-H-161E. Schlage heavy duty D55PD
1 each deadbolt lock, conforming to Federal Spec. 181k,
Schlage B46GP
2 each strike plate
1 each aluminum threshold
1 each weatherstrip
Note: Hardware to be 20 minutes fire rating
HW #3
1 each pre-hung door, non-removable pins
1 each lockset, Schlage A40S
I each strike plate
HW ##4
1 each pre-hung door, non-removable pins
I1 each latchset, Schlage ATOS
1 Pach strike plate
9 . 5-3 Installation
Deers and hardware are to he installed in such a manner
as to provide maximu-n s-. urlty and weathertightness.
Mastorkey all iocks fzr each facility as follows:
0 Exterior walk door
1) Lockset keyed separate , Masterkeyed alike.
2) Deadbolt lock keyed separate, Masterkeyed alike.
U 8)
Store Front Windows
8.6-1 Scone of Work
Furnish material and labor to install store front window
vections.
8.6-2 Materidls
Store fronts shall b,; "Nordic" Series F.
All members to be 6063-T5 extruded Natural Aluminum,
Clear Anodized or Bronze ar specified by owner.
All exposed portions of extruded alur.iinum store front
molding shall be given an Anodic Oxide coating with
Alumilite 204 in accordance with Alcoa Specifications.
8.6-3 Installation
All joints are to be neatly fitted, s3curely fastened , glazed
and sealed as shown on drawings and specified.
9 . 0 FINISFIES
9.1 fainting
.1-1 Scope of Work
Furnish labor and materials to prepare and paint the
Interior and exterior walls, paritions, doors, trim, and
miscellaneous items requiring painting or architectural
finishing.
Sub-Contractor shall obtain painting schedule and color
selection from owner. Sub.-Contractor shall submit a list
of paint type and shades to owner for approval prior to
start of work.
,1-2 _Materials
Paints and stains by Rodda unless otherwise advised by
owner.
Block filler- unspecified
Primer - as manufactured by Rodda
9 .1-3 Tnstallation
Number of coats specified is considered minimu-n .
Contractor shall ap _ly materials in sufficient quantity to
properly cover the surface and obtain a first class surface.
Application-Protect all work of other trades . Work damages
as a result of this contractor shall be repaired at the Sub-
Contractor's expense to the satisfaction of the owner.
Finish hardware shall be removed or covered during all
painting operations. Before beginning any work, inspect
all surfaces to be painted to assure a first class finish .
Notify owner if any surface should be corrected before
beginning work. Absense of such notice will be construed
as acceptance of surfaces and later claims of defects will
not be accepted by owner. Clean and prepare all surfaces
as recommended by paint manufacturer. All floors shall be
broom clean before application of finish materials.
9.1-4 Painting Schedule
a) Masonary Block Walls
1st coat-Masonary block filler (50 sq. ft, /gal.)
2nd coat-Masonary block filler (50 sq. ft./gal.)
3rd & 4th coat-Acrylic laytex cement paint
b) Exterior Wood Surfaces
1st coat-primer
2nd & 3rd coat-finish paint or primer
(material used shall be suitable for exterior use)
c) Exterior Metal Surfaces
1st coat-metal primer
2nd & 3rd .,uats-primer paint
C�a)
9 .1-4 Painting Schedule cont.
d) Interior Wol)d , Doors, Millwork, etc.
(Stained finish)
1st coat-Penetrating Stain - wiped
2nd coat-Sanding Sealer flat
e) Gypsum Boara
ist coat- 1/2 size and 1/2 texture tinted
2nd coat-semi-gloss, washable paint
Cleaning
Upon completion the painting contractor shall remove from
the building all materials and debris created by hirr. and
leave his part of thw work in a clean and finished condition
acceptable to the owner,
Guarantee
The painting contractor shall guarantee his work for e period
of one year when using the materials as specified. If, for
any reason, the painting contractor cannot guarantee his
work using the materials specified , or because of the con-
ditions of previous coatings, he shall bring it to the ownar's
attention before starting any painting. This guarantee shall
include protection from all moisture or water leaks in
exterior walls,
9 . 2 Suspended Ceilings
9. 2-1 Scope, of Work
Furnish materials and labor to install the suspended
ceilings as scheduled on drawings.
9 . 2-2 Materials
Suspension system to be exposed T-System of cold rollea
Electroplated steel with baked white finish.
nccoustical board to be 24" x 46" x 5/8" non-directional,
p,?:forated, stippled lay-in type.
Hangers are to be 12 gauge galvanized annealed vire unless
otherwise noted on drawings.
9 . 2-3 Installation,
Ceilings are to be installed true and plumb, with all trim
and support angles at perimeters, spring clips, and other
accessorie3 necessary for a complete cetling Installation.
9.3 Resilent Flooring
9 . 3-1 Scope of Work
Furnish materials and .labor to install tile flooring as
scheduled on drawings.
Cay)
9,3-2 Materials
Tiles are to be vinyl asbestos , 12" x 12" x 3/16" . Base
to be 4" high rubber, 1/6" thick, top set.
9.3-3 Installation 1 and install
Install tile with a hard set adhesive, Apply
the in accordance with manufacturer's recommendations.
9.4 Gypsum Drywall
9 .4-1 Scope of Work
Furnish labor and materials to install gypsum drywall.
9 ,4-2 Materials
Standard: l!2" Gypsum
Restrooms: Water--resistant
ti
Joint Treatment: Perf-A-Tape Joint system
9 .4-3 Installation
Install all gypsum drywall in accordance with manufactures s
specific-1tions and the Uniform Building Code,
PECIAL'1':C�;�
10.1 Toilet ani' natll AoccSsnries
10.1-1 ,aco�)e of '.lork
Furnish materials Nana labor to install accessories
as shown on drawinr;s and specified below.
1u.1-2 Materi ale,
a) :Il rror-Jiai,ii Carey
b) Towel Dispenser-Oul.ti-Ford Scott 995 .
c) Soan Eispenser-Industrial ;;rade.
(j) 'toilet. 'rissue Dispenser-;cot.t: ;.964 .
c) Toilet Seat Cover Dispenser-Industrial „rade.
�) Grab liar-1-1/4" stainless steel,Global.
10.1-3 In•3t,allat.ion
Fastenings and mountin, devices shall. be of the
most secure and durable nature possible consistent
with Commercial Building quality in Drywall
Partitions .
w ml wKwallw
11. 0 Ec;UIPMENT �Ngj USEDD)
12.0 FURNISHINGSSNOT USED)
13. 0 SPECIAL CONDITIONS (NUT USES
14 . 0 CONVEYING, SYSTEMS (NOT USF.F)
- Cay
15. 0 GENERAL MECHANICAL AND PLUMBING
15.1 Mechanical (Not Used)
15.2 Plumbing
15. 2-1 Scope of Work
Work shall include but not be limited to furnishing
materials and labor to install all plumbing and to connect
with those utilities provided ay others.
15. 2-2 Materials
Pim FittlE,lc s
1. Sanitary, waste, an(: storm drain lines in the building
and to a point 5'0" 'aeyond the building shall be service
weight reinforced hubless type cast iron. Cast iron
pipe and fittings shall conform to ICBO ISI 4--1.
2. Sanitary vent piping three inches and larger shall be
service weight cast iron as specified. Sanitary vent
piping 2-1/2" and less shall be Schedule 40 galvanized
steel. Vent piping underground shall be cast iron soil
pipe,
3. 'Vent piping above grade may be PVC.
4 . Domestic Nater piping in the building shall be Type 1
copper water tubing ASTM B-88 with wrought copper
sweat fittings or Scheduled 40 galvanized steel, with
galvanized malleable iron fittings.
5. Domestic water piping outside the building less than
3 inches shall be Type K hard drawn copper with wrought
coppersweat fittings. Install below normal frost line.
6 . Sanitary and s0vm drain lines five feet outside of
building to be salt glazed , ASTM C-14 or C-13.
7. Hose bibbs inside nuilding shall be 45 degree angle
pattern 3/4" hose end, chrome placed, brass withwheel
handle. Hose bibbs in outside walls of building shall he
flush mounted wall hydrant, Zurn A-1498 encased type
wall hydrant cover. (Rust-Proof Type.)
Floor a.nd Celling Plated
Provide chrome elated brass escutcheons where piping
passes throught finished floors , wall partitions, and
ceilings.
I
O s)
Plumbing Equipment
1. Water Heater - Furnish and Install a complete water
heater system for all plumbing fixtures indicated on the
drawings. Heater shall be WeGtinghouse 6 gallon
electric water heater or equal. Heater shall be complete
with temperature pressure relief valve, safety shut off
valve in hot and cold water supplier, back draft, and
diverter.
2 . Plumbing Fixture - Fixtures must be delivered to the
building properly crated and in perfect condition.
a) Water Cloaets - Elier with valve flush and Stasco
white seat, (open fron for public use).
b) Lavatories - E1)er wall mounted with hot and cold
manual mixer faucets.
15. 2-3 Installation
All plumbing shall be in accordance with the Uniform
Plumbing Code.
Fastening and mounting devices shall be secure and durable
and ccf.sistent with Commercial Building (duality.
Pipings and fittings for future use shall be plugged and
protected in such a manner to insure minimal damage to
threaded ends and those partitions to be tied into at a
later date.
Sub-Contractor shall provide to owner and Engineer a
detailed sketch at 1/4" scale showing exact location and
approximate depth of fixture stubs to facilitate connection
at a later date.
16. 0 ELECTRICAL
16. 1 Electrical is not provided by Thomas Consulting Engineers, Inc.
I
c t�►— Imo. L.h•.�" i o hJ�=.�
r� &�s F=01,*C F.5uI Lt�>llJ
tet''
i a►� �. �,,.1 �e�...t is Iia
4'1
G,```�F0 PRFF`r�o
rr,
�� �vl,Cis 10 ��'r �•�
!' RON
r-
R.
_7m
f.)x
qw
1'j 4.. Ll►�-.L�.l.._ I�` car=-�N G �c.,.....�___.�2ll�..�.�_. ;�._
V es.
�n
i
h+6 -+ 'max LoC� � '�' 12.'
1
w fnI V
> IV1��.... V'. ` L'.� ,L,r����,�'�,. `1�.��_1� `'"�,.,��...I�r '-ia.'1...J�..� , ..._.<7 �l► �S
tr
4 4,
_ ► �.pc..t� Lc..��.
I`t
- -- > ...I` '�' "�"' L'J V.�r `> 1.✓l� .>'4 fes.: �✓►�'t-r C
w -- s 4
1 1
�.� .L /-s�,a> -gyp C:.i� c:Jt-'F�.1G ,b}. -;;, d4 A" 1 4, �nl,
*4
w7lff
i
Icy ,�.�-�_ �5 X U►I I �� "` � �I
4 2.
..7 '"'r 1 1 Ail C��"i '��,rw -..��3--� ,�..�'.-.�C`�i•�`�:�.��V��F�C..�r�..r.,�4..� �/��14 .1�.
L
-10
'or"
vow
� � �
1
1 �
��� � � f�'� � LI �'�`- HCFC-. k �1C��
_.,.�;
� r
Address,/' ,�'�5_��.� �JD - , Permit No.
Name of Occupant' I-,'ILA
Permit cl -rge pp -----
Paid by
Date connected
Type of Building r cwt ,1� _ Inspection fee
Service Rate_ -L' �' Paid by _ Date
Contractor_ -___ Assessment Paid
Size of connection
i
CA
Q
Cy
o n
Z
t.
_ l