Loading...
Case File ADDRESS: i N H J r� cD w J isVecord:;Vnicrofim\targelsVwiiding.doc Page No. 8 CASE HISTCRY FOR CASE NO.: MS196-0171 ELIJAH h EGHBAL ROSTAMIAN 10875 3W 78TH AVE 06/18/98 Req/Action Description Re Schd/ End/ Action Notes Disp By Update Upd Date By Code Sent DoneDone MSTA799 Building Final 01/25/98 / / 01/22/98 BLDG, PLM, MECH: FAIL RB 04/20/98 JT 1. Drive approach and sidewalk are not repoured this date. 2. Underfloor (crawl space): a. Insulation fallen out of floor cavity at various locations-reinstall. b. At location of dryer vena (out of floor) water linen exposed. C. support flex duct at plenum box. d. Insulate duct at plenum box. e. Remove wood and paper debris. f. Support dryer venting with wire or 1-inch matal staps. 3. Provide proper access to house abut off and access cover. 4. Fire-caulk gas line at fireplace. Owner to use solid fuel. Does this unit have combustion air? 5. Provide for flow out of frontal underfloor vent well to keep water from entering the crawl space. 6. Exterior deck handrail still 2x6 and lose that 30-inchsn in height. 2 5/8-inch width allowable. 2x6 okay, if with grip for fingers. handrail/guardrail requires 14-inch minimum. MSTA799 Building Final / / / / 04/1'1/98 PASS RB 0./17/98 RB MSTA960 (F) Issue Cert. of Occupancy / / / / 04/17/98 MAILED 6/12/99 MAIL VN 06/11/98 VLN MSTB708 Erosion control / / / / la/�0797 USA 01/01/98 J•N d H n: L� 1� J CJ r. L L0 J Page No, 7 CASE HISTORY FOR CASE NO.: MST96-0171 ELIJAH & EGHBAL ROSTAMIAN 10875 SW 78TH AVE 06/18/98 Action Description Req/ Schd/ End/ Action Notes Diap by Update Upd Code Sent Done Done Date By MSTA799 Building Final / / / / 12/31/97 1. USA ok FAIL RB 01/05/98 RB 2. Hose bibbe not installed at exterior locations (frog-fres ty[e required). 3. Cleanout cap required at frontal location from sanitary. 4. Pressure relief tube not installed at hot water heater. 5. Range oxhaust venting not working. Also, seal all joints of duct connections and secure with 3-screws. 6. Fireplace shut-ff valve and log lighter not installed or working. 7. Garge slab not poured. *Flash perimeter to protect structural element and finish products. -Do not encase gas piping. Protect appliances[ 8. 11/1'1 6, 11/26 garage slab issues need to be cleared. Please see reports for complianc+. P. Insulate skylight within attic where insulation has fallen. 10. Unable to crawl under floor access needs to be opened. 11. Where is house water shut-off.? 12. Water supply for refrigerator shall be no less that e/8-inch. 17. Drill holes in concrete U/f vent well to allow water flow and not allow for puddle and water flow to U/f crawl. 14. Exterior deck handrail shall not be less than 30-inches and shall be gripped (2x6 flat). MSTA799 Building Final / / / / 01/15/98 Corrections of 12/31/98 not made - FAIL GL 04/20/98 JI I � Page No. 6 CASE HISTORY FOR CASE NO.: MST96-0171 ELIJ_AH 6 EGHBAL ROSTAMIAN 10875 SW 78TH AVE 06/18/98 Action Description Req/ Schd/ End/ Action Notes Disp By Update Upd Code Sent Done Done Date BY ------- ------------------------------ ------- -------- -------- --------------------------------------- ---- --- ----- MSTA790 Electrical Final / / / / 12/31/97 Approved as noted: PASS BRt 12/37./97 J111 1. 3-way switch in hall near bedroom floats. ART 380-10 (b) some box setback. 2. A few receptacles float, SEE 410-56 (e) . Sheetrcck cut around outlet needs patching 370-21. MSTA795 Mechanical Final / / / 12/31/97 FAIL RB 12/31/97 J•H MSTA795 Mechanical Final 01/25/98 / / 01/22/98 See BLDG. r'INAL PHIS DATE FAIL RB 01/7.5/98 J'H MSTA795 Mechanical Final / / / / 04/17/98 PASS RB 04/17/98 RB MSTA797 Plumb Final / / / / 12/31/97 FAIL RB 12/31/9.7 J•H MSTA797 Plumb Final 01/25/98 / / 011:2/98 SEE BLDG FINAL THIS DATE. FAIL RB 01/25/98 J•H MSTA797 Plumb Final / / / / 04/17/98 PASS RB 04/17/98 RL MSTA'798 Final inspection / / / / 04/17/98 PASS RR 04/17/98 RB Lr F-- J CO C7 It! .J Page No. 5 CASE HISTORY FOR CASE NO.: MST96-0171 ELIJAH G EGHBAL ROSTM3IAN 10875 SW 78TH AVE 06/18/98 Action Description Req/ Schd/ End/ Action Notes Disp By Update UNd Code Sent Done Done Date By MSTA770 Misc. Inspecti-in / / / / 11./26/97 Courtesy garage inspection: NOTE.. Gs 12/09/11 •'.i 1. Furnace plenum must be encased with 2-inch concrete. 2. Gas pipe cannot be encased in concre-te unless sleeved and sealed at both ends. 3. Flash all exposed wood where in contact with concrete. 4. Floor drain in garage needs to have a sand/oil ■epartor. 5. Landing needed at exterior garage man door (inside). 6. UFER ground rod has been cut-off a new one needs to be installed (and inspected) . MSTA7'1 —REINSPECTION— / / / / 09/19/96 foundation evaluation; concern of owner- FAIL RB 09/19/96 RB afraid that vents will be above floor level.... The following was observed and repor'ed: .l. Full height stem wall exists at front opening to garage. Elevation at P'6" from curb.209 w/garage el. at 207.5. ......stem wall above height of street. Should have been 3-1/21 drop w/storm grate, as per plans, 2. No block out for the furnace. 3. lack of ventilation for cross venting- 1545 sq.ft. 15 vents req'd w/9 ventc installed. 4. No Ufer ground. 5. No low point crawl drain. a ►- 6. cold joints noted w/in perimeter of CY Nstem walls of garage. Lf front side i r rt rear wall- both at corners. F- 7. Inadequate intermediate piers- lacking in compressive strength. r-" a] B. 1/2" anchor bolts used rather than CD 5/8" 6 are greater in excess of 41; Ltl J engineering specs. 9. No HD's installed w/in the stem wall- rebar req'mts. 10. The beam pockets appear to be ok for decking w/o interference from venta. Page No. 4 CASH HISTORY FOR CASE NO.: MST96-0171 ELIJAH & HOHBAL ROSTAMIAN 10875 SW 78TH AVE 06/18/98 Action Description Req/ Schd/ End/ Action Notes Lisp By Update Upd code Sent Lone Done Date By ------- ------------------------------ -------- -------- -------- --------------------------------------- ---- --- -- ----- --- NSTA740 Insulation Inap / / / / 04/28/97 INSULATE: FhIL RB 04/28/97 RB 1. headers 2. below vent baffles 3. missed at various locations 4. around recessed light fixtures 5. skylight perimeters CHINK WINDOWS / DOORS VENT BAFFLES MISSED FIR.ESTOP ALL THRU HOLF. PENETRATIONS VAPOR BARRIER NEEDED AT VARIOUS LOCI-TIONS MSTA740 Insulation Insp / / / / 04/29/97 pending- vapor barrier where needed PASS RB 04/29/97 RA chink door/windows where lacking remove vapor barrier covering kraft paper insulation MSTA745 Gyp Board Insp / / / / 05/23/97 PASS RC 05/23/97 ROC MSTA755 Rain drain Insp ! / / 12/06/96 req. clean-out PASS MS 12/06/96 MRS MSTA760 Water Line Insp / / / / 08/09/96 PASS MS 09/12/96 MRS MSTA765 Appr/Sdwlk Insp / / / / 06/12/97 remove dirt/2" 3!4" gravel compacted. PASS PI 06/27/97 A•W Felt around watei meter. Sidewalk formn for concrete MSTA765 Appr/Sdwlk lamp 07/01/97 / / 06/12/97 1. Replace broken curt at catch basin. FAIL PI 07/01/97 S*W 2. Forms not ready. 3. Asphalt not cut. Call for inspection. MSTA765 Appr/Sdwlk Insp 07/01/37 / / 06/19/97 Compact 3/4 minus. PASS PI 07/01/97 S*N CL ft: f% MSTA765 Appr/Sd,.:,c Insp / / / / 03/30/98 1. C-.-rb not formed correctly. FAIL PI 03/30/98 J•H y 2. 6-inch min. drive depth. H 3. Hinge 3-feet. r. J 4. Slope south and not correct. �-r M LL) MSTA' 65 Appr!Sdwlk Insp / / / / 04/02/98 PASS PI 04/02/99 J•H --� MSTA770 Misc. Inspection / / / / 07/16/97 Note: please see file regarding flatwork SLAB RB 07/16/97 J•H code and workmanship issues for garage slab. 5 pages this date. MSTA770 Misc. Insp+ctiot / / / / 11/1'7/97 SIAS RA 11/17/97 RB Page No. 3 CASE HISTORY FOR CASE NO.: MST96-0171 ELIJAH i EGHBAL ROSTAMIAN 10875 SW 78TH AVE 06/18/98 Action Description Req/ Schd/ End/ Action Notes Disp By Update Upd Cod-) Sent Done Done Date By ------- ------------------------------ -------- -------- -------- --------------------------------------- ---- --- -------- --- MSTA725 Framing Inap / / / / 03/2:/97 dig out furnace plenum box- 3" flow of FAIL RB 03/21/97 RB concrete bane; gypsum cover behind furnace; provide srliment trap for gas line to hot water heater; vent baffles; continue gas line to range; enclose lid of fireplace cavity; insulate & flame spread fireplace cavity; shut-off valve req'd at fireplace; exhaust vent missed at laundry; nail plate laundry rm plumbing; full nailing needed at H-clips thru out; 3' garage slab needed- slope towards entranci; nail sheathing entire perimeter; roof vents need to be sealed at roof level; shingle installation require 4-nails per shingle; roof vents needed to be installed in accordance with install. standards; electrical cover. MSTA725 Framing Insp / / / / 04/04/97 mach issues; vent baffles; shower FAIL RB 04/04/97 RB blocking (hall); caulk behind roof vents; change out large roof jack for tight fitting (smaller) jaci-. NOTR; ELECTRICAL/GAS RANGE 7 SOLID FUEL/GAS FIREPLACE -t MSTA725 Framing Insp / / / / 04/29/97 PASS RB 11/17/97 RB 14STA726 Shear Wall Insp / / / / 02/14/97 nail shear walln; interior shear-ply FAIL RB 02/16/97 RB rear wall of garage h block where missed; gyp shear- MSTA726 Shear Wall Insp / / / / 03/20/97 pending- nail aheathtng entire perimeter PASS RB 03/21/97 RB i-- MSTA727 LOW Voltage % / / / / / 04/11/96 BT2 MSTA71s ilas Line Insp / / / / 07/16/97 5 pages of comments about this job, PASS RB 07/16/97 J*H please see file copy. J [O MSTA73'i Gas Line Inap / / / / 07/14/97 No TEST, installer supplied gauge PASS TLP 07/17/97 J*H CM broken. LL1 J Page No. 2 CASE HISTORY FOR CASE NO.: MST96-0171 ELIJAH k EGHBAL ROSTAMIAN 10875 SW 78TH AVE 06/18/98 Action Description Req/ Schd/ End/ Action Notes Disp By Update Upd Code Sent Done Done Date By ------- ------------------I------------ -------- -------- -------- -------------`-----------'----------- - ---- --- -------- --- MSTA710 Pont/Beam Structural / / / / 11/19j96 DONE BY TLP FIRST DONE GS 12/11/96 TLP MSTA711 Poet/Beam Mechanical / / / / 11/12/96 pending- support flex PASS RB 11/12/96 RB MSTA713 Crawl Drain / / / / 04/17/98 PASS RB 04/20/96 JT MSTA715 Pim/undalab Inap / / / / 11/15/96 PASS TLP 12/09/96 TLP MSTA717 ?Lm/Underfloor / / / / 11/18/96 PASS MS 11/18/96 MRS MSTA720 Mechanical Inap / / / / 02/14/97 see framing thin date FAIL RB 03/21/97 RB MSTA720 Mechanical Inap / / / / 03/20/97 see framing thin date FAIL RB 03/21/97 RB MSTA720 Mechanical Inap / / / / 04/04/97 secure combustion air at fireplace; FAIL RB 04%04/97 RB insuale & flame aproad at fireplace; connect exhaust vent at bathrooms- use reducer for connection. MSTA720 Mechanical Innp / / / / 04/29/97 PASS RB 11/17/97 RB MSTA722 Plumb Top Out / / / / 02/14/97 PASS MS 02/19/97 MRS MSTA'123 Electrical Service / / / / 03/19/97 rebar grounding required DIS MJR 03/31/97 MSR 03-26-97 information on grounding MSTA723 Electrical Service / / / / 04/01/97 cover of garage floor rebar for COV MJR 04/03/97 MJR grounding approved wrong clamp used MSTA723 Electrical Service / / / / 04/04/97 PASS MJR 04/04/97 MJR MSTA724 Electrical Rough In / / / / 03/19/97 sign permit PASS MJR 03/31/97 MJR MSTA724 Electrical Rough In / / / / 12/05,97 ufer grnd was cut. repair has been made NOTE GS 12/n5/97 GES howevsr ground clamp has been removed and panel in no longer gronnded y MSTA725 Framing Insp / / / 1 02/14/97 shear req'mt.e; electrical cover; vent FAIL RB 02/19/97 RB baffles; roof venting; shower blc^king; nail plate protection; mach cover; tempered glazing req`d at master bedrm; -r seal foundation wall in garge; vaulted ygable framinq needed for ceiling; b 9 a.l J MEN Page No. I CASE HISTORY FOR CASE NO.: MST96-0171 ELIJAH 4 EGHBAL ROSTAMIAN 10875 SW 78TH AVE 06/18/98 Action Description Req/ Schd/ End/ Action Notes Dinp By Update tlpd Code Sent Done Done Date ti•;' ------- ------------------------------ -------- --------- -------- ----`---------------- --------- ---- --- MSTA005 Applicatica. received / / / / 03/21/96 PASS BON 04/11/96 BT2 MSTA008 Permit Created / / / / 04/11/96 PASS RT 04/11!36 ^T2 MSTA010 Check for prcl. restrict. / / / / 03/28/96 PASS TD 04/11/96 BT2 MSTA012 Plans routed tL Plans Examiner / / / / 03/28/96 PASS JD 04/11/96 BT2 MSTA026 Plane approved by Plans Exmr / / / / 04/11/96 PASS RT 04/11/96 BT2 MSTA030 Reviewed plans routed to DSTS / / / / 04/11/96 PASS RT 04/11/76 BT2 MSTA050 Hold for / / / / 04/2x/98 hold c/o until confirmation back from 04/20/98 JT Rick B., no crawl drain inspection. sent final approval back to Rick. jeanne t. MSTA092 (F) Issue combination permit / / / / 05/14/96 PASS B 05/1.4/96 BON MSTA097 Issue plumbing signat.re form / / / / 05/14/96 PASS B 05/14/96 BON MSTA098 Issue electric signature form / / / / 05/14/96 PASS B 05/14/96 BON MSTA705 Footing Insp / / / / 08/07/96 PASS TLP 08/12/96 BT2 MSTA706 Foundation Insp / / / / 08/07/96 PASS TLP 09/19/96 RB MSTA706 Foundation Insp / / / / 09/19/96 see <-REINSPECTION- (page down) FAIL RB 09/19/96 RB M.9TA706 Foundation Innp / / / / 11/17/96 pending- vent placement a/in cripple PASS RB 11/12/96 RB wall where needed. anchor bolts. MSTA707 Slab Insp / / / / 11/17/97 1. Do not encase gas lino extension into PART RB 11/17/97 J•1I concrete slab. 2. Maintain elope towards front entry of garage to facilitate water flow. 3. Protect drain at rear of garage wall. Do not allow contact of concrete with ABS piping material. MSTA707 Slab Insp / / / / 12/05/97 gar line caujot be encased in cone GAR GR 1'./05/97 C.E.^ flash exposed wood in contact w/cone MSTA707 Slab Inap / / / / 01/05/98 garage: PASS RB 01/05/yA „P C` R protect gar line t% protective barrier placement �- dig-out underneath furnace plenum F-- J MSTA707 slab Insp J < ! / al/07/9e barrier inspection- prior issues ok PASS RB 01/0e/9e Rte t7 W MSTA710 poet/Beam Structural / / / / 11/12/96 tighten anchor bolts; sheath < 14m pony FAIL RB 11/12/96 PP .J Ovalle; strap supports for flax duct; dubl plate req'd where decking it per,endicular; all-thread to upper stud walls; plumbing under-floor req'd; add vents into cripple Mn11 where needed. r q 7G CITY OF TIGARD BUILDING INSPECTION DIVISION ( v '�,� 24-Hour Inspection Line: 639-4175 Business Phone: 639-4171 j '/ � C µS- 0985" Date Requested: _ �y — I ?� _ A.M > P.M. _ MST: h`'1� Location: Tenant: Suite:_ _Bldg: _ MEC: Contractor: / YI,1 _ — �( }� _ phone: [ PLM: _ Owner: _Phone: li(. ELC: 8 H O M E A !m 0/i f✓y EI.R: "kIAE Gbti A L,— 2. SMftLee, L P, 8 EMS �� srr: �� _ BUILDING— BLDG(con't) P�UMDl9_ `ECH N . L ELE CTRL AL SITE e Post/Beam Post/Beatn C ( Tmv+kftr Cover/Service Sewer/Storn footing Roof I1ndl'I/Slab Rough-hr Ceiling Water Line Slab framing Top Out Gas line Rough-In UG Sprinkler foundation Insulation Sewer Hood/Duct Reconnect Vau!t Bsmt Damp Drywall Stone Furnace 'Temp Service MISC. Masonry ('citing Rain Drain A/C Illi Slab Shcar/Sheath fi Alm Craw d Dr Heat Pum- I,ow Volt Appror A pprove Approved Appro,— Appr/Sdwlk o!Approved Not roved ,roved Not Approved Not Approved FINA INAL FINAL. FINAL rz —� J Lel O C'1+11 for reinspection Reinspection fee of S required befo a ne t' .;lection D l friable to inspect Inspector Date J Page— — _ —of CITY OF TIGARD DEVELOPMENT SERVICES 13125 SW Hall Blvd., Tigard,OR 97223 (503)6394171 CERTIFICATE OF UMCt. PANC'Y PERMIT #. . . . . . . : MST96 0171 DATE ISSUED.- 04/ 17/98 PARCEL: 1 S 1 36CP w 07400 SITE ADDRESS. . . : 10875 SW 78TH AVE SUODIVISION. . . . : MI_P94-0021 ZONING:R---4. 5 F,;t.CiC K, . . . . . . . . . . LOT. . . . . . . . . . . . . s001 JURISDICTION:TIG CL.iISS OF WORK. :NEW TYPE OF USE. . . :SF TYPE OF' G•ONSTP r 5N OLC:UPANCY GRP. :R3 OCCUPANCY LOADz1 Ramat^k9 : PATH I Ownei,: ­I_,I 1t)H & E:G1 10AL ROSTAM 1 Aly '.a30 SW CAI_DEW ST IRTLAND OR 97211) i hrcne #s 24(­212516 I LHANT PER APPRGVAL FROM OWNER Phone #i: Reg #. . : 000131 This Cor-tificAte Ut-ants rc_cUpal)cy cif the aibolie refer•enc:ced bi..tilding or- portiot, ther,eofi and conFit-mv that the buildinU has bepn inspected for-, compliance with ' he State of (]rayon Specialty Code% for, the yr^aup, occupancy, and use ander iich t;tip ref.,pr-enced Iyer twit was issued. ►` !ILDING INSPECTOR ✓IN5PECT 5UC'CRVT" iiF N .� L F- E IN CONSP 1 CMLK, PL ArE CC �1 1 .V CITY OF TIGARD BUILDING INSPECTION NOTICE Inspection Line: 639-4175 Business Phone: 639-4171 Footing Rain Drain Cover/Service FINAL: Foundation Water Lin Ceiling -Plumb. Post/Beam Mech. Shear/Sheath Framing -Mech. Plbg.Und/FI /Slab Plbg. Top Out Insulation -Elect. Post/Beam Struct. Mech. Rough-in Gyp Bd. -Bldg. San. Sew Gas Line Appr/Sdwlk Reins. Other: Date: -- 1,�, _� A.M. P.M. ___ Entry: _ Address: f —7. Tenant: -- - --__ _ _ Ste _-_ MST: 5(� 01 BLIP: Con/Own: -- -- ----- - - - - MEC:— - PLM ,— ELC: _ THE FOLLOWING CORRECTIONS ARE REQUIRED: ELR: a E- W C.7 J In pector, _ Date: _ C4 �4PPROVED DISAPPROVED/CALL FOR REINSP. CF CO ENGINEERING PERMIT DATE ISSUED: 08/01/96 By: - ---------- PERMIT # . . . . . . . : ENG96-0043 PRIM. PERMIT # . : ENG96-0043 PARCEL: 1S136CA-07400 SITE ADDRESS . . . SW 78TH AVE ZONING:R-4 . S SUBDIVISION. . . . : MLP94 -0021 BLOCK. . . . . . . . . . . LOT. . . . . . . . . . . . . : 001 ----------- _ ____ ---- ---- ----- ------- ---- ------- PERMIT TYPE. . : SOP PUBLIC IMPRV QUANT. (LIN FT) VALUE AGREEMENT DATE : / / GRAD/EROS -***- ASSURANCE EXPIRATION--- STREET 11 $ PERFORMANCE: / / SAN SEW $ I MAINTENANCE: / / STM SEW $ PATHWAYS e - $ ALL OTHER -***-. $ TOTAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ Remarks : STREET OPENING, TO INSTALL A (BLDG) SIDE SANITARY SEWER SERVICE LATERAL Permittee : - -- - - ----• ----- - -- FEES -------- - ----- EGHBAL ROSTAMIAN type amount by date rec t 3830 S .W. CALDEW STREET OPEN $ 60 . 00 JMH 08/01/96 96-282401 PORTLAND OR 97219 MISD $ 1500 . 00 JMH 08/01/96 96-282401 Phone # : 494-1670 @WK. Engineer: $ 1560 . 00 TOTAL Phone # : ----- -- REQUIRED INSPECTIONS --- -- -- - Permittee/& nt Si nature : -- -STORM SEWER-- - - ---STREET- -- -- M.H. & C.B. CRB LINE & GRADE PIPE LN & GRD SUBGRADE BCKFLL & CMPCT BASE ROCK AIR & TV TEST LEVEL COURSE City of Tig Oregon WEARING CC. r-' 13125 S .W. Hall Blvd. - - -SAN. SEWER- - - TRAFF & PED CUNT P.O. Box 23397 M.H. & C.O. MONUMENTATION Tigard, Oregon 97223 PIPE LIN & GRD STREETLIGHTING Phone # : 639-4171 BCKFLL & CMPCT WALK/APRON/RAMP r AIR & TV TEST ca FOR INSPECTION, CONTACT: - -GRADING- -- -- Letha Thomas #639-4171 (office) - -REPR' S/ADJ, S- - CONTOURS #780-2647 (mobile) DRAINAGE - ---PATHWAYS--- - EROSION CNTL.