Report .44f• •• •• •• • • • • ••
• • • • • • • • •• • • •• • •
• • •• •• • • • • • • •
••• •• •• ••• • • • •
COMcheck Software Version•4.O 1 ••
Mechanical Ca�n ,liar�c;
"tic to
. ... . . ... .
OCT 5 ?D16
Section 1: Project Information ••• •••• S. •.
. . . . . . . . . .
• • •
Energy Code:2014 Oregon Energy Efficiency Specialty Code • ••• •••• • •TP1 it a.ery p � 4r,
Project Title:Tigard Apartments
Project Type: New Construction
Construction Site: Owner/Agent: Designer/Contractor:
1304 SW Scholls Ferry Rd
97008
Section 2: General Information
Building Location(for weather data): Tigard,Oregon
Climate Zone: 4c
Section 3: Mechanical Systems List
Quantity System Type&Description
12 HVAC System 1 (Single Zone):Packaged Terminal Heat Pump
Heating Mode:Capacity=14 kBtu/h,
Proposed Efficiency=3.00 COP,Required Efficiency=2.83 COP
Cooling Mode:Capacity=14 kBtu/h,,No Economizer,Economizer exception:Low Capacity Residential
Proposed Efficiency=9.70 EER,Required Efficiency=9.23 EER
Fan System: None
12 HVAC System 2(Single Zone):Packaged Terminal Heat Pump
Heating Mode:Capacity=11 kBtu/h,
Proposed Efficiency=3.20 COP,Required Efficiency=2.89 COP
Cooling Mode:Capacity=12 kBtu/h,,No Economizer,Economizer exception:Low Capacity Residential
Proposed Efficiency=10.70 EER,Required Efficiency=9.74 EER
Fan System: None
Section 4: Requirements Checklist
In the following requirements,blank checkboxes identify requirements that the applicant has not acknowledged as being met.Checkmarks
identify requirements that the applicant acknowledges are met or excepted from compliance. 'Plans reference page/section'identifies where in
the plans/specs the requirement can be verified as being satisfied.
Requirements Specific To: HVAC System 1 :
• 1. Equipment meets minimum efficiency: Heat Pump: 2.83 COP 9.23 EER
Requirements Specific To: HVAC System 2 :
• 1. Equipment meets minimum efficiency: Heat Pump: 2.89 COP 9.74 EER
Generic Requirements: Must be met by all systems to which the requirement is applicable:
• 1. Calculation of heating and cooling loads.Design loads are determined in accordance with the procedures described in the
ASHRAE/ACCA Standard 183.Altematively,design loads have been determined by an approved equivalent computation procedure.
✓ 2. Equipment and system sizing.Heating and cooling equipment and systems capacity do not exceed the loads calculated in accordance
with Section 503.2.1.
Plans reference page/section:
✓ 3. HVAC Equipment Performance Requirements.Reported efficiencies have been tested and rated in accordance with the applicable test
procedure.The efficiency has been verified through certification under an approved certification program or,if no certification program
exists,the equipment efficiency ratings are supported by data furnished by the manufacturer.
✓ 4. Thermostatic Controls.The supply of heating and cooling energy to each zone is controlled by individual thermostatic controls that
respond to temperature within the zone.
Project Title:Tigard Apartments Report date: 09/08/16
Data filename:\\Projects.jetheating.local\Projects\2016\16-0219-TIGARD APTS\1 ENGR\11 SPPT\1 HVAC\Comcheck-Bldg
A5.cck Page 1 of 3
r
Plans reference page/section: ' •• •• • ' • . . . .
• • •• •• • • • • • •
✓ 5. Heat pump supplementary heat.Heat pumps having supplemEg y�lectria resister-lee heat Zane controls that,except during defrost,
prevent supplementary heat operation when the heat pump c2'n fiesct the tfeating'logd. • ••
Plans reference page/section:
• • • ••• • •••
✓ 6. Set point overlap restriction.Where used to control both heating an:co�iag,.zope ternostatic cintrols provide a temperature range
or deadband of at least 5°F(2.8°C)within which the supply of hgatgig aid cooling:nergy;to the apneas capable of being shut off or
reduced to a minimum. • ••• • • ••• '
Plans reference page/section:
••• ••• • • •• ••
✓ 7. Optimum Start Controls.Each HVAC system has controls that vary:he sti t-up,'tirrme pf de systenito9ust meet the temperature set
point at time of occupancy. • • ••• ••• •• • •
•
• ••• • •
Plans reference page/section:
✓ 8. Off-hour controls.Each zone is provided with thermostatic setback controls that are controlled by either an automatic time clock or
programmable control system.
Plans reference page/section:
✓ 9. Shutoff damper controls.Both outdoor air supply and exhaust are equipped with not less than Class I motorized dampers.
Plans reference page/section:
✓ 10.Freeze Protection and Snow melt system controls.Freeze protection systems,such as heat tracing of outdoor piping and heat
exchangers,including self-regulating heat tracing,include automatic controls capable of shutting off the systems when outdoor air
temperatures meet code criteria.
Plans reference page/section: NA
✓ 11.Humidity control.If a system is equipped with a means to add or remove moisture to maintain specific humidity levels in a zone or
zones,a humidity control device is provided.
Plans reference page/section: NA
✓ 12.Humidity control.Where a humidity control device exists it is set to maintain a deadband of at least 10%relative humidity where no
active humidification or dehumidification takes place.
Plans reference page/section: NA
✓ 13.Ventilation.Ventilation,either natural or mechanical,is provided in accordance with Chapter 4 of the International Mechanical Code.
Where mechanical ventilation is provided,the system has the capability to reduce the outdoor air supply to the minimum required by
Chapter 4 of the International Mechanical Code.
Plans reference page/section:
✓ 14.Demand controlled ventilation(DCV).DCV is required for spaces larger than 500 ft2 for simple systems and spaces larger than 150 ft2
for multiple zone systems.
Plans reference page/section:
15.Kitchen hoods.Kitchen makeup is provided as required by the Oregon Mechanical Specialty Code.
Plans reference page/section:
✓ 16.Enclosed parking garage ventilation controls. In Group S-2,enclosed parking garages used for storing or handling automobiles employs
automatic carbon monoxide sensing devices.
Plans reference page/section: NA
✓ 17Air system balancing.Each supply air outlet and zone terminal device is equipped with means for air balancing in accordance with the
requirements of IMC 603.17.Discharge dampers intended to modulate airflow are prohibited on constant volume fans and variable
volume fans with motors 10 horsepower.
Plans reference page/section:
18.Manuals.The construction documents require that an operating and maintenance manual be provided to the building owner by the
mechanical contractor.See long description for specifications.
Plans reference page/section:
✓ 19Allowable fan floor horsepower.Each HVAC system at fan system design conditions does not exceed the allowable fan system motor
nameplate hp(Option 1)or fan system bhp(Option 2)as shown and calulated in requirement details.
Plans reference page/section:
Project Title: Tigard Apartments Report date: 09/08/16
Data filename:\\Projects.jetheating.local\Projects\2016\16-0219-TIGARD APTS\1 ENGR\11 SPPT\1 HVAC\Comcheck-Bldg
A5.cck Page 2 of 3
r
✓ 20AII air-conditioning equipment and air-handling units with direct gtcparipion coaling ad a c.olingcapacitt at ARI conditions greater than
or equal to 110,000 Btu/h that serve single zones have their si pai f�gope,�atf5noi trooled:ccord'ng to cede specific requirements.
••• • • •• • • • •
' Plans reference page/section: NA • • • •• • • ' • • '
•
Section 5: Compliance Statement .;• ••• •'; .; • •:
• •• ••• •• • • •• • •• ••
•
•
•
•
•
•
Compliance Statement: The proposed mechanical design representedaVisiniument jpboftVitent Ajt6 jhe;building plans,specifications
and other calculations submitted with this permit application.The proposed mechanical systems have bee designed to meet the 2014
Oregon Energy Efficiency Specialty Code requirements in COMcheck Version 4.0.4.1 and ti i ply, *,;14,+. he mandatory requirements in the
•
Requirements Checklist. •� •/ ••• • • •
•
•
Jeff Stauffer, PE t0lrj� �' C�. ••• 8 Sept 2016
Name-Title Si%nat r./ / Date
Section 6: Post Construction Complia ce Statement
D HVAC record drawings of the actual installation,system capacities,calibration information,and performance data for each equipment
provided to the owner.
❑ HVAC O&M documents for all mechanical equipment and system provided to the owner by the mechanical contractor.
❑ Written HVAC balancing and operations report provided to the owner.
The above post construction requirements have been completed.
Principal Mechanical Designer-Name Signature Date
Project Notes:
Building 5
Project Title:Tigard Apartments Report date: 09/08/16
Data filename:\\Projects.jetheating.local\Projects\2016\16-0219-TIGARD APTS\1 ENGR\11 SPPT\1 HVAC\Comcheck-Bldg
A5.cck Page 3 of 3