12925 SW PACIFIC HIGHWAY-1 ADDRESS:
is\records\microflm\targets\buiHing.doc
March 3, 1997
Trans World Consortium, Inc. CITY OF TIGARD
100 Kerr Parkway#16
Lake Oswego, OR 97035
OREGON
RE: Tigard 99/Cellular Site Site Plan Review
12925 SW Pacific Highway
PC#: 1-113c SIT#: 97-0003
Submittal documents for the above referenced project have been reviewed for conformance with
the applicable 1996 Oregon Specialty Codes and other applicable codes and standards. The
following ;omments are noted:
SWUM- arm"a
1. Roof storm drainage piping must be connected to an approved storm drainage system
[Section 1506 and 1804.7 and OPSC Section 1101].
2. The storm drainage plan shall adequately address the number o"catch basins required to
handle the parking lot and hard surface runoff. The Uniform Plumbir:j Specialty Code
(UPSC) Section 1108 allows a maximum 6' outlet on each catch ',asin, and Table 11-2
limits the maximum surface area one catch basin can :serve to 7,133 square feet at 1%
slope of the horizontal line from the catch basin. Additiunai catch basins are required to
adequately serve the area.
3. Provide a utility plan showing the location, size, type, and slope of piping for sanitary sewer,
storm sewer�n(4 atch basins,and potable water.
4. Submit a parking lot layout detailing regular, compact, and handicap parking stalls, off-load
aisle,and accessible route for handicap accessibility.
5. Provide the total square footage of impervious area. Includ roofs, sidewalks, parking lot,
and any gravel areas.
6. Provide structural details and calculations on retaining wall. J'
7. Provide number and location of fire hydrants on site.
8. Pruvide fire flow testing pursuant to NFPA 291. Submit results using:
A. Hydrant flow test report
B. Required fire flow report
Please submit three copies of revised submittal documents and a letter indicating your response
to the above comments for review. Please call me at (503) 639-4171 if you have any questions.
Sinccrely,
Robert Poskin, CBO
PIANS EMMINER
13125 SW HcP Blvd., Tigard, OR 97223 (503)639-4171 TDD (503) 684-2772
wr
INSPECTION NOTICE
City of Tigard Building Departxk"nt
13125 Sit Hall Blvd_ Tigard, Oregon 97223
Inspection Line (Roc Phone)t 639-4175 Business Phone: 639-4171
Inspection
Footing Plbg. Underslab Mach. Rough-in Appr/Sdwlk
Found. Mg. Top C•it Use Line FINAL:
Poet/Beam .^,tract. San. Sewer Framing -Bldg.
Poet/Beam Mech. Rain Drain Insulation -Plumb.
Plbq. Underfloor Natat r� Gyp. Bd. -Nech.
Date Requestedt ^ Time AM
v
Bulldert
TNF. FOLJ�OWJNQ CORRECTIONS ARE REQUIRED:
Date:- _
APPROVED DISAPPROV3D APPROVED SUBJECT TO ABOVE
Call For Reinsp
Construction Inspectim t&Related Tests
Carlson Testing, Inc.
93-944.7 P.O.Box 23814
306 NO. - Feb 11 , 1994 Tigard,Oregon 97281
Phone(503)684-3460
REPORT OF IN-PLACE SOIL DENSITY TESTS FAX s 684-0954
HAE KIM
Client -- ---- — - - -- — ---�.
TIGARD SITE
Project r ;1yc ^r-r nnr �- w TTGOAQ0 0 --- —
Soil Description may„ 9�E?Max. Dry Dry Density_� ,t —lbs./cu.ft. Optimum Moisture_���Tt. _ % Method of Test 4:;TAI Pi «?
Serial a rr,h- ,-
UATE OF 7[STELEV. LIFT MOTS URE IN(LOS/CU.FT.) %
TEST N0. T E *i T LOCATION FT. NO. % —WET DRY COMPACTION
SF
T :)
SF
r 7 2 P.
I
Remarks: -
90*., COMPACTION IS REQUIRED
Tested by CARLSON TESTING INC.
Information contained herein is not to be reproduced, except in full, without prior authorization from this office.
Construction Inspection &Related Tests
Carlson Testing, Inc.
93-944. P.O.Box.23814
JOB NO _ _----_ Feb 1 ! , 1`774 Tigard,Oregon 97281
Phor,e(503)684-:3460
REPORT OF IN-PLACE SOIL DENSITY TESTS FAX#684-0954
HAE KIM
Client --- - — -- -- - _.� - -------
TIGARD SI TE
Project ._i ' AL1 124C LE:Jr uJAJ Y TTIAQQ n!,'2 ---— - — --- ---
Soil Description -1 "-() nF_'T97rT _c�_�_,E_rQM UDRSE Rt?nTHFF'S - pfinr.PFSti ( MOD,T TF'D
Max. Dry Density-_ i J 6 1--lbs./cu.ft. Optimum Moisture 17 % Method of Test A';rM 1)1-557
Serial# — 1099,q N11C _3440
DATE OF TESTELEV. LIFTFRt),E IN LLACE DENSITY %
TEST NO. TEST LOCATION FT. NO. WET DW COMPACTION
SFOLD LOT J ='��25 SOUTHWEST PACIFIC HIGHWA
,-11 5 WESTSID OF LOT JJ.1 . 9 91 .6 79
SF OLD LOT J2925 SOUTHWEST PACIFIC HIGHWA
�- ST SID f OF OT X71 . 8 7y
SF- OLD LOT - 2-:92-5 SOUTHWEST PACIFIC HIGHWA '
AS T 5IL)F OF LOT -4 — 118.0 93.." 3
I
Remarks: --- --- .
901 C:OVOACTION IS REQUIRED, _ --
Tested by �_�,� CARLSON TESTING INC.
Information contained herein is not to be reproduced, exc-pt in full, without prior authorization from thin office.
Coustruction Inspectiou &Related Tests
Carlson Testing, Inc-.
CP-9447
Dec23 , 1993 P.O. Box"23814
I JOB NO. Tigard,Oregon 97281
Phone(503)684-3460
REPORT OF IN-PLACE SOIL DENSITY TESTS FAX#684-0954
HAE KIM
,tient ---
-- -
TIGARD SIAL
Project 1292S SW PAC IF
Soil Description —_ '4"-O ROCK F 20M MQRSE BROTHERS PROGRE5S _PIZ_-__
Max. Dry Density __ 123 .6 Ibs.icu.1t. Optimum Moisture 14 .4 % Method of Test AASHTO T-99
Serial# _ 19971 NUC 3440
DATE OF TEST ELEV. LIFT MOISTURE E IN sC,-.DEN ITV %
TEST N0. TEST LOCATION FT. NO. % WET — DAY COMPACTION
SF
12-21 1 SOUTH SIDE 0 ' 7 .0 131 .8 123 .2 100
SF
12-21. 2 NORTH SIDE 0 ' 6 .7 132 .1 123 .8, 100+
Remarks: (-TtY nF TTGARD -
95% COMPACTION IS REQUIRED
— - - - —
FILL MAJERIAL AT OLD LOT: 1WV2b 5QUIRWEbT PACIFIC
Tested by I VANN/Mgw CARLSON TESTING INC.
Int)rmation contained herein is not to he reproduced, except in full, without prior autho*ization from this office.
Construction Inspection & Related Tests
Carlson Testing, Inc.
P.O. Box 23814
JOB NO, Tigard,Oregon 97281
Phone(503)684-3460
REPORT OF IN-PLACE SOIL DENSITY TESTS FAX#684-0954
Client -- /� -------
Project _ --- ----
Soil Description -- - - - ----
Max. Dry Density ' —Ibs.ic"u.ft. Optimum Moisture- % Method of]'est .
Serial#
DATE OF TEST ELEV. LIFT MOISTURE IN-PLACE DENSITY %
TEST N0. / TEST LOCATION FT. NO. % WET Dqy COMPACTION
1 } f f �'? L-�' �► �.�! (�t VA I L�' 1�, /,1?3,�2
16,7
Remarks:
i Lel - 2_3 -- -- -
Tested by CARLSON TESTING INC.
Information contained herein is not to be reproduced, except in full, without prior authorization from this office.
List street addresses) for this parcel
66BUILDING PERMIT€€€��€aaAAAA€AAaaAAAA€AAAAAAAaSAAab3aAAA€AAAaaaAAAAaAaAaAaA€AC
• :BUP92-0361: PROJECT:DEMOLITION STATUS:I UPD:11/23/93: :JH °
° PERMITTEE:ROBERT LIM KIM PRIM. . :BUP92-0361: °
° SITE ADDRESS:12925 SW PACIFIC HWY °
i)dCiaPARCE].�f�A.A3.AAAAAAA���€€AA.�.€��€AAAAAA6aAAAAAAAAAAAA€€€€€€A3AAaAaSaAAA.AaS�C �
2S302BD-02600 ° CREATION DATE:
° fl$PROPERTY LEGAL LOT?. . . :
flA° MILLER, MARIE B & ° LAND VALUE—$: 263760: °
° EMERY, ROSEMARIE BLDG VALUE. .$: 145300: °
BY KIM, ROBERT & KIM, RAE L7 TOIL VALUE. .$: 409060:
° 1360 SW WOODWARD WAY ° PARCEL USE. . . :CC ' °
PORTLAND OR 97225 CENSUS BLOCK. :
° flAAAAAAAAaAAaAA€AAaaAAfiAAAAAAAAaAAaaAAC1 CENSUS TRACT. :
° SIZE. . . . . . . . . . 0.00:acres " FLOOD ZON. . . . :NON:
o ZONING. . . . . . . :C-G ° WATER SERVICE:TIG
COMPLAN. . . . . . :C-G: ° SEWER SERVICE:SWR:
° QAPLATNAMEA`db$AAASAAAAAAAAAAAAaAAA€AaC� STORM URN. . . . :
NORTH TIGARDVILLE ADDITION ° NPO. . . . . . . . . . :3
DIV: BLOCK: LOT:37 UPDATED. . . . . . :08/20/93: :WC
' AAAAAAAA�€AAAAAAAaAAASAAAAaaAAAAAAAAAA@AAAaAAAAAAAAAaAA,aA:�AaAAAA€€€€€€�€AAi °
�€a€AzAAfiAAAAAAAAAAAAAAAAS�:�€€Aaa€€a€€€��€aa��a55€a5a€ab��€fa€€a€€aa€aa€5���a�i
PARCEL: Street-address Attrib Record Change D,ac Gis Esc
List street eddreen(es) for this parcel
6ABUILDING PERMZT`dAAaAaAAAAAAAAA3AAAA3AAAAAAAAAAAaAAAAAbfiAAA€�€AAa€AAAAAAaAAAAC
• :BUP92-0361: PROJECT:DEMOLITION STATUS:I UPD:11/23/93: :JH °
• PERMITTEE:ROBERT LIM KIM PRIM. . :BUP92.-0361: °
• SITE ADDRESS:12925 SW PACIFIC HWYo °
flAOAPARCELAAAAAAAAAAAAA�€€AAAAAS�AAAAAAAABAAAAAAA€a€AAAAAAAAA€€€€�€€€�Aa€€AAArcr
2S102BD-02600 CREATION DATE:
Q&PROPERTY OWNERAAAAAAaAAAAA&hAA€AAAAAq LEGAL LOT?. . . :
QV MILLER, MARIE B & " LAND VRLUE. .$: 2.63760: °
EMERY, ROSEMARIE ° BLDG VALUE—$: 145300: °
BY KIM, ROBERT & KIM, HAE LIM ° TOTL VALUE. .$: 409060:
1360 SW WOODWARD WAY ° PARCEL USE. . . :COM °
° PORTLAND OR 97225 CENSUS BLOCK. :
flAAAAAAAA.AAAAAAfiAAAAAAAAAaAaAAAAAAAAA�� CENSUS TRACT. : °
SIZE. . . . . . . . . . 0.00:acres FLOOD ZON. . . . :NON:
ZONING. . . . . . . :C-G WATER SERV10E:TIG:
COMPLAN. . . . . . :C-G: ° SEWER SERVICE:SWR:
GAPLAT STORM DRN. . . . :
' NOPTH TIGARDVILLE ADDITION ° NPU. •3
° DIV: . BLOCK: LOT:37 ° UPDATED. . . . . . :08/20/93: :WC °
' 3AAAAAAAAAAAAAA6FiAAaAAAAAAAAA€aAAAAaAA@AAAAAAAAAAAA€�aAAaAAAAAAAAAAAAAAAAAAi °
vp F4
Aaa£�AfibAAAAAAAAAAAAAAAAAaAAAAAA.AAAAAAAA3AAAAAAuA ��
��'fS� SC��� 1�/�/93 • � cJ
Cy
*11 vp
6 lit
PT-iE WORK
CITY OF TIGARD PERMIT PERMIT #. . . . . . . : SIT93-0029
COMMUNITY DEVELOPMENT DE, AP.(TMEJNT DATE ISSUED: 11/24/93
.11
13126 SWIA&H Blvd.Tigard,Oregon 97223e8199 (503)939-4171
PARCEL: 2910213D-02600
SITE ADDRESS. . . : 12925 SW PACIFIC HWY
SUBDIVISION. . . . : NORTH TIGARDVILLE ADDITION ZONING: C'-•G
BLOCK. : 1-01.. . . . . . . . . . . . . :137
TYPE OF WORKS:ADD PAVING?. . . . . . . . . :N REGO. NO. :
EXCV VOLUME. : Cy GRADING?. . . . . . . :Y VALUE. . .
FILL VOLUME. : 100 Cy LANDSCAPING?. . . . :Y
ENG FILL .). . . . . . :Y SITE PREP?. . . . . . :Y
SOILS RPT REQD? :Y STORM DRAING?. . . :N
IMPERV SURFACE. . : sf
Remav-l-(s : J . SUBMIT COMPACTION REPORTIS TO THE CITY OF' 'TIGARD.
L. COLL FOR FINAL INSPECTION.
C)tqnev,: FEES
ROBERT LIM 1Q1y1 type amol-tnt by date r-ecpt
1360 SW WOODWARD WAY PRMT $ 22. 50 JH 11/24/97
P L C K $ 15. 00 JH I I/0'4/93
PORTLAND OR 1)'71-'-1325 5 P C"T $ 1. 1 JH 11/24/93
Phone #:
OWNER
PI-ione 38. 63 TOTAL
Reg 0. . : 12.10000
REQUIRED INSPECTIONIS
This permit is issued subject to the req!i1ations contained in the Et-o s i on Cont r-o 1
Tigard Municipal Code, State of (Ire. Specialty Codes and all other F*i I I I T-1 SPECt ion
applicable laws. All work will be done in accordance with Grading I n s p
approved plans. This permit will expire if worl( is not started Final Inspec-tion
within 180 days of issuance, or if work is suspended for more
than 180 days.
Permittee S i g n a t i.t v,e
Tssl..ted By -
Caa 1. for inspect i on - 639--4175
C,ay
cru �Gv Fink +rS�'t7+'n
(ePAs
r
J1 A 'fnl(-1 LOT
i
C7 kA
i
CITY OF TIGARU`�� \ 4,!e Awrovag.... .. ........ ...........................
Conditionally Approved................................ –j —1- — --.
For only the work an described In,. 1
PEnMrr No.
See letter to; Pollow.................
. . T
Job Address:_(
i Sy:_-_ -----�__ Coate:f
�...
Residential Buildinq Permit AP lid cation
City of Tigard
13125 SW Hall Blvd.
Tigard, OR 97223
(503) 639-4171
Jobslte Address: - ,L S Gni C z i /Y";160�
i
Offlt-.e Use Oni
Subdivision: Lot#
Planck/Rec# _
Valuation:
I,� / Permit #
Owner: Reissue o;_�--
Address:_� 6of ��
L r— Approvals Required
Phone: S C7 5' – (� Z (� _ / Planning
Engineering
Contractor: Other
Address: _ _ --
Items Regulted
Subcontractors _
Phone:
Truss Details
Contractor's License It
(attact copy of current Oregon license) Other _
Subcontractors:
Plumbing: —
Mechanical:
(attach copy of current OR Contractor's License)
ArchitectlEngineer:
Address:
Phone:
COMMENTS: C
0O
It < X.[.>zt f
Applicant Signature & Phone number
Received by: _ Date Received: __
i
f
i I I I Ili-!i 11 II � I •,'. ;.'. i
!`If•1I'll I I1 11;1) I" t rl
i 11 HAI
i
V'Liffl II, I {if I 'i l� ;'ll )`11 111 II 1 ! I�j1111 11jI I
+l11 1 !?1 P!1 E'II I'/1
r'! f i(A 1141_.1 -14. t
I
1
I
!I
l
I
I
1111 , 11 IIf'11uIIII I � ' f !- I�
It
I
1
I
INSPECTION NOTICE
City of. Tigard Building Department
13125 SR pall Blvd. Tigard, Oregon 97223
Inspection Line (R/eco-.O-Phone): 639-4175 Rue:.ness Phone: t,19-4171
Inspection:
Footing Plbg. Undernlab Mech. Rough-in Appr/Sdwlk
Found. Plbg. Top Out Cas Line FINAL:
Post/Beam Struct. San. Sewer Framing -Bldg.
Poet/Beam Mech. Rain Drain Insulation -Plumb.
Plbg. Underfloor Nater Line Gyp. Bd. -Mech.
Date Roqueeleds_ / //-1I Tim{e.�ls� AM PM
Address: ����5 �rmit
Builders —
THE FOLLOWING CORRECTIONS ARE REQUIRED:
44
� 1
Inspector:—_ L �_ _ Date:
X',,APPROVED DISAPPROVED �^ APPROVED SUBJECT TO ABOVE
Call For Reinap.
BUILDING PERMIT
CITY OFTIFARD TWTY�A'F 0 PERMIT #. . . . . . . : B*U P 9 4-.--�03 6 1
CIMMUNITY DEVELOPMENT DEPARTMENT1 71 DATE ISSUED: 12/23/92
13125 SW Hell Blvd. P.O.Box 23397,Tigard,Oregon 97223 1603)639-4175 77
PPHE66. . . a ir ,-!S 6W Pi h6 i f 16 1!Wy - RAReffi=a
SUBDIVISION. . . . - N01014 TIGARDVILLE ADDITION ZONING: L--b
BLOCK. . . . . . . . . . . LOT. . . . . . . . .. . . . . .37
REISSUE: FLOOR EXTERIOR WALL CONSTRUCTION-
CLASS OF WORK. :DE FIRST'— . - s 1\11 3: E: W1
TYPE OF USE. . . :COM SECOND. . . : s f PROTECT OPENINGS?
-l'YPE OF CONST. :5N THIRD. . . . : s N: S1 E W:
OCCUPANCY GRP. :02 TOTAL------: Vi sf ROOF CONST: FIRE RET? :
OCCUPANCY LOAD: BASEMENT. : s-f AREA SEP. RATED:
STOR. s HT. : ft GARAGE. . . - s OCCU SEP. RATED".
BSMT?i MEZZ": REOD SETBACKS----- REQUIRED-------------------
F'LOOR LOAD. . . . : p s f LEFT: ft RGHT- ft FIR SPIKL: SMOK DET. . :
DWELLING UNITS: FRNT: ft REAR: ft FIR ALRM: HNDICP ACC:
BEDRMSt BATHS.- IMP SURFACE: PRO CORR: PARKING:
VALUE. f: 0
Remarksi Demolist-i existing building. All debris to be removed. Sewer to be capp ?
d
off and insf)ected by C.. i t y.
Owner: FEES --__--------__-.
ROBERT' LIM KIM type amol-tnt by date recpt
1360 SW WOODWARD WA`.' PRMT $ 25. 00 BCR 12/23/92 -
5PICT s 1. 25 BCR 12/23/92 -
PORTLAND OR 97225
Phone #.-
1-ontractor.
(.JWNER
i2lb. 25 TOTAL
Reg 00000
REQU I RED 1111SPILC-11UNS
This permit is issued subject to the regulations contained in the Cap sewer I i n e
ligard Municipal Code, State of Ore. Specialty C,)des and all other i n a I Inspection
applicable laws. All work will be done in accordance with
approved plans, This permit will expire if work is not started
within 180 days of issuance, or if work is suspended for more
than 180 days.
Pe r m i l;t e e S i gnat i-tre
..............................
Issi-ted By :
Call for inspection 639-4175
• 13125 Sw Blau Bwa. PLNCK/RECT #
CITY O�� TI( -ARD PO lloK 23397 PERMIT #
COMMUNI'IT DEVELOPMENT DEPARTMENT Tigard,Oregon 97223 —
(503)63"171 DATE ISSUED
JOB ADDRESS: L ' �3 _ w. tJ�li /�� � 1�;� TAX K4P/LOT _
7'
SUB: LOT: � r �)ZZ � LAND USE:
_
VALUATION:
OWNER SPECIAL NOTES
NAME: Y�o 7 T REISSUE OF:
ADDRESS: �/ 3 6 D , u GJ . L-slQ(j JW LCL G✓N V LAST REISSUE:
FLOOD PLAIN/
PHONE: LA 'pU/S , __ SENSITIVE LAND?
CONTRACTOR APPROVALS REQUIRED
NAME: PLANNING: —
ADDRESS: _ __ ENGINFERING:
FIRE DEPT:
PHONE: OTHER:
CONTR. BOARD #: _ EXP DATE:
ITEMS REQUIRED
LU,BCONTRACTORS: PLUMB: _ LIST/SUBCONTRACTORS:
MECH: BUS TAX:
' CHS-NGINFER CALCULATIONS:
NAME: �- -----_,�_ _ TRUSS DETAILS: _ ----
ADDRESS: _ _ OTHER:
PHONE:
PROPOSED BLDG. USE:
COMMENTS:
_ r
APPLICANT 5IGNATURE
Received By: _ D..te Received: _
CITY OF TJ ;AM) RE.CEIP'r OF POYMENT RFCF.1 PT NO. 9P
C-J-4-71-K AMOUN]" P 6. 5
NAME
I IM Kill, RIJBIJ6, CARH ilMOUN T 0. 00
ViDDREGiS 1360 5w WOODAARD WAY PAYMCNT DATE 14'10':?. 9 a
{:,ILJBD T Q f S ION
POVTl,_f_4Hf'j, OR
PURPOSE- OF V',F.)YMEN I AMOUNT Pr)iD E'.ILIPPCJSF OF- P-1AYMENT flMIXINJ PAID
10JILDING PERM E.115. 00 ST. BUILD PFR L5
;)EVOLITInN PERMIT BUP9 2 1
sw f-:11PICIFIC, Hic-14AWAY
r�,,)TAL PMOLINT PAID