Loading...
Report bbd � �- 1315-3 5 !°Cv 9*t Gtr , DAILY FIELD REPORT FOR STRUCTURAL WELDING ACS Testing Inc. ?4Q9 SW Tech Center Dr.Ste. 145 sP17Aff Tigard,OR.97223 rr+rxrrr. Date: 10-20-16 ACS Job#51 680599 Fax:503-620-2748 avis TNIV XI;� INC Permit#: N/A S044 .3799 Inspection type: CONTINUOUS PO#6312 IMPERIAL.STEEL CRAFT,INC@ IMPERIAL STEEL CRAFT,INC 5455 SE ALEXANDER Is this a re-inspection? ❑yes W1 No 5455 SE ALEXANDER HILLSBORO,OR 97123 Weld Process Used: FCAW-G HILLSBORO,OR 97123 ' If Continuous Inspection performed,complete the following INSPECTOR:Jerry Frampton Cert#OBOA 859 Volts/Amps Monitored? V✓ Yes [-IN. ❑NA Pre-Heat Monitored? ✓❑Yes ❑No ❑NA Reviewed prior inspection reports: Yes No NA z Yes P � p �✓ Joint Assembly Verified? ✓ No FINA Approved plans available: ❑f Yes No NA Interpass temps checked per WAS? z Yes [IN, ❑NA QA Manual Reviewed: o Yes No NA Rebar welding? ❑Yes ONo [:INA MTR's Randomly reviewed: Ir l Yes No NA CE below.55%? 1:1 Yes [:]No Rebar size and grade? Size(s)# ASTM: Welder Certification Verified: ❑Z Yes E] No F] NA RE-WORK NEEDED ❑Yes allo WPS verified: © Yes F] No F] NA Electrodes per WPS used? 0 Yes n No [:] NA NCR/Notes/Conditions: N/A Seismic Inspection F1 NA Electrode: E71T-1 Continuity Plates ✓Yes ❑No Frame: BRACE FRAME K Zone checked oYes ❑No Other: MT Required? [:]Yes W✓No b° i Location of Inspection? ❑On Site oFab.Shop Fab Shop IMPERIAL STEEL CRAFT,INC. Type of Weld(s): Full Pen&Fillet tiN The following was noted: ACS representative at fabrication shop for continuous visual inspection of CJP groove welds for braced frame connection assemblies numbers 1 and 2. This work is per detail 10/1.1,no revisions. Picture 1 Picture 2 All fabrication of the mentioned pieces was completed and meets the minimum requirements of AWS D1.1 section 6,visual inspection requirements. No issues noted. NON-DESTRUCTIVE TESTING [-]NA a UT a MT n PT If NDE is required there will be a separate report attached. Foreman notified of nonconformance items? ❑Yes n No aNA Foremans Name: Pieces noted in box above unless ayes noted otherwise meet the minimum Reviewed aLe mzffaate:10-21-2016 visual requirements of AWS DI.1 Section 6 ❑No 05rh Bob Brown,President Int. BB/JF CC; VinceGallina { Visual Inspectors are in compliance with ACS Testing's Written Practice.