9055 SW EDGEWOOD STREET ADDRESS:
9
i \records\microflm\targets\building.doc
CITY OF TIGARD BUILDING INSPECTION NOTICE ,
Inspection Lire: 639-4175 Business Phone' 639-4171
Footing Rain Drain Cover/Service FINAL:
Foundation Water Line Ceiling -Plumb.
Post/Beam Mech. Shear/Sheath Framing -Meeh.
Plbg.Und/Flr/Slab Plbg. Top Out Insulation -Elect.
Post/Beam Struct. Mech. Rough-in Gyp. Bd Bld�i
San. Sewer Gas Line Appr/Sdwlkns.
Other: —
Date. A. P.M.. Entry: _
r-.
Address:
Tenant: --- —— — S — MST: D y3
/
BUR
Con/ vnA_ 4-tt OZU�C)c,�� MEC:
PLM:
ELC: _THE FOLLOWING CORRECTIONS ARE REQUIRED ELR:
InspectorDate:��
___APPROVED ___DISAPPROVED/CALL FOR REINSP. CF CO
CITY OF TIGARD BUILDING INSPECTION NOTICE
Inspection Line (Rec-O-Phone): 639-4175 Business Phone: 639-4171
,\
Inspection:
Footing Susp. Ceiling Sprink. Rough-in Appr/Sdwik
Foundation Plbg. Underslab Mech. Rough-in Fireplace
Post/Beam Struct, Plbg. Top Out Elec. Rough-in FINAL:
Post/Beam Mech. San. Sewer Gas Line -Bldg.
Plbg. Underfloor Rain Drain Framing -Plumb.
Alarm Water Line Insulation
-Mech.
Underflr. Insul. Shear Wall Gyp. Bd.
/ -Elect.
Date Requested; / Time: AM'— PM
Address: fj 4j t:L 1
Duilder: —
-. L
Permit #: J
FlTHE FOLL NGCORQUI D:
~-r<•
r�
Inspector:
\ ` Date �
xAPPROVED DISAPPROVED APPROVED SUBJECT TO ABOVE
__Call For Reinsp. -? G
Com'
CITY OF TIGAR UILDING INSPECTION NOVICE
Inspection Line (Rec-O-Phone): 639-4175 Business Phone: 639-4171
Inspection:_ c
Footing Susp. Ceiling Sprink. Rough-in Appr/Sdwlk
Foundation Plbg. Underslab Mech. Rough-in Fireplace
Post/Bearn Struct. Plbg. Tno Out Elec. Rough-in �� FINAL:
Post/Beam Mech. ;an. Sewer Gas Line -Bldg.
Plbg. Underfloor Rain Drain Framing -Plumb.
Alarm Water Line Insulation -Mech.
Undertlr. Insul. Shear Wall Gyp. Bd. -Elect.
Date Requested. �1 Time:!_AM 2,' Li'M
G
Address:
Builder. `J Permit # '57 Oe2
THE FOLLOWING CORRECTIONS ARE REQUIRED:
i iJ� l i�S v L it ns� AV)
Inspector:. Date:__
_APPROVED `T"APPROVED _APPROVED SUBJECT TO ABOVE
_1417all For Reinsp.
"77Z:4 r.-arz.- c c/1 t-„ r r7Z" plc-crN c.
February 1, 1996 CITY OF TIGARD
OREGON
OTT, GARETH S ANNE
9055 SW EDGEWOOD
TIGAR.D,OR 97223
Re: PERMIT#MST93-0432 at 09055 SW EDGEWOOD ST
Inspection(s)have been conducted on this project. However, we have no record of any subsequent
or final inspections within the past 180 days.
Please note that permits become void if there has not been an inspection performed for over 180
days. In that case,the Building Division may require a new application and fees to continue work.
The City may also pursue civil enforcement if work has proceeded without inspections or if an
unfinished project is outstanding.
Please advise the Building Division, IN WRITING, within 15 days, regarding the status of this
project. You may request additional time to complete the project.
Respond, IN WRITING, to: Building Division, 13125 SW Hall Blvd., Tigard OR 97223. Be
sure to include the following information:
1. Permit#.
2. Address of property.
3. Your name.
4. Your day time phone number.
If you are ready to schedule your next inspection please call our 24-hour Inspection Recorder
at 639-4175. Please call the Building Division at 639-4171 for information regarding the next
inspection you require.
13125 SW Hall Blvd., Tigard, OP 97223 (503) 639-4171 TDD (503) 684-2772
LN-.5 CTION NO ICE
City of Tigard Building Department
13125 SII Ball Blvd. Tigard, Oregon 97223
Inspection Line (Rec-O-Phone): 639-4175 Business Phone: 63 171
Inspection:
Footing Plbg. Underslab Mech. Rough-in Appr/Sdwlk
Found. Plbg. Top Out Gas Line FINALi
Pcet/Beam Struct. ,an. Server Frmming -Bldg.
Poet:/Beam Mech. Rain Drain Insulation _plumb.
Plbg. Underfloor Nater Une gyp: Bd.' -Mech.
Date Requested: ����/ o Tlmef AM PN
Address:_ C�l/� [wwLYl w 17f�rJl Permit tt11L '73
Aud iMr f v TT
TNR FOLLOWING OOMNCTIONS ARE REQUIRED:
----------------------------
Inspector: -
---- Dates
ROVED __— DISAPPROVED -- APPROVED SUBJECT TO ABOVE
Cail For Reinsp.
INSPECTION NOTICE
City or Tigard Building Department
13125 St Hall Blvd_ Tigard, Oregon 97223
Inspection Line (Rec-O-Phone)z 639-4175 Business Phone: 639-4171
Inspection: -- --._---- _--- --
Footing Plbg. Underslab Mach. Rough-in Appr/Sdwlk
Found. Plbg. Top Out Gas Line FINAL:
Post/Beam Struct. San. Sewer Framing -Bldg.
Post/Beam Mach. Rain Drain Inlftil6fiya Plumb.
Plbg. Underfloor Nater L sW Gyp. Bd. -Me
Date Requested: Time: AM PH
Addreae: Permit #:
Builder:
THE FOLLOWING CORRECTIONS ARE REQUIRED:
Inspectors 4-N Date:_ _ l r
APPROVED DISAPPROVED APPROVED SUBJECT TO ABOVE
Call For Reinsp.
U-tv e W—
------------ --I
INS ECP ON NOTICE lav
City of Tigard Building DepsrtwnDnt
13125 8% Ball Blvd. Tigard, ciregon 97223
Inspection Line (Rec-O-Phone 639-4 175 Businesrt Phxne: 639•-4171
Inspecticnr_ �� C� —- _ --
Footing Plbg. Underalab ^Hoch.ugh-in Appr/Sdwlk
Pound. Plbg. Top out � .s Line FINAL:
— t San. Sewer raming 1 -Bldg.
Post/Beam Hach. Rai.. Drain Insulation -Plumb.
Pibg. Underfloor Ns�ter Line Gyp. Rd. -Hoch.
Date Requested. 06/ Tlms� AN PN
Address.
Builder: -+-
TRE FOLLOWING cTIOHS ARE REQUIRED: C1
Inspecto
V-/—APPPDM DISAPPROVED APPROVED SUBJECT TO ABOVE
_--_Call For Reinap.
Igo PECTTION NOTICE
City of Tigard Building Departws&t
13125 SM Ball Byrd. Tigard, Oregon 97223
InspectionLine (Rec-tO-Phnone)t 639-4175 Business Phone: 639-4171
Inspection, --
Footing Plbg. Undernlab Hoch. Rough-in Appr/Sdwlk
Found. Plbg. Top Out Gas Line FINAL:
Post/Beam Struct. San. Sewer Framing -Bldg.
Post/Beam Hoch. Rain Drain Insulation -Plumb.
Plbg. Underfloor Nater Line Gyp. R1. -Much.
To
C y^
Date Requested: j — 1 �� Tom: 71M -PN
Y �Jy�
At'.1resa: �Q �� J �-�IP Permit bs Vq
Builder:__ ---
THE FOLLOWING OORRECTIONS ARE REQUIRED:
Inspectors _ `✓' V Date: —cl 4
APPROVED DTSAPPROV6D APPROVED SUBJECT TO ABOVE
Y _call For Reinsp.
11P--
2-312S
Cit7 Of Tigard Building Dopa
` 13125 Bw nail Blvd. Tigard, Oregoe 9
C" Inapec-tion Lino (Rec-o-Phone): 639_4175 Buaineas Phone: 639-4.171
Impact ion:
Footing Plbg. Onderelab Mech. Rough-in ApP r/Sdwlk
Found. Plbg. Tcp out Gas Line
FINAL:
Post/Beam Atsru �7 San. Sower Framing -Bldg.
Post Beam ueoh. Rain Drain Insulation
-Plumb.
Mg. Underfloor Nater Lina Gyp. Rd. -Mach.
Date Requestedt —c.,4 U
Tim$ AM pK
r 1 1pp � Q
Address n')�) �- ! .s lr-:i,nl f -3
� . Po1 1
Builder4_ L \OCo Zo Z (0 }fyh
TUX FOLLUHIW� ODRRaCTiONS ARs RBoIRsot l��*CI a�{ ✓ `� (,�k
Inspectors
_ --------�r— ,.� Date:
PROVED �� DISAPPROVED 4_ APp.,k("D SUWSCT To ABOVE
Call For Rainep.
City of Tigard Building Department
k3135 80 Hall Blvd. Tigard, Orman 97
inspection Line (Rer_-O-Phone)1 639-4175 Busines■ h 639-4171
Inspection$
�ftoPlbg. Underslab Mech. Rough--in Appr/Sdwlk
OU . Plbq. Top Out. Gas Line 11MALt
Post/Beam Struct. San. Sewer Framing -Bldg.
?coat/Baum Mech. Rain Drain InsulitLon -Plumb.
Plbq. Underfloor water I.i.ne Gyp. Bd. -Mach.
Date Recpiestedt J 1 `� Tisiet AK pK
Addceaat 166.. ��
Vomit 0I MS1- �?3 0-f 3?--
THE FOLLOWING CORREC"10148 WU RVQ1YIRED,
Inspector: —��_— Dates
/L� _ --1_
— APPROVED DISAPPRnVRn APPROVED SUBi1tCI TO AHlri/R
Call For Reinsp.
1NSP c�t�OAo, U
city of Tigard Building Departarsnt
]3125 s11 Ball Elvd. Tigard, Oregon 97223
inspection Line (Rec-O-Phones )"9 175 Business Phones 639-4171
Inspections
Tooting PIbg. Underslab Mach. Rough-in a Appr/Sdwlk
FounR. Plbg. Top Out Gas Line FINAL%
Post/Steam Struct. San. Sower Framing -Bldg.
Post/Beam Much. Rain Drain Insulation -Plumb.
Plbg. OrArrfloor Nater Line Oyp. Bd. -Mach.
i
Date Requesteds_ �____TisaeI
t..�
Addrssss Permit is 0 /32'
c <
guilders NcyrLe
THE FOLLOWING CORRECTIONS ARZ REQOIREDs /„/O �_ � q3
Z1.1-4107 _401
Inspectors) . s _ _ Dates
APPROVED nISAPPROVEn APPP.OVED SDBJZCT TO ABOVR'
Call For Reinmp.
r�
CITY' OF TIGARD
COMMUNITY DEVELOPMENT DEPARTMENT
13125 SYi Hall Blvd,Tigard,Oregon 97223.8199 (503)039-4171
,i Wmit it tssuea 5ugf.: t;, tfli
,e-d Awicipa Cede, Stitt of Ure.
.iirdhle lal's hit hark will be date :n arCordArcr 4ith appltwea Pott/Beam bI ct, Nui ].r; , r
am. Ins pet-oll wil: expire la "04 i5 hat :tarter Aithin let Pva Idb*&14 mp":hiq ti Ero51 oy-
vs of issuanck, or it iscro is tuspr ir,,p f;r-a'•J
1
at I
"t LA
CITY OF TIGARD — RECEIPT OF PAYMENT RECEIPT NO. 4, P,41-511 6
CHECK AMOUNT i.::ST. 613
NAME OTT CASH AMOUNT 111. 00
ADDRESS a 9055 SW EDGEWOOOD PAYMENT DATE 08/10/93
TIGARD, OR SUBDIVISION
97223—
,URPOSF. OF PAYMENT AMOUNT PWD PURPOSE OF PAYMENT AMOUNT PAID
UILDING PERM MST93--0432 233. F,15 MEFH6NiCAL- PE 25. 00
'T. BUILD PER 12. C)3 PLAN CHECK FE 16. 25
OTAL AMOUNT PAID 287. 68
144
i
CITY G TIG"D 13123 SWN.b°'V& PLNCI(/RECT N
PERMIT 0 �ff 3.- Gc(31---
COMMUNITY DEVELOPMENT DEPARTMENT � oi
(5W�)630�•"71" DATE ISSUED
JOB ADDRESS: -04V J .`�". �L)�0� TAX MAP/LOT 5/O Z DG OS 9
SUB: F�QL A LOT: /2- LAND UFE:
VALUATION: 7✓��-
OWNER h �CIIAL NOTES
NAME: � 13—�E-T�1 �° 01 ) REISSUE OF:
ADDRESS:
LAST REISSUE:
_j �, � � ��,� -
'� RS172, FLOOD PLAIN/
PHONE: Z U+'� �` SENSITIVE LAND:
CONIRACTOR APPROVALS REOUIREO
NAME: (_.¢ p/LJ PLANNING: _
ADDRESS: ENGINECRINC: _
FIRE DEPT:
PHONE: OTHER:
CONTR. BOARD 0: EXP DATE:
IT S REQUIRED
SUBCONTRACTORS: PLUMB: _ LIST/SUBCONTRACTORS:
MECH: BUS TAX:
ARCH/ENGINEER CALCULATIONS:
NAME: TRUSS DETAILS:
ADDRESS: OTHER:
PHONE:
PROPOSED BLDG. USE:
COMMENTS: , + .{ 170 o' Q Z XY Z
A CAN SIGNATURE
PERMIT k ACCT # DESCRIPTION AMOUNT AMOUNT PD. BAL. DUE
M5f 3og3z. 10-432 00 Cuilding Permit Fees C>7-77r-V c9 33. i-V
10-431 00 Plumbing Permit Fees
_ I0-431 01 Mechanical Permit Fees
10-230 01 State Building Tax (5x)
Building
Plumbing
Mechanical
10-433 00 Plans Check Fee / 03 BO 'S
Building /
Plumbing
Mechanical �!C�
10-230 06 Fire
30-202 00 Sewer Connection
30-444 00 Sewer Inspection
25-448-02 Commercial TIF Fees
25-448-04 Industrial TIF Fees !_ _
25-448-06 Institutional TIF fees
25-448-03 Office 1 (F Fees
25-448-LI Residential Traffic Fees
25-448-05 Mass Transit TIF Fees
52-449 00 Parks System Dev Charge (PDC;
31-450 00 Storm Drainage Syst Dev Chrg
(SSDC)
24-445-01 Water Quality (Fee in lieu of)
24-445-02 Slater Quantity (Fee in lieu of)
TOTAL
l
nm/3587P.WPF
Permit No:
Address:
I
zl Issued by:__---_--- Date:
. ----..—_..--._FOR OFFICE USE ONLY------
STATEMENT:
INFORMATION NOTICE TO PROPERTY OWNERS
ABOUT CONSTRUCTION RESPONSIBILITIES
Note: Oregon Law, ORS 701.055(4) , requires residential construction permit
applicants who are not registered with the Construction Contractors Board to
sign the following statement before the building permit can be Issued.This state-
ment is required for residential building, electrical, mechanical, and plumbing
permits. Licensed Architect and Engineer applicants, exempt from registration
under ORS 701.010(7), need not submit this statement. This statement will be
filed with the permit.
Fill in the applicable blanks, and initial boxes 1 and 2, and either box 3A or 3B:
1 . I own, reside in, or will reside in the completed structure.
2. 1 1 understand that I rnust register as a construction contractor if the structure is sold
or offered for sale before or upon completion.
3. A. 7 My general contractor is
Contractor registration number_____
I will instruct my general contractor that all subcontractors who work on the struc-
ture must be registered with the Construction Contractors Board.
OR
3. B.( , `I I will be my own general contractor.
!f I hire subcontractors, I will hire only subcontractors registered with the Construc.
tion Contractors Board. If I change my mind and do hire a general contractor. I will
contract with a contractor who is registered with the Construction Contractors Board
and I will immediately notify the office issuing this building permit of the name of
the contractor.
I hereby certify that the above Information is correct and that I have read ani- anderstand
the Information Notice to Property Owners about Construction Responsibilities on the
reverse side of this form_.
Sign Aure4-0111"ermit Applicant Date
CONSTRUCTION CONTRACTORS BOARD
0244) 8/91
WHITE COPY TO ISSUING AGENCY PERMIT FILE
PINK COPY TO APPLICANT
INFORMATION NOTICE TO PROPERTY OWNERS
ABOUT CONSTRUCTION RESPONSIBILITIES
fNOTE: This Information Notice to Property Owners About Construction Responsibiflties
was developed by the Construction Contractors Board in accordance with ORS 701.055(5),
passed by the 1989 Oregon Legislature.
If you are acting as your own contractor to construct a new home or make a substantial improvement to an
existing structure, you can prevent many problems by being aware of the following responsibilities and areas
of concern.
EMPLOYER RESPONSIBILITIES:
If you hire persons not registered with the Construction Contractors Board to do labor in constructing or assisting
in the construction or improvement of a residential structure, you will, in most instances, be ruled to be an
"employer" and the people you hire will be ''employees". As the employer, you must comply with the following:
Oregon's Withholding Tax Law. As an employer, you must withhold income taxes from employee wages at
the time employees are paid. You will be.liable for the tax payments even if you don't actually withhold the
tax from your employees. For more info•mation, call the Oregon Department of Ravenue at 378-3390.
Unemployment Insurance Tax_ As an employer, you are required to pay a tax for unemployment insurance
purposes on the wages of all employees. For more information, call the Oregon Employment Division DHR
at 378-3224.
Workers' Compensation Insurance: As an employer, you are subject to the Oregon Workers' Compensation
Law, and must obtain workers' compensation insurance for your employees. If you fail to obtain workers'
compensation insurance, you may be subject to penalties and will be liable for all claim costs if one of your
employees Is injured on the job For more information, call the Workers' Compensation Division DIF at 373-7434.
U.S_ Internal Revenue Service. As an employer, you must withhold federal income tax from employees'wager.
You will be liable for the tax payment even if you didn't actually withhold the tax. For more information, call
the Internal Revenue Service at 221-3960.
OTHER RESPONSIBILITIES AND AREAS OF CONCERN:
Code Compliance: As the permit holder for this project, you are responsible for re6olving any failure to meet
code requirements that may be brought to your attention through inspections.
Liability and PropeDamage Insurance: Contact your insurance agent to see if you have adequate insurance
coverage for accidents and omissions such as falling tools, paint overspray, water damage from pipe punc-
tures, fire, or work that must be re-done.
Time to Supervise Employees- Make sure you have sufficient time to supervise your employees.
Expertise: Make sure you have the expertise to act as your own general contractor, to coordinate the work
of rough-in and finish trades, and to notify building officials at the appropriate times so they can perform
the required inspections.
If you have additional questions, write to: Construction Contractors Board
700 Summer St. NE, Suite 300
Salem, OR 97310-0151
Phone 503-376-4621
0244J 10124M
CITY OF TIGARD RECEIPT OF PAYMENT RECEir-r NO. :93-242866 t
(CHECK, AMOUNT 151. 78
Ame a OTT, GARETH S CASH AMOUNT 0. 00
I)DRESS 9055 SW EDGEWOOD PAYMENT DATE c 08/03/93
TIGARD, OR SUBDIVISION
URPOSE OF PAYMENT AMOUNT PAID PURPOSE OF PAYMENT CAMOUNT P01 1)
LAN CHECK . 76
AMOUNT PAID 151. 78