Loading...
15850 SW 74TH AVENUE dEMNAD r --- 15850 SW 74TH AVENUE a� a r 0 un co ui WN N I 1111111M C17YOFTIOARD STU: PE34MI'T ITTCITY WARD COMMUNITY DEVELOPMENT DEPARTMENT C11 01119014 I'N-'PM:I''Y' NO . : 5:1882229 13125 S W.Hall Blvd.,P.O Box 233517,Tigard,Oregon 97223,(503)639-4175 1)(-)*I*F: ISSUED; 1-:1.1 */188 l-'PTM . l-,MT . N0. E3(:J1.7-159 ,JOID AD011741-ESS : 13S."50 SW 74111-1 A-VI-7 1AX MAP/1.0'T PSI. I.P.DC14100 SUH: L F 11" LAND I.JSI::* : IAYT Si:[7F: : WOPK CL.ASS : 57 111 LISE, ')'YPE:-, : (",I.11:41C: Y A P 11)!a 200 VAI-LA" .1 VIPF"AM APEA Y 1.,.::1! FIA-L'? : NO PAVIN(.*1111? NO (a 1.-4 A UT N G NO L.A N 1)S GA i::,.r N(.,, ? NO S 11 (I:- 11114N.PAPA 1 1. NV NO O L NO !11;:3;3 . 00 RE 39()11.) rites OLAN' AlIVIE.W 1:) 1;L V Ll 1-t'43$1 tar yy00:5 51 Alli: 'TAX $ C 0 N T R A C T 0 R 143"l . 65 This permit is issued subject to the regulations contained in Title 14 of the TMC. State of Oregon Specialty Codes,zoning regulations P F,::C F..T P I N 0 and all other applicable codes and ordinances, and it 13 hereby ........................... agreed that the work will be done in accordance with the plans and specifications and in compliance with all applicable codes and ordinances The Issuance of this permit does not waive restrictive covenants Contractor and subcontractors shall have current city business tax permits Tnis permit will expire and become null and void If work Is not started within 180 days,or if work 19 Suspended or abandoned for a period of 180 days any time after work has commenced It shall be the responsibility of the permittee to assure all required inspections are requested and approved Permittee Signaturs, histwd By 1 14 SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE CITY OF T16A S FERMI T PERMUT NO . 51881759 RD CrWOFiMAW 2L COMMUNITY DEVELOPMENT DEPARTMENT DAI'F: 1:153SUED : 9/1.9/68 13125 S W.Hall Blvd.,P.O.Box 23397,Ticiard,Oregon 97223,(503)63941)t) mr.m. i:)m*r .NO . 8131759 JOB ADOPIESS : 'TAX MAP/LOT 2.51.1-2101CI-100 5UB . I AND USIE 1 01 STZF-: W(PI( C A ASS : SITEWORK LISE IYPE ; I.NDUSIPIAL. CUBIC, YAPDS : 9000 AREKA : YES IH:NGINFERED FJL.11-7 : NO 1-.:IAV7:NG'? : NO GWADING'? NO LANDSCAP ING7 : NO S3 7 S .1 r.-:' PIRI:­ 'TI PAPAON7 : NO SIT1111-M DRAINS'? : NO -EF.S : 0 C:I,to i,k Pcil-ImIci PERMIT 1111109 . 00 W "19 o".sPLAN PEVIEW lit W 14:13.lit 1. E 1:)(.p im.v c,%i-t-3 n (31� 97003 R 1-3M4cwlh: ( w3) 64el 2:1-3 7 Sj'TA'T E TAX $9.4111) 3EVFA.(:K"MF.'N1' CHAIA;A:-'S C. llN I R A C T 0 11:11TAL : $198. 45 R RE(.-,Eipr NO . 307)6, This prrmit is Issued Subject to the regulations contained in Title 14 of the TMC. State of Oregon Specialty Codes,zoning regulations and all other applicable codes and ordinances, and it Is hereby agreed that the work will be done In accordance with the plans and specifications and In compliance with all applicable codes and ordinances The issuance of this permit does not waive restrictive covenants Contractor and subcontractors shall have current city business tax permits This permit will expire and become null and void if work is not started within 180 days,or It work is suspended or abandoned for a period of 180 days any time otter work has commenced It shall be the responsibility of the permittee to assure all required inspections are requested and approved. Permittee Signature Issued By -"At I 1:M ,. SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED Aflr-)VE WN XW !�f CITY OF TIRD September 8, 1_988 A OREGON Mr. Darrel Kraxberger, AIA 12900 SW Hackamore Beaverton, OR 97005-7238 RE: WCTM 251-12DC Tax .Lot 1400 Dear Mr. Kraxberger: A review of the plans for placement of fill material on the above referenced property has been cn;ducted. The following shall apply: 1.. Approval of placement of fill material is for areas above the floodplain (elevation 131). 2. No fill mater!al shall be placed in the drainage swale between section 2+57 and 3+00. 3. Streets shall be kept clear of dirt and debris. 4. Dust control shall be provided as necessary. If you have any questions, please call 639-4171. Sincerely, Brad Roast Building Official ht/6916D 13125 SW Hall Blvd-P.O.Box 23397,Tigard,Oregon 97223 (503)639-4171 - — u f XW W ADDRESS ASSIGNMENT REQUEST Please help me inform the proper parties for address assignments by Riving me the following information: o Site to be assigned an address (Tax Map and Lot Number) a o Former address at site (if applicable) o Type of. unit (single family dwelling, multi—family dwelling, commercial unit, office shell. with suites.. . ) o Number of units (i.e. , apartments). Please indicate where I may find a site plan for reference. o Comments: o Property owner or developer to confirm address with Name: Address: o Name and address of other parties to receive address confirmation letter. o Planning file number to receive copy of address confirmation letter. Q ht/7288D �� ( )eel // � I N N O Q 9o'ozi I 'Ob1 3Abn3 L31HY,3ONS 01'091ONOI vrO11tiO M•,lI,9ZofON C*j Q ~ Q M on W W (n —61.—1 I � q Pa N Ift 0 I I I z I a y w IK cr F 0 W U � I Y I rr � 90 W� • i I WWI \ I JOO G. 8 Q N W W In 1n N CITY OF TIGARD Washington County, Oregon NOTICE OF FINAL ORDER - BY HEARINGS OFFICER I . Concerniug Case Number(s): SL 38-04 2. Name of Owner: Loy Clark Pipe Line Co. / Ronald D. Clark, Pres. 3. Name of Applicant: Darrel U.W. Kraxberger, A.I.A. Address 12900 SW E]ackamore City Beaverton State OR Zip 97005 4. Location of Property: Address 15850 SW 74th Ave. Tigard, OR Legal Description 2S1 12DC 1400 5. Nature of Application: to fill a drainage draw adjacent to Fanno Crk with aprox. 200 cubic yds of fill and a concrete pipe C rep ace P a dr unctions. Drama e draw is within the 100ear _ -- y fINZp r . Proposal would include removal of like amount of material from a bank withTi-tt5e7T00aP2iT;C11 La compensate tore ects o proposed- d fill. Property zoned I-P. 6. Action: Approval as requested Industrial Park xx Approval with-conditions Denial 7. Notice: Notice was published in the newspaper, posted at City Hall and mailed to: -X The applicant & owners _ x _ Owners of record within the required distance __X_ The affected Neighborhood Planning Organization _X Affected governmental agencies 8. Final Decision: THE DECISION SHALL BE FINAL ON November_ 1988,UNLESS AN APPEAL IS FI_F D. The adopted findings of fact, decision, and statement of condition can be obtained from the Planning Department, Tigard City Hall, 13125 SW Hall Blvd. , P.O. Box 23397, Tigard, Oregon 91223. 9. A=1: Any party to the decision may appeal this decision in accordance with 18.32.290(b) and Section 18.32.370 which provides that n written appeal mAv he f led within .10 days after notice iv given and sent. The deadline for filing of an appeal is 3:30 P.M. ngVember 10. questions: If you have any questions, please call the City of Tigard Pl.nnning Department, 639-4171 . 0257P/0006P BEFORE THE HEARINGS OFFICER FOR THE CITY OF TIGARD, OREGON IN THE MATTER OF THE APPLICATION ) FOR A SENSITIVE LANDS PERMIT TO ) No. FL88-04 PROVIDE BOTH FILL AND REMOVAL OF ) MATERIAL WITHIN THE 100 YEAR ) FLOODPLAIN; j ) Daryl Kraxburger, Applicant. ) The above-entitled matter came before the Hearings Officer at the regularly scheduled meeting of October 13, 1988, at the Tigard Civic Center-Town Hall , Tigard, Oregon; and The applicant requests a sensitive lands permit, to fill a drainageway and floodplain area with approximately 200 cubic yards of fill and to remove an equivalent amount of material in another location in the floodplain of Fanno Creek; and The hearings Officer conducted a public hearing on October 13 , 1988 , at which time testimony, evidence and the Planning Department' s Staff Report were received; and The Hearings Officer adopts the findings of fact and conclusions contained in the Staff Report, a copy of which is attached hereto, and marked "Exhibit A" and incorporated by reference herein; NOW, THEREFORE, IT IS HEREBY ORDERED that SL 88-04 is approved subject to the following condition: Page 1 - SL 88-04 1 . The area below the 100 year floodplain elevation shall be dedicated as greenway - open space to the City. A monumented boundary survey showing all new title lines, prepared by a registered professional or land surveyor, shall be submitted to the City for review and approval prior to recording. The applicant may delay the dedication of the greenway until after a permit, as required by condition #2 herein, is obtained, however- the oweverthe performance assurance or letter of commitment as required in condition #7 shall remain in effect until such dedication is made. 2 . A permit shall be obtained ty the applicant from the U.S. Army Corp of Engineers (Authority: Section 404 , Clean Water Act, 33 U.S .C. 1344) for discharge of dredge or fill material into waters of the United States . A copy of the permit shall be provided to the City Engineering Division by the applicant. The applicant may begin work on landfill above the floodplain without said permit, but any fill or removal of material below the floodplain shall be preceded by the permit required in this- condition of approval . 3 . Sanitary sewer and storm drainage details shall be provided as part of the public improvement plans. Calculations and a topographic map of the storm drainage basin shall be provided as a supplement to the public improvement plans. Pag; 2 - SL 88-04 Calculations shall be based on full development of the serviceable area. 4. A grading plan with surveyed cross-sections of the fill and excavation areas and earthwork quantity computations shall be provided as part of the storm drainage public improvement plans. 5. The proposed storm drain shall be centered in a 15 " public utility easement and constructed to public standards. The easement shall be executed on forms provided by the Engineering Division. 6. Five (5) sets of plans and profile public improvement construction plans and one ( 1) itemized construction cost estimate, by a Registered Professional Engineer, detailing all proposed public improvemen•cs shall be submitted to the Engineering Division for approval. . Two (2) sets of plans and profile plans shall he submitted for preliminary review prior. to submittal of final plans. 7. Construction of proposed public improvements shall noir commence until, after the Engineering Division has approved public improvement plans. The section .gill require a 1008 performance assurance or letter of commitment, a developer-engineer agreement, and the payment of a permit fee. Also, the execution of a compliance agreement shall occur prior to, or concurrently with the is: e of approved public improvement plans. Page 3 -- SL 88-04 =w I 8. The applicant may delay the implementation of conditions 1 , 2, and that portion of condition 7 that applies to Engineering Division approval of the public improvement plans, to facilitate the U.S. Army Corps of Engineers permit. However , the applicant will retain in place the 100% performance assurance or letter of commitment until said conditions are met. 9. THIS APPROVAL IS VALID IF EXERCISED WITHIN ONE YEAR OF THE FINAL APPROVAL DATE. DATED this- day of October ,,/1988 . Kenneth B. Stewart Hearings Officer Page 4 - SL 88-04 WIWIWAMW !fid ff_ 4 STAFF REPORT AGENDA ITEM 2.2 OCTOBER 13, 1988 - 7:00 P.M. TIGARD HEARINGS OFFICER TIGARD CITY HALL - TOWN HALL 13125 SW HALL BLVD. TIGARD, OREGON 972.2.3 A. FACTS 1 . General Information CASE: Sensitive Lands SL 88-04 REQUEST: To fill a drainageway and floodplain area with approximately 200 cubic yards of fill and to remove an equivalent amount of material in another location in the floodplain. COMPREHENSIVE PLAN DESIGNATION: light Industrial ZONING DESIGNATION: I-P (Industrial Park) APPLICANT: Daryl Kraxburger OWNER: Loy-Clark Pipe Line Co. 1;-900 SW Hackmore 3905 SW 141st Ave Beaverton, OR 97005-7238 Beaverton, OR 97005 LOCATION: 15850 SW 74Lh Avenue (WCTM 2S1 12DC, Tax Lot 1400) 2. Background Information No previous applications have been reviewed by the City regarding this property. 3. Vicinity _Information Fanno Creek lies within the western portion of the property. Parcels zoned R-7 (Residential, 7 units/acre) and R-12 (Residential, 12 units/ acre) are situated on the west side of the creek. A combination of properties zoned I---P and I-L (Light Industrial) are in the immediate vicinity to the north, east, and south. Access to the property is provided by 74th Avenue which borders the eastern lot line. 4 . Site Information and Pro )gsal Description The property is undeveloped and covered by a combination of trees, brush, and grass. The 100 year floodplain, which has an elevation of 131 feet, ocr-upies the western half of the parcel. A small drainageway runs under 74th Avenue and across the subject property to Fanno Creek. The applicant proposes to eventually vst,,blish an office, maintenance shops, covered equipment storage, and yard for the pipeline business. Prior to begirnnirir3 this rroject, the atn,? icant is requesting approval to place approximately 9,000 cubic yards of fill on the uplands portion STAFF REPORT -- SL 08 -04 (KRAY,BURGFR) - PAGE 1 Exhibit "A" of the property. Of this amount, approximately 192 cubic yards of fill will be placed within the 100 year floodplain. A culvert- will be used to accommodate the water flowing in the drainageway. 5. Age- icy and NPO Comments The US Army Corp of Engineers have authorized the proposed work subject to conditions (see attachment). The Building Division has no objection to the request. The Engineering Division has the following comments: The applicant- has submitted a topographic survey and grading plan showing the fill;.ng of a draw from Fanno Creek. A volume of material equal to the fill is to be excavated from the bank of the creek. A 24" storm drain is proposed to replace the draw as a drainageway. The floodway extends to the edge of the floodplain throughout this reach of Fanno Creek. The excavation and fill. are within the 100 year floodplain. The draw is a natural drainage with slopes in excess of 25 percent. Consequently, a Sensitive Lands permit is required. The Sensitive Lands Ordinance requires that land form alterations will preserve or enhance the flood plain storage function and maintenance of the zero-foot use floodway shall not result in any narrowing of the floodway boundary. This requirement is met since there is an excavation along the creek bank equal to the fill of the draw. The Ordinance also requires that alterations not result in a decrease of the water flow capacity or any increase in the water surface elevation of the 100-year flood. Since the excavation is in a more hydraulically efficient portion of the floodway than is the proposed fill, the water flow capacity will be increased by this project. Consequently, there will be no rise of the water surface elevation of the 100-year flood. In addition, the 0rdinance requires that the landform alterations not leave steep slopes that will result in erosion, stream sedimentation, ground instability, or other adverse on-site and off-site effects or hazards. Filling of the draw will eliminate the existing steep slopes. The exist.iny drainage within the draw will be routed through a proposed storm drain that will eliminate sedimontation and erosion caused by off-site run-off. The Unified C<ewerage Agency indicates that the strength of the existing B-inch sewer line should be evaluated to determine if the line will resist the additional lead created by the fill . NPO Ifs states that the data submitted for review was insufficient with regard to upstream and downstream imparts. No other commonts were re-_eived. S1AFF REPORT -- SL BR-04 (KRAXRURGFR) - PAGE 2 i B. FINDINGS AND CONCLUSIONS The Planning Staff has determined that Comprehensive Plan policies 2.1.1, 3 .2. 1, 3 .2.2, 3 .2.3, 3.5.3, and 3 .5.4, and Community Development Code Sections 18.68 ar►d 18.84 are the relevant review cri' aria in this case. The Planning staff finds that the application is consistent with the relevant Plan policies based upon the following discussion: 1. Policy 2. 1. 1 is satisfied because the NPO and surrounding property owners have been notified of this hearing and given an opportunity to comment. 2. Policies 3.2. 1, 3.2.2, and 3.2.3 are satisfied because the proposed alterations within the 100—year floodplain will not result in any rise in flood elevation. Also, the streamflow capacity of the zero--foot rise floodway will be maintained and it does not appear that any upstream of downstream changes in the floodplain will be made. As a condition of approval, dedication of sufficient open land will be made to enhance the greenway which abuts the property on the west. I 3. Policy 3 .5.3 is satisfied because additional greenway wil be provided as a condition of approval and this in turn will repre—,ci-st another addition to the Fanno Creek greenway system as called for in the Comprehensive Plan. 4 . Policy 3.5.4 calls for the provision of an inter—connected pedestrian/ bicycle path throughout. the City. The location of this path is riot known at this time, but it probably will be located on the west side of Fanno Creek. As a result, a pathway should not be constructed in conjunction with this proposal. The Planning Staff finds that the proposal meets the relevant criteria found in the Community Development Code. based on the following findings: 1 . Chapter 18.68 is satisfied because the proposal meets all of the requirements of the I—P zone. 2. Chapter 18.84 is satisfied because the application meets all of the relevant sensitive lands criteria in section 18.84 .040(a) and (b)- if the conditions of approval are rt►et as indicated b+alow. C. RECOMMENDATION Rased upon the discussion above, the Planning staff recommends approval of SL 88-04 subject to the following conditions : THE FOLLOWING CONDITIONS SHALL BE SATISFIED PR10R TO ISSUANCE OF A SLTE WORK PERMIT BY THE BUILDING DIVISION (STAFF CONTACT: CONDITION 1, JOHN FEIGION, CONDITIONS 2-7, GREG BERRY, PHONE 639--4171) . 1 . The area below the 100 year floodplain elevation shall be dedicated as greenway — open space to the City . A monumented boundary survey showing all new title lines, prepared by a registered professional or 6 j land surveyor, shall be submitted to the City for review and approval prior to recording. STAFF REPORT — SL 08 04 (KRAXPURGER) — PAGE 3 M WX W1 NMI W W A permit shall be obtained by the applicant from the U.S. Army Corps of Engineers (Authority: Section 404, Clean Water Act, 33 U.S.C. X1 1344) for discharge of dredge or fill material into waters of the United States. A copy of the permit shall be provided to the City Engineering division by the applicant. 3. Sanitary sewer and storm drainage details shall be provided as part of the public improvement plans. Calculations and a topographic map of the storm drainage basin shall be provided as a supplement to the public improvement plans. Calculations shall be based on full development -of the serviceable area. 4. A grading plan with surveyed -ross—sections of the fill and excavation areas and earthwork quantity computations shall be provided as part of the storm drainage public improvement plans. r 5. The proposed storm drain shall be centered in a 15' public utility easement and constructed to public standards. The easement shall be executed on forms provided by the"Engineering Division. 6. Five (5) sets of plan and profile public improvement construction plans and one (1) itemized construction cost estimate, by a Registered Professional Engineer, detailing all proposed public improvements shall be submitted to the Engineering division for approval. Two (2) sets of plan and profile plans shall be submitted for preliminary review prior t:o qubmittal of final plans. 7. Construction of proposed public improvements shall not c6mmence until after the Engineering division has approved public improvement plans. The section will require a 100% Eerformance assurance or letter of commitment, an developer--ingineer agreement, the payment- of a permit fee. Also, the execution of a compliance agreement shall occur prior to, or concurrently with the issuance of approved public improvement . plans. 8. THIS APPROVAL IS VALID IF EXERCISED WITHIN ONE YLAR OF THE FINAL_ APPROVAL DATE. ba [9-10 P EPARED 8 : Keith Eiden Senior Planner (ke/7415D) / STAFF' REPORT — SL 88-04 (KROXH URGER) - PAGE 4 W -ago Wo! FA CITYOFTIGArRD PLAN CHECK APPLICATION COMMUNITY DEVELOPMENT DEPARTMENT CM TW'4RD PLAN CHECK 0 13125 SW Ho 6W. P.o.BW 23MMEoo" PERMIT N _ '0` ° (sos)aw 4»s DATE ISSUED JOB ADDRESS: _ TAX MAP/LOT SUB: LOT: LAND USE: --� VALUATION: OWNER - 7 SPECIAL NOTES NAME: :�, _,�,, K r"i r, �^ i„� r _ REISSUE OF: _ ADDRESS: - ^� LAST REISSUE: FLOOD PLAIN/ PHONE: __ SENSITIVE LAND: /tip'�-1 , .�/ 1 APPROVALS REQUIRED CONTRACTOR PLANNING: NAME: ENGINEERING: ADDRESS: FIRE DEPT - OTHER: PHONE: ITEMS REQUIRED LIST/SUBCONTRACTORS:NAME _ ARCH/ENGINEER BUS TAX: ADDRESS: _ - CALCULATIONS: ADDRESS: _ TRUSS DETHILS: - — PARKING PLAN: LANDSCAPE PLAN: _ PHONE: OTHER: COMMENTS: PERMIT M ACCT H DESCRIPTION AMOUNT AMOUNT PD. BAL. DUE .a '1L�c 10-432 00 Building Permit Fees - 10-431 00 Plumbing Permit Fees - _ 10-431 01 Mechanical Permit- Fees " - - 10-230 01 State Building Tax (5X) Bu i ld i rg -- -- ----- Plumbing i Mech 10-433 00 Plans Check Fee Ruilding -- Plumbing Mech -_ 30---202 00 Sewer Connection 30--444 00 Sewer Inspection 51-448 00 Street System Dev Charge (SDC) 52--449 01 Parks i System Dev Charge (PDC) - 52-449 02 Parks I1 SYS*-em Dev Charge (PDC) --- 31-450 00 Storm Drainage Syst Dev Chr-g (SSDC) 10-230 09 IRFD 10-230 06 Washington County Fire N1 (95X) 10-220 00 Amart/Wedgewood — TOTAL REC y APPLICANT SIGNATURE. — Received By: _ y Date Received: ht/3587P/18P - -