Loading...
10500 SW GREENBURG ROAD-2 • r t, + t w l J 1 4" _•w+WtHWrW.Yir.,: '. - .. caaw...w.rY�4.ww:wa+:www.w+.+W.,Ww -._._-_h.,w;,. ��%aFi`K� '#.'idAf ,.gyri .. - .. . . --_ - - ._.._ y.:ar.i1Y1M4 +iY►+:rriw..... G iiN f w 'c w oa • o i n. � r` • r • .68 40 01 0 SID 04� r � 4-N 03 MAP 1 200�1 f� ' SUITE 100 < w J --- C1 IN 110 lel- R .0TOILET ROOM REN,40DEL : ..1,--- 1.._1_ I ° SUITE 300 v 0 0 c cy 72 .02 10500 SW GREENBURG ROAD AREA of WORK r 0 0 > f C�'Y��Y OF� TIC__ARIA w o a � PORTLAND OREGON cor�itionally ...._�...� j e �� Fo 1ow....».......«... c a G it9 i A , ted...»...».....�1 1 $ o C O /�.- ATermit Wtnrttscr. r W V o eco N ddren BY. 1/,+1 Ik-Ab 1 G Dote: U H a b DEFERRED T)" SUITE 200 Fire Sprinkler �.. f Fire Alarm �'rMncY Load L� Mechanical Conatroo W Typo rf DEMO FLOOR PLAN r/ Plumbing �`� Rated Corridor ity CC1 4" 1'-0- Electrical Enerkv rods Equ- Ogee Truro Engineering A -mosibility i2 Shol+Drawings Other Y � 177- v-1 CPT-1 �r^` . ,. : . � , �W� �� :.•,: , :;: OFFICE COPY P roject 10219 HA .. LUX" PLAZA 5 101 :.t a; ,.. �•. . KEY PLAN WDM 13� NTSFEMODSL 1!6•. nil 12 Ali �4) ),q ` '1 "6� L NOOLN PLAZA 20 10600 aw Q.... 24HALL ..'102 INDEX. OF DRAWINGS 1201 _ , oN 1i 15 10; '•,,';:.'".;::•.' 16 A2.1 INDEX, KEY PLAN, PARTIAL. FLOOR PLAN, REFLECTED CEILING PLAN AND NOTES 19 r OILT 23 R., A8.1 DETAILS � t 202 13 4 B.. . ..W '! 1, 0 3-s SCOPE OF WORK _ �� �,,�.:;�•,����� 6 V­1 Sv-1 r' THE SCOPE OF WORK FOR THE PROJECT INCLUDES INTERIOR TENANT IMPROVEMENTS • • FOR AN APPROXIMATELY '289 SQUARE FOOT TENANT ON THE FIRST FLOOR. ;� � , 0R DESIGN DATA OSSC 2902.3 EXCEPTION 01 OF AVOW ONE RESTROOM EXISTING SQUARE ADDITIONAL TOTAL S.F. EXITS EXITS OCCUPANCY FOR 0 OF FIXTURES FEET TOILET S.F. REQUIRED PROVIDED PLUMBING REQUIRED o GROUP MACKENZIE 2006 •� -- ALL RIGHTS RZSERVED 2 REFLECTED CEILING PLAN 3 ENLARGED TOILET ROOM PLAN SUITE 100 a 1,793 S.F. 134 S. 1,927 S.F. 1 10 OCCUPANTS 1 TOILET REQUIRED THESE DRAWINGS ARE THE PROPERTY GROUP AIACKENZIE AND ARE NOT TO B SUITE 200 a= 1,974 S.F. 155 S.F. 2,129 S.F. 1 2 11 OCCUPANTS 1 TOILET REQUIRED USED OR REPRODUCED IN ANY faANNER WITHOUT PRIOR WRITTEN PERMISSION ALL EXITS ARE EXISTING AND HAVE APPROPRIATE EXIT SIGNAGE REVISIONS: SCHEC�ULE OF TOILET ACCESSORIES NOTES BUILDING 1S FULLY SPRINKLED AND HAS NEPA SMOKE DETECTION THROUGHOUT �< REVISIONS REVISION DELTA _ -- _^- WITH ON SITE EMERGENCY GENERATOR FOR FIRE, LIFE/SAFETY BACKUP POWER � THIS CLOSING DATE wo SHEET G8-1: (,FAB BARS 1. REMOVE EXISTING TOILET PARTITIONS, PLUMBING FIXTURES, ACCESSORIES, FLOOR FINISHES AND RUBBER BASE. DEFE. QED SUBMITTAL BOBRICK SATIN F"�;�ISri, OR EQl;.4l. 2. REMOVE EXISTING DRINKING FOUNTAIN. PTD-1: PAPER TOWEL DISPENSER/DISPOSAL. 3. REMOVE EXISTING CARPET AND RUBBER BASE. OSSC SECTION 106.3.4.1 (by separate permit) BOBRICK 8-3944, OR EQUAL 4. PATCH AND REPAIR EXISTING CORRIDOR AS NEEDED, MATCH EXISTING FINISHES TO BUILDING STANDARD. FIRE SPRINKLER NOTE: DESIGN BUILDERS FOR M.E.P. AND FP. ARE FULLY SCD-1: SEAT COVER DISPENSER do ALARM RESPONSIBLE FOR THE DESIGN OF THESE SYSTEMS/COMPONENTS. BOBRICK 8•-221, OR EOUAI. 5. NEW P-LAM VANITY TOP AND BACKSPLASH, SEE 4/A8.1• MECHANICAL THESE SYSTEMS/COMPONENTS SHOWN ON DOCUMENTS ARE SCHEMATIC � ,-- ' ° TTD-1: TOILET TISSUE DISPENSER 6. NEW FLOORING AND 6 RUBBER BASE, THIS ROOM. ' BOBRICK B-68Fi7, OR EQUAL. 7. NOT USED ELECTRICAL ONLY: THEY ARE NOT INTENDED TO REPRESENT FINAL/CODE 8. NEW P-LAM WAINSCOT TO 4'--0" AFF WHERE INDICATED BY - �- - - PLUMBING COMPLIANT DESIGN. PROVIDE DESIGN DOCUMENT SUBMITTAL. TO NTD-1: NAPKIN DISPOSAL 9. EXISTING 1x4 FLUORESCENT FIXTURE TO REMAIN. ARCHITECT OF RECOP.D FOR REVIEW PRIOR TO SUBMITTAL _ t ti LIQUIDBOBRICK 8-•254, OR EQUAL 10. EXISTING GYP BOARD CEILING TO REMAIN. SHEET TITLE: _ �? '1 LSD-1: LIQUID SOAP DISPENSER 11. NEW BUILDING STANDARD, DISABLED TOILET FIXTURE. ADA IMPROVEMENTS BOBRICK 8226, OR EQUAL 12. NEW GRAB BARS, GB-1, SEF 3/A8.1. _VALUATION F W - $2,500 X �? 13. NEW SOAP DISPENSER, LSD--1, SEE 3/A$.1. � 25X VALUATION OR UPGRADE � =625 PAaTiAI_ Fi..00FI NERAL NOTED' 14. NEW PAPER TOWEL DISPENSER/DISPOSAL. PTD--1, SEE 3/A8.1. _ _ _ 15. NEW BUILDING STANDARD SINK AND FAUCET. ADA UPGRADE REMOVAL OF ALL BARRIERS, UPGRADED MISC. -- - -� HARDWARE AND NEW ADA COMPLIANT TOILET ROOM. PAN AM NOTM x "�• �• ': A. DIMENSIONS REFLECT FACE OF FINISH TO FACE OF FINISH. UNLESS NOTED OTHERWISE. 16. NEW BUILDING STANDARD LIGHT BAR OVER MIRROR AT VANITY. : 17. SEAT' COVER DISPENSER, SCD--I, SEE 3/A8.1. 8. WALL THICKNESS ARE NOMINAL, UNLESS NOTED OTHERWISE. 18. ALIGN NEW WALL WITH EXISTING WALL.. LEGEND 1 C. ALL INTERIOR WALLS TO GO TO UNDERSIDE OF GRID UNLESS NOTED OTHERWISE. 19. NEW TOILET TCSSIJF_ DISPENSER, TTD-1, SFE 3/A9.1. t SEE DETAIL x/A8.1. -- - --- - -- - - r - -------- 20.NEW NAPKIN DISPOSAL, ND-1, SEE 3/AA.1. --•�-_-- ' D. ALL INTERIOR DOORS TO BE SOLID CORE FLUSH WOOD DOORS TO MATCH BUILDING 21. UNFRAMED MIRROR, LENGTH OF COUNTER TO 7' AFF. r.:=? c=== EXISTING CONSTRUCTION TO BE DEMOLISHED DRAWN BY: SAA t STANDARD UNLESS NOTED OTHERWISE. 22• PROVIOE DOOR HARDWARE FOR PRIVACY LATCH INDICATOR. - CHECKED BY: SBH A E. OUTLETS INDICATED ARE NEW UNLESS NOTED OTHERWISE, SITE VERIFICATION HAS BEEN 23.NEW P-LAM VANITY T OP AND BACKSPLASH, SEE 4/A8.1 SIM. EXISTING WALL TO UNDERSIDE OF GRID PERFORMED AND PLAN AND CEILING INFORMATION HAS F�EF:FI UPDATED. 24.PATCH AND REPAIR WALL PROVIDE METAL CAP AT PLUMBING. ; (OBSERVATION IS LIMITED TO VISIBLE/ACCESSIBLE AREAS). CM7RACTOR TQ FIELD VERIFY AND CONFIRM ADDITIONAL REQUIREMENTS WITH 'LEVANT. EXISTI►VG DEMISING WALL TO STRUCTURE ' ' F. LOWER v�oC PAINT SYSTEMS TO BE UTILIZED, ro nvcy.UDE PRIMERS AS WELL INTERIOR FINISH NOTES NEW DEMISING WALL TO STRUCTURE, SEE 1/A8.1 � AS FINISH PRODUCTS. EXISTING ?. HOUR MATED WELL A21 • G. CONFIRM CLgtMT SWITCHING CONFIGURATION. RELOCATE AS REQUIRED. ,A. ALI INTERIOR FINISHES BUILDING STANDARD, COLORS TO BE COORDINATED WITH OWNER. � EXISTING RECESS, � GAN LIGHT H. PATC11 AND REPAIR ALL EXISTING WALLS WHERE AFFECTED BY NEW WORK. _ Q NEIN RECESS&) CAN LIGHT JOB NO. C. PROVIDE NEW PAINT, 8" RUBBER COVED BAS AND SHEET VINYL I.N TOILET ROOMS 102 � 202. ����. 0. PROVIDE 4" RUBBER BASE TO MATCH BUILDING STANDARD AT HALL 101 do 201. EXISTING 1X4 SURFACE E. PAINT EXISTING GYP BOARD CEILINGS THROUGHOUT. --' MOUNTED FLUORESr,F_NT FIXTURE. Mmr '1'S etyJ���M1J111pa-AM.ON Z" O3/n/Oa 0►34 1: M v . .. f1.•1.:1!-•_..w Mw'w1:l.•e _ _ .ter-_.....www+--r.w+.-_..�......._... � .._ ..-..11A.Y. w•N......1M+941V. , .YtP...rM r:_..{].1Ff .':Nt I.iRM4 tF MM r" I I f. 111 sr �ra''Y �► 11� l 1 fit r 14 l l l ri a ♦ a >Y 71 0 i n ..rig, ... n. • r t . , somm • I i ... a4.4 .. . . ,a W . l a , . q i t 0 r i; nw..�...... 1W :tel Sig.iu,iWwNrtdYJdi{tt+fi�&u4trLYtW:•r ra:wl •toutirn'uYi�fY�,fMl�:ti1r••..,'�u" ._MA n.rAWCiw.Wa'awr.. �!— —_ � ,:•. , .. .'..• .,,�q�y...+,,,..:... _ ...,....,r+..rs.a,.uwr.r:.u.,:.ts:cs-,m.:yw,.anya(� -rp,g--. - -- - ----_.. . _ _.._ r rs a� C a WOOD STUDS WITH j" C a t WATER---RESISTANT GYN m METAL DECK AS OCCURS -/�- BD AT TOILET ROOM SIDE r` 4 �. * �,. a OUTLETS r oo N • " DEFLECTION SPACE `a — SWITCHES v .� �(DO NOT FASTEN STUDS P-LAM COUNTER, ENVIRONMENTAL OR GYP BU TO RUNNER) X dt ` � a O n BACKSPASH AND SKIRT CONTROL5 J \`-1' MIN L3 _ — 7 CONT 18 GA METAL. �. ` PLYWU TOP k EDGES M FASTENED TO DECK AT 2'--0' - -- I ( ATTACH W1#10 x 2 .NACCESSORY _ B ACCESSORY D SWITCHES AND OUTLETS v 40 x OC STAB:'GERED n - - �I I I / SCREWS AT 6' OC COUNTER DISABLED PAPER DISABLED TOILET p c c o TOWEL DISPENSER/ SEAT ROVER DISPENSER c c y SINK HEADS • c WASTE RECEPTACLE SCD-1 p ao GYP 6D c \-2X4 AROUND PERIMETER PTD--1 v c FASTEN RUNNER TO q � G EASIDE AT 2 -0 OC " 2X4 AT STL FLAT BAR CL SOUND BATT INSULATiGN AS OCCURS V-O%� 3'-6" • c 0 CUT TAPER-- / o m TYP AT OEMISING WALE z W .• 050 OFF GYP BD - --METAL STUDS 3' u" �c c " AT WALLS --� n ,� WRAP ALL WASTE AND HOT , W : a c N WHICH Rt:CIEVE 'n WATER SUPPLY LINES °i ---CONT ACOUSTIC SEALANT at C vi FLAT BASE A AGAINST TRACK - - - -� -- M CS1 n0 1 Q b E SIDE �. NO SEALA14T AT SIM COND I X 2" FLAT BAR 6" o, 8 LAG SCREWS TO 2X4 _ ' 00 MAX- PROVIDE 2X4 BLOCKING BOTTOM TRACK TO FINISH AS REQUIREDOC - CONCRETE' TYPICAL DISABLED ACCESS STALL -'� FLOOR W/ POWDER DRIVEN r np SLAB I J ANCHORS AT 4'-•-0' OC 0 EquietyOff"I'm 3 i GYP BD PARTITION at METAL DECK I 2 COUNTER DETAIL N FrgORIFq .1 3"s1!-°• .1 1 112--f-0- A�.1 1/4' 1'-0" z � Project LIGHT BAR • PLAZA TOLEr ROOM UNFRAMED MIRROR FEMODB- WITH J--BAR METAL L940OLN PLAZA°p X90 SW GIEENBURG AD. PORTL.AM, OPREX" 2 PLASTIC LAMINATE VANITY A8.1 AND BACKSPLASH v'11 D A j) (03 PLASTIC LAMINATE #411A � N _ END PANEL ORS N DF CI GROUP MACKENZIE 2006 ALL RIGHT; RESERVED THESE DRAWINGS ARE THE PROPERTY OF GROUP MACKENZIE AND ARE NOT TO BE a VANITY' ELEVATION USED OR REPRODUCED IN ANY MANNER, WITHOUT PRIOR WRITTEN PERMISSION �.� 1/20•1'-0' ---------- REVISIONS: �F REYSIONS REVISION DELTA .� TNIS CLOSING DATE G SMEE r SHEET TITLE: DEMLS ,n DRAWN BY: i CHECKED BY: SHEET: A8811 r J08 N0. 202OM-CM PEW WT. 03 �-46 :t(1omaem\Mafia-r,h.ft= MA oa/m/a 1*" 1�, r . .. gMan.:tx�.ltM+tMl+gl,f/.z �•.,.. - --- .. .._...__........�. ...r....—..ter. _.•. .. 'N� . ........,..:t.N9!"Nmn.n lw........r.y .- .....,... ..e.+a.-•-rw•s, �+- '_'^'^ .I.n�.'�"..-- •-_ - - - II I ! ! !1 l! i I I, 1 t 1 ' 1I 1 !1 ! 1r I1 ILII t III II Illl , lllll lII1 I� q Iltq I I II ii Ii ; 1 ! ,. _ , ` Cm �m �O .sego 10 t 1 r2 a 14 !8 17 10 to >�1 8s� >e� � �e 2T 219 Ira 30