Loading...
11685 SW NORTH DAKOTA STREET-1 1S d10)ida HiHON MS 589`6 a Y a 0 0 z 3 0o T T 11685 SW NORTH DAKOTA ST CITY OF T I GA R D PLUMBING PERMIT DEVELOPMENT SERVICES PERMIT#: PLM2004-00459 13125 SW Hall Blvd., Tigard, OR 97223 (50 )639-4171 DATE ISSUED: 10/13/2004 SITE ADDRESS: 11685 SW NORTH DAKOTA ST PARCEL: 1S134CA-00300 SUBDIVISION: ZONING: R-4.5 BLOCK: LOT: JURISDICTION: TIG CLASS OF WORK: NEW GARBAGE DISPOSALS: MOBILE HOME SPACES: TYPE OF USE: SF WASHING MACH: BACKFLOW F REVNTRS: OCCUPANCY GRP: R3 FLOOR DRAINS: TRAPS: STORIES: WATER HEATERS: CATCH BASINS: 1 FIXTURES LAUNDRY TRAYS: SF RAIN DRAINS: SINKS: URINALS: GREASE TRAPS: LAVATORIES: OTHER FIXTURES: 1 TUB/SHOWERS: SEWER LINE: ft WATER CLOSETS: WATER LINE: 1.300 ft DISHWASHERS: RAIN DRAIN: buU R, Remarks: Private utilities for 6 lot subdivision. Other fixture is(1)manhole. _ Owner: _ FEES Description Date Amount TODD PAYS 17481 SW HOODOO CT [PLUMB] Pennit Fee 10/13/2004 $885.60 BEAVERTON, OR 97007 [PLMPLN] Plan Review 10/13/2004 $22.1.40 (TAX]9%State Surcharl 10/13/2004 $70.85 Phone: 503-591-5078 Total $1,177.85 Contractor: TROY ELLIOTT PLUMBING PO BOX 195d NORTH PLAINS, OR 97133 REQUIRED INSPECTIONS Phone: 503-309-5750 Water Service InspWater Service Insp Reg#: PLM 34-402PB Water Service Insp IA' 152310 Storm Drain Insp Storm Drain Insp Storm Drain Insp Storm Drain Insp Final Inspection IL �c This permit is issued subject tt, the regulations contained in the Tigard Municipal Code, State of OR. m Specialty Codes and all other applicable laws. All work will be done in accordance with approved W plans. This permit will expire if work Is not started within 180 days of issuance, or if work is suspended for more. than 180 days. ATTENTION: Oregon law requires you to follow rules adopted by the Oregon Utility Notification Center. These rules are set forth in OAR 952-0001-0010 through OAR 952-0001-0100. You may obtain eopiPs of these rules or direct questions to OUNC by calling 1503) 246-6e99. Issued By: 2z&uz� Permittee Signature: Call(503)639-4175 by 7:00 P.M.for an Inspection needed the next business day Site Utilities'+ Plumbing Permit A n City otTigard •`— 1RecjeiveVd 1,/0 el Permit No.:AS 13125 SW Hall Blvd.,Tigard,OR 97223200 Plan Review Other Permit No.: Phone: 503.639.4171 Fax: 503.599.1960 Date/By: p C Ij l - 24-Hour Inspection Line: 503.639.4175 Date Reody/By �r r 0 see Page 2 for Internet: www.ci.ligard.or.us Nolilied/Method'v �i�o Supplemcutallnformalinn rye n�� �Vrgl "N a FEE" SCHEDULE New construction Demolition _- Forspecial Information use checklist Descri tion Ea. Tidal ❑Addition/alteration/replacement ❑Other: New 1-1-famlly dwellings(includes 100 fl.for each utility connection) CATEGORY OF CONSTRUMON SFR(1)bath 249.20 1-and 2 family dwelling E]Commercial/industrial SFR(2)bath T 350.00 SFR(3)bath 399.00 ❑Accessory building ❑Multi-family _ --- Each additional bath kitchen 45.00 ❑Master builder ❑Other: Fire sprinkler(_sq.fl.) Page 2 JOB SIT' INFORMATION AND LOCATION Site utilities Job site address: �OCYyt � U , -S1i�'G Catch basin or area drain 16.60 /(p City/State/ZIP: Drywell,leach line,or trench drain 16.60 Suite/bldg./apt.no.: Project Warne: / Footing drain(no.linear rt.:`) Page 2 �C�f Manufactureo home util lies 110.00 Cross street/directions to job site: Manholes 1660 folie _ Rain drain connector 16.60 e GdrS/ 421��, f/i�'d'1� /ssGrr Sarnlary sewer(no.linear fl.:_� Page 2 Storn.s-wer(no.linear ft.: Page 2 Lot no.: Water servi:P.(no.linear fl./ Page 2 , Subdivision: —--- Fixture or Item Tax map/parcel no.: Absorption valve -_ 16.60 DESCRIPTION OF WORK ' Backflow preventer Page 2 - Zf �'�Si���►�I�� C/ /�� Backwater valve 16.60 Clothes washer 16.60 Dishwasher 16.60 Drinking fountain 16.60 [3 PROPERTY OWNEit ❑ TENANT �— -- Ejectors/sump 16.60 Name: 1O - _ Expansion tank 16.60 Address: Fixture/sewer cap 16.60 City/State/ZIP: -` Floor drain/floor sink/hub 1660 Phone:( ) Fax:( ) Garbage disposal 16.60 Hose bib 16.60 n APPL11'4NT ❑ CONTACT PERSON`- ice maker 16.60 Business name: PGS S � isG_t `jG• Interceptor/grease trap -_ 16.60 4. Contact name: � /�/ �G,v s - Medical gas(value:S ) - Page 2 Address: z 5—h/ Primer 16.6^ W City/State/Z[P: �� e7� V 749121 Roof drain(commercial) 16.60 Sink/basin/lavatory 1660 5 Phone:Qp4j) j /` �07� Fax: :(5 ) Z/' ' d S(X! o Tub/shower/shower pen 16.60 E-mail: /A-GLj ig x !��� D MC.-sit Urinal 16.60 (' CONTRACTOR Water closet 16.60 Business name: Water heater 16.60 Other: Address: &6MIS Subtotal City/State/ZIP: Aid A 1/V J -11-3 Minimum permit fee: $72.50 Phone:(Sad) 3 0�� 5-,75-d Fax:( ) Residential backflow minimum ermit fee: $36.25 Q �j Plumbing Lic.no.: Plan review (25%of permit fee) Z 0 CCB Lic.: D 6(, G State surcharge(g%of permit fee) Authorized signature: TOTAL PERMIT FEE / Print name: �. Date: rf This permit application expires If a permit Is not obtal within 190 days after It has been accepted as complete. 'Fee methodology set by Tri-County Building Industry Service Board. iUluildingNpvTntr1PLMII-Pertnh App doc 12/03 44046167(10102/COMMEB) Plumbing- Permit Application - Uty of Tigard • Page 2 -Supplemental Information Fee Schedule:' Residential Fire Supp ession S stems: Site Uitilitiiii Fed f alt) T`w; rDO i1_ 1 (xitrta e: Feritnit Fee: _ Footing drain-I"I(X)' 55.00 0 to 2,W', $115.00 Footing drain-each additional 100' 46.40 .001 to 3,600 _ $16 .00 Sewer-I st 100' 55.00 L37,201 ,601 to 7,200 $220.00 and greater _ S309.00 Sewer-each additional 100' 46.40 Water Service-Ist 100' / 55.00 S, Medical Gas S stems: Water Service-each additional I(A) / 46.40 Sts Storrs&Rain Drain-I st 100' / 55.00 /, WOO Permit Fee: Y $1.00 to$5,000.00 Minimum fee 572.50 Storm&Rain Chain-each additional 100' 46.40 8s, $5,001.00 to$10,000.00 $72.50 for the first$5,000.00 and$1.52 for each w A011(a) Total ' additional S100.00 or fraction thereof,to and including$10,000.00. Commemia:Rack F,ow Prc,,ention Device 46.40 510,001.00 to$25,000.00 $148.50 for the first$10,000.00 and S1.54 for F,!�odentisl Bac"ow Prevention Device each additional 5100.03 or fraction thereof,to minimum permit Cee$36.25, 27.55 _ and including 525,000.00. Rain Drain,single family dwelling 65.7.5 S25,001.00 to 550,000.00 5379.50 for the first$25,000.00 and$1.45 for Ins ct,on of existing plumbing or each additional$100.00 or fraction thereof,to 1� g p g and including 550.000.00. specially re uestea inspections-per hour 72.30 550,001.00 and up $742.00 for the first$50,000.00 and 51.20`, 1 Subtotal: Z, Q each additional$100.00 or fraction thereof. J i Fixture Work- Are you capping,moving o replacing existing fixtures? If "yes",please indicate work p formed by fixture. Failure to accurately report fixtures could sult in Increased sewer tees* a.,.. . New 1CIf Comments regarding fixture work: Ba tia /Font Rath -Tub/Shower _ -Jacuzzi/Whirl ool - Car Wash -Each Stall -Drive Thru Cuspido,fWater As irator Dishwasher -comvwmMT -Domestic �\ Drinking Fountain Eye Wash Floor Drain/sink 2" 3„ .4" Car Wash Drain Garbap,! -Domestic Disposal -Commercial *Note: IC the fixture work.im'de 44 s permit results in an -Industrial Increase of sewer EDUs,a sewer per ill be Issued and Ice SeEaraRefri .Drains fees assessed for the sewer increase must be paid before the oils aratle Dues Station) plumbing permit can be Issued. Rec.Vehicle Dump Station P g P , Shower -Gang -Stall Sink -Har/lavatory OUantitV Total -Bradle7 - Isometric or riser diagram is required if fixture quantity -Commercial _ total Is>9. -Service Swimming Pool Filter Washer-Clothes Water Extractor _ Plan Review =ter Closet-Toilet _ Plan review is required if fixture quantity total Is>9. Urinal Other Fixtures: i\P,ildinaNr"?nlN'LH-PermhAppdm 3103 CITY OF TIGARD 24-Hour BUILDING Inspection Line: (503)6311-4176 INSPECTION DIVISION Business Line: (503)639.4171 MST / / SUP Received ----Date R uested_/o)�k, _AM _PM SUP — Location Suite— MEC _ Contact Person Ph( ) J-3 _e- _7 PLM Contractor Ph(—) 3WR _ BUILDING Tenant/Owner � ELC Foo"ng Foundation Access: ELC — Ftg Drain Crawl Drain ELR --- Slab Inspection Notes: SIT Post&Beam Shear Anchors —_ Ext Sheath/Shear Int Sheath/Shear — Framing Insulation Drywall Nailing Firewall Fire Sprinkler Fire Alarm Susp'd Ceiling Roof Others — Final PASS PART FAIL - PLUMBING Post&Beam Under Slab Rough-In Water Service Sanitary Sewer Rain Drains _ Catch Basin/Manhole Shower Pan Other: Z" PART FAIL HANICAL Post&Beam Rough-In Gas Line IL Smoke Dampers -- _ OC Final N PASS PART_FAIL -- -- — – -- ELECTRICAL Sen Ice W Ro,.igh-In — a U3/Slab W Low Voltnae _ —^ F ire Alarm F.nal Reinspection fee of$� required before next Ina PASS PART FAIL LJ P — fin• Pay et City Hall, 1315 SW Hall Blvd. SII•E F] Please call for reinspection RE:_ L7 Unable to Inspect no acorn Fire Supply Line ADA t Approach/Sidewalk pib �wMR Other: Final DO NOT REMOVE this Inspktlen nMWfd tr M 8010 OW PASS PART FAIL i October 13, 2004 (OREGON F TIGARD � Mike Van Loo Alpha Engineering, Inc. 9600 SW Oak, Suite 230 Portland, OR 97223 I Re: Alternate Materials and Methods - Feihrenbacher Subdivision Dear Mike, We have received your request for an alternate material to be used for a section of storm drain located 4t the Fehrenbacher Subdivision in accordance with Section P2601.2 of the State of Oregon One and Two Family Dwelling Code. Your proposal is to use C900 PVC as an alternate to 3034 PVC piping due to the shallow burial depth. We could approve this alternate with the following documentation submitted for review. 1 Two (2) sets of drawings stamped by an engineer licensed by the State of Oregon showing the location, extent, material and fittings that are proposed. All wyes, tees, cleanouts and other fittings associated with the C900 PVC piping shall comply with the Plumbing Code requirements for storm drainage installations If you have any questions, please call me at (503) 718-2448. Sincerely, IL Gari Lampella NBuilding Official C. Mike Sheehan, Sr. Plumbing Inspector John Williams, Plumbing Inspector/Plan Review Mike White, Engineering Tech II Hap Watkins, Inspection Supervisor File 13125 SW Hall Blvd., Tigard, OR 97223(503)639A 171 TDD(503)684-2772