10500 SW GREENBURG ROAD-2 •
r
t,
+ t
w
l
J
1
4"
_•w+WtHWrW.Yir.,: '. - .. caaw...w.rY�4.ww:wa+:www.w+.+W.,Ww -._._-_h.,w;,. ��%aFi`K� '#.'idAf ,.gyri .. - .. . . --_ - - ._.._ y.:ar.i1Y1M4 +iY►+:rriw.....
G
iiN
f w
'c w
oa
• o i n. �
r` • r • .68
40
01
0 SID 04� r �
4-N
03 MAP 1 200�1
f�
' SUITE 100 < w
J --- C1 IN 110
lel- R
.0TOILET ROOM REN,40DEL
:
..1,--- 1.._1_ I ° SUITE 300 v 0
0
c cy
72
.02 10500 SW GREENBURG ROAD AREA of WORK r 0 0 >
f C�'Y��Y OF� TIC__ARIA w o a
�
PORTLAND OREGON cor�itionally ...._�...� j e
�� Fo 1ow....».......«... c a G it9
i A , ted...»...».....�1 1 $ o
C
O /�.- ATermit Wtnrttscr. r W V o eco N
ddren
BY. 1/,+1 Ik-Ab 1 G
Dote: U H a b
DEFERRED T)"
SUITE 200 Fire Sprinkler �.. f
Fire Alarm �'rMncY Load
L� Mechanical Conatroo W Typo
rf DEMO FLOOR PLAN r/ Plumbing �`� Rated Corridor ity CC1 4" 1'-0- Electrical Enerkv rods Equ- Ogee
Truro Engineering A -mosibility
i2 Shol+Drawings
Other
Y
� 177-
v-1 CPT-1 �r^` . ,. : . � , �W� �� :.•,: , :;: OFFICE COPY P
roject
10219 HA .. LUX" PLAZA
5 101 :.t a; ,.. �•. . KEY PLAN WDM
13� NTSFEMODSL
1!6•. nil
12 Ali
�4)
),q ` '1 "6� L NOOLN PLAZA
20 10600 aw
Q....
24HALL
..'102 INDEX. OF DRAWINGS
1201
_ , oN
1i 15 10; '•,,';:.'".;::•.' 16 A2.1 INDEX, KEY PLAN, PARTIAL. FLOOR PLAN, REFLECTED CEILING PLAN AND NOTES
19 r OILT 23 R., A8.1 DETAILS � t
202 13 4 B.. . ..W
'! 1, 0 3-s SCOPE OF WORK _ �� �,,�.:;�•,�����
6
V1 Sv-1 r'
THE SCOPE OF WORK FOR THE PROJECT INCLUDES INTERIOR TENANT IMPROVEMENTS • •
FOR AN APPROXIMATELY '289 SQUARE FOOT TENANT ON THE FIRST FLOOR. ;� � , 0R
DESIGN DATA OSSC 2902.3 EXCEPTION 01 OF
AVOW ONE RESTROOM
EXISTING SQUARE ADDITIONAL TOTAL S.F. EXITS EXITS OCCUPANCY FOR 0 OF FIXTURES
FEET TOILET S.F. REQUIRED PROVIDED PLUMBING REQUIRED o GROUP MACKENZIE 2006
•� -- ALL RIGHTS RZSERVED
2 REFLECTED CEILING PLAN 3 ENLARGED TOILET ROOM PLAN SUITE 100 a 1,793 S.F. 134 S. 1,927 S.F. 1 10 OCCUPANTS 1 TOILET REQUIRED THESE DRAWINGS ARE THE PROPERTY
GROUP AIACKENZIE AND ARE NOT TO B
SUITE 200 a= 1,974 S.F. 155 S.F. 2,129 S.F. 1 2 11 OCCUPANTS 1 TOILET REQUIRED USED OR REPRODUCED IN ANY faANNER
WITHOUT PRIOR WRITTEN PERMISSION
ALL EXITS ARE EXISTING AND HAVE APPROPRIATE EXIT SIGNAGE REVISIONS:
SCHEC�ULE OF TOILET ACCESSORIES NOTES BUILDING 1S FULLY SPRINKLED AND HAS NEPA SMOKE DETECTION THROUGHOUT �< REVISIONS REVISION DELTA
_ -- _^- WITH ON SITE EMERGENCY GENERATOR FOR FIRE, LIFE/SAFETY BACKUP POWER � THIS CLOSING DATE
wo SHEET
G8-1: (,FAB BARS 1. REMOVE EXISTING TOILET PARTITIONS, PLUMBING FIXTURES, ACCESSORIES, FLOOR
FINISHES AND RUBBER BASE. DEFE. QED SUBMITTAL
BOBRICK SATIN F"�;�ISri, OR EQl;.4l. 2. REMOVE EXISTING DRINKING FOUNTAIN.
PTD-1: PAPER TOWEL DISPENSER/DISPOSAL. 3. REMOVE EXISTING CARPET AND RUBBER BASE. OSSC SECTION 106.3.4.1 (by separate permit)
BOBRICK 8-3944, OR EQUAL 4. PATCH AND REPAIR EXISTING CORRIDOR AS NEEDED, MATCH EXISTING FINISHES TO BUILDING STANDARD. FIRE SPRINKLER NOTE: DESIGN BUILDERS FOR M.E.P. AND FP. ARE FULLY
SCD-1: SEAT COVER DISPENSER do ALARM RESPONSIBLE FOR THE DESIGN OF THESE SYSTEMS/COMPONENTS.
BOBRICK 8•-221, OR EOUAI. 5. NEW P-LAM VANITY TOP AND BACKSPLASH, SEE 4/A8.1• MECHANICAL THESE SYSTEMS/COMPONENTS SHOWN ON DOCUMENTS ARE SCHEMATIC � ,--
' ° TTD-1: TOILET TISSUE DISPENSER 6. NEW FLOORING AND 6 RUBBER BASE, THIS ROOM.
' BOBRICK B-68Fi7, OR EQUAL. 7. NOT USED ELECTRICAL ONLY: THEY ARE NOT INTENDED TO REPRESENT FINAL/CODE
8. NEW P-LAM WAINSCOT TO 4'--0" AFF WHERE INDICATED BY - �- - - PLUMBING COMPLIANT DESIGN. PROVIDE DESIGN DOCUMENT SUBMITTAL. TO
NTD-1: NAPKIN DISPOSAL 9. EXISTING 1x4 FLUORESCENT FIXTURE TO REMAIN. ARCHITECT OF RECOP.D FOR REVIEW PRIOR TO SUBMITTAL _
t ti LIQUIDBOBRICK 8-•254, OR EQUAL 10. EXISTING GYP BOARD CEILING TO REMAIN. SHEET TITLE: _
�? '1 LSD-1: LIQUID SOAP DISPENSER 11. NEW BUILDING STANDARD, DISABLED TOILET FIXTURE. ADA IMPROVEMENTS
BOBRICK 8226, OR EQUAL 12. NEW GRAB BARS, GB-1, SEF 3/A8.1. _VALUATION F W - $2,500
X
�? 13. NEW SOAP DISPENSER, LSD--1, SEE 3/A$.1. � 25X VALUATION OR UPGRADE � =625 PAaTiAI_ Fi..00FI
NERAL NOTED' 14. NEW PAPER TOWEL DISPENSER/DISPOSAL. PTD--1, SEE 3/A8.1.
_ _ _ 15. NEW BUILDING STANDARD SINK AND FAUCET. ADA UPGRADE REMOVAL OF ALL BARRIERS, UPGRADED MISC.
-- - -� HARDWARE AND NEW ADA COMPLIANT TOILET ROOM. PAN AM NOTM
x "�• �• ': A. DIMENSIONS REFLECT FACE OF FINISH TO FACE OF FINISH. UNLESS NOTED OTHERWISE. 16. NEW BUILDING STANDARD LIGHT BAR OVER MIRROR AT VANITY.
: 17. SEAT' COVER DISPENSER, SCD--I, SEE 3/A8.1.
8. WALL THICKNESS ARE NOMINAL, UNLESS NOTED OTHERWISE. 18. ALIGN NEW WALL WITH EXISTING WALL.. LEGEND
1
C. ALL INTERIOR WALLS TO GO TO UNDERSIDE OF GRID UNLESS NOTED OTHERWISE. 19. NEW TOILET TCSSIJF_ DISPENSER, TTD-1, SFE 3/A9.1. t
SEE DETAIL x/A8.1. -- - --- - -- - - r - --------
20.NEW NAPKIN DISPOSAL, ND-1, SEE 3/AA.1. --•�-_-- '
D. ALL INTERIOR DOORS TO BE SOLID CORE FLUSH WOOD DOORS TO MATCH BUILDING 21. UNFRAMED MIRROR, LENGTH OF COUNTER TO 7' AFF. r.:=? c=== EXISTING CONSTRUCTION TO BE DEMOLISHED DRAWN BY: SAA t
STANDARD UNLESS NOTED OTHERWISE.
22• PROVIOE DOOR HARDWARE FOR PRIVACY LATCH INDICATOR. - CHECKED BY: SBH A
E. OUTLETS INDICATED ARE NEW UNLESS NOTED OTHERWISE, SITE VERIFICATION HAS BEEN 23.NEW P-LAM VANITY T
OP AND BACKSPLASH, SEE 4/A8.1 SIM. EXISTING WALL TO UNDERSIDE OF GRID
PERFORMED AND PLAN AND CEILING INFORMATION HAS F�EF:FI UPDATED. 24.PATCH AND REPAIR WALL PROVIDE METAL CAP AT PLUMBING. ;
(OBSERVATION IS LIMITED TO VISIBLE/ACCESSIBLE AREAS). CM7RACTOR TQ FIELD
VERIFY AND CONFIRM ADDITIONAL REQUIREMENTS WITH 'LEVANT. EXISTI►VG DEMISING WALL TO STRUCTURE '
' F. LOWER v�oC PAINT SYSTEMS TO BE UTILIZED, ro nvcy.UDE PRIMERS AS WELL INTERIOR FINISH NOTES NEW DEMISING WALL TO STRUCTURE, SEE 1/A8.1
� AS FINISH PRODUCTS. EXISTING ?. HOUR MATED WELL A21 •
G. CONFIRM CLgtMT SWITCHING CONFIGURATION. RELOCATE AS REQUIRED.
,A. ALI INTERIOR FINISHES BUILDING STANDARD, COLORS TO BE COORDINATED WITH OWNER. � EXISTING RECESS, � GAN LIGHT
H. PATC11 AND REPAIR ALL EXISTING WALLS WHERE AFFECTED BY NEW WORK. _
Q NEIN RECESS&) CAN LIGHT JOB NO.
C. PROVIDE NEW PAINT, 8" RUBBER COVED BAS AND SHEET VINYL I.N TOILET ROOMS 102 � 202. ����.
0. PROVIDE 4" RUBBER BASE TO MATCH BUILDING STANDARD AT HALL 101 do 201. EXISTING 1X4 SURFACE
E. PAINT EXISTING GYP BOARD CEILINGS THROUGHOUT. --'
MOUNTED FLUORESr,F_NT FIXTURE. Mmr
'1'S
etyJ���M1J111pa-AM.ON Z" O3/n/Oa 0►34 1:
M v
. .. f1.•1.:1!-•_..w Mw'w1:l.•e _ _ .ter-_.....www+--r.w+.-_..�......._... � .._ ..-..11A.Y. w•N......1M+941V. , .YtP...rM r:_..{].1Ff .':Nt I.iRM4 tF MM
r" I I
f. 111
sr �ra''Y
�► 11� l 1 fit r 14 l l l ri a ♦ a >Y
71
0
i
n
..rig, ... n.
•
r
t
. ,
somm
• I i ... a4.4
.. . .
,a
W .
l a
,
. q
i
t
0
r
i;
nw..�......
1W
:tel Sig.iu,iWwNrtdYJdi{tt+fi�&u4trLYtW:•r ra:wl •toutirn'uYi�fY�,fMl�:ti1r••..,'�u" ._MA n.rAWCiw.Wa'awr.. �!— —_ � ,:•. , .. .'..• .,,�q�y...+,,,..:... _ ...,....,r+..rs.a,.uwr.r:.u.,:.ts:cs-,m.:yw,.anya(� -rp,g--. - -- - ----_.. . _ _.._
r
rs a�
C a
WOOD STUDS WITH j" C a
t
WATER---RESISTANT GYN m
METAL DECK AS OCCURS -/�- BD AT TOILET ROOM SIDE r`
4 �. * �,.
a OUTLETS r oo N •
" DEFLECTION SPACE `a — SWITCHES v .�
�(DO NOT FASTEN STUDS P-LAM COUNTER, ENVIRONMENTAL
OR GYP BU TO RUNNER) X dt ` � a
O n BACKSPASH AND SKIRT CONTROL5 J
\`-1' MIN L3 _ —
7 CONT 18 GA METAL. �. ` PLYWU TOP k EDGES M
FASTENED TO DECK AT 2'--0' - -- I ( ATTACH W1#10 x 2 .NACCESSORY _ B ACCESSORY D SWITCHES AND OUTLETS v 40
x OC STAB:'GERED n - - �I I I / SCREWS AT 6' OC COUNTER DISABLED PAPER DISABLED TOILET p c c o
TOWEL DISPENSER/ SEAT ROVER DISPENSER c c y
SINK HEADS • c
WASTE RECEPTACLE SCD-1 p ao
GYP 6D c \-2X4 AROUND PERIMETER PTD--1 v c
FASTEN RUNNER TO
q � G
EASIDE AT 2 -0 OC
" 2X4 AT STL FLAT BAR CL
SOUND BATT INSULATiGN AS OCCURS V-O%� 3'-6" • c 0
CUT TAPER-- / o m
TYP AT OEMISING WALE z W .• 050
OFF GYP BD - --METAL STUDS 3' u" �c c "
AT WALLS --� n ,� WRAP ALL WASTE AND HOT , W : a c N
WHICH Rt:CIEVE 'n WATER SUPPLY LINES °i
---CONT ACOUSTIC SEALANT at C vi
FLAT BASE A AGAINST TRACK - - - -� --
M CS1 n0 1 Q b
E SIDE
�. NO SEALA14T AT SIM COND I X 2" FLAT BAR
6" o, 8 LAG SCREWS TO 2X4 _ '
00 MAX- PROVIDE 2X4 BLOCKING
BOTTOM TRACK TO FINISH AS REQUIREDOC -
CONCRETE'
TYPICAL DISABLED ACCESS STALL
-'� FLOOR W/ POWDER DRIVEN r np
SLAB I J ANCHORS AT 4'-•-0' OC 0 EquietyOff"I'm
3
i GYP BD PARTITION at METAL DECK I 2 COUNTER DETAIL N FrgORIFq
.1 3"s1!-°• .1 1 112--f-0- A�.1 1/4' 1'-0"
z �
Project
LIGHT BAR
• PLAZA
TOLEr ROOM
UNFRAMED MIRROR
FEMODB-
WITH J--BAR METAL
L940OLN PLAZA°p X90 SW GIEENBURG AD.
PORTL.AM, OPREX"
2 PLASTIC LAMINATE VANITY
A8.1 AND BACKSPLASH v'11 D A j)
(03
PLASTIC LAMINATE #411A �
N _ END PANEL
ORS
N
DF
CI GROUP MACKENZIE 2006
ALL RIGHT; RESERVED
THESE DRAWINGS ARE THE PROPERTY OF
GROUP MACKENZIE AND ARE NOT TO BE
a VANITY' ELEVATION USED OR REPRODUCED IN ANY MANNER,
WITHOUT PRIOR WRITTEN PERMISSION
�.� 1/20•1'-0' ----------
REVISIONS:
�F REYSIONS REVISION DELTA
.� TNIS CLOSING DATE
G SMEE r
SHEET TITLE:
DEMLS
,n
DRAWN BY:
i
CHECKED BY:
SHEET:
A8811
r
J08 N0.
202OM-CM
PEW WT. 03 �-46
:t(1omaem\Mafia-r,h.ft= MA oa/m/a 1*"
1�, r
. .. gMan.:tx�.ltM+tMl+gl,f/.z �•.,.. - ---
.. .._...__........�. ...r....—..ter. _.•. .. 'N�
. ........,..:t.N9!"Nmn.n lw........r.y .- .....,... ..e.+a.-•-rw•s, �+- '_'^'^ .I.n�.'�"..-- •-_ - - -
II I ! ! !1 l! i I I, 1 t 1 ' 1I 1 !1 ! 1r I1 ILII t III II Illl , lllll lII1 I� q Iltq I I II ii Ii ; 1 ! ,. _ , `
Cm
�m �O .sego 10 t 1 r2 a 14 !8 17 10 to >�1 8s� >e� � �e 2T 219 Ira 30