Loading...
10300 SW NIMBUS AVENUE-2 i ,f { SYMBOLS LEGEND // /%� S NEW CONCRETE PAVING-SEE SPECIFICATIONS / SEC TION 02520 AfAX O PM_ *' MAX. SLOPEOFHAN&CAPACCESSHEAMPS: J:J2 SIM. ( ' MAX SL OPE OFS/DE�WALKS: 1.'20 � NG ` H ,70 EL F_ V, OFNEW PA V/NG AF Urr/NG EX/Sr1NG PA V/NG SHALL 175.76 EXIST i MA rCH E.X/STELEV 0000 175.28/ 175.26 / �. -- 11rI1L--- EXISTING SIDE WALK,RAMP OP, STAIRS TO REMAIN N o` �' LANDSCAPE PLANTING BED OR LAWN-SEE I A LANDSCAPE PLAN FOR MATERIALS AND LOCATION ? €XJSj 1 SEE LANDSCAPE_351 i npw WA • • DRAWINGS F_ _ o w TYP. Of 11 A. `• ~ EXISTING ASPHALTIC CONCRETE PAVING TO BE �'IS ;. ) '` \ 1 .Y,•,' REMOVED. VERIFY CONDITION OF EXISTING \ -,.o" - SUBBASE. RECOMPACT AS NECESSARY TO v`` PM ,�.. J� TYP. ,� PROVIDE PROPER DENSITY, PROVIDE NEW 0 04 TYP. 176�� `,:. '^ 07 CRUSHED GRAVEL BASE COURSE COMPACTED `" Y �r 5 � TO 95% COMPACTION. PROVIDE NEW ASPHALTIC j VERIFY 1 SEE LANDSCAPE _ / �� CONCRETE PAVING,2' MINIMUM THICKNESS. o DRAWINGS Y w — NEW SIDEWALK(1:20 SLOPE) _ � � . : 177.1 2% MAX. SLOPE AT DISABLED PARKING L' , cn r 76.45 �, 6,9 ` + SPACES. MATCH SURROUNDING PAVING FOR -� TO PUBLIC SIDEWALK ON x SCROLLS FERRY ROAD f 76.48 '' VERIF�1` gP FLUSH LEVEL SURFACE. SEE SPECIFICATION Q f 76.90_ '►•; EXIST. WATER pg SECTION 02510 Q �' G METER,SPRINKLER c VALVE PDXES \ _ ,.. DISABLED VEHICLE LOADING ZONE.OR ACCESS PATH 3 I 7 06 `�0 STEP BUILDING C t WITH PAINTED 4' WHITE STRIPPING. SEE SPECIFICATION o 176.38 SECTION 09900 6 DETAIL PM/09 ' I I w n Y S REMOVE EXIST.RAMP 6 U_ CC � co/ REPAIR A.C. TO MATCH IT EXIST. @ 2%SLOPE, MA" EACH DIRECTION CUTBACKEXIST, � ) 7� ,��( `, 175. T W �u, REE FOR CLEAR ,� KEY NOTES �, Q ru ACCE99 0 SIDEWALK `. 1 SYMB301- REFERENCE NOTED ON PLANS oe �' �c pm f. REMOVE EXISTING LANDCAPE 2. REMOVE EXISTING CURB AND/OR SIDEWALK Z 3, REMOVE EXISTING MOW STRIP 6 RELOCATE w rt SPRINKLER KLER HEADS AS REO'D-SEE LANDSCAPE Z W cr ` MATCH -, I 4. NEW CAST N PLACE 6 HUGH CONC.CURB-SEE DETAL PM/02 V EXIST `� •• �c, ,� � ' M 5. -WHEELCHAIR ACCESS DIRECTORY SIGNAGE-SEE DETAIL PM/12 W � a 5 -� 6. NEW PAINTED METAL HANDRAIL OR GUARDRAIL -SEE PROJECT ♦♦ �� MANUAL FOR DETAILS CD 7. EXISTING CONCRETE SIDEWALK AND/OR CURB TO REMAIN ,h y • r -•eC n. N o 4 �' \� � {• 8. NEW PANTED METAL HANDRAIL OR GUARDRAIL-SEE DETALS v -►, r ♦ 9. NEW 6'X 6'X 48'CONC.WHEEL STOP W/(2) 18'LONG REBAR 50 \ DOWELS INTO PAVING N f 75.07 _ r ALTE;WATE: NO. 1: 174.57 ;r.,. PROVIDE CONC..RAMPS 1:12 AT ALL EN FiY THRE3FiOLIJS WHERE (,Q THE DEFERENCE BETWEEN THE TOP OF THE THRESHOLD 6 ( ��I s c \' THEADJACENT EXTERIOR CONC.WALK IS GREATER THAN Ile. , + :ISI t BUILDINGS B,C,6 L. \\\\ \ T _j q 8 — CONC, SIDEWALK W/1:20 MAX.. \ . 1745 x .SLOPE-SLOPE AWAY FROM BLDG, \ 5 (0 1/4'PER FT. � Z BUILDING J •� .04 BUILDING B EXIST. TREE •,o 174,77 `' f Y VERIFY PO OT ,� \\ STRUGT. W/NEW 4 �., REMCVE AS REO'D /� W \ = \/ / W \0000000� ♦ \� . ,� ��,�� t ' , � • �� ' SIDEWALK ` ` TP FACILITATE � � � < � �_1 ` ��/ �-• W \ CONSTRUCTJON OF � �� \ ►--i G\ W/LAN SCAPOORO. •', �� V, •� r�Tcb 172.03 / � - - � �`•`��4� � • EXISTCONC.SIDEWALK W/1:20 kM, '��, rpm 02 SIM. �-"� / �� Q `\ SLOPE-SLOPE AWAY FROM BLDG. �1 ' 1/4'PER FT, $ --7 Ep. ♦ \ ` $pGHANDRAIL SLOPE TO MATCH 4 RETAINMG WALL-3 TY a�� ELEV.OF EXIST.WALK 4 �._ SEE STRUCT. � r � 1 6 J72.10 IZQ 0 � ♦ � \ rte• / . 171.90 t171.64 �7 –A - `. • �r � s� HAw RETAWpqCyR ♦ ted• SEE STRUCT. _ (171.64 \ \ goo. ` \ REMOVE TREE 6 ROOT \ R✓P q5 p J z o v \ STRUCTURE AS PART - �- O Ln \ ♦ OF ALTERNATIVE NO.2 \ \ PE PLANN•f�G BF _D l ��-��! W o o REMOVE t=xrsT.wo .� _-..___.. ,,/ -,3 :� s�� �/- ;,� �v�e m N 5 MED FIN W ITCH WAL C TO REMAIN 9 C'DAR . 13 C,. JM A D INT.AS PAR AO ATE ' 2 �7Jf, PROW=NEW CONC. BJDWALK(SHADED) -�� ' � O ar\s L r. -T SITE PLAN - ,��� �n�� ,�,�� 00 gin, \ low 20,.0• N01III I 103 SW ' - 00 Nimbus Avenue \ \N1\\ �. 1 of 2 \� SHT. O ------SH COPYRIGHT u,;i If this notice appears clearer 01:111 the document, the document is of marginal gtlj1:;y. Lit_ - ..::, t ��l������ 1�1Ifl��ili� ��f�l�il��,�}. . �I11ji+��l�l� l 1�1{I{I'!{I{I I{III{l�lll�•� ' 1�1��,�1�.��1{.!. _����- " ���I + I { {� .x.. r. IllA04 n( . . Amp- CD 'r f AiTERw►rE: No. Z PROME NEW CONC,RAMP - (MAX. 1:12 SLOPE)W/HANDRALS 1 3 EA.SUE FOR ACCESS TO SLJITE L3. 00 ' 1 ( ��J _ UJ X LDr 1 . W \ m u, i cc 3 IDILm-3 1 — PROVIDE CONC.\ SIDEWALK(SHADED) ` U ¢ 3 a• Lo 1 t 1 - 1 W 0 1— �cn CC U) �,n REMOVE EXIST. WOOD CONC. SIDEWALK FRAMED FIN WALL PA T CH SLOPE AWAY FROM WALL 6 CEILING TO 1 . SSG \ ` . ® 1/4 PER FT.- �, REMAIN W/1X8 CEDAR I 167.58 MATCH ELEV. OF EXIST. TRIM BOARD&PAINT AS WALK P ARTO"D@ ALTERNAit > +10-.3— 11 1 167.94 �- (r z LU CLZ v �D - � _ o. 1 167.66 67. ( U.1 t 168.04 BUILDING I 1 Tep Ir p y I 1 < R 1 j 50---- y RE TAiINIO WALL- - I SEE S TAIICT. 1 z ` ►nr pp• tA �-✓~ , — - — NEW HANDICAP RAMP `.I 60'x60' (1:12 SLOPEI W/1-1/2• �..r �..... U) j3MMIN.LAN U a 15D- DIA.METAL HANDRAILS - 1 I d. ING EACH SME I ( I 1 1 p 1 -7 m i 4-- � id. 165.78 '8�/ 1 F 7.91 167.99 &a Ah lawt cj� CL1 1167.51 67,95 ��� � 1 5 167.50 &Tmam / .� PROVIDE CONC. 1 1 — ALK i 16e.02 SIDEW (eHADEDI W I6,.90 — r— REMOVE EXIST. wUUQ 167.97 L1J FRAMED FIN W,kLL PATCH 1 00 WALL 6 CEILING TOmoi' �` -�1 FROM BLDG. AWAY , 1 REMAIN W/1 X8 CEDAR �� LOP � TRIM BOARD&PAINT AS y —PRAT-DA-ADD-'�4LTEAFIAiE ,l 167.97 No--yam `. NEW CONC. WALK-SL -� �� j r TO TOP OF EXIST.ST S- 167.94 - 11 � � 1 •. ' ,� SLOPE 1/4'PER FT. M 167.48 167,99 167.47 / EXl9T - .. REMOVE EXIST. WOOD i ` `, . ` - � \ 1 11 FRAMED FIN WALL PATCH 1 v _ , ;����� � , /-' WALL 6 CEILING 10 REMAIN W/1X8 CEDARLU _ ` pt��• �,• 1 .•' 1 TRIM BOARD 6 PAINT AS �I 1 G �r ,� .•' -+���ALI& '� � , -fAf{fi-8A-A6t3-AtTC-FihtA�f� � �' . . , .. O ` - -- .O _ , 0 E �9Qo eoo -- 5t �� �1 �k)�l�V�- ONL z x f f) nAD 10 \ O \ VERIFY CONDITION OF i u1 0 PROVIDE CONC. EXIST. TREE ROOT STRUCT. D SIDEWALK ISHADEDI MAY REO, TO ADJUST 9=WALX ni .� ,WIDTH• TRIM TREE AB � co. ` � ' REQUIRED n r� rn \ 00 o w z a m SITE FLAN IT I !•.206.0• 10300 SW Nimbus Avenue %" NORTH 2 of 2 1 A2 11 1 i. SHT,. 1F T COPYRI r N7 If this police appears clearer 01;111 the document, the document is of marginal qua':;y. t . 24 X I �It�i ���1�1�� `. t �Fl��i� ��lr��rll+n(I(n(I(�((li(n (n(I(((( ln�l(ulh(liln(( ((uhm (II(Inilinnl((nt(n(li(I(m(llltl rt�i ► �i `` ' ��lt ^��y � ..__.i..:.,.. .wise•. nitdy�i'�fisM'nN '.W#w ,'1 L� l� ♦ v �{°y �`�if A�t�,� � � � r • , ADDRESS: 1 yky„I t; x i { a .1 is\recorc4s\i nicroflrrm\targets\building.doc \h AL r ` a i "��ic� INSPECTION NOTICE.. (, ' eo� city of Tigard Building "� 1 13125 BO Ball Blvd. Tigard, Oregon 97223 Inspection Line (Rec-O-Phone)t 639-4175 Bueinene Phone: 639s' .171 Inspectiont__ C4Footing Plbg. Underelab Koch. Rough -in LSdwlk Pound. Plbg. Top Out Gas Line FINAL: Pott/Beam Struct. San. &.+war Framing -Bldg. Poet/Beam Mech. Rain Drain Insulation -Plumb. 0 Plbg. Underfloor Water Line Gyp. Rd. -Koch. -y l Date Requested% r —Tines Q AK PK Address t >>J r' l W��-l5 Permit. Builder; THE FOLLOWING CORRECTIONS ARE REQUIRED: Inapector: _ Date$ PPRoVED __ DISAPPROVED AppRMgD SDSJ=CT To ROM �-call For Reinap. CITE( OF TIGARDBUILDING,� PERMIT PERMIT f#. . . . „ . . OUf= i COMMU14ITY DEVELOPMENT DEPARTMENT D,:)t E. ISSUED: 13126 SW Nall Blvd.Tigard,Oregon 07221.8100 (593)630-4174. 1 PARCEL: 111 iVIVIOXX-00000 bi TE AIJDRES:;. . . . 10,-:110 ;DW NIMBUS AVE. SUBDIVISION. . . . . ZONING: 131_01.'K. . . . . . . . . . LOT. . . . . . . . . . . . . ., RE I SSUI : FLOUR EX TL• R I Ok WAL1_. CONSTRUCT I!)IV— CLASS OF WORK. :01.-T FIRST. . . . : Sf N: S. E: W. TYPE:: OF' USE. . . :GON tSECUND. . . : Sf Ol-'1=:N i 1 1(35'?-- ---------'-- TYPE (35'?._ _-----_._.--TYt=sic. OF" LONST. :5N T 1-41 RD. . . . . Sf N: S. Eli W. IJ(I 'UPANC Y [.-.,RP. -B2, T•C11 AL.. -..._.._____: N 5f RUOF CONST: FIR' PET? : OCCUPANCY LOAD: BASEMENT. : sf AREA SEP. RATE=D: R. : HT. : f•'t GARAGE. . . : Sf UXU SEP. RPrCU: DSMT?: ME Z'? : RE:_UD SL-`.TBASKS. _-- RE OUI RED ._.__. FLOOR E...00D. . , . .. usf LEFT: ft RGHT: ft FIR SP"H'L.: SMOK DET. . : DWELLING UNITS4 FRNT•: fit REAR: ft FIR ALRM: FINDILF' ALC-Y Br:,DRMSi: 1:1ATFiS IMF' GURFACIE : PRO CORR: PARKING: VALUE. 9 : 1;--'3417 Re-nar--Ps . Fori.lni Pr,opert ips; ADH improvements to the ar'oas5 adjacent, to hi.liidinr: � C:, L, SAT-icl P. DOUDL..E F?ERM11 FEL FOR WORK DONE WITHOUT F,ERMIT 1=•r-� F F1UM 4-''RQPEwRTIES type amoi.int by dat e recpt llllj:Alb SW NIMBUS AVI^: IJLL1.1, $ 16. a3 -•• 10/25/93 93--2'4545v Jf-'C.T $ 24. 65 JW 10/26/93 - T1(:3i=)RD OR 37E:;_W Pr2riT' 1, 493. 00 JFI 10/ct!E)P)3 - "�one #: `i123 C+Et�r-QIC;11r� PRM"F 1; 493. 00 .1H 10/2.6/9,3 - tM(�ritriii c�toi, _._..... ,. R R M CONS-r•RLIC? ION NW F11, T'1 I 'Ji41'L.0ND OR 97209 -»_-.- Ph o n e E28-7177 1 1329. 4U TO TAL 4. 38304 RE OU I RED INSPECTIONS i pis permit is issued suoject to the regulations contained in the Feat ol.trid 1nsp ____._____._�,•_�_�_.. Tigard Ounicipai Code, State of Ore. Specialty Codes and ell other Slab In!-.-p applicable laws. All work will be done in accordance with Appy/!r dw l k I n s p approved plans. This permit will ekpire if work is not Started Misc. Inspection within 180 days of issuance, or if work is suspended for more Final I n s pec•t i on tan 180 cays. r r,r 5 m•lt't:Ese Si.Clni.itltr^ta y Call for- i rl apect i on — 639--4175 i Commercial Building Permit Application City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 (503) 639-4171 Job51te Address: Office a Use O.n�1 C Tenant: Suite!f Planc*JRec# '' F Valuation: 1 i rl • Owner: �UY LVV� I�/LoY ra ;, (J IcI�r-JCa1 nnr� rr - � Address: j a r) �� I V f t.4,1��►�'.�' _ Approvals Required - >t, Planning Phone: Engineering Other- Ll _ � Contractor: I �1- LY �-1 r `�'�• ?�. Address: ?, 3 1�1 N w L� l) •�` �j Type of const: Occupancy class: rZ Phone: -71 – / /2-_2- 5 __�a Sprinklered? (Yes' No Contractor's License # ' - %�t (attach copy of current Oregon license) Sq. ft.of project: Story(1st, 2nd, etc.) . Architect/Engineer: ,_ Proposed use. Address: _ Note: PlumLAng & mechanical pians —-- must be submitted at time of building permit application. Phone: COMMENTS: Applicint Signature I& Phone nuffber Received by: !Lt - il.J _ Date Received: l /,-1- .S ZI 3 F Permit # Account Description Amount Amt. Pd. Bal. Due Bldg. Permit (BUILD) • Plumb. Permit (PLUMB) Mech. Permit (MECH) State Tax (TAX) 3'l•G'J s Bldg: Plumb: Mech: I Plan Check (PLANCK) _ Bldg: Plumb: Mech: Sewer Connection (SWUSA) Sewer Inspection (SWINSP) Parks Dev Charge (F'KSDC) Storm Drainage Chg (SDSDC) Residential TIF (TIF-R) Mass Transit TIF (TIF-MT) Commercial TIF (TIF-C) Industrial TIF (TIF-1) Institutional TIF (TIF-IS) Office TIF (TIF-0) Water Quality (WQUAL) _ Water Quantity (WOUANT) ` -�, Fire District (FIRE) ; TOTALS .. .,..r.#ra" .,t'.rt,ku_N�w�r'..._....r , x:..'.:, .,.r,-,, . ..,'rtti:a, v ,f:u';�,Mvr r, Cfkru`.l'r4'Ya°,,,As^7�Jn i}Yrw.,S*ri'ilt'tl�'h@d:aVstaws..,,,rtxcawirvc.i^r•»i.VrMVA,aark ..7i R ?la�?i"��4I�3aN'1�1.CYHY+miri:r,vnw,•u,«.. i OCT-26-1993 09:53 FROM FORUM PROPERTIESN . [ C TO 6E347297 P.02 I FORUM PIZOPER.TIF.S ' October 26, 1993 ar Victor Adonri city of Tigard .� Planning Department K 13125 S.W. Hall Blvd Tigard, OR 97223 Dear Victor: The ourpose of this letter is to set fort), that the landscaping modifications that are a part of the ADA modifications we are discussing will not significantly reduce the percentage of landscaping at Scholl3 Business Center'. We do not believe the reduction in landscaping will exceed 14. In fact, because of the rr'e aesthetic concerns associated with ADA compliance, in many cases, A , the scope of the proposed replanting Will exceed the minimum 25% landscape requirement. Victor, thank you for your prompt attention. I Sincerely, FORUM PROPERTIES, I C. i Michael J. Ho . it � f RECEIVED PLANNING I Il(;T 2 5 iJ93 { r4 i I f t'iWr,wP'PrW.MtuPwFAu.M-r ar n ,� .• r •,• ••• .. .w,.v�Wa�M�}• r Alm "Y', 5 '..k e!Y'rnt'AOp�'"t�xh.",'+N. "."'o.''A.`wYr ,�ts+� v4•{;.. h - CI'T'Y Of. T'IC:iARD C)h PAYMENI FIEC IP'T NO. x93--;='4`5485 CHEMK AMOUN T s J.010. 65 IvaiMF:; s 1 L.II;I.JIA PR1:1PFIRTIf-U CASH ►4MGIJN"r' s 0. 00 fall)>FTF '.a:a s PAYMFNf 1>►aIK 0 1fA 0,i9,3' MAD I V I.`~3 I ON �PURPOSE OF PAYMENT AMIJLIN'r PPIL.I fAII:F=11.1;-;k:. (W PHYMENf WILMIVf PHID 113I.T.."L.DIN1.4 F'EMM 493- 00 131)l l.. D ING PC:f2M 4'x,3. V110 r � E � i I r IA?;00 SW NIMBUS ' 1 L)l f'11. AMOUNT 14M) _ _ —> :1,010. f.!`, � e CA i l Y 1.1F I I lillkl� kl:t:::F 11='I 11F k,PYMF N C I2r C;E 1 F f NO. %93-24b459 L 14VA;K 00111L.IN•1- s 316. 1-43 F� & 1,1 fa.CN1;113iJ1 1 11 h l 1;fl f.;f1�;H AM(.)t.1N T s �. I�cavMc:rl r urrrf: = 11�7�:-'°i%�i;3 F2r: s :338 NW "OH faVf ;I ll:fl)T V T'';.I.ON s P11 BOX '-08 3 F-ORT`L,ONll, t.JF3 t� ;?'111+► 1�t.JRl�I�;+I (W PAYWINIT 14MI11,II41 11(411) I'11rTt!IJ;;F: 01 PilYMI-I'41 ►1C�r1i1IIJI F'IIII> P1, 04N CHECK F:F '_..•J 0 .744(,: ti F✓~l. A3 III"I ill . r)IyIl)I1NT PAID - _ 1 i11i. 63 A 'x Y 1 { 1 1 'i PROJECT MANUAL D luHlDHl\\l(2r IF CHIME A\L ((-7� 10300 S.W. NIMBUS AVE. ` TIGARD OREGON 1 SCHOLLS BUSINESS CENTER J A FORUM PROPERTY l '4 DATE: JUNE 9, 1993 f� JOB NO: 93102-10) Y J Al Y us n�wiwAA.,wO111NFf.YYrax�,.fy�.,iw�ry rter wrapq.axgrw:rcv n,+x�:rew.�vm.wlrl�w��n..rn`�..�..•.... •...... .l 1-. t • EXIST. CONC RAMP NEW 4'-C" WIDE CONC & SIDE WALK TO I RAMP& SIDE WALK TO BUILDING ENTRY L BUILDING ENTRY 1 SKA REMOVE EXIST TREE &LANDSCAPE AS REQ'D 4'.0- � 04 46 ...... SKA ' f 1 I i I i I , I 1 � R I I �f I I J I i 4 3 ` • / S_KA 1 , i NORTH t.L 1.H SGHOLLS-BUILDING'PSKA ST ARK M A R C H I T E C T S DRAWING-—ma -- _ -- —� — O BUILDING'P'SITE PLAN _ _ _ 5285 S.W.MrAMWSROAD•St?rM5+0•t.AKEOSVIPW'OR•97(155 cAtE AS NOTED vee. 93102 1.00 �snsl6s4-4741 FAX J5(Inew7+2 ASE. 06/09/93 0!- i` f f t REPLACE EXIST H.C. PARK'G SIGNAGE W/REQ'D VAN ACCESS. t SIGNAGE i LANDSCAPE LAWN i 1 --4"WIDE CONC.CURB-MATCH ELEV �► OF EXISTING SIDE.WALK FOR LANDSCAPE SOIL RETENSION 1/2" EXPANSION JOINT + ;.;•''Z W/EXP.MATL_.(E.J.) ;. �.:.'.:. NEW N.C. _ - PARKING SIGNAGE M 0 . l ' —6"X 48"CONC.WHEEL STOP W/ (2) REBAR DOWELS IN TO PAVEMT 03 � LLI L Ill •.••. ___ 60" X EXIST WALK WIDTH,CONIC. —— — -- LANDING - SLOPE TO PARKING LO I iv 6'-0" 5' 0" 6,-()" AT 1:50. REMOVE EXItiT SIDEWALK AS REa'D FOR IJEW 6'LONG,CONIC. RAMP SIDE OF 60"LANDING(MAX SLOPE1:12) �_ -- NEW 4"WIDE WHITE PARKING LOT STRIPING AS SHOWN-PROVIDE H.C. SYMBOL.STRIPIN( PER CODE .r I 91-0" B'-0" 91-07--- VAN SPACE 1 STANDARD SPACE H.C. ACCESS RAMP _ - - - 1/8"=1'-011 NORTH 1� ` SCROLLS •BUILDING'P' SKA R U h F #2i` A R C 11 1 T F. C T S_ "WING TITLE FSTARK OS1VF OL ACCESS RAMP DETAIL ® LOCATION #Pt 5215 .� .WFMbMfE M .MWS NO �SUfOLAK1i FAX�30711�M�1•T1 1 r,�Le AS NOTED OB 93102.1.00 ISM)M4f741 ATE 06/09/93 r, i f L R ' E : I I i4L1 { ill TACTILE WARNING STRIP -- 1/8"DEEP X 1/2"TOOLED .� JOINTS 0 2"O.C. CONC. RAMP W1 HEAVY \ LANDaCAPE BROOM FINISH JK S 3EXPANSIONcn CONC.WAJOINT,TYP. xSLOPE - 1:12 MAX. cnwEXPANSIONE- 1:12 MAX. EXPANSION 'wJOINT --� 0 cv JOINT = in — 6"HIGH CURB SEE PLAN 6.- A.C. 6' o" A.C. PAVING NEW CONC. RAMP PAVING- SEE SITE PLAN j t CURB RAMP PLAN 1/d"=1'-0" L E F: ssss5::. SCROLLS- BUILDING'P' S KA _S T A R K ss A R C tl 1 7 E C T S [wAvnNw nn�. CURB RAMP PLAN _ ■ ■ S.NS S W MPAIXIWS ROAD•SUM Mn LAKE OSWRI10.Oft 9"033 t7EI N 93102-1.00 �,/ t' PAX 0011 M44147 Are. 06/09/93 ALE. AS a'10WN �— -- i t•' I, i � I E 1 I ; t ' 'w ; i a I s I r I . t EXPANSIC,y TACTILE WARNING STRIP JOINT 1/8"DEEP X 1/2"TOOLED ! JOINTS ® 2"O.C. t CONIC.WALK - _ GONG. RAMP W/HEAV'r' BROOM FINISH x Q r SrOA N �� 040CL OQ� _ 6" HIGH '' CURB i - SKA 05 A.C. PAVING 1 5'-0" SEE PLAN 5'-0" PAVING - SEE SITE PLAN CURB RAMP PLAN 1/4"=l'-0- ; PROJECT TITLE LEE RUFF SCHOLL& BUILDING'P' SK/[J A __�-----— ---- STARK A R c 11 1 T E c T S cxiAw Na trnF �� ' -- --- --_--�- CURB RAMP PLAN 4 ^ w j fa{S W.M!'.uIOV.'S Rt1AD•tiUfl7i)10•LAKE OSWFIW,UR•47015 u ' (tcn)694 A74 FAX 13011 MAI-4717 A7E. 06/09/93 .ALE: AS SHOWN oar 93102-1.00 F ; t r' NSq k�hn+� y jai+rt,w r.b a n sr a +q.n rp"d�tAblUAf PN � I r 5 .;1 y ;i �I J, I 14 j f I e I r i I .I -- MATCH EXIST.DIM. .I SEE PLAN FOR DIMENSION _ CONTROL JOINT (DOLED EDGE 4"CONC. WALK/RAMP -SEAL JOINT C OVER GRAN. FILL SLOPE 1:12(MA� 'a 3/8"EXP.JT.MATL.W/ - EXIST.AC. PAVING 1/4"TOOLED EDGES 8" N3 CONT.T& B. &SEALANT - i CONC. RAMP 3/4"=1'-0" PROJECT In SCROLLS-BUILDING'P' RUFF F F ___-__ S KA i :.,. .., _ _ I STARK :n A R C H l ? G C ? S DMWINOnnE CONC. RAMP O5 3:05 S W.MCAIKtwS ROAD•SUM 4o•LAKF(AMM11,0,OR•0013 �/v «„e,,,,,, FAx 13031 Ax�ai�� ATE 06/09/93 Ale 3'= 1' 0" o 93102-1.00 It I yS yt" `l 'J �!, f cs•T , r I I e I i I i i I MATCH EXIST.DIM. • SEE PLAN FOR DIMENSION 4"CONC.WALK/RAMP --"—" -- CONTROL JOINT OVER GRAN. FILL —RAMP BEYOND TOOLED EDGE SEAL JOINT FINISH GRADE 6" r�� — CONCRETE CURB SLOPE 1/4"/FT. ..L77 .• :,.. .• N3 REBAR TOP& _ _ :;•;;• o BOT. CONT. ff = i 3/8" EXP.JT. MATL.W/ EXIST.A.C. PAVING I, 1/4"TOOLED TEDGES 8" #3 CONT.T a B. CO NC. RAMP 3/4"=-1'-01' PRWFrTTITLE3 > L E E � SCHOLL&BUILDING'P' S KA y,. RUFF ---- ---- �.+ STARK A R C N I T 1. T S pFUW NCi TITLE: 06 ' CONC. RAMP _ 5'.95 S w MFAfK)W S ROAD•Sl'f18 No•LAKF OSwFX;O.OR•O1UlS (5(11)M,,,7,7 FAX(sOnM4n4' krE. 06/09/93 AlE AS NOTED oer.93102-1.00 7i #* l I M � { ❑ PROJECT MANUAL ❑ SCROLLS BUSINESS CENTER d • PHASE I d FORUM PROPERTIES, INC. BEAVERTON, OREGON p, a; DATE: MAY 21, 1993 JOB NO: 93081-20) ,., 1 Scholls Phase I She Access Table of Contents A. TI TLE PAGE B. TABLE OF CONTENTS C. PROJECT INFORMATION D. PROJECT TEAM E. GENERAL NOTES F. DRAWINGS Architectural Al Site Plan(Buildings'B'&'C') A2 Site Plan(Buildings'L) G. SPECIFICATIONS DIVISION 2 -STTEWORK 02510 Asphaltic Concrete Paving 02520 Portland Cement Concrete Paving DIVISION 3-CONCRE'�E 03300 Cast-in-Place Concrete I DIVISION 5-METALS 05500 Metal Fabrications i DIVISION 9-IF-INISHES 09900 Painting H. SITE DETAILS&ELEVATIONS i I a Lee • Ruff • Stark Architects 5121193 " ,S I 1 Scholls F,hase I Site Access Project ri �fotmation Site Area: Existing � BIIILI)ING: e Building Address: Buildings 'B', 'C' and 'L' 10240 S.W.Nimbus Ave. Tigard, Oregon Building Area: N/A Improvement Area: N/A Consmaction Type: V - N, Sprinklered Occupancy: Group"B-2" Location: Separated all sides Building Use: Office/Manufacturing Governing Agency: City of Tigard Oregon VICI TY MAP ell—i LAI I� • n O !I teEee � l \ er• I �i t lot a WATIN Ft tune, .101 I MDOr N_ it I o w �etr ,I erto -- ./.- wnw • talo � �#0690 r; - \ j -- \ IlCAe \ to MO AT HI 1 .w►Iwwotow 90U M to � a MEI.IMI t:OPWIN.t1 M1111 I � Lee • Ruff • Stark Architects 5121193 .._.......w..,..A•Ms.., ... .... _.... ._._ _. .. .,^"IAS :... r r' Saholls Phase I Site Access Project Team FORUM PROPERTIES 10240 S.W. Nimbus Ave., Suite L3 Tigard, Oregon 97223 (503) 684-0510 ARCHITECT, LEE RUFF STARK, ARCHITECCS 5285 S.W. Meadows Road, Suite 340 Lake Oswego,Oregon 97035 1 (503) 684-4747 J,ANDSCAPF, CONT AS;TJL NORTHWEST LANDSCAPE INDUSTRIES 16075 S.W. Upper Boones Ferry Road Tigard, Oregon 97223 (503) 684-1450 dl-7 S1 Lee • Ruff• Stark Architects 5121193 S F Scholls Phase I Site Atxess Gerle;jl Demolition Notes GENERAL DEMOLITION NOTES 1. Contractor to coordinate the removal and disposal of all existing building materials scheduled to be removed with the Owner. 2. All landscape material schedule to be removed shall be the responsiblity of the Landscape contractor. General Contractor shall coordinate all work to be performed by the Landscape Contractor. 3. All work inidcated as"uw be removed"to be taken to an approved dump site location,off site. 4. Contractor to patch,repair or replace any surface damaged during construction. Owner and Architect will determine the extent of repair required. 1 S. Contractor shall take care to protect all items scheduled to remain or to be relocated. L i, V 1 I Lee • Ruff • Stark Architects 5/21/93 1 r Y, „ .., ,�.i,Avfrn•>.x.,(,,,..r,.m,...._... ,,........ 'r1�Y.Mrr.�. i . F}Yk., ��' r: R' Scholls Phase I Site access General Notes GENERAL NOTES 1. All workmanship and materials shall conform to tl:e latest adopted building code edition,and to conditions and ` specifications of all governing authorities. 2. Contractor shall field verify all dimensions and corxiitions prior to st..uting construction and report any discrepancies to the Architect. Any correction work required as result of not reporting such discrepancies shall SFr t be preformed at no additional cost to the Owner. f!. .,..w, 3. Contractor and subcontractors"I carefully examine the site and the construction documents of the Work. Errors and omissions in the plans of specifications shall be called to the attention of the Architect prior toFti{ submission of bid so that addenda may be issued. Eailure to do so on the part of the Contractor does not , relieve him of the responsibility to provide a correct and finished product. ': k1�All 4. The Contractor shall obtain and pay for all permits,fees and taxes required. 5. The Contractor shall provide and pay for dumpster,telephone,temporary toilet facilities for his/her and his/her subcontractor's use. 6. General Contractor to coordinate Architectural drawings with Landsacpe and Structural drawings. All landscape materials grading,irrigation furnished by Landscape Contractor. All demolition of landscape material to be preformed by Landscape Contractor. 7. All landscape;planting design and irrigation system design to be by LandscapeContractor. Submit plans and specifications to Architect and Owner for review and approval prior to constriction. LandscapeContractor to pay all fees and obtain all permits and approvals from governing agencies necessary to complete work. Coordinate with General Contractor those items for demolition not indicated on drawings. t 1 8. Dimensions take precrrdence over scale. Dimensions are typically to face of structure and framing unless otherwise noted. 9. Contractor shall keep the area of Work free of garbage and debris on a DAILY basis. C 10 if adjacent tenants are disturbed by noisy construction(i.e.,jack hammering or core drilling),or odors(i.e., 1 sealants),such activity shall be rescheduled after hours. Owner shall pay no overtime for after hour activities. I 11. Work affecting access to tenant spaces(i.e.parking lot striping,sidewalk construction at tenant entries shall be f scheduled after hours.Owner shall pay no overtime for after hour activities. 12. No storage outside of buildings shall be allowed without authorization by Owner. 13. No construction signs of any kind shall be allowed on the premises. 14. Owner shall not be responsible for tools or material goods stolen or damaged on site. y 15. Upon completion of Work the Contractor shall thoroughly clean the premises and power wash all adjacent sidewalk clean of dirt and debris after completion of the installation of the landscape improvements. 16. Contractor shall warrantee all parts,labor,equipment,and material provided under this Contract for a period of j one(1)year,upon completion of contract. v 17. All substitutions shall be submitted to and approved by Owner& Architect,prior 10 implementation. y Lee•Ruff• Stark Architects 6/11/93 i 4' r ' r , Scholls Phase I Site Access Section 02510 SECTION 02510 ASPHALTIC CONCRETE PAVING PART 1 GENERAL 1.1 SECTION INCLUDES A. Asphaltic concrete paving. B. Design of final mix to meet specified requirements. 1.2 RELATED SECTIONS A. Section 02.520 Portland Concrete Paving. B. Section 09900-Painting: Pavement markings. 1.3 PERFORMANCE REQUIREMENTS A. Strength: Designed for parking, light duty commercial vehicles, and movement of fully loaded semi tractor-trailers for auto delivery. B. Appearance: Fine surface aggregate for smooth appearance grade. 1.4 QUALITY ASSURANCE A. Perform Work in accordance with Washington Department of Transportation and City of Portland standards. j; 1.5 REGULATORY REQUIREMENTS " A. Conform to rpplicable local code for paving work in public right-of-way. 1.6 ENVIRONMENTAL..REQUIREMENTS rye. 1 A. Do not place asphalt when base surface temperature is less than 40'F,or surfs is wet or frozen. t.r PART 2 PRODUCTS - t a 2.1 MATERIALS A. General: Use locally available materials and gradations that exhibit a satisfactory record of previous installations. B. Asphalt Cement: ASTM D946. d' I C. Aggregate: Crushed stone and gravel,znd sharp-edged natural sand. jD. Mineral Filler: Rock or slag dust,hydraulic cement,or other inert material. E. Primer: Homogeneous,medium curing,liquid asphalt. 2.2 ASPHALT PAVING MIX w' A. Provide plant mixed,hot-laid asphalt-aggregate mixture complying with ASTM D3515. 1 Lee, Ruff. Stark Architects age T s �,,«,a„ ,, •, s. �, ,r �t�4*;wn' �r•�+rP'y"a' �+ ,^'�;, pilll_ U t" a _ t - al f i a Y Scholls Phase I Site Acces Section 02520 SECTION 02520 i PORTLAND CEMENT CONCRETE PAVING PART 1 GENERAL I 1.1 SECTION INCLUDES • A. Concrete paving,sidewalks,east curbs and extruded curbs. 1.2 RELATED SECTIONS " 1 A. Section 02510- Asphaltic Concrete Paving. 1 B+ Section 09900-Painting: Pavement markings. I1.3 SUBMI17ALS A. Confor% with requirements of Section 03300 for concrete materials. +, 1 1.4 QUALITY ASSURANCE �� A. Perform work in accordance with requirements of Sections 03110,03200 and 03300. ,•, B. Obtain cementitious materials from same source throughout. 1.5 REGULATORY REQUIREMENTS IA. Conform to applicable local codes for paving work on public right-of-way. f I 1.6 ENVIRONMENTAL REQUIREMENTS J A. Do not place concrete when base surface temperature is less than 40 degrees F,or surface is wet or frozen. i PART 2 PRODUCTS 21 MATERIAI S A. Form Materials: Smooth faced wood or steel,at the discretion of the Contractor. f B. Reinforcing Steel: ASTM A615,60 ksi yield grade;deformed bullet steel bars,unfurnished. C. Concrete Materials: As specified in Section 03300. D. Air Entrainment Admixture: ASTM Cii,.^. E. Curing Compound: As specified in Section 03300. F. Expansion Joint Filler. ASTM D1751,asphalt impregnated fiberboard or felt,3B"thick. G. Joint Sealer. Polyurethane Sealant, ASTM C920, Grade NS, Class 25, Use NT, M, A, O; multi- component chemical curing, non-staining, non-bleeding,capable of continuous water immersion, non- sagging type. 1 Lee, Ruff, StarkArchitects — — - a�T l _ a 9 a: Scholls Phase I Site Acces Section 02520 I 3.8 FIELD QUALITY CONTROL IA. Testing firm will take cylinders and perform slump and air entrainment tests in accordance with Section 03300. 3.9 PROTECTION A. Immediately after placement,protect pavement from premature drying.excessive hot or cold temperatures, Iand mechanical injury. END OF SECTION l I l 1 l } l l l 1Lee, Ruff, Stark Architects . - age . d uvd Tp•? .' � I,h�i���i`+�t �r�� AV�ih�. - :.t. s.�.2 ?P++N, .. Si �f Section 03300 Sch oils Phase I Site Access ` SECTION 03300 CAST-IN-PLACE CONCRETE PART 1 GENERAL i 1.1 SECTION INCLUDES A. Normal weight concrete for cast-in-place and tilt-up applications,as shown on Drawings, f B. Construction joint devices associated with concrete work. f C. Curing and finishing of cast-in-place concrete surfaces. y 1,2 RELATED SECTIONS +* A. Section 02520-Portland Cement Concrete Paving. I B. Division 15: Mechanical items for casting into concrete. 1 C. Division 16: Electrical items for casting into concrete. } i 1.3 SUBMITTALS E Ar Product Data: Ptwide data on joint devices, attachment accessories,admixtures and other proprietary materials and items. IB. Concrete Design: Submit proposed concrete mix designs. Submit laboratory test reports for each mix design,verifying compliance with specified requirements. 1.4 QUALITY ASSURANCE A. Perform Work in accordance with ACI 301,"Specifications for Structural Concrete for Buildings",and j ACI 318. IB. Concrete Testing: Engage an independent testing laboratory to perform material evaluation test-;. Field testing of materials will be done by Owner's testing laboratory. C. Verify conformance to ACI 305R when concreting during hot weather. 1 D. Verify conformance to ACI 306R when concreting during cold weather. 1.5 PROJECT CONDITIONS A. Do not place any concrete that has not been tested,unless acceptable to Architect. B. Cold Weather Conditions Comply with applicable provisions of ACI 306 and following: I I 1. Do not place concrete when temperature is below 40'F. l 2. Provide adequate equipment for heating concrete materials and accessories. 3. Protect concrete during freezing or near freezing weather. 4. Kap all concrete materials and accenories free from frost. 1 5. Do not place concrete against frozen,or frosted ground. 6. Do not use frozen materials a•materials containing i e. C. Hot Weather Conditions: Comply with applicable provis' is of ACI 305. Prevent excessive concrete Itemperatures or water evaporation which will impair requir-A strength or serviceability. i I I r -Lee, Ruff, tark Architects alae T � 6 �r y 5 - t' rr P,yr �a G U `tr 11 h A6 Scrolls Phase I Site Access Section 03300 �� +y rx PART 3 EXECUTION Y ti�l{k 3.1 EXAMINATION A. Verify requirements for concrete cover over reinforcement. B. Verify that anchors,seats,plates,reinforcement and other items to be cast into concrete are accurately placed,positioned securely,and will not cause hardship in placing concrete. 3.2 PLACING CONCRETE A. Place concrete in accordance with ACI 304. B. Notify Architect minimum 24 hours prior to commencement of operations. C. Ensure reinforcement,inserts,embedded items,formed expansion and contraction joint.-,,and vapor barrier �.. { are not disturbed during concrete placement. ` D. Install construction joint devices in coordination with pattern placement sequence. Set top to required elevations. Secure to resist movement by wet concrete. E. Maintain records of concrete placement. Record date,location,quantity,air temperature,and test samples taken. F. Place concrete continuously between predetermined expansion,control,and construction joint-,. Do not interrupt successive placement;do not permit cold joints to occur between construction joint-,. I G. Deposit concrete in horizontal layers not deeper than 2.feet. Where placement consists of several layers, place each layer while preceding layer is still pla%tie to avoid cold joints. H. Consolidate placed concrete by mechanical vibrating eq,ripment, in accordance with ACI recommended practices. 1. Use adequate number of units to properly consolidate all concrete. 2. Use only qualified workers under experienced supervision. l I. Saw cut joints within 24 hours after placing. 3.4 CONCRETE FINISHING-SLABS A. Steel trowel surfaces of all stabs 1. Steel trowel dense and smooth. i 2. Make minimum of two passes,but not more than necessary. 3.5 CURING AND PROTEC'1ION f A. Immediately after placement,protect concrete from premature drying,excessively hot or cold temperatures, and mechanical injury. 1 B. Clue floor surfaces in accordance with ACI 308. C. Cluing Compound: At exterior slabs, walks,and curbs,cure by use of membrane forming curing and sealing compound. I. Apply per manufacturer's directions,nri b=!v in continuous operation by power-spray or roller. 1. Verify compatibility of curing compound with coa:'ngs, flooring materials,paint,or other finish l materials that are in du-ect contact with concrete. Where compatibility can not be guaranteed,cure by moisture curing method. D. Do not nermit rain water or water used in curing to wash clown over faces of exposed concrete. ( 3.6 FIELD QUP,LI'i'Y CONTROL r A. Field inspection and testing will be performed in accordance with ACI 301 and under provisions of Section 01410. 1 1, Lee, Ruff, . tark Architects - 9 age L k I t 1 Scholls Phase l Site Access Section 05500 txy I SECTION 05500 METAL FABRICATIONS 3 J' PART 1 GENERAL 1.1 SECTION INCLUDES r A. Steel pipe handrails. 1.2 RELATED SECTIONS A, Section 09900-Painting: Paint finish. • l 1.3 DESIGN REQUIREMENTS { 1 A. Railing assembly,wall rails,and attachments to resist lateral force of 50 lbs at any point without damage or permanent set. Lry' 1.4 SUBMITTALS A. Shop Drawings: Indicate profiles,sizes,conner:icn attachments,reinforcing,anchorage,size and type of fasteners,and accessories. Include erection drawings,elevations,and details where applicable. B. Indicate welded conrecuons using standard AWS A2.0 welding symbols, Indicate net weld lengths. S I1.5 QUALIFICATIONS 1.6 FIELD MEASUREMENTS IA. Verify that field measurements are as indicated on Drawings snd used in the preparation of shop drawings. I PART 2 PRODUCTS I 2.1 MATERIALS I A. Pipe: ASTM A53,Grade B,Schedule 40. { B. Splice Connectors: Steel concealed spigots for welded connections at pipe rails. C. Welding Materials: AWS D1.1;type required for materials being welded. D. Shop and Touch-Up Primer: SSPC 15,Type 1,red oxide. E. Touch-Up Primer for Galvanized Surfaces: SSPC 20,Type 1 Inorganic. F. Grout Non-shrink type, pro-mixed compound consisting of non-metallic aggregate, cement, water reducing and plasticizing additives,capable of developing a minimum compressive strength of 7000 psi at 1 28 days. 1 2.2 FABRICATION- PIPE HANDRAILS IA. Appearance Grade: Provide railing systems of highest architectural quality for appearance. Grind exp(Med f joints smooth and flush for undetectable appearance. Steel surfaces to be free of pitting,fabrication marks and other defects. j B. Fit and shop assemble components in largest practical sizes,for delivery to site. { t ILee, Ruff.- Stark Architects Page i ! ._.... ... .. ,.....,•..uw•n1,ma,wiNA:n.orrvr+..u.:.,...a:,.,...,.:.....___ ........vN�, .I' tim►�bgpapf'�P'�"9'"1"v n1ip+F' y�'�' Scholls Phase I Site Access Section 09900 SECTION 09900 PAINTING PART 1 GENERAL 1.1 SECTION INCLUDES A. Surface preparation and field application of paints and coatings. B. Work includes painting and finishing of exterior exposed items and surfaces throughout Project,except as excluded below, whether scheduled or not. Where items or surfaces are not specifically scheduled or designated to be painted.Architect will select finish from standard coatings and colors available. " I C. The following items are not included as work required to be field finished under t,Is section, unless specifically designated otherwise on Drawings: 1. Items specified to receive factory finish coating as final finish, or materials with integral color intended to be final finish coating. 2. Finished metal surfaces,such as anodized aluminum,stainless steel,chromium plate,copper,and bronze. Shop priming and galvanizing is not to be considered a final coating. 3. Concrete and asphalt paving,other than painted lines and symbols. I 4. Concealed surfaces in spaces that are both inaccessible and non-visible. 5. Moving parts of operating units that would be adversely affected by painting. , 1.2 DEFINITIONS � 1 A. Conform to ASTM D16 for interpretation of ter as used in this Section. 1.3 SUBMITTALS A. Product Data: Provide data on all finishing pro lucts.and special coatings. Include manufacturer's f application instructions. B. Painting Schedule: Submit schedule,in format matching schedule at the end of this Section,listing exact I ' manufacturer and products proposed for each system. C. Samples For Verification: Submit two samples, 8 x 8 inch in size illustrating selected colors and textures for each color selected. .�;. 1.4 QUALIFICATIONS i A. Manufacturer: Company specializing in manufacturing the Products and quality level specified in this t, section with minimum 5 years experience. B. Applicator: Company specializing in performing the work of this section with minimum five years documented experience in painting for commercial projects. 1.5 FIELD SAMPLES A. Provide field sample panel illustrating coating color,texture,and finish. Provide sample for each coating and color. B. Locate where directed. Accepted sample may remain as part of the Work. I I ,ee, Ruff, lark Architects 512F93 age I r h ' Section 09900 Scholls Phase I Site Access 2.3 FINISHES A. Refer to schedule at end of section for surface finish schedule. B. Allow 15%.oras required,for deep tone colors. PART 3 EXECUTION 3.1 EXAMINATION A. Verify that surfaces and substrate conditions are ready to receive work as instructed by the product j manufacturer. be fini:,hed prior to commencement of wor'c. Report any condition that B. Examine surfs, scheduled to ginning o[ work will .:^sti'ute acceptance of substrate may potentially affect proper application. Be conditions. C• Test shop applied primer for compatibility with subsequent cover materials. D. Measure moisture content of surfaces using an electronic moisture meter. Do not appy finishes unless moisture content of surfaces are below levels recommended by the coating manufacturer. 3,2 PREPARATION I A. Correct defects and clean surfaces which affect work of this section. Remove existing coatings that r exhibit loose surface defects. B. Asphalt Surfaces Scheduled for Paint Finish: Remove foreign particles to permit adhesion of Finishing I materials. C. Galvanized Surfaces: Remove surface contamination and oils and wash with solvent. Apply coat of etching primer. D. Concrete Surfaces Scheduled to Receive Pain t Finish:grease a do'on of v°�i�m phosphate,alkali I powder,and other foreign matter. Remove oil and gree ith well and allow to dry. Remove stains caused by weathering of corroding metals with a solution of sodium metasilicate after thoroughly wetting with water. Allow to dry. E. Uncoated Steel and Iron Surfaces: Remove grease,mill scale,weld splatter,dirt,and rust. Where heavy coatings of scale are evident,remove by wire brushing or sandblasting; clean by washing with solvent. ric acid solution,ensuring weld joints,bolts,an,'-tuts are similarly cleaned. Apply a treatment of phopho JSpot prime paint after repairs. loos 1 F. Shop Primed Steel Surfaces: Sand and scrape to remove e primer and rust Feather edges to make touch-up patches inconspicuous. Ciean surfaces with solvent. Prime bare steel surfaces. G. Exterior Wood: Remove dust, grit, and foreign matter. Seal knots, pitch streaks, and sappy sections. ' Fill nail holes with tinted exterior calking compound after prime coat has been applied. i 1 3.3 APPLICATION A. Apply products in accordance with manufacturer's instructions. h. Do not apply finishes to surfaces that are not dry. I C. Apply each coat to uniform finish. J D. Apply each coat of paint slightly darker than preceding coat unless otherwise approved. E. Sand wood and metal lightly between coats to achieve required finish, F. Vacuum clean surfaces fres,of loose particles. Use Lack cloth just prior to applying next coat.G. Allow applied coat to dry before next coat is applied. j H, Where clear finishes are required,tint fillers to match wood. Work fillers into the grain before set. Wipe !I excess from surface. I. Prime concealed surfaces of interior woodwork with primer paint. I 1 ee, Architects 5/21/93 age i�� It - 4 „ a _ s4,%F �,�'�.` � s t� •� Rd � ,{� 4 �,:,� ��a.. ..._.....,,,o,,.w„w.mae:n::v+..�r„"... ,..�.. „nx,�n.!aMM-w.w�.._.._..w5f•,.,1..�,.w�.:.�u.�:':a.:•i�.•l�,�b i �.'Vr^• a..nd n� �!S.a.,w t 7 � 4t. y.. I 1 i I I 1 FACE OF EXIST.BLDG WAIL I — WALKOVER I WHERE OCCURS -- CONC.WALK OVER — EXP.MAIL W/1”DEEP SEALANT GRANULAR FILL JOINT ® TOP FLUSH W/CONC. —1/2"TOOLED EDGE / SLOPE 1/4"PER FT. FINISH GRADE N l :L.Q...o.fy..i7p•. i cc in— ii��77 •�f•1'• • #3 REBAR CONT. 6" WELDED WIRE NOTE FINISH WALK / FABRIC TO MATCH EXIST. CONC. WALK @ GRADE 1 1/277-o" rnOJECT T1 ILE: M1 ,NO LEE SCHOLLS-PHASE I EXTERIOR ADA IMPROVEMENTS Pm RUFF 'W" _�_�r.. ----- ------__---- ; §-T A R—Xt? n R c N T E c r D""""NO SIDEWALK ® GRADE 0 1 32BS S W.MEADOWS ROM•SURE UO•I-AKE OSWF-OU,OR•VOt5 �/ soilM,,7„ FAxl+onARA A741 AiE: 5/21/93 CALL 3"= 1'-0" oeB: 93081.2.00 ; t, JI it y, ��,A Y4[M, i${• �o '' .i 1. - .,� ':� ,lH•, �, n-� -M1.., F B � i edk, 6 4�J w - ,..1t r �1 Y �qp YqM�,3�{W. '�" :!6�Y �11 yery�}'"�� ,�' lWY4rodMM• a F7 ,.I _ CONCRETE SLAB ' FINISH GRADE 0 SIM. COND. 1/4"RAD, TYP. EACH SIDE SEALANT 1"DEEP,TOP OF SEALANT FLUSH W/TOP OF CONCRETE. ' 3/8"PRE-MOLDED EXPANSION SEE PLAN 6" 2" JOINT MATL. w 1/2"RAD.(MATCH EXIST.) ): SLOPE 114"lFT. - CONCRETE CURB l7,7 Z SEAL JOINT TO .,'. • 0 . .o 000 .� • 8 0 Qg OO iv C7 PATCH EXIST PAVING-OR m REPAIR AS REOUIREn p0 p o I S3 REBAR TOP& BOT.CONT. I GRANULAR BASE (NONE 0 SIM. ) -WELF)FD WIRE FABRIC ` TYPICAL CONCRETE CURB 1 1'-0° i PROJECT TIT[E I I LEE —'7,*' SC)HOLLS-PHASE 1 EXTERIOR ADA IMPROVEMENTS _ w A RUFF S>.a 'V� STARK �N A R C H I T E C T S CAWNO T17LE: �'— - TYPICAL CONCRETE CURB o^ 1 520NW.1-IEADOWSROAD-WrM 310-LAUO5WFGO,OR-97013 _ L (w11664a7�1 FAX(301)664-4747 DAIS 5/21/93 SCALE" AS NOTED J"t" 93081-2.00 t g 11 4 hA 4P' f , Ilk L • s PIP r , u r, I I • 1 1 y �5 I 1/4"WIDE x 3/8"DEEP JOINT W/1/4'TOOLED EDGES-SPACE f JOINTS EQUALLY ® 5'-0"O.C.MAX. — CONC.WALK TO MATCH EXIST.(U.N.O.) II WELDED WIRE FABRIC COMP.GRAN. FILL CONTROL JOINT 3=1'-O" t i ISEH « SCHOLLS-PHASE 1 EXTERIOR ADA IMPROVEMENTS P•M --STTa tc s: A a c rl i 'r E c T s Dr1A11nrvcr Til-LE CONTROL JOINT 03 1)8S 5,1V.MEArX)W S ROAD•SUM YID•LAKY.0SWFc'0.rNt•97015 (503)61144741 FAx�sosl�++J17 TE: 5/21/93 ALE: 3"= 1'-U" as 93081.2.00 I y �. w { I 1 I 11 I I SEALANT 1"DEEP,TOP 1/4"RAD.TYP._ _ _._� OF SEALANT FLUSH WITH • I EACH SIDE W/ TOP OF CONC. I TOOLED EDGE 3/e" 3/8" PREMOLDED EXP. EO. EQ. JOINT MATL. I CONC.WALK/PAVING _ — I LONG SMOOTH OT 24"O.C. •� 16" 7: GREASE AT ONE END :e 'y •. • . .' ""`� `' '• WELDED WIRE FABRIC ,. I • ' 8 •p 2'-0" e°° -- AGGREGATE BASE --4 8 °° I ° PREPARED SUB GRADE NOTE: PROVIDE EXP.JOINT NOTE: SEE PLANS FOR LOCATIONS 0 ?0'-0"MIN. ANT"TOOLED JOINTS ® 5'-0"O.C. MAX. 0 WALK OR AS INDICATED ON PLANS EXPANSION JOINT 1 11/2"=V-0• tN FRO J F,., CHOLLS-PHASE I EXTERIOR ADA IMPROVEMENTS P�ATARK 3E A R C H I TR LT—Fl T S pgANnru3 nttE: ��— '— EXPANSION JOINT SW.MEAIX)WSROAD•a1rM UO•LAKEOSIVE00.OR•41035 5/21/93 5CA�E: AS NOTED 109" 93081x-2.00 )661�u7 F•AXIw))1NM4141 DA15. .: .. ..,r,.,xomwan.:xn<wiWxn uryaM•.+w•.imn.n.,.�,r•.........- t MN 1 '1 r, 1 1 - I` Milk al MATCH EXIST. DIM. I SEE PLAN FOR DIMENSION -CONTROL JOINT - TOOLED EDGE 4"CONC.WALK/RAMP SEAL JOINT OVER GRAN. FILL 7 1 SLOPE 1:1`2(MAX,) v .�,- ,ter 3/8"EXP.JT.MATL.W/ EXIST.A.C. PAVING 1/4"TOOLED EDGES 8» I &SEALANT p3 CUNT.T& B. CONC. RAMP 3/4N=l'-O" _ L E F. SCHOLLS.PHASE 1 EXTERIOR ADA IMPROVEMENTS P M R—LIF 1 __ - ------ . — STARK A R C 11 1 T E- C T S naAvhwo nn- - —`�-- CONC. RAMP _—_ 05 32833W MEADOWS R0A13•SART 340•1 AKE OSWEC;O,OR-970 73 _ (303(694-4747 FAX(3U3)6644747 TE- 5/21/93 ALE: 3"= 1'-0" oe93081-2.00 ;�"' ,..^ -.-"' ....•'^'^'�'"�wkn101MYiuf'W}Y A11d'6M:1J'T'!M9:'MV1".JSfhK{Y,'YMMWMAW'aws.r r•-..•.•.•. -•.. .. ••.•-'•"+'pM! 0. .W+v C� .... ,.✓'w+ne«wawku`Nre}N'ri Yew v hr..,,.....n .... ._. ,_ - 1 1 I • 1 I ` j t � i . l i f i I SEE PLAN FOR DIMENSION MA•fGH EXIST.DIM. CONTROL JOINT 4"CONC.WALK/RAMP _ OVER GRAN. FILL RAMP BEYOND _ r TOOLED EDGE 17 INISH GRADE 6" SEAL JOINT CONCRETE i CURB SLOPE 1/4"/FT. v M3 REBAR TOP& BOT.CONT. - 3/8"EXP.JT. MATL.W/ EXIST.A.C. PAVING 1/4"TOOLED EDGES 8" M3 CONT.T 8 B. I I CONC. RAMP 311"=1'-0" N FCT TITLE: LEE SCHOLLS-PHASE 1 EXTERIOR ADA IMPROVEMENTS M G �RUI•F -- S T A R K A R C H I T F. C T S DRAWING TITLE: — -- CONC. RAMP off` 5285 S.W.MFARE TX)WS ROAD•SUUO•LAKE OSWUM),OR•r"S — X11 .41 1505)684.1"7+T FAX(SO')RMJT4T )ATE: 5/21/93 ALE:AS NOTED ljoa r:93081-2.00 I 4R dLti �trTnbh.:Nt^h1 ,yF1!"Sa'°i 'Hpr III ft '` •R .r ,, l I C EXPANSION TACTILE WAR14ING STRIP JOINT 1/8"DEEP X 1/2"TOOLED ICONC. WALK JOINTS ® 2"O.C. o — CONC. RAMP W./HEAVY --- .�_ BROOM FINISH I v X Q IS�OA N ��• 7 O� a OQ�' 6" HIGH 1 - - CURB 4 05 A.C. PAVING t 5' 0" SEE PLAN 5'-0" PAVING -SEE SITE PLAN CURB RAMP PLAN 1/4"=l'-O" SCHOLI_S•PHASE 1 EXTERIOR ADA IMPROVEMENTS P M RUFF �__- STARK A R C H I T E C T S UFv nrxa rr t�E: — - - CURB RAMP PLAN 07 5'-85 s W MFADOWS ROAD•SLIM 310•LAKE OSWFOO.OR•97015 ' 1%w)M4-4141 FAX %M)MA4747 ATE: 5121/93 AU: AS jHOWN oer:9308'1-2,00 I h I,. k t 1 f i i k TACTILE WARNING STRIP ` 1/8"DEEP X 1/2"TOO-ED —. JOINTS ® 2"U.C. i I CONC. RAMP W/HEAVY —LANDSCAPE BROOM FINISH _ f 1'-0 4" / it PM f 06 CONC. WALK EXPANSION JOINT,TYP. U) EXPANSION SLOPE- 1:12 MAX. w5 SLOPE 1:12 MAX. i I JOINT 0 a EXPANSION LL 0 I O 7-j 7 JOINT _— U) •- 1 9 8"HIGH CURB W-0" SEE PLAN W-0" A.C.PAVING NEW CONC. RAMP PAVING - SEE SITE PLAN CURB RAMP PLAN 1/4"= 4 1-ON I 1PnOJFCT TITILFI O LEE "' SCROLLS-PHASE 1 EXTERIOR ADA IMPROVEMENTS P M RUFF STARK +: A R C 11 1 T E C T S (91AWNOTM ____STARK "- E CURB RAMP PLAN O V 5283s W A7E-ADOW S ROM•SUM S+n•LAKE OSWECA,OR•97035 smr.w+a7n PAX(103)MIJ747 )ATE: 5/21/93 ALE: AS SHOWN [oejo.P?081-2.00 " ' r ` iT1fi PM PM 11 11 ' SIM. t r x � I 30'TYPICAL Ln Qi 2'-0"O.C. w I 2 TYP. 4"WIDE PAVEMENT z MARKING PAINT 2 -- STRIPPING-MATCH COLOR OF EXIST. m 9"-0" 9'-0" 8.41 STANDARD SPACE VAN SPACE 1 I I ti. It DISABLED PARKING PLAN STANDARDS FOR REFERENCE ONLY -NUWiN S F E SCHOLLS-PHASE 1 EXTERIOR ADA IMPROVEMENTS P A RUFFP FF ---- hp, STARK A R C 11 1 T_ E C T S DRAWING TITLE: DISABLED PARKING PLAN O� .5293 S W.MEADOWS ROAD•SVTTF.N0•LAKE OSWEGO,OR•V1015 -. (503)W-4747 r•Ax(3011 M19.IJLT DATE: 5/21/93__T-_W- AS NOTED Jon r 930131-2.00 Y j I I y { ti I` 7 5'-0" 0 PARKING STALL PAVEMENT MARKING PAINT , I ' L00011 NOTE: `) GRID IS FOR I PROPORTIONAL E Q REFERENCE ONLY, PP NO('TO BE PAINTED. I CENTER IN HDCP ( ? STALLS-AS PER SITE PLAN&CODE a i I 0 4" 0 PARKING STALL l DISABLED SYMBOL ` NO SCALE "nOJECT TITI-F DRAWING NO 0 e E -- SCROLLS-PHASE I EXTERIOR ADA IMPROVEMENTSM RUFF _ STARK R C N I T E C T S DRAWING TITLE: -� HANDICAP SYMBOL 5285 S W.MF.AMIWS ROAD•SUM MO•LAKE OSWFOO,OR•07015 -- — 10 (M)684-4747 FAKISnl NW-4741 5/21/935/21/93 scnLE AS NOTED "'�' 93081.2.00 i " M,r@Y:�` " P+, G „nppxnl 4v;F. : u'Mtt�"'IIR,IM�'r'I.S►�'” +` ^ X'. FF� r 4 a,•�:r�i�Ylur�wYiaiLLL. .w .3 i , ,.�:,. ;.., .; ... ...,... _._. ... ,n: . i r, I DISABLE PARKING SIGNAGE SIGN NO.OR20-6B i .. I' INTERNATIONAL_SYMBOL ♦"— --—_ OF ACCESSIBILITY,2-1;2" w TALL { 1 rr PARKING WITH DMV = DISABLED PERMIT ONLY Z VIOLATORS SUBJECT TO -----314"TALL LETTERING, U- TOWING UNDER HELVETICA MEDIUM i O_ ORS 811.620 AND A F FINE UP TO$250 ORS 811.615 'v VAN PARKING SIGNAGE VAN-ACCESSIBLE —® sIM.COND. SIGN No. OR20-60 NOTE:SIGN BACKGROUND BLUE, SIGN LEGEND R BORDER WHITE DISABLED PARKING SIGN NO SCALE PROJECT TITLE: NO SCHOLLS-PHASE I EXTERIOR ADA IMPROVEMENT S _ P M RUFF *w STARK 1^ A R C 11 I T E C T S DRAWNG TITLE: DISAI3LED PARKING SIGN ',283 S W.MF.AIRtWS ROAD•SI IRF.Nn•LAKE 0S"00.OR•917M (uY3(6xa-�7a7 FAX 6844747 LAI E 5121/93 cALE: AS SHOWN 93081-2.00 i MAIN i ti 5 - INN 1111" ,. -Im +. ? `.;. 66 , 6 J"^ R` C t tE 1 � 1 9" I 11 1 a .080 FHK. ALUM. SIGN @�HEELCHNR ACCESS I BRONZE ANODIZED 4 RAMP FOR TMS 1/2"HIGH WHITE BUB UNG LOCATED HELVETICA MEDIUM 1" AT SUVVIE � #� 1" o LETTERS I --1/4"HIGH WHITE ---FOR ASSISSTANCE QB 3/8"HIGH WHITE INFORMATION CONTACT HELVETICA MEDIUM _._ ---]FORUM PROPERTIES LETTERS {{ a LEASING OFFICE AT 1/2"0 x 1 1/2"LG. 'I SUITE L3 BOLTS TYP.T&B W/S.S.T.WASHERS ij ALIGN W/TOP II 1/2"R OF BRICK REVEAL J Ui 4 X 4 CEDAR POST, PAINTED, ANGLE TOP BACK 0 45' FROM SIGN AND SET IN 1'-0"DIA.X I Z-0"DEEP TAMPED GRAVEL f FOOTING NOTE:VERIFY SIGN VERBAGE W/OWNER PRIOR TO FABRICATION I !VOTE:LETTERS TO BE PAINTED d CENTERED ON SIGN i RAMP ACCESS DIRECTORY SIGN J -, " NO L E SCROLLS-PHASE I EXTERIOR ADA IMPROVEMENTS P M IFF AnIN S 1'A R K si A R C H I T E C T S ORA WINO TITLE: -- -' RAMP ACCESS DIRECTORY SIGN 12 52M3 3 N' MF-AfX)W S COAD•SURE 11O•LAKE OSWF—.OR•77d11 ----- (501)to 1747 PAX(501)W44747 n: 5/21/93 CALF: 3"= V-0" .ions. 93081-2.00 h ', t I A'T �_'� ��� .. �.»._.,.,.-......_. 1_-- .._,._.,.�... � •��� ' Y`�,I I f�I ������1,�E�LYba. ..A,�� v ' >. I M � f Y3 i+ r 36" CLR. EXISTING CONC.WALK RAISED CONC. CURB ' z '6 4�i PM r 14 SECTION 0 M A Q U) Lu w 1 1/2"O.U.METAL PIPE j w RAILING, PAINTED 60" U 60" a LANDING LANDING Q LL 0 12" 12' `* _ cl C? I i ELEVATION SECTION DAMP ELEVATION 1/4"=l'-O" PROJECT TITLE: W. l NO LEL SCROLLS-PHASE I EXTERIOR ADA IMPROVEMENTS P M_ RUFF STARK .. A R C N I T E C T S DRAWING TITLE: - RAMP ELEVATION/SECTION ♦♦♦♦ 5:83 S.W.MEADOWS ROAD•Sl'RP.310•LAKE.OSWFXK),OR•01075 _____ -- 3 IS0I)W-47/7 FAX(107)6M-m7 DATE 5/21/93 SCAT' AS NOTED JOA" 93081-2.00 . d i • I ,i I I �1 Y 1.1/2"DIA. (1.90 O.D.) STD.STL. PIPE VERT. SUPPORT —1/2"TOOLED EDGE I • 3/8" EXT, MATL.W/ 1" DEEP SEALANT ® TOP OF JOINT o. EXIST.CONIC.WALK z NON-SHRINK GROUT 4 ..a, •, I I I I SIZE OPENING IN CONC. ..aQ.;;,•;: FOR PIPE RAILING UNDISTURBED SOIL 6" I MAILING FTG. DETAIL @ RAMP 3"=1'-O,, PROJFCT TITLE: OnAWING NO L F•F s»:>:>> SCHOLLS-PHASE I EXTERIOR ADA IMPROVEMENTS M RUFF { v S T A R K_ ; A R C N I T f C T S MAIMING TITLF y _ 3313 S W,MEADOWS ROAD•SUITT W-LAKP OSW F.tK1.OR•97(D S RAILING FTG.DETAIL 0 RAMP �SU)AMJ7�7 FAXISH16NJ747 DATE: 5/21/93 SCALE: AS NOTED JoE# 93081-2.00 1 ,Y r r-M� liSv `3N n .,S�r„v;r,v,Ny"+k^'k"°"tM1�1IN�'1 •+Ms fi���""`� N+`{,tW�•.., l,.x. r 'A w I } I f 2" L 3'-0" 3'-0" " i t r b GUARD RAIL— — w 0 SIM. COND. M i 0 -SET GUARD LL I w RAI L/W 4"CONC. WALK/RAMP -- v) CONC.SIM. OVER GRAN, FILL Lu TO DET. PM/14 I > t 3/8"FXP.JT. MATL. W/- �, 1/4"TOOLED EDGES —RAMP BEYOND - TOOLEDCr. • ': EDGE i CONC. j RETAINING I WALL. SEE CROSS SLOPE=1:50(MAXI STRUCT. I 3/8"EXP.JT. MATL. W/ 1/4"TOOLED EDGES '' o FIN. d GRADE RAMP SECTION 3/4"=1'-0" PROJECT TITLE: OnAWNG NO SCROLLS-PHASE 1 EXTERIOR ADA IMPROVEMENTS PM R u IF F: ->Maa _STARK A R C H I T E C T S ORA WINO TITLE: '- Ramp Section - I 3285 S.W MEADOWS ROAD-SLIRT.310•IaKF.OSWTfiO,Olt•07035 _ 15 4503)681-4717 FAX(30))694-4747 ATE: 5/?1/93 °TALE AS NOTED 93081-2.00 q 4 . .nWnww..r�,Jd- -,..r....wn+.KaM.xaNtlY,AWr�llwaww rwva ...,., AFGHAN RIPPEY INC. 2446129 x.02 1 i Gorll �a M # q Ncr.. C. 11a) oG 6P,WuLArL- V14- T -2�j" KF-V 15,004 e p OREGON o � �111���) lu�l[r• — Rpt. NPS 1 GENERAL NOM, I1, Contractor to verify and confirm all dimensions and conditions and notify - engineer of any discrepancy prior to start of work. i . i 2. All fcotuigs to bear on natural undisturbed soil. ' 13. Concrete strength to be 3000 psi minimum at 28 days. F „4. Rebar to be ASTM A615 grade 60. L AFGHAN RIPPEY INC. �;-)CHQLL-2 ' CONSULUNG ENGINEERS - - _W _ CHK BY-DATE- 9221 rDATE9221 S.W.Barbur Blvd.,Suite 105 � l,UA_ J06 NO�� Portland,Oregon 97219 Tel(503)2446(" cucFt I nr I � k