Loading...
6713 SW BONITA ROAD-1 I (N - - 0 (-j o 45.476.0' 63.0' - 54.0' - 306.0' 129.1' Z r --- __-- ^ --- -- -- -- S 889'49'000 W _- --_- - - 848.50' r'�_ �- 2C.0' � - ELECTRICAL LtJ Q Z N z a) TRANSFORMER Z r 4Gz - 6, 6 'A' LZ C/1) w z o I S epoces 0� 1 24 p, 7 spaces 24.0' 38 spaces 0 1 R=50' R_5, rY,q `L m o m 34.0' V _ 17 V 17 V _ - - Q /, U Q U 3 SITE � v'<NN " t p!J" 10 0 2 < CrC.) Q Lo C)a SW BONITA , I v� I - - 8 1j, 16( .0 BUIL!SING "C" I VICINITY MAP 84,000 SQ. FT. --- N N I 19 .L' I z r3 15525.0'.0 - - 0.0 60.6' 15Ja � { 6 0 S 4 7 10 O m 13 .0' 0.5'- $ OD 45.0' 14.0' 25.0 ' in (TYP.) TYp. I L- A A At A S A l� � L� A& AAA -AAAA& � � L� 50.0. S 0, �` 36 0' 0.0 - if 10 0' R= ( 10'0' 8 0' 27.9' 19.0' 15.0 8.0' 25.0 18.0' o.c 1e.0' SITE AN ALYSI S r 5010' 15 .0' 4-E.0' I ) 34.0 I SITE AREA 359,167 SQ FT (8.24 AC I BUILDING AREA o C NORTH 80,000 SQ FT I 2.0' 18.0' 25.0' 19.0' 19.0' 1 19.0' 15.0' 78"750 SO FT ,�--,r----,�--.� - 9C.0, TOTAL 158,750 SQ FT 9 0' H LOT COVERAGE 447 F- - 4.5' - - 10 LANDSCAPING 12X(1.33/1000) ttIf'I a _ PARKING '212 aces I o o -5 3 0' - I $ - e 3 0' 5.0' -7IV �/ ,Ic.,lr 5.0 - - - cV 0 . - - 11 23.5' 16.0' - 8 O, I v _ ��� - 50 LEGEND I I 25.0' DOCK HIGH DOOR 6C.01 8 4. � 6 0' I 39.5' 19.0' DRIVE IN DOOR I I 0 v c BUILDING "D" I 13 .0' ,S .G' 780750 SQ. FT. �• .1 40.0' 15.0' - 525.0' 43.5 2 0' I ,,J,,D,�,� i 2 spaces 25.0' 30DATE: I 1 1 JUNE 26, 1990 _ .____ � � AWN BY: 1 o MAP 2 21 6 CHECKED BY: 10.0' s 86.7' -e - 2 3' 34.7' - -� 10 spaces S 89'45'45" W 245.00' 4 spaces 1 _ -"��---N 88'44'08" E 114.78' REVISIONS• 8. 1 Q t� CHp.I..l611� 41 "." 7 2' -�l � 4.0 18.C' 21.5' 19.0 7-1�-9a --- 0.I 293. I Q 790 - 5.0' _- %2!21 W I L GRAPHIC SCALE .�r .>r+v ,b�7"PP/4 a.S-3ro Cid.�19 �7 115 /-CURB CUT PER M��er y g _ A' CITY CITY OF TIGARD STANDARDS IAl5rjlm(- SEE DETAIL l Df 1!>Qr ) � 'L���.C �i Q P;� �rAalaumc�s�no.�sw,cv►�rn. 4,I ,»a Au nro�m Aoe� S . W. BONITA wne w 0 "m - -- APPROVED FOR CONSTRUCTION I CITY OF TIGARD SHEET I lay- _ SID 1 OF JOB NO. 1 ST. CONSTRUCTION SET 7/24/90 290231 J.. 1 I -.,.. '�" - - - 'Tie"'_�.'-:•�':-��.'VC1ltum�rta.3le��,in""'Fp'w"-^ .'.:`•.'M:'�.a ,�'aa,lYliey` ... ..a.w..,�...+.r.r.�.....-� u..a.rnm.r.�.�.�.. � - ...,.. .., � I , - ' .w.- ... ' ' .- I{ Illlillflll'I Ililll. �I:11 �I�IIII'►jIIIIII1�11� I r1I1 fl IIIIIrIi1Il�.111111) �II;IIIIIIIIII�IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII,IIIIIIIIII�tI11rI,IIIIIIIIIIIlI111'111I�11, +,rte NOTE: IF THIS MICROFILMED 4 s 8 7 8 9 I I I I Q DRAWING IS LESS CLEAR THAN THIS NOT ICi; TT IS DUE TO THE QUALITY OF THE ORIGINAL DRAWING. OE d2 92 Lt Y2 S2 *�L E2 Pf! IZ 02 61 91 LI 91 e1 ♦I CI 21 II 01 -6 B [ 9 S b EI Z Ia,rlY ,►11IIIIII HIIIIIIII nuI nnhu,I nUI N,l(IIIIbt11II11tIlU1I uulnul uNInuN111I1NII1111I UIII N1II1111II111II1HIl11'11I11I1111IIIIllllllllll(IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII�IIIIIIIIIIIIIIIIIIIJIIIIIIIIINIIIIIIIlI1111II111IIINiiittl!;;illlpllWllllllillllLflIUIIIIIIIIIIIIIIWII111 ` MARCH 28 19 92 I ' o r 1 G" CUT-IN TEE C_ / W/ (2) 10" MJ X MJ BUTTERFLY VALVF W EXIST. 10" WATER LINE Ilk EXIST. FIRE-� �Or X 12" REDUCER 5 N 5' ' 4 9 00 W 6 •l E• . 5() y HYDRANT I 1 r O • W C) Q Q- Q, 1.0% MIN. Cu _ u/ 8' PV(' 11 1.J'X MIN RiM 14-9 ��►►RRQQ� ' c �� f 1 14/.00 I f RlAfH+ �i1T (TY9.) r IE t 89-4A'DO�N - -.----- 111: 41.<►C! --- - - fi�fi.50' YY + 6' PVC O 75 6' PVC O - w * ` �� fh- - 1 N U , o Z IE 147.SL1 1R a l *•-�+. _ 5 a N 1' O l - �� Z O w • RI 1 9 r �" aK o EXIST 90'ID 5 C - `OHO 7 iV000 I -- __ RIM 149.50 3 t aCea IE 148.40 . QJt; a�N �t1 W 01 uj O XIS'T. S.S. uH _ s• I E 1 a�.00 "4l STORM LINE V- - 51,�---- _ :y1 I (� Q rn V U� j1 O27X QO2.7X 0; _ � 0Z64 CN D.S. - - - a v,� ,� = 0I.-_ I E 151.00 (TYP) - 4 in O I U in fY`� - I � a oa� F.H. ASSEMBLY I i 6" X MJ X 6" FLG TEE 0�_ • 8 - %JtTS&A MH W/ CA� AND THRUST KOCK RIM 1 1 0 TOIE 149.30 9 FIED GRADE - � 11 • t• It j 'c c• R1tiK. EKE ��. �. BUILDING C» I . I � _� a F��„��. • 8 •,000 SQ. FT. Ia •1 x °> P�FV 6 rri - I� MJ n M B .,� 1`� r .Co j z is MJ x 1" I P7 GRU�.�� 1 SIM 149 75 w ' E 147.25 I n I • I w c 41 - -TAP S.S. MAIN - - -- F " - 4" PVC o Sal 8 _ rr o 1 - 4" p V C.0 C.0 -�Y- - --- - -C 0. ---- ------- C. m No- = 4 CH3CK VALle � MUILLEI2 C��,�.:12;pr.;� �� � ' • pVC C.O. >r SANITARY C -- � � -:_--- -- - SANITARY � � � 'r12E-,!deA rc, o��� �•I 40 15o.G,o rRi� t5 d' 154. Irv, I.�l� 1 M 150. RIM 150.40 I 5� `� 1 - IE 14 .90 � �E 147.9 _.._-_! E 1x7.9 IE 147.90 - i �K�` - --- --- t off- ♦♦♦ Il -_ �------,r- ♦ ♦ __ . l� A ♦ ♦ ♦ ♦ ♦ I - - - 1 DIA RAM 1 o��v �-co<;�4 FI-4 J u -O n • V/�� �oIIOIJ.TI _ _ Y U 3 4 U o Q o m 4 ca 7 C F.H ASSEI,A_bLY �---_ - - - a UI RIM 150.40 G-1,AT_ VALvE 11 ,A I`' Ir, +__q O'Z IE 147.99 -(� /Lv1I�CR�N _GnE7%� ' 'HATER M . R �'•g pV - -- t - 01 >,Z 4' _ �7 S 1" AKIN. 6" PV ,n a1K PVC W ~1.0% M -- - . to -'rte 1.07K I / 10" PVC ,y 10" P ,+x / C� 12" MJ X 12" MJ TEE W/ (1) MJ X M, _ 1' 1C1r 0 0.9 ---- ---- - -------.•____- I i�- _ u�l�, 51 " [ , � '7RAll�1 `/i460 . C� 12" 13QTlTRFLY VALVE a (1) MJ X MJ 8" '�- 1 SE DIA AM ? O 0.976 0C. 0C.0. - I B�TtPL�4" f/ALVE AND THRUST BLOCK I -- --- --- O. _ C O 8 D.i - G1Z.2O12 AZA• �; s I . �IJwcR °GEN'LpID�'1 SEE DIAGRAM t 4__ 1_ P-- Q -- ---i p 12` PVC C O 0.67. 15 SSEMBLY_/ Z STORM M1'I' 1 ' C)1, I 3 •8" X 8' MJ X 6" G TEE a W/ CAP AND VST BLOCK J RIM 150.10 RESET Mol I� $ -- v� IE IN 144.6 N XIST' I . ,4 IE IN 143.28 (E, IM 149.75F • ;ol W MEI �O -- I 1' -- ,W IN 144.80 S IE 147.25 � 1 I --r--- �� DIAGRAM 20. IE OUT t�t3.00 (W) 1 - ; le 1. X �_Tl - C.0 -- - u C.O. 'o I V 3r 10" PVC O 1.4% P A 8" PVC 6U 2.2X 01.0% , C.O. EXIST. SAN. M.H. - - -----�-- -a+------- --------------- - ----- -------- -------�- 1� . ------------ - ---� ------ ------ - ----- -- Y -- - -- -�--- -- --------- --- --- --- �, s IM 1 N a PVC O L gg+ pyo �� �n p�,eC IE�1 •+ g - ' 2. X M awo7C MIN 5 J I IE IN 140.55 (N 2 OX MIN r 0 IN. ' i I T M IE IN 143.95 F. •/; I Y. IE OUT 140.45 (�S) ' . V 0 - . Q ' �' c-Z -- ` RESET AS � / �� �- - - � ---- ----- --- - - ----n - -���� � -� �- �-- - -Q 0. D.S. 53,5 J---- D.S --- -� REQUIRED FOR j ! S D.S. 15 5 D.S. D.S. D.S. NEW ELEVATION ! �. MAIN• IE, 151.00 IE 154.50 IE 151.00 IE 154.50 IE 151.00 I J W s 4" PVC � 4" PVC- ---_ - ----- -- - 1 ` - ---- -- - - _ .�- - --- --- {. - -- - ---- - --_--- ---0 - -- - -- -- �_ - 0----- f C 0. SANITARY C.O. I C.O. C.O. C.O. SANITARY C.O. , t Cl) PROPOSED- LEGEND I EXISTING SANITARY SEWER - ----- - - - - _s - - -- `�� B U ► L D t N G „p„ +. • i ------------------ - STORM SEWER 6F-NCH MARK � � __.._.. 1 I ' 78, 750 SQ. FT. AtER LINE � , � LATCH BASIN ❑ � Cl /y of Ti gv� d Br os s Cop RIM 151.00 i I � FIELD INLET o y 1117 H r l AIW corner SW L o n dmo r k L n alb, Ne.so I F �-•�. T SW �'2n d A v e. 6' PVC o t.o �0 r CLEANOUT 0 C.O. EL Q VA T/ = 00 ' ` f " j '1 '1 DOWNSPOUT o o.s EX:ST. M.H. 0) nN / 65. `o i MANHOLE 0 M.H. �fj, RILAND,o c. . (NG�D 1929 DATUMI _ 2 a coo FIRE HYDRANT �+---} F.H. +�(�*,� ��`�• / F.H. ASSEMBLY • �', , b WATER METER ❑ G 6' X 6' WJ X 6" 1 TEF FI LD INLET �!��y ', DATE: I W/ CAP AND THRUST BLOCK 155 30 I FDC / I --- --- ----- I, 2.80- t �� ° .PINE 26, 1990 12" MJ X 6" FLG TEE W/ (1) FLG X MJ --� o ----y--- ------.-----_-_-- I A BY: -- - - - -- v---------- �` 6 pVC O 1.OX - MAP 6' BUTTERFLY VALVE CHECKED BY: / °cep + '. 114. ' 4 cea 1d 813-*4'08R 4 76'; �- i i° � • _ .•. ,. •� �� REVISIONS: 29�,�J G '�,/ ' • • y.. • ._47,� •_. f40 ii v�I - - - r '- (,9(' H. M•i _ I !?[t IF M 3y 96�UA N (� • S "1221 VI • �_ c-� !'.�. i -r. I • 63 NO :1- • - r , _� I r BUTTERFLY VAtVE GRAPHIC SCALE _ A ` ,55 , D4 1 � o •n �. 70 ,t JO tf0 ,hh. i '�if ) �r f I l �r•b '_ � - -' -,. - _ srr _ _..'f�+t- /. -� ".1� - � _ .�. r --- r-.... •'+ f0 yL() 0 V �b 3y Eq9 U r D aid 14p I, i ay Ohl('_ /� 1 faoL fill. h. ° •� �'p1 hC h P' rD by .0 g 9 r`ir A et , ati 1` yy ,qq 1 d`aI f 0 ,I Yf� ?. i'' h q 1 X 12" MJ X MJ CUT-IN TEE W 1 OM1' it I' ib , ° ,' 9 YwQf[lRi/�Af10 Aa•OOAr[7P. P / • tit' Sh . MJ X MJ 16" BUTTERFLY VAX • pD • ,` e h 1 (((((( )))))) BONITA R �l� .0�� Pallimm t 1 MJ X MJ 12" AND THRUST BLOCK I • 9 rt •, ,�--�XIST. 16" D.I. qU a =Qm* SHEET s.aro W ,p'�- ~' � IST. SANITARY M.H,, ,• I I F 38 6 - SD 2 1 � i 1 OF JOB N U. CONSTRUCTIONS T 7/24/90 290231 1 . . ► , , � / 1 � Y'• .:....., �.._rS j -- .a. r �•.,YA' . ...__- .... '� "' /b.W.4:4(+WI•MWY4A.4ii.:.uU�"4,.i.. .u•e._...tiMi.. • .w-!w mRAR.+nT.T*Rl6a... 'a'.:.v-r elens.r • � (II�IIIIIIIIIIIIIIII�II��1/ L�Ii1.11I11 r kIIIIIIIIIfIIIOII�IIIilI111�II1I111I111I1) IIIlI111IrIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIiI!i1IIIIIIIIIIIIjiillllflllll11111I111111111IIlIlI I , , �.. 1 NOTE: IF THIS MICROFILMED ( '� 5 d 7 1® 9 INO I I 12 DRAWING IS LESS CLEAR THAN ° THIS NOTICE; IT IS DUE TO • J}IE QUALITY OF THE ORIGINAL ' DRAWING. OE 62 aZ LY 92 SZ bZ '�>j t2 IZ OZ !II P- 1­40 9' -41 rl EI ZI I I 01 6 9 t 9 S •Ir b E Z I"•« - � ,rllllnllnn�unhHl�nHluN�llahH1g1111U11InIIInII�nn1n�IN�ndnnluuhlu�luIIIIHIul1II111IIIIlI11n�Intlllullullllllllllll1111IIIIlIIIIIIIIUIUIlI1111III11IIIIlIIIl1IItIlIIIIlI1111I1t11IIIIllflulunlun�lulllnll►111IIUIIWLIIIIIIIIIIll11hl1llllllll11111111IIWIll11 - I 1 MARCH 28 1992 FILE NO. 3, ,9 BONITA PD. -6,,713 STR. OPN. PERM:T 1 i I I Fax Transmittal Memo 7872 No of Pages ',day's Date( Z/ Time / /9 To / I From J v1n11 . �� -.�a Cf.' t-� � �VI-1ck r ti P � �-AAA Company Company Location Location Dept.Charge Fax It Z Z 1 —6 ,Z7 Telephune 0 Fax# Telephone#W 3 c"j 4 17 l Comments Original Disposition ❑Destroy ❑Return ❑Call for e.rpickup II �� C�kr v- _�� %t�ew -t w z� r z a�� /3 C) i230 NO. 34948 1I"yd nranch 030 UNITED STATES NATIONAL BANK Of Oregon Tigard,Oregon VOID AFTER 180 DAYS ;;ITYOF TI17ARD705 /29 • PAY + **<*. :5u r., L L A R S AND NO C E N T 5 TO THE ORDER OF CITY OF TIGARD JAMES C EDDY �^ CIO SPIEKER PARTNERS / 5550 SW MACADAM AVE SUT 300 ! AuthorzedSignatL PORTLAND OR 97201 \ �Ho c� N�®l�� Authoriv d Signature 2 CITY OF TIGARD, TIGARD, OREGON / NO. r------ -- 34948 _ 1NV DATE INV NO DESCRIPTION APOUNT ----------- 15/ 2-C /91 REFUNC 450.00 . r. 5550 S.W. Macadam Avenue t Portland, OR 97201 P.O. Box 5909 n Portland, OR x,7228.5909D .r l� d 503 221.5700 D S P1 t.h l It FAX: 503 221.8627 ;JUN 21 K01 June 20, 1991 CITY OF TIUARD Mr. John S. Hagman Engineering Department City of Tigard P.O. Box 23397 Tigard, OR 97223 Re: Street Opening Permit 379-90 Dear John: Regarding the above permit, please be advised That the two sections of sidewalk at Nelson Business Center hav 1 even completed and are ready for inspection. After your aVproval, please forward us our final K5_ .00 deposit on that permit. Please call if you have any gf*stions. Sincerely, SI'IEKER PARTNERS \ ludy A. Nrandrup 1 I L1 Office Coordinator f7,0) r z rc V � crI'Y nrTzcunm ID%.pENo=RFnEQo= 'Ilii-- form is a multi-u--e form' Appropriate receipts mzst be attached' Documentation io inportant for all purposes. Stapledmcunva-T-itation to form. MMOl NO. : DAM VIf �4c-) #� Date Description, Irmice No., etc. Acx"mt No. Amount Re lru� � Mileage $0.255 /u*oxxoR=In0 [D\I&NC%: &S OF/ SIMA!I?}DE� (Up to $25.00) Se�,ctinn managorI\mzh' Agent ($25'01-2,500'o0) Division Manaqar ($2,500'01-7. 500'00) Dept' ($7,500'01-15,000'00) city &dminiotz-atoc _______ ________ ($15,000'01- 7) Local Contract Review Board ke/l5nIF ______ 7 9 - �P o At - r� �7e ,e� V7 lyl�jJlL�� F'•c.�,w c'oma.. 0'...Xe, CITY OF TIGARD May 1, 1991 OREGON John B. Souther Jr. , Partner S-H-Eddy-Souther # 244 Partners 5550 S.W. Macadam, Suite 300 Portland, Or 97201 RE: Stree,� Opening Perm-'-t # 379-90 (Amended) , Assurap.ce for Bonita Road Improvements Dear Mr. Souther: In the matter of. the Three thousand two hundred thirty dollars ($3, 230 . 00) Street Opening Permit Performance Bona , dated November 12th, 1990, between S-H-Eddy-Souther # 214 Partners and Stewart Title Insurance Company and the City of Tigard, Oregon; this is to serve as written acknowledgement that the City has no further interest in said Bond and, therefore, declares that this assurance obligation is void. If you have any questions regarding this matter, please contact John Hagman at 639-4171 . Sincerely, Randall R. Wooley City Engineer r]j/J11:1-]).)3 13123 6W Hall Blvd„RO.Box 23397,Tigard,Oregon 97223 (503)639-4171 — —� i CITY OF TIGARD - RECEIPT OF PAYMENT RECEIPIT NO. :91-212594 CHECK. AMOUNT 450. 00 � IMF : JAMES C. EDDY CASH AMOUNT" 0. 00 „ )DRESS C/o SPIEKER PARTNERS PAYMENT DATE 04/30/91 5550 SW MACADAM AVE. S-300 SUBDIVISION PORTLAND, OR 97201- IRPOSE OF PAYMENT AMOUNT PAID PURPOSE OF PAYMENT AMOUNT PAID ISTOMER DEPO� 450. 00 I i Pf=ET OPENING PERMIT # "/9-91/1 TAL AMOUNT PAID - - - -) 450. 00 JAMES C. EDDY 1611 C/O SPIEKER PARTNERS 66.50 SW MACADAM AVE. SUITE 300 221-5700 PORTLAND. OREGON 97201 24 24 22 22/11230 Igo April,Y.9, 19 91 1 PAY TO THE City c f Tigard _ $ 450.00 ORDER OF_ — — — Four hundred fifty and no/100 — — — DOLLARS tuBANK JJJOHNS LANOINfI BRANCH , 6TOU SW MALA OAM AVE fNORTLAR10,0R 97207 11+JITEtl STATF9 h.+TIOAIAL BANK 0V OHFUON II'00 l6 + 111' I: L 2 3000 2 201: L90 001, 7 3 fie OE1l1CH AND RETAIN THIS STATEMENT THE ATTACHED CHECK IS IN PAYMENT OF ITEMS UFSCRIRET`Brew Ir NUT CO"RECr PLEASE NOTIFY US PROMPTLY.NO R9CtIPT 09[1"[0 JAMES C. EDDY CIO SPIEKER PARTNERS DATF DE'•:CRIPTION AMOUNT 4/29/91 Final Deposit for Street Opening lirmit 379-90 #4'10,01 SHES 11244 1550 S.W. Macadam Avenue 300 Portland, OR 97201 up P.O. Box 5909 U Portland, OR 97228-5909 503 22APR 3 Q 1991 1.57m SI'II:Kl,K FAX: 503 221.8627 CITY ()F: TIGA RD a April 29, 1991 Mr. John S. Hagman Engineering Department City of Tigard P.O. Box 23397 Tigard, OR 97223 Re: Street Opening Permit 379-90 Dear John: Per our phone conversation of this date, enclosed please find our check in the of$450.00 to be held by the City of Tigard until the completion of the two remaining sections of sidewalk at Nelson Business Center. This $450.00 will replace the Asst.-ance Deposit of $3,230.00 now being held by 411U .- piny. Please forward to me the necessary form for submittal to submit to I leor T a Try so they can release these funds back to us. It is also understood that upon complet r and inspection of the two sections of sidewalk, the $450.00, will be returned to us by th ��'ity. Sincerely, SPIEKER PARTNERS John B. Souther, Jr. Partner Enclosure l a ,17 , 7-0 ' 7 9 _ Z 4 / I 74, c A;;, 74C �� 6 c �,� p M L s ew ""�f C 5550 S.W. Macadam Avom 'te 300Portland, OR 97201 Ir P.O. liox 5909 Portland, OR 91228.5(0) FAX: 509 221•R1;27 April 15, 1991 RE nbmwE Q Mr. John S. Hagman APR 1 6 1991 '41 CITY OF. TIGARD Engineering Department CITY OF TIGARD P.O. Box 23Y7 Tigard, OR 97223 RE: Street Opening Permit 379-90 �T� til/9� 0� Dear John: Spieker Partners would like the City of Tigard to release our Assurance Deposit in the anioutit of$3,230.00 regarding the above referenced permit. As a replacement, we are willing to submit a new deposit of$225.00 to cover the two sections of sidewalk which have not vet been poured (see attached letter). Additionally, I have enclosed a copy of a drawing showing our proposed solution to the existing catch basin in Bonita Road. As you know per the letter dated April 9, 1991 from Mr. David G. Larson of Mackenzie/Saito, that catch basin is not needed to handle the existing flows on S.W. Bonita. John, it is also our understanding thgt theme wal _from I-5 4.the_newW . roach has been backfilled and inspected by the Citi+ of Till and, as such, all issues raised :n your - letter have been completed. Please give me a call after you have had a chance to review this letter so that we can complete the appropriate paperwork. "Thank you for your cooperation. Sincerely, SPtEKER PARTNERS r ,,._JAn B. Souther, Jr. Partner 244.L04/snz Enclosures 1 r CS."'I C. SCHIEWE & ASSOCIATES, INC. GENERAL CONTRACTORS October 1, 1990 Mr. John Souther �nieker Partners 5550 S.W. Macadam Avenue Suite 300 Portland, OR 97201 RE: Nelson Business Center Subject: Addend= to Street Opening Permit 7379-90 Dear John: This letter is to inform you that the driveway and sidewalks covered in the Addendum to Street Opening Perr..it `379-90, dated August 23, 1990, is complete kh t e exception of approximately 225 square feet where._thg two ecistiag telephone poles are �c�ted_ The cost to complete this work is $225.00. We have been communicating with G.T.E. about relocating these poles, but haveof been 'v n as to when a given any indi.cat�o en the relocating will be done. Yours truly, y Don Erickson DE/so 1024 N E DAVIS STREET PORTLAND,OREGON 97 ,.:2 PL40NE EC31=4-561 7 04 15, 91 09:34 $503 236 9679 C. SCHIEWE ---- SPIEKER P:1RT\'ERS 2 cm SHEET NO- OF! CALCULATED BY DATE (503) 23466].7 CH$-KED BY DATE yQALR A T .... S .__._......._'_._..� — —i— - Ern� •'4.' C. t�`^� ' -S'' , I G t i, I ; t t , h' rr Ike i i I I i t i i I � . c I t t i • ! � i I : ; i t t , i , , I I ! i 04 11/91 14:50 $503 684 7297 CITY OF TIGARD Z 001 ACTIVITY REPOR' RECEPTION OK TRANSACTION # 10495 CONigECTION TEL 503 221 5700 CONNECTION ID SPIEKER PARTNERS START TIME 04/11 14:49 U-'AGE TIME 01' 51 PAGES 4 tAE:M0 I Solis =� f��,-,`�9'ti^ �Co.e-IN P� 04/11/91 13:44 V503 221 5700 SPIEKER PA-ITMERS »»» CITY OF TI(;ARD 00l%004 5550 S W Mundum Avel'uu. �udc 41M1 VurrlanA, OR 9 201 P-0 Rox 509 Pnrilnnd OR y722R•5911q iO3 221 i700 SPIEKI-H FAX. SU4 :21-NGV FAX TR.ANSMY'CTAL Date: r - Tln1e: 1'Icasc. deliver the followinges immediate) to: Pa� y Name: _ _ '� �s 0 Company:_ 1 ax N'ulnher: 0031 221-8627 ( ' �rr:nlentti: Total Number of llaees (mc ludw� ever sheet); 1 .� IF YOU T)IF) NOT RTa'F,IVF. All I. PAGES. PLEASE CALL (503) 221.5.100 (14/11/91 13.44 V503 221 5700 SP I EKER PARTNF RS •-- CITY OF T 1 CARD Z 002/004 ~ MACKENZIE ENGINEERING INCORPORATED 0,5,90 S.w 9ANCRCFT gT -10 AN 89039 PORTLAND.ORF(3')N 97201.0039.1503)224 9aeQ FAX(503)238 1285 FAX CoviU sHEET NACU*XZIL/SAZTO & ASSOCIP-aS, P.C- April 9, 1991 (503) ZZ4-9970 fax (503) 22-19-Usl 14ACYOZ1E EN61MELRING INGOR"RAl D (103) 21-4-9980 Fa} (503) 274-9311 Bancroft/P. City of Tigard Portland. Oragon97201 Aox 5903 Engineeriog, Department .,.u. soa Attention: Mir. Greg Berry, P.E. GATE: 13125 S.W. Hall Blvd, COMPANY- p,0, Box 23397 PAX 0--� 'rigard, Oregon 97223 ATT ENT10N: JOS Rp. Bonita Road - 0Q0T Catch Basin g4sCAIPT10N: -- ----- Nelson Bualneso ("%enter Project Number 290231.06oN:��-- --'—`- -_ TOTAL. NUMBER OF PAW: Dear Mr. Berry' I have reviewed the dralnoge Implications of deleting (filling) of ti,e 000T catch basin at tr1A northwest corner of the Bonita Road 1-3 overpass. This catch basin was plugged and filled qy the construction contractor et the Nulson Businsss Centoi, as a free discharge onto the site would have caused significant damage. Pursuant to your diacussion with Lans Stout of our office during the week of Aprii 1, 1891, our review is to be based upon a 25-y,:ar storm and 0ty Code ^riteria of not more than 4" of depth of flow against the curb. Drainage Area: 800, length x 23, w de (half stroet) 18,400 s.f. 42 acres to 5 min. its _ 3 4 ocher/hour C: 0.9r, Q a CIA 1.28 cubic feet/second Average L.ongitudInal Grade along Flow Lne From the attached ohart, flow width near the CB at Bonita Roaci station 12+70 Oust wetst of Nielson Driveway) . 3.6 feet. The flow depth along the curb face at this point Is approxirnafely .11 feet WAY), based upon a 2% cresri slope on Bonita Road. This is well within she City of Tigard maximum criteria of 4" flow depth at the curbline. 04/ 1/91 13-45 $503 22.1 5700 SPIEKER PARTTNERS ••• CITY OF TICARU 003/004 AF 1-91 THU 14:21 MSA/ME 1 h AX NU. bN`'eb iI bb UC/U J 'M ♦r Mr. dreg Barry, P.E. Bonita Road - ODOT Catch Basin Project Number 290231.06 April 9, 1891 Pape Nurviber 2 Please do not hesitate to call with any questions you trey have. Sincerely, 17 r 41— N1U505 David G. Larson. P.E. Project Manager 0"a N SO DOL/kew cc: John Souther • Spleker Partners Lane Stout - MSA �N1�1�019�•OIVi�It tsu 04%11/91 13:45 V503 221 5700 SPIEKER PARTNERS ­ CITY OF TICARD g 0041c"04 ni n i i c+ i iiu 1 4 1 0 1 uIL;OM/I� i i nn irv, vu.>cw L cU4 i , u.J; j.; T : SX67S05T2.67 r c w �Y- EXAMPLE: 01VEN; nx O,QI6 ; 3x=0.03 O S 6x0,04 ; T e 6 FT 0.2 FI ND' 0.6 40 Q ■2,4 FT3/S Qtt*0 038 FT 'S 0,4 0.1 W a0 Z 0.08 T FT) 08 30 02 %0.0 Sxj-10 F 8 0.01 20 "' Oc2 ,' U. 0.02 O.OF 4 0.01 �� IO 0.006 0.006 0.0 - Z 0.004 0.06 ' — .2g CSS 0.08 4 i 0.002 p.I 3 0.9 U0' 0.6 0.001 x J 0009 M►.--- -- T0.4 or For V-Shope, uee the nnograph with 0.006 Sx=Sxigx2Asxl � gx2) s4i 5�Z 0.004 T 2) To determintdlsCW941 in gutter with 0.2 — yy --�-- Tg composit• erode Stopes, find Os using — To and 5Y. Then, u3e CHART 4 to QW SX find E• , The totol diechorge 10 r�,p E.) , and Qw:q-Qs. CHART 3. Fluw In triangular gutter sections. MACKENZIE ENGINEERING INCORPORATED 0690 S W BANCROF i s7 •P O BOX 69039 PORTLAND,OREGON 97201 0039 1(503)224-9560-FAX(503)228 1285 April 9, 1991 City of Tigard Engineering Department Attention: Mr. Greg Berry, P.E. 13125 S.W. Hall Blvd. P.O. Box 23397 Tigard, Oregon 97223 RP: Bonita Road - ODOT Catch Basin Nelson Business Center Project Number 290231.06 Dear Mr. Berry: I have reviewed the drainage implications of deleting (filling) of the ODOT catch basin at the northwest corner of the Bonita Road 1-5 overpass. This catch basin was plugg,d and filled by the construction contractor at the Nelson Business Center, as a free discharge onto the site would have caused significant damage. Pursuant to your discussion with Lans Stout of our office during the week of April 1, 1991, our review is to be based upon a 25-year storm and City Code criteria of not more than 4" of depth of flow against the curb. Drainage Area: 800 1 length x 23 1 wide (half street) 18,400 s.f. .42 acres TC = 5 min. i25 - 3.4 inches/hour C = 0.90 Q - CiA 1.28 cubic; feet/second Average Longitudinal Grade along Flow Line = 6.9% From the attached chart, flow width near the CB at Bonita Road station 12+70 Gust west of Nelson Driveway) = 5.5 feet. The flow depth along the curb face at this point is approximately .11 feet (11/2"), based upon a 2% cross slope on Bonita Road. This is well within the City of Tigard maximum criteria of 4" flow depth at the curbline. F\91-(H\902?1 06M kaw Mr. Greg Berry, P.E. Bonita Road - ODOT Catch Basin Project Number 290231.06 April 9, 1991 Page Number 2 Please do not hesitate to call with any questions you may have. Sincerely, COOS David G. Larson, P.E. Project Manager oR"EGIO : a DGL ksw O,q V 13, `/0 cc: John Souther - Spieker Partners + Lans Stout - MSA I I i F Bei-04%W73f OFM i"W - i- 0.56 '-)x 1.67 50.5 2.6"r - T n d 5� EXAMPLE: GIVEN: '~ n=0.016; Sx=oo3 0 S S=0.04 ; T =6 FT 0.8 02 FIND' 06--40 0 =2.4 FT3/S Ott =0038 FT 'S 04 0I w F 20 lit 006 -j T (FT) Q 06 01 K 3p 02 - 004 Sx � 10 001 20 ri 0m, LL 0.1— 6 0.08 C 0.02 CY 006 -- 4 0.01 10- - 0008 008 0 006 8 _ 0 04_ 0.04 2 0.004 0.06 0.08 4 0.02 � 0 002 0.1 3 0.8 0001 001--06 gone - _----- —=7`f 0.4 I) For V-Shope, use the nW�+ogropi� with Q006 - S x2 S x= Sxi Sx2 A Sxl 4 Sx21 0.004 2) Tc determine discharge in gutter with 102 composite cross slopes, find Os using 0w ;(S Ts and Sx. Then, use C14ART 4 to Sx find Ec . The total discharge is c)v+ Q:QI/(I - Fo) , and Qw= Q-Qs . CHART 3. Flow in triangular gutter sections. 23 IMr' ANT _ ESSAO �o ,L— / A.M. DATE AIME` P.M. M OF—_-- — PiiOPVE_ S'_70 AREA CODE NUM6ER EX?ENAfDtJ TELEPMNEC PLEASE LL CAME TO SYOU WILL LL AG BE AIN WANTS TO BEE YOU RETURNED YOUR CALL AL ATTENTION MEBFIAGE.� �_--- O ' << C� ` e, s1�N o _ Lit L1O U.9.A. M y �►� TOPS OAM 3002 a C�pct March 28, 1991 CITY OF TIGARD OREGON Judy Brandrup, Office Manager Spieker Partners PO Box 5909 5550 SW Macadam Ave. Suite # 300 Portland, Or 97228-5909 RE: Street Opening Permit # 379-90 Dear Judy: Our inspection of the site in regard to said permit reveled that work is still not complete. The two sections of missing sidewalk have not been installed, the telephone poles have not been moved, �. the sidewalk from I-5 to the new approach is not backfilled, and, as far as we could determ-�ne, the gutterline drainage issue (from the State overpass) is not jatisf-ictorily resolved. Therefore, release of your performance assurance is not possible at 4, this time. Sincerely, t � John S. Hagman Engineering Technician Ij/1-jb-sp.JH c: file 13125 SW Hail Blvd.,P.O.Box 23397,Tigard,C rogon 97223 (503)639-4171 -- --— — — 70 74 te C- A-4!5' 5550 S.W. Macadam Avvnuf e 300 Portland, OR 97201 P.O. Box 5909 Portland, OR 97228-5909 503 221.5700 SIIIIALk FAX: 503 221.8627 �„� D �� IM& GU March 14, 1991 MAR 15 %99% OF G�1 Mr. John Hagman City of Tigard Engineering Department P.O. Box 23397 Tigard, OR 97223 Re: Street Opening Permit # 379-90 Dear Mr. Hagman: Per our conversation today, enclosed please find our general contractor's letter notifying us of the completion of the work related to the above matter. By copy of this letter we are requesting an inspection of the site to release our )erformance assurance deposit of $3,230.00. Thank you for your immediate attention to this matter. Sincerely, SPIEKER PARTNERS Judy Brandrup Office Manager i9/9/ \Enc3losure 1►� r r / f G� [CSD C. SCHIEWE & ASSOCIATES, INC. GENERAL CONTRACTOP. November 15 , 1990 Mr . John Souther Spieker Partneis 5550 S .W. Mncad nm Avenue Suite 300 Portland , OR 97201 RE: Nelson Business Center Subject : Street Opening Permit #379-90 Dear John : As of November 15 , 1990, all w, rk associated with the above referenced permit has been completed . Yours truly , Don Erickson DE/so IS20 1024 N.E DAVIS STREET PCRTLAND,OREGON 97232 PHONE 503/234-6617 FAX 503/236.9679 REE: OPENING PCRMI-- PER-FORYANC SCUD BOND NO. grow Ars, ?I--:I BY THEsZ PREsE:r.-n that we, _S-H-Eddy-Souther #244 Partners as Principal, andStewart Title nsurance ompany _ as Surety, are jointly and severally held and bound a;ato the c:ty of T..g.Lrd, Oregon, in the sum of Three thousand two hundred thii ,y and no/'100 Dollars ($3,230.00 -) for the payment of which we joix .ly and severally bind ourselves, our heir, exe_stcrs, admi.nistrators,-successors and assigns f-=ly by these presents. TaF C:,NDITICN OF THIS BOND IS SUC'.1: That whereas the Pr'nci.pal herein has made application to the City Encineer cf the City of Tigard for a pe--mit t:, construct rnnrrpta _S W R _drjyP' a r�nn� within the Cit--,r of Tigard richt-of-way of S.W. Bonita Road Tigard, OrP_gon, under `'e provision_ of Ordinance No. 74-14 and 76-11 Code of the City of Tigard, and whereas said application was approve_ by the City Engineer of said City and a permit issued, subject to and urcn certain conditions, directions, sti_ulaticns, terns, provisions and requirements provided fr.: iLn said permit, a copy of which permit is attached hereto and hereby made a par_ of this bond to the same e_cte:.t and ef_ect as if written herein and specific reference ncw made to all the tnrms, provisions, specifications and recui.re_:.enta set out, declared ,d provided for in said Permit; NOW TF=AFORE, .._ T=' Principz? herein spall faitt.fully and t`uly observe the terms, provision:, conditicns, stipulaticcs, directicne and recuirements cf said permit and shall in all respects, whether the same be enumerated herein cr not, faithfully comply with the same and shall assume the defense of, indemnify and save harmless the City of Tigard, its officers, agents and employees frcm all claims, liabilities, Ices, damage cr property directly or indirectly resulting from or arising out of the cperaticns or conduct of said Principal cr any subcontractor in connection with per-F—ma*+ce or conduct of the work under said permit, and shall in all respects faithfully keep and observe all of said terms, provisions, conditions, stipulations, directions and requirements, then this obligation is void, otherwise it shalt remain in full force and effect. WITNESS our hands and seals this 12th dzv of November 19 90 l` '7 fit,-Y�^✓1 � L-� �i�t��'}•`i Jo ,'hn B. Souther, Jx—, artner S-H-Eddy-Souther #244 Partners I Countersigned by 5550 S.W. Macadam, Suite 300 — u)a, Portland, OR 97_201 Attorney-in--fact hr/5 rPerf.mst i '!M�o�rrio►Mrr-- - sao FOR_ V v l DATE '- -��.TIME. P.M. P.M. M �� _ OF "� 1 AREA CODE �-- -- _.___-... TELEPHONED PLEASE CALL CAME TO BEE YOU WILL CALL AGAIN WANTS TO SEE YOU ZIAL REIURPIEO YOUp CALL ATTENTION - MESSAGE SIGNED (�� ITNO IN U. �� (�t-A7UP6 F IIQ�. 7TIGARD November 2r,, 1990 OREGON S-H-Eddy-Souther # 244 Partners 5285 SW Meadows Road, Suite # 131 Lake Oswego, Or 97035 RE: Street Opening Permit # 379-90 Assurance Dear Mr. Southern: Enclosed, please find (original) performance bonds dated August ?.3th, 1990, and August 17th, 1990; said bonds are hereby acknowledged to be void. In lieu thereof, the City has accepted a performance bond dated November 12th, 1990, to assure completion of work under Permit # 379-90. Sincerely, ",V-- Randall R. Wooley City Engineer dj/1-shesp.RW 13125 SW Hall Blvd.,P.O.Box 23397,Tigard,Oregon 97223 (503)639-4171 -- STREET OPENING PERMIT r' r PERFORMANCE BC',M BOND NO. K;JOW ALL HEN BY =SE PRESENT, that we S-H-Edd _-Souther #244 Partners as Principal, and _7l t e nsurdnCe Cofiipaliy _ an Surety, are jointly and epverally held and bound unto the City of Tigard, Oregon, in the sum c� Three thousand two hundred thirty and no/100 _ Dollars ($3,2.i(1.CO ) for the payment of which we jointly and severally bind ourselves, our heirs, executors, adminiatra.tors,-Quccesscrs and assigns firmly by these presents. THE CONDITION OF THIS BOND IS SUCH: That whereas the Principal herein has made application to the City Engineer of the City of Tigard for a permit tr, con5truCt_conrrata S-W ' _drjyP �waV dRLL _ with-'n the City of. Tigard right-of-way of S.W. Bonita Road Tigare, Oregon, under he provis,.on of Ordinance No. 74-14 and 75-11 Code of the City of Tigard, and whereas said application was approved by the City Ergineer of said City and a vermit issues:, subject to and upon certain conditions, directions, stipulations, terms, provisions and requirements provided fcr in said permit_, a copy of which permit is attached hereto and hereby made a part of this bond to the same extent and effect as if written herein and specific reference new made to all the terms, provisions, specifications and reiuirements set out, declared and provided for in said permit; NOW TE£REFORE, 7F THE Principal herein shall faithfully and truly obser-.e the terms, provisions, conditions, stipulations, directions and requiremeiits o' eaid permit and shall in all respects,, whether the sante be enumerated herein or not, faithfully cr.mply with the same and shall ass+me the defense of, indP-mr: `y and save harnless the City of Tigard, its officers, agents .and employees it-a all claims, liabilities, loss, damage or property directly or Indirectly resulting from or arising out of the operations or conduct of laic; Principal or any subcontractor kn _onnection with performance or conduct of the work under said p-rmit, and shall in all respects faithfully keep and observe all of said terms, provisions, conditions, stipulaticns, directions and requirements, then this obligation is -old, otherwise it shall remain i full force and effect. i WITNESS o>>r hinds acid seals this I?th day of November l9 90 John Q. Souther, Jr.,- Partner S H-EddySouther #244 Partners Countersi ned by: y5550 S.W. Macadam, SOte 300 — � uJa� Portlanu, OR 97201_ _ Add_ ss �S / Attorney-in-fact t G e z 5 br/ rPerf.mst Csee fir.+ r2Lh Ia a as Al M in Avenue tiPIEf� lune WO IlorIland. OR ()"201 Vdft Q11 PORTANT AVR,, 5113 dll S-oo FAX: 503111.962- FQR i L ao man DATE._. —TIME_ L� 11 \5 \Aa __-_�C ✓� '-M_ — neirs IPHONE r4 7 _ AREA V. ?8 NUMBER SXtEN910JN�`' ✓ �t-�/� C .C,�1Q� °2✓1A- TELEPHONFPLEASE CALL CK ------ �/ CAME TO BEE YOI WILL CALL A041N ��� WANTS TO BEE YOU RUSH RETURNED YOUR ALL SPECIAL ATTENTION CAA.- ` 1L1n2rip� JJ `q ul. MESSAGE --- - SIGNED ---- �'�` .;H0 IN L OFFICE PRODUCTS TOPS3002�S and printers, Inc. 228-2395 r November 7, 1990 CITY OF TIGARD OREGON Mr. John Souther, Jr. P.O. Box 5909 Portland, OR 9722£3-5909 RE: Street Opening Permit 0 379--90 I C,iar Mr. Souther: The bond, now consisting of two (2; performance assurance documents, can be reduced in the followij.g mariner: 1. YOU must submit a replacement perfo -mance assurance bond in form approved by the City, in the rum of $3, 230. 00, to the City. 2 . I will then pre vide to you lett--- r(s) which will enable termination of the two existing performance assurance document-s. Sincerely, John S. 11agman1 Engineering Technician c: Gene Mildren P.O. Box 69039 Portland, OR 97201 dJ/1-Js.,JH 1312; .;W Hall Blvd.,PO.Box 23397,Tigard, -)regon 97223 (503)639 71 ' /V e Is-ot- g«.rl->t err t1yeu-140-- / r 2 Y le'l"/j oe__e_� 741lWel r� y� 11 l 34>2 �.�q,.��r e.�� �e.p o�tl �� �f3�17�� 1ta► �wcwu!'kkt t SS'' t O INC1Q S550 S.W. Macadam Avei cite 300 Portland, OR 97201 P.U. Box 5909 Portland,nR 97228 5900 D � � N 03 � �n PAX: 503 221.862' u D SI'll:hI:!' OCT 22 1900 low& CITY OF ,TIGARD October 17, 1990 Mr. ,"ohn Hagman CITY OF TIGARD Engineering Department P.O. Box 23397 Tigard, OR 97223 RE: Nelson Business Center Project Number 290231 Dear John: This letter is to request an inspection by the City of Tigard in order to release the bond Provided for street opening permit #j379-90. All work associated with this bond has been completed with the exception of approximately 225 square feet of sidewalk where two existing telephone poles are located. We have attached a letter form the general contractor, detailing the scope of work to be completed and the cost of this work. Thank you for your a'-tention to this matter. sincerely, SPIEKER PARTNERS "ffbhn B. Souther, Jr. iC� p3 Partner L. 25/snz Enclosure �M/ UU I-1 1-du WLU 14.00 I'hh/I IG 1 I'rn IVU, ouocco i tori r, uc uc vn� M 1 •'91) 12:26 10303 251 6617 C. VRIEWE MACKENZIE SAITO �Oo: CSS _ C. SCHIEWE & ASSOCIATES, INC. GENERAL CONTRACTORS October 1, 1990 Mr. Joh,a Souther Spieker Partners 1550 S.W. Macadam Avenue Suite 300 Portland-, OR 97201 RE: Nelson Business Center Subjecr.: ' Addendum to Street Opening Permit 4379-90 Dear .John: This letter is to i:tform you that the driveway and sidewalks covered in the Addenduw to Streot Opening Permit 1379-90, dated August 23, 1990, is complete with the ex:option of approximately 225 square feet where the two F_,d sting tAlephoee poles are located. ''his coat to complete this work is $225.00. We have been coma=icating with G.T.E. about relocating these poles, but have not been give_n any im dication as to when the re3ocating will be done. Toars truly, Dori Erickson DE/so I 1014 N.E.DAV3SFREET POF AN 0.0RE)oN!7232 PHONY 503/234.8817 FAX 503/236.9879 l wk N� ua-) (3-wo-l-le clf 4-0 U001 TZ 7f 2.4��n me- so Vv� `4� �1 • �ac.�J ,ti �V�S ._...._ G`�� Zt4 \Cj v � 1 1� Q I CIS-CLMI C. OJ 1 V2 w.,r.. ....J{; .n r... - ..Y.s,•r,1, aim 1n.YY'.eHiwH,y..... , 5550 S.W. Macadam Aven uite 3110 Portland, OR 97201 P.O. Box 5909 Portland, OR 97228-;Ooo 503 221.5700 PAX: 503 221.8027 SPIEKER October 3, 1990 Mr. John Hagman CITY OF TIGARD, OREGON P.O. BoX 23397 Tigard, OR 97223 RE: Street. Opening Permit ,#379-90 Dear John: Spieker Pa rtr?rs hereby requests that the City of Tigard hereby reduce our bond at Nelson Business Center to approximately $225. 00 as we have completed all required work with the excsDti_on of two small sections of sidewalk, which cannot be completed until GTE moves their existing telephone pole. I have included a copy of a letter from Mr. Don Erickson of C. Schiewe & Associates, Inc. regarding the remaining work. Should you have any questions regarding this regiest, please do not hesitate to contact me directly. Thank you for your cooperation. Sincerely, SPIEKER PARTNERS JGhn B. Souther, Jr. Partner L. 18/snz Enclosure n ,/1✓L �r� O ';�';e�c / / jej r i %%So C. SCHIEWE & ASSOCIATES, INC. GENERAL CONTRACTORS October 1, 1990 Mr. John Souther Spieker Partners 5550 S.W. 11acadam Avenue Suite 300 Portland, OR 97201 RE: Nelson Business, Center Subject: Addendum to Street Opening Permit #379-90 Dear John: This letter is to inform you that the driveway and sidewalks covered in the Addendum to Street Opening Permit #379-90, dated August 23, 1990, is complote with the exception of approximately 225 square feet where the two existing, telephone poles are located. II f t The cost to complete tris work is $225.00. 4-- r-e..loc.�Ke� c-ost '11 'jLn We have been communicating with G.T.F. about relocating these poles, but have net been given any indication as to when the relocating will be done. Yo,,rs truly, Don Erickson DE/so 1024 N E.DAVIS STREET rORTLAND,OREGON 97232 PHONE 503/234.6617 FAX 503/236-9f 79 U C I 0 3 1990 MACKEN71E ENGINEE' G INCORPORATED RJEUTC MY MACKENZIE/SAITO&ASSOCIATES, P.C. 0690 S W. BANCROFT STREET a P.O. BOX 69039 PORTLAND, OREGON 91201.0039 1503)2249560 (503)224 957 FAX(503)228 1265 August 22, 1990 290231 Date: Project Number Tb: City of Tigard Attention. John Hagman Project Name: Nelson Rusi ness Canter Please find attached: _ shop drawings - rlcns samples ______ specifications copy of letter change order details calculations Number of copies: Description. 3 Sets: Bluelines,.SD5 Sidewalk Plan _X__ For your use For your review For approval Aa requested REMARKS: Copy to: — - ----- --- - - -- Sinned: Ted Gertner/ds Mailed Delivered _ 7o be picknd up If enclosures ere not es noted,Mlndly Molly us at Once CI'TYOFTIFAPD ORE03N August 21, 1990 Mackenzie/Saito & Asscc. 0690 SW Bancroft Street Portland, OR 97201 REs Street Opering Permit 379-90 Dear Mr. Gentner: This is provided to you to acknowledge our approval of contir,ied use of the existing asphaltic concrete si,lewalk adjacent to the overpass guard rail, on the north a-de of Bonita Road, in lieu of replacing it witti a concrete sidewalk; since it will be rem-ved within three years by reconstruction of the freeway overpass. Sincerely, John S. Hagman ~ Engineering Techniciaa jr/gentner.JSH b 13125 SW Hall Blvd.,P.O.Box 23397,1igard,C regon 97223 (503)639-4171 — MACKENZIE ENGINEERC INCORPORATED 0690 SW BANCROFT STREET PORTLAND,OREGON 97201(5n3)224.9560 RECORD 07 TELEPHONE CONVERSATION 106 "l- �Q�,1j / - --- -- - JOB N0. V cG DATE- 1� LITIME_ -L=� pu--� INCOMING CALL PERSON JC��r. DJ -._' __- _ OUTGOING CALL_ _ COMPL.NY_-_ l CL _ , PHONE NO. SUBJECT: R F MA R KS__ IL I`CD -- Q, ---------- 7,1 S'rREE1 OPENING PERMIT PERFORMANCE BOND BOND NO. KNOW ALL MEN BY THESE PRESEPTS that we, 5-11-Eddy-Souther #244 Partners __- as principal, and Ticor Title Insurance Coinp31i as Surety, are jointly and severally held and bound unto the City of Tigard, Oregon, in the sum of SeVQn tIiOLSarij One hundred and n(2ZI00 Dollars ($ 7,._.J0.00 ) for the payment of which we jointly and severally bind ourselves, our heirs, executors, adminLetrators, successors and assigns firmly by these presents. THE CONDITION OF THIS BOND IS SUCH: That whereas the Prirctpal herein has made aprlication to the City Engineer of the City of Tigard for a permit to)4_ imtall concrete S/W & dr_i& a'J a ron within the City of Tigard right.-of-way of S.W. L,;njta Road Tigard, Oregon, underht` e pruvisit n of Ordinance No. 74-14 and "6-11 Code of the City of Tigard, and whereas laic' application was approved by the City Engineer of said City and a perinit issued, subject to and upon certain conditions, directions, stipulations, terms, provi.si-r— and re.:uirements provided for in tiatd permit, a copy of which permit it3 attached hereto and hereby made a part of this bond to the same extent and effect as if written herein and specific reference now made to all the terms, provisions, specifications and requirements Eget out, declared a-id provided for in said permit; (` NOW THEREFORE, IF THE Principal herein shall FaithfuLly and truly observe she terms, provisions, conditions, stipulations, directions and requirements of said permit and shall in all respects, whether the same be enum,rated herein or not, faithfully comply witF. :he same and shall assume the defense of, indemnity and save harmless the City of Tigard, ita officers, agents and employees from all claims, liabilities, lose, damage or property dire-tly or indirectly resulting from or arising out o: the operations or coniuct of said Princinal or any subcontractor in connection with performance or conduct of thu work under said permit, and shall in all tespec`.s faithfully kee ) and observe all of said tc.:ms, previsions, conditions, stipulations, directloie and requirements, then tF ,s obligation is void, otherwise it shall remain in full force and effect. TNESS uur hands and neala t'-,is _17th dny of 4 , 1st . 90 #11­11ddy-Sou �Utler� •Ir. ar .ne ther 4 Partners �7�5�:--Pe-doves oa a ��e—T3T� La!<e Oswego, OR X7035 Cosntersigned by: Tib ,►.1St ka�}c-r 1 gent /� Add96 (6LA,itJ�� dr br/StrPerf.mst Attorney-in-Fact | ^ -- — - ------ -- -- '- - -- -- -- - ' ` . ^ | / � . . OF TlMA�D - RECEIPT (-IF PAYMENT REC:EIP[ NO. �9o-203866 JAME: C. EDDy CHECK AMOCNT : 2E!7 Oct C/O SP2EKEp �A�7NER8 [f8H AMOUNT : �^00 | ^ / 52�= Su MEADDWS R�, �NO_ 13� FA '�"ENT DATE OSW[GO. OP 3UB�lVI5tCIN � pURPOSE DF PAYMENT AMOUNT FAIr) �URPOS� OP PAYMENT AMMUNT Fi4ID / FUBLlC I -------_____-------- - / / / | � | | | | �7rEET OPE41N8 PERM1T ! ' / 1*0T4L AMOUNT PAID | ' '`. �^\"\\ � � �� _� ( [ &/ N^___� , toe ILA - - 2'-4" X 2'-4" X 2" CAST IRON GRATE 18" 1/4" DUI. HOLES SCREWED PLUG FOR CLEANOUT PAVED AREAS OUI OF IRif f AREAS � AT V-0" O.0 AROUND -- - b.11 �' 1 - " 1 - 1 PERIMETER AT TOP CAULK PIPE INTO HUB NOTE: MINIMUM 2'-0" COVER AT ALL PIPE NTIL I MINIMI E AREAS. D.I. PIPE U 1 COVER IS ACHIEVED. 00 PROPOSED z �- CONCRETE WALL PANEL PAVEMENT AREA- S -DUCTILE IRON DOWNSPOUT , , �� o SECTION PLAN _ ❑ ❑ Qo �` 0 N PROTECTION PIPE, TERMINATE / Ei CRUSHED d0 w 0 90 DE^REE SHORT TURN D.I. PIPE 5'-0" FROM 3/4"-0 GRANULAR o i� / NATIVE ROCK BASE __- - _ _ - �•- C1 E- Q ELBOW NUBLESS CAST IRC)^� IT- BUILDING FACE BACKFILL - / MATERIAL = OR LANDSCAPING a F WITH STAINLESS STEEL / a I_ `° -- Q o o BAND, TYPICAL - p o L -- -- - - - - - - - N CD 45 DEGREE SHORT TURN `O "' I/e C z \ ELBOW - \ r� T.S. 2 x 6 x .188 ca Z -�' �I CLEANOUT FRAME Y cv - - w o —SOLID GROUT AT BASE z o g --� AND COVER _I F"" z r- I -APPROVED SEWER LINE iv FINISH GRADE O q�cv o L. 45 DEGREE ELBOW _T W Z N rn TFOOTING w n� - - D _ _ _- iTTf 45 DEGREE WYE77 —11..� Ll� �1 'I TT — N U a 00 — - IT L �— - — _ it r UJ wa �� EL EVATION - - - _ TT � o rn \ SEE UTILIrr PLAN _�� 1�_ jco FOR PIPE SIZE,rYPE I - _ CONCRETE I I I Iii 1/4" PLATE STEEL ALL WELDED U Q L vi a N .i1 __ I _ CONSTRUCTION. ASPHALT EMULSION Q - I.- CO,`TED INSIDE AND OUT. = o --fTT- - 1 I 1 =i I j=l i' 2'-0" X 2'-0" " o N 1 DOWNSPOUT CONNECTION 2 PAPE BEDDING 3 CLEANOUT DETAIL 4 MAILBOX DETAIL s CATCH BASIN _ SD J 3/4" = 1'-O" SD 3 N.T.S. SD ' N.T.S. NOTE: VERIFY QUANTITY AND LOCATION WITH OWNER 1/211 = 1'-0" SD;, NOTE: USE LYNCH TYPE CATCH BASIN 3/4" = 1'—•0" OR EQUAL w I. TOOLED — - 4' o"------ i Z Lu 2x CROSS SLOPE // R/W L_ V a EDGE -- I 1 1/7' 1 1/2 ED1GE,"TYPE 0) 17H F _ Tom'.Y: 4" CONCRET --s' MIN. C 0 1 WIDTH 0 SIDEWALK - WITH CONTRI J� ��-! T 5'-0" p• SEE NOTE 6 .�.► z 1 SEE PLAN _-�- r CURB JOINT SLOPE TOP OF CURB 1 2a/ I ` 0 �— 1 4" CRUSHEL TOP OF SIDEWALK r - - _ - cu uj C4 0 EVEN WITH PAVING IT L 11 Lt I 1J.1 111 BASE - a , L_ CL - � CURB BEYOND PAVING SECTION ' = -� 1/8" FALSF JOINT SECTION I z N N ALIGN WITH CURB / BEYOND ( `2"of 3/4"-0 TOOLED EDGE `COMPACTED SUBGRADE F1__4" CONCRETE SIDI-WALK BROOM FIN)! WITH MEDIUM BP.00M _ SIDEWALK ADJACENT TO CURB Y I� ca PAVING SECTION FINISH 5'-0" 5'-0' .� •• CURB TAPER AT SIDEWALK _ /SLOPE 1.12 MAX_ _ -- - ----- -- -- ---v-- R/W co n u ° ° ° it� �" MINIMUM 4, / , a Z 1 -- S� MI N.�. DIMENSION _ - a' --c - - _. TY I --- IIII111 ON PLAN- j1p " "''llEXTRUDED CONCRETE CURB SE7 IN EPDXY CEMENT ---2500P.S.I I ROAD - W 6"MIN. 6" ASPHALT PAVING _ 1- -•>II' ��- � - CONCRETE i _ � • � ' I SEE NOTE S I FINISH GRADE _. CRUSHED ROCK RASE 4" GRU;HED ROCK BASE - \ - - 1 CONCRETE SLAB UNE)ER SIDEWALK, TYPICAL STORM DRAINPIPEz" of Sia"-o / AT SIMILAR S P I PER UTILITY LAN COMPACTED SLBGRADE _ — CONDITION ---- SIDEWALK AWAY FROM CURB EE DETAIL SD7 FOP TAPERAT UR13 I-_ Y NOTE* SIDEWALK - I. CONCRETE SHALL BE 3000 PSI AT 28 DAYS , 6 TACK MIX , SLUMP RANGE r L - I--� SEE PAVING TYPES FOR OF 1 V2" To 3" CONTROL JC (TOOLED) A' 2. PANELS TO BE S FEET LONG PAVING THICKNESS AND P� 5'-0" O.C. BASE THICKNESS ► 3. EXPANSION JOINTS TO ]E PLACED AT SIDES OF DRIVEWAY APPROACHES , — EXPANSION UTILITY VAULTS,IMHEEL IAIP RAMPS, 9 AT SPACING NOT TO EXCEED 45 FT. J AT 20'-0" 4. FOR SIDEWALKS ADJACEJT TO THE CURB 8 PIURED AT THE SAME TIME AS THE \`— 1 1/2" STE CURB, TH: JOINT BETWE=N THEM SMALL SE A TROWFLFD JOINT WITH A MIN. 1/2"RADIUS. b �CTRUDED CURB DETAIL _ ENTRY SIDEWALK �_ CONCRETE CAP 9 ?YPfCAL SIDEWALK EDGE, TYPIC �D3 3 4" = 1'-0" -= 4" = 1'-O" ,� - , �, .+ 5 SIDEWALK SHALL HAVE A MINIMUM THICKNESS ' r 6 INCHES IF MOUNTABLE / SDS 3/ SD 3/4 — 1 —0 Sr) . N.T.S. 'URB "IS USED OR IF SIDEWALK IS INTENDED IS PORTION OF DRIVEWAY. � w �/ OTHERWISE SIDEWALK SHALL HAVE A MINIMUM 1HICKNESS OF 4 INCHES. SLOPE SIDEWkLK PANEL 6. DRAIN BLOCKOUTS IN CURBS SHALL BF. EXTENOED TO HACK OF SIDEWALK WITH 3"DIA. PLASTIC PIPE AT 2% SLOPE CONTRACf10N JOINT TO IE PLACED OVER PIPE. i r 6" 10 GA. 40 -0" MAX 15'-0" MIN. I— � R/W LINE LIJ MESH ORIVFWAY r - j�" ,WASHINGTON COU14TY I A DEPARTMENT OF LAND USE C04CRETE SIDEWALK w in' w AND TRANSPORTATION I 0 oa Q "DOLT MODERN MUELLER CENTURION FIRE HYQRANT, J o� �, A-442, 6'MJ, 5 1/4'MVO, 3 PORT ( 2-2 1/2 NSr OPT'JI,AL DATE CIVIL ENGNL'ER DIIAWN APWA NO. WA9K COUNTY Na m J }> a SII+:' ALK HOSE CONNECTION, 1-4 1'/2"NST PUMPER), I I/2" J A EXPANSION { 6 =1 N f} '.CC ,LION PENT OPR NUT, OPEN LEFT,CGI.OR: YELLOW �I-lam " ' �` "'� A WN NONE CS— 305 N JOINT B > U)tr CONTRACTION JOINT ��- TOOL JOINTS B 1'-6" BEHIND BACK OF CURB �y `��K CURB JOINT TOOL JOINT$ 1'-0" BEHIND BACK OF SIDEWALK A G it?:2 v''1 �` �5' 0" 12'-6" MIN. !2'-6" MIN. 5'- 0" `•� -- �,.., 25 _Z5 MAX. 25 - 0 M'r AX I po __CAST IRON VALVE BOX LAN Z ' ASSEMBLY 3" OR LESS e) VF r 1 LATE: - 1/2• EXPOSURE - 6/22/90/ _ =iElr-lig S� Gehl - DRAWN BY: USE EXISTING EXPANSION JOINT QR 0- �A plwl tiG SAWCUT AND PLACE COIR JOIN TT w I COVER DRAIN "��� a SEE D�VG. N0. CS-301. cn nIf_-fnI ROCK W/ TAR PAPER 51"S ELEVATION B-B r w _ In CHECKED BY: alll�i 1 11l'II BEFORE BACKFILL LL I Z) Ifl ' II - 111-1, - O Ip Q IIT1�II II > I -MJ HYDRANT OUTLET li II(j 6"MJKF'LG GV-----,, STREET . J a �7I _.____. .. _T_,--- -- =6T1 - REVISIONS: � III - - f � 1111.4c �I. 10 GA. MESH _ «., - - _ lril +E I-t/2"ABOVE 2 OF 3h MINUS -- _ f yi: �mr IrTtr�Imq znT fi��Grn f� _ SECTION A—A '---6" MJ x MJ HOLDING SPOOL/ -� f / (SEE PLAN FOR MAN SIZE) ' BASE ' IIII MAIN W/ MJx 6 FLG TEE \ ONCRETE I. CONCREI ? PI SHALL HAVE A MINIMUM BREAKING STRENGTH OF 3000 P 1 1/2 YDS OF 4"x8%16" CBLOCK AFTER 111 DAYS , 6 SACK MIX . 11/2"-3/4" DRAIN ROCK Z CURB JGI11T SHALL BE A TROWELED JOINT Y'ITH A MINIMUM 1/2" RADIUS ALONG BA;K OF CURB. 3. EXPANSION JOINS SHALL BE 1/2• PREMOLDED ASPHALT IMPREGNATED MATERIAL OR EOUAL, EXTENDING FROM SUBGRADE TO FINISHED GRADE. ( 4. SEE DWG. N0. CS-300 AND NO. CS-305. II COMMERCIAL DRIVE AY LET"OL t'11""\STANDARD FIRE HYDRANT DETAIL MAG7(ENZIE/SAGTO M ASSOCIATES. P.C. 1990,ALL RIGHTS RESERVED I S�= N.T.S. 5D3 ° THESE DRAWINGS ARE THE PROPERTY OF MA(*ENIIE'WTO J ASSOrUTES,PC(MSA) ARE NOT TO BE. USED OR REPRODUCED IN ANY MANNER, ExCEPT*REI THE PRIOR WRrTTEN PFFIWSSION OF MSA SHEET SD 3 I OF •- JOB NO. > P290231 CONSTRUCTION SET 7/24/90 `_. �, _ _ ...._`........_ _ - - -..... ...,,M.,-.�,.... ;"';;:,I I ( I ' -I 1 I I �'I 1 III'1 I 1 I I 1(I j 1• I I 1 I 1�i ....._ ._!�R�•�.�„'• M�,".w�...:.�`_?�:�ars-• -._•�,�•�o+ti':. c.....--•--n.- _a,r,r.. 10 � ' • I I ' t � `' III 11111 1 1 EII I I I I II�rI11111II�I�11111I1I1lEIIl1���llllll II��IIIIIIIIt�IIIlII11111III11111II�1I111,111111I111I11111I11111)II11Ir11lIIII111IIlIIIIili�11111. . ' � � 1 NOTE: IF THIS MICROFILMED DRAW1W iS LESS CLEAR THAN THYNOTICfi " IS DUE I)*'QUALITTY•OFTTHE ORIG NIAL - - - DRAWIIIC. OE 62 92 LZ 9? SZ 1I E2 ZZ 14? OF 61 BI LI 91 SI 41 EI 21 11 01 6 9 L 9 9 111, E 2 IN• "" ,►1IIIIIIIIIIIIIItI)IIIIIIEIEIEIIdEEt11t111�UII�IIIIIIHh11IIlElII1111�1Inlun�tIIIII111HHI111IIIluhllllulllll�1611t{I11II111111IIIhI11►GI'IIII�IIIIIIII►�1IIIIIIulnulul�ullluuhluhu111wI1Iu�1uJI1111111111It1�1111;1Iuhwlllul�Iu�l�llul,lulgllllwlull MARCH -_— 28 1992 1 I APPROVED FOR CONSTRUC T fON r 1� y -T-_��-_ CITY OF TICA RD �4, E Copy _ `- moiourV. 1' 7 "- - c--- BY '•' - Z - A1—IGH-CURB W/ BUILDING LINE OLLJ .. _ .. ..,— .. .. __�.___ ". --._ __-_�.._�". __ -• "- qjX LINE_ -�-_ .PtIE•MOULDED EXPANSION �i 1� � Q 0 LtP JOINT PILIE GL.1 1►I��L �D���� , ^ _ V APRON -' rH•i � �- W _...-__._- - --. �.�.----- ---�----._-___ _ ,_.-- _�._.._-•------ ---- - --------- ---------_. ------- - - _—._ SLQPE e. A, LV�•GNJZC�JFPG,o/ NAG�I�TInNca, L _ - - V)1 ° � IZ- w �I-rT1F'YA9cHTGT cD W o TT ,0P WoRIG• f�-�- ? a h LLJ — - •..3. L o ALG tLNO�Y!'�1C l/dA+Ct.. Al14diI�A! �► I� (� a �0 0 0 _ c>C - - --- - -- - .i'779i6+�+ONii�CRf �'' J�/+�`/!ITlDit/! c5 /O� Z Lil� PACE CURB — W V / a m O . . 3 z 1 v .S w 0 < C4 I +6r-T • _ I- J _•,:. ..;� ,Vis:; �`•-+�'% !, l= D, It/P��'7F,Y CITY �l�/.fArr-:.-MW Z4 �/e5 ARM& u r� IL) cti .A .�•" EGTION A-A. I /iw+ ci4v,"^%r0 w�4y /VF'rA./i. �1 �'7�/�� r' -- �° — y �3 I� L Building 'I g NOTE: NCRETE SHALL HAVE A ` 1 cY`Avv� A44 4SOO SQ•FT. IN BREAKING STRENGTH I� A1 ° - -` �2,000 SOFT. CI - Of3000PSLAFTER 20DAYS. ,7. I S7- S7I ' LL - --- . . • A • - DMNiERCI#L DR,lvt: �Y ro, .� I 7-1 N 2 STORY N --- I - • 5 �b5 OctcA , .®le�srlow'.5 / drs I/�'Y d�' .R/ 11P, V) Z 0•' -.971-0" _ fi�Xr►G L .a>dE' /i�?'•• �+�' �.'� W300'- U � -�D (� ] - -- 7 N Po�AY� P T. C ua W 5 ' ,a+E' 13t' ie"low"rte af V - �� S LA's D�GI�•"c ���r � O It A ,rs� d� ✓•�s.c,D +c .�r y\ZD 01r 'n z3 25�-0 ONt PLANK / -D -- — EXTRUDED CONCRETE CURB ScEt m IN EPDXY CEMENt [ � 6W4. 6" --------ASPHALT PAVING VrA%nvmr � Joe ..�. _� -- – FINISH GRADE CRUSI IED ROCK BASE �,�141` W Z - - °- O � C/-) I •+r� W l � 'lI li ._�r o _ N.1.C. _if t__ 1�1I1" F1 T-1,l I E SEE PAVING TYPES FOR -- _ 1 — PAVING THICKNESS AND BASE THICKNESS --- f = I � o - w C) EXT�?UDUD CLIP-5 Z Q o f IRT SIDEWALK HE lE ---� ;1 h--. ------.--____..__ _________ - --- - 4 --- - ---- - - - -- - - CL - r _ O �poR\DCEME,.N,T CGNCRETE N RELOCATE —- 0 _ T � . Icxlg'f1NGto>;.cn .. ,. EXISTING ING I - � , — - . . .. , L1J POWER POLEMTej h. f [] N•1,C. ia� S� LL•t WOO•.S-I.Ar••OATS.SIS SAC•Ix,11.100-IMA.Gi or I y=-_3- ' 2 "tt ALK PA.CLS SMALL SC SOUAAL,)•:Or3P 5:11,11(s.?.014-3 s`A r A►►•T. t— ! CO PN . 31OC3 A. NAv( • uGM G-Ock �.y - T EDGE OF — •-V� �, CURB j 1 0 -V//,e�z ow 3ol�0 250.^O.. 93'-5" DATE: _ 8/3/90 O DRAWN BY: Building A TWG 45,000 SO.FT. 0 CHECKED BY: REVISIONS: - NO WORK 1N THIS AREA \� ° _ --- WTURI= ^ iVEWAY i ° - o _ G l 112P) GUT --' --- 191110. ALL RIGHTS RESOM ►IE r,�oo►1 �- /r ? weallSWIVM vE"Iie MIs4DNE'�a w•s „c SIGN BY OTHERS CONTINUE SIDEWALK ,C� COORDINATE W/ TO EAST PROPERTY SHEET LANDSCAPE ACCESS S.W. Bonita Road 22 CONTRACTOR w 601F/X1/prz*j Awr-0,0r. 4-"zw/ SD 5 SIDEWALK PLAN w North I 7- 90 JOB N0. OF y 1s b SIDEWALK PERMIT SET 8/7/80 290231 � IU T. III r I I I I ., I I •I I I ' _.:_-.--�.._ ...--..--�_ I I II I �I l l I �) I I(I I S I I I I I I I i i•� I i I I I I I t I t t I I I I I I T I I I ._Y ----- - , ,.,.�'I'�l�+`'='--,� _•., ,,..,,_ _ _..,.. _AAAA .. ,,,,. tj?1.11I1 111 I I V III I II I 1 1 I III I I I 1 1 I 1 1 I I 1 I 11 III III 111 I I III III III III I I III 111 111 III III III III �t1 III L,r. ,. NDIE: IF THIS MICROFILMED '_� 2 3 4 - 5 Q �-7— 8 9 10 — 11 12 DRAWING IS LESS CLEAR THAN THIS T IS DUE TO TFIF QUALITY OFTHE ORIGINAL ' DRAWING. OE 62 92 L2 92 SZ b2 E2 22 12 02 61 91 LI 91 51 bl EI 21 II 01 6 9 L 9 ra� b I. E 2 1 OLD- fellIL'IIIIIIIIIIIIIIIIIIH11111111HII1111�111111NIIIIp11111111111SHLIIII1IIII U11111111111111111111I111111111111UIIIIIIII111111111111111111111IIIIIIIIIIIIUIIIIIIIIIIIIIIIIIIIIIIII111111111111111111pII11Wu111HllllllllllllllllllllllllllllllWllllIII1111111�111llUI11111111111W11111 I MARCH 28 1992 r _ now 111 %_ r'wee- JAMES C. EDDY N2 1509 C/O SPIEKER PARTNERS 6285 S.W. MEADOWS RD., NO. 131 884'4898 24-84/1230 LAKE OSWEGO, OREGON 47039 N August 17 , y 19 90 i i,AYMTHE a 2$/.�� ORDER OF City of Tigard _ ___j $_.___._,.-___—_ a Two Hudnred eighty-Seven and nO/100 - - —��—_ _DOLLARS. '.PEST ONE BANK 6285 S.W. MEADOWS ROAD, SUITE 142 I-AKE 03WECO, OREGON 97035 11.00 L 50911' 1: L .2 30008481: 8 10C L 2S00t, its ALI= � •.�� 379- 90 it I I � _ ITY OF T T CARD — RECEIPT OF PAYMENT PECE i PT NO. :90-2c_)T866 CHECK AMOUNT' ^87.1:11:) TAMES C. EDDY CASH AMOUNT : U.c)(:) C/0 SPIE['EP PARTNERS PAYMENT DATE t_1e/11/91: 5-1295 SW MEADOWS RD. NO. 1771 SUEDIVISION Lr4E OSWEGO. OR 97035— I Cr PAYMENT AMOUNT PAID PURPOSE OF PAYMENT AMOUNT PAID 287.00 L I :[-. T OPEN T NG PERI-111 0779-90 C ai. AMOUNT PAID — _ __ j.87.iu:) I) ''' mac/ »hfn2/' o� I�aC:/c'P..�i?�2/S�►:7�o c':,.//� �� � the �fi-,zzf �6`7 ed7, i,z✓ had .vx of y anal 9rb C.U/ IW4'f know bud That he c&"Ial ria/,� 711d , 01, 6e zc✓ 9 f0. IMPOgTA T MESSA5E FDS ., DATE r` ,'- %.` �' A.M. TIME ��- P.M. M r:�•�< �_ PHONE_ AREA CODE 'NUMVER Ex TENSION I ' TELEPHONED PLEA:E CAU CAME TO SEE YOU WILL CALL AGAIN WANTS TO SEE YOU ALISH RETURNED YOUP CALL 9PEuU1L ATTENTION MESSAGE /1 YJ or 17 Z O SIGNED I.RHO IN U.S.A / TOPS FORM 3002P d r _ a� U APPLICATION - STREET IMPRC -MENT/EXCAVATION COPY TC: URDIN �vCE NO. 74 1J (WHIT_)-FILE pa• (YELLOW)-INSP. (INSTRUCTIONS ON SEPARATE SHEET) (PINK)-OTHER AGENCY BLDG (BLUE)-APPLICANT APPROVED X APPLICATION NO.: 424 NOT APPROVED Cl IN' (11 I I(.:�kl), ORF,(.OV FEE_ AMT. S $240'04) PENDING FEE PMT. ( I I HALL RECEIP clo–zo u-2 PENDING SECURITYPUBLICy WORKS DEPARTMENT av DATE_ PENDING AGENCY "OK" – – – Application and Progress Record – – – – – – – – – – MAINTENANCE BOND A1- 10% PENDING INFORMATION -) FOR STREET INIPROVEMENT/EXCAVATION AS RE QU�REU X '—'-- ANNUAL PFNUING VARIANCE �.) EXPIRATI N AT r one year –_ PERMIT NO 379-90 DATE ISSUED -� /1 BY: (1 ) APPLICATION IS HEREBY MADE T'O EXCAVATE FOR AND INSTALL_ _concrete_sidew_ k & drkyeway apron __ AS DESCRIBED HEREIN, IN FULL ACCORDANCE WITH CITY REQUIREMENTS. APPLICANT Mackenzie/53 LQ_4_Ass4c_ _U6%QSW _5an_Qr41t._ S ._ _.Portlatldi_s?A-__2Z2QL__�_22 1-957Q_ NAME ADDRESS CITY PHONE CONTRACTOR_Schiewe & Assoc Inc. 1024 NE Davis Portland, OR 97232 234-6616 NA .- ME ADDRESS — -_- - - CITY _—__—PHONE PIANS BY _japplicant).__ NAME ADDRESS CITN/---- rNONE I ,T(MATED IMPROVEMENT TOTAL VALUATION ( COST): S �000•QO-_______ DOLLARS (2) EXCAVATION DATA: FOR OFF1 E `cwiiN — _ 0.04 x s , 00 STREET DESCRIPTION PROGRESS 8c INSPECTION STATUS NAME. SURFACE CUT CUT CUT MATERIAL INSTALLED — a^ TYPE LENGTH WIDTH_ DEPTH ITEM & QUANTITY ITEM DATE REMARKS/TYPE B" STREET OPENED Bonita Rd see a tached ian INSPEC- - i --- -- _ R TION _ I E � — - Q U ESTIMATED STREET OPENING DATE. E ESTIMATED STREET CLOSING GATE: - / / T ----- --- _ E (3) SECURITY NO. _ SECURITY AMT.: E �i�000.00 $TREEr `— Tr CLOSEA SIURETY CO.: Tien � Ue _ !^ _. n. FINAL ---= cEH.IF1_EDrH-c-K C-ns14 I soNt,*jd - INSPEC. IS 7! /IC+Cf•e•Vc Y }�.f, . (4) PLOT PLAN: INDICATE SITE PERTINENT PHYSICAL SPECIAL PROVISIONS ; CONDITIONS FEATURES. EXCAVATION LOCATION AND EXTENT. }) 1. All work shall conform to Cites # DD�nC� AAA I ( I ' Standards and Specifications _ I k/aQ►ae si>•c 1 ) 2. OtifY Ci Inspector (Carl Viewed -21 ( 1 _ *639-4171 ?.4 hrs prior to starling work. --- u' Bonita Rd3. Traffic con-rol shai.l be arovid'ad -, ---- ---------- . ro _ -- - _- fOr by the contractor.--- 4. ontractor. __4. Excavator must compl with URS7..7.541_ryc,L 757571 I Utility_ Pre-location, etc. ). I I ( I (5) NOTE THE CITY OF TIGARD DOES NOT, HEREBY. GRANT PERMISSION TO APPt.ICANTS TO CONDUCT WORK WHERE RIGHT-OF-WAY JURISDICTION IS TH4T OF WASHINGTON COUNTY OR THE STATE OF OREGON. THE APPLI_ANT AGREES TO DEPOSIT TI/E REQUIRED SECURITIES, TO COMPLY WITH ALL PERTINENT LAWS AND CONSTRUCTION SPECIFICATIONS FERTINENT TO CONDUCT OF THF WVRK, AND TO SAVE HA EMPLOYEES AGAINST ANY INJURY OP DAMAGE WHICH MAY RESULT FROHARMLESS THE CITY AND M APPLICANTS E ARJS APF'I IC ANTS SIGNATURE c - _ ` DATE .– OF TIGARD F?E(.,EIPT OF F(241�11ENT PEUI,F'T NO, CHECI : APIOUNI' CA5H AP10(.0-17 17" '731: 11`1-17 F' F AN'TNES",;) SbI ME,`jVOlr-., RD NO 1711 I—Af E OSWEGO Llr-'.� 9 7. E OF ra . HEIJI "MOUNT PAI D PURI."'DSE or-, r'AYME1,11 AMOLINT P;41 T., 7, 240. Tc I r1f F VL 0-4 Al'1011-1t1T PAID JAMES C. EDDY N2 1507 C/o SPHEKER PARTNERS 6285 S.W. MEADOWS RD., NO. 131 684-4666 24-84/1230 LAKE OSWEGO, OREGON 97035 August 13, 1990_ PAYTO THE City of Tigard ORDER OF $ 240.00 Two hundred forty and no/100 - - - .-DOLLARS WEST ONE BANK 5285 S.W. MEADOWS ROAD, SUITE 148 IAKE OSWEGO, OREGON 97035 us00 &507mis e: 1230008t.131: 13100 & 2500 IT 11 STREET OPENING PERMIT PERFORMANCE BOND BOND NO. KNOW ALL HEN BY THESE PRESENTS that we, S-H-EddySou`her #244 Partners as Principal, and Ticor iit,e Insurance Company as Surety, are jointly and severally keld and bound unto the City of Tigard, Oregon, in the sum of Six thousand and no/100 Dollars Dollars ($6,000.00 ) for the payment, of which we jointly and severally bind ourselves, our heirn, executors, ad,uinistratora, successors and assigns firmly by these presents. THE CONDITION OF THIS BOND IS SUCH: That whereas the Principal herein has made application to the City Engineer of the City of Tigard for a permit to install concrete S/W & driveway apron. within the City of Tigard right-of-way of S.W. Bonita Road Tigard, Oregon, under the provision of Ordinance No. 74-14 and 76-11 Code of the City of Tigard, and whereas said app--cation was approved by the City Engineer of said City and a permit issued, subject to and upon certain conditions, directions, sti.pulationG, terms, provisions and requirements provided for in said permit, a copy of whic. permit is attached hereto and hereby made a part of this bond to the same extent and effect as if written herein and specific reference now made to all the terms, provisions, specifications and requirements set out, declared and provided for ii) satd permit; NOW THEREFORE, IF THE Principal herein shall faithfL.11y and truly observe the terms, provisions, conditions, stipulations, directions and requirements of said permit and shall in all respects, whether the same be enumerated herein or not, faithfully comply with the same and shall assume the defense oi , indemnify and save harmless the City of Tigard, its officers, agents and employees from all claims, liabilities, loss, damage or propert} directly or indirectly resulting from or arising out of the operations or conduct of said Principal or aey subcoitractor in connection with performance or conduct of the work under said permit, and shall in all respects faithfull, keep and observe all of said terms, provisions, condit-ons, stipulations, directions and requirements, then this obligation is void, otherwise it shall remain in full force and effect. WITNESS our hands and seals thio 13th day of — uqus : 193 James C. ddy, Fortner S-H-Edd louther #244 Partners _ 5285 S.W. Meadows Road, Suite 131 Lake Oswego, OR 97035 Ccuntersigned by: COR TITLE TNSURANCE COMPANY , TRUSTEE 13� . .►-C � � � �i s �p-,�cr �t Agent K V,— �ee� 13815 S .W. Pacific Hwv . --- Address - -- —�-- — 1 C�e.t.s6 cC Tigard , OR 97223 ---___— _.__ ............................ f Attorney--in-fact br/StrPerf.mst �N�LSo1� �Ih-I EsS CE�T�� � s s�pEw�c,K 4 C_Ueacur �-=IDE V-I zk.l� Corgi Sr Ru�-rlo�.l cosi C-s�t Nl�,LT"� ���1sT� (LI►a r Au. FT) x 5'-o �W I aT?A) = 31 y Z , 5 , F-T. S,q2�,2., 5 i5o�. Fr. .X -S 1.75 (COST/5..r-r) �\�STI MATE —4 46/ 00(v • a$ (Er}bT Gt�¢t3ruT d- �Iv u��tK�/ I NJ '9' dit-ir--A-A Fr) s'-�" 6,-JIDr0�e . 7s 56. Pr roq$.7S rte, Fr. x 1 .75 lcos�fSc . FT� = 7! 17 2. 81 �c�TI M AT-E Asace lozq p�E "'s L o SYS lf��55- By_Tltil ---- caNST. T ESTIMf�TE — DATES-. ------ MACKENZIE ENGINEERING INCORPORATED JOB NO 0890 S W SANCROFT STREET PORTLAND,OREGON 91201(503)224-9560 SHT OF - P 0 BOX 89039 PORTLAND,OREGON 97201 FAX X5031228 1285 ®19 A��ZIE ENGI RESER INCORPORATED 90- 43810 Washington County C C'RPORATIOII Page 1 of 2 AGRi.FMEN'T FOR PERPETUAL EASEMENT For Motor Vehicle Driveway on Adjoining Parcels Residential Use THIS PERPETUAL EASEMONT, made and entered into this August 14 19 90 between; S 1iVOMPAMOX S-H-Edd Souther #244 Partners hereinafter called the first party, hod c� -icy $oU�er #244 Partners hereinafter called the secord party, WITNESSETH WHEREAS, the first party is the owner in fee simple of the following described real property in the City of Tigard, County of Washington, State of Oregon, to wit: See Attachment - First Party and the second party is the owner in fee simple of the following described real property in the said City, county and state, to wit: See Attachment - Second Party and said two parcels of real estate adjoin each other; and WHEREAS, the parties desire to grant to each other an easement and right to use the described motor vehicle driveway now or to be constructed along and upon a portion of both of the parcels in conjunction with any lawful. use. NOW, THEREFORE, in consideration of each party's granting to the other an easement hereinafter described, and other valuable consideration each to the other in hand paid, the receipt of which is hereby acknowledged: FIRST: First party conveys to second party a perpetual easement for motor vehicle driveway purposes for use in conjunction with any lawful use along and upon that portion of first party's Troperty described as fnllows: to wit: See Attachment - First Party SECOND: Second party conveys to the first party a perpetual easement for motor vehicle purposes for use in conjunction with any lawful use along and upon that portion of second party's property described as follows, to wit: See Attachment - Second Party THTRD: It is mutuslly agreed that er:ch party may use in common with the ether party, the whole of said motor %-!hicle driveway, including that portion thereof situated on the property of he other party for ingress and egress of motor vehicle, pedestrians and used Incidental to any lawful use of the property. C LA CORPORATION Page 2 of 2 FOURTH: This agreement should bl,nd and inure to the benefit of, as the circumstances may require, not only the immediate parties hereto, but also to their respective heirs, executors, a.lministrators and successors in interest as well. FIFTH: WE17 Phe maintenance shall be a shared responsibility of the parties and each of tl.e parties shall share the cost of maintaining the easement. The obligation to share maintenance costs shall begin when the driveway in completed. SIXTH: E0151!EZRM1} Each of the parties shall maintain liability insurance which, at a minimum, meet the standard in the industry for the particular types of uses for which the properties are used. The insurance policies shall name the owner of the adjoining parcel as an additional insured in connection with the use of the easement. SEVENTH: In construing the foregoing agreement, the plural shall mean and include Lhe singular whenever the context so requires. IN WITNESS WHEREOF, the undersigned corporation has caused this easement to be executed by its duly authorized, undersigned office: s acting pursu-nt to resolution of its Board of Directors. S-11-Eddy-Souther 4244 Partners Name of ClpXTXyXWXn Partnershi By: ' ?PM) James C. Edd10 Partner ily: Secretary STATE OF OREGON ) as. COUNTY OF W �,y�) August 14, 19 90 Personallyaanpeared James C. Eddy and _ _ who, each being first duly sworn, did say that LhA former is ��� Partner _ pR%#iC, x x � xQha•e:l+�ut:t.X,tk la abaXxx a , and that the seal affixed to the foregoing instriment is the corporate seal of said corporation and that said instrument was signed and sealed in behalf of said c rpo-ration by authority of its boater of directors; and %dch of them acknovld,pdggd said instrument to be its voluntary act and deed. MyjbOTTTKQYu� %0NY WHEREOF, ,have hereunto s my hand and sethis 14th day C 19 90 U � � � rte ; AALIAA 1 N t Pu is for Oregon j�.0 F r,II21tf SEAL) My C6mmission 'sxpires: C1-�1393_ 4ftdoW as to legal description thrA-- day_of, 19 By: Title: Approved this —z1A4-sf , 19 DEPARTMENT OF COMMUNITY DEVELOPMENT oZ By' - Titles" ATTACHMENT - FIRST PARTY PARCEL_ I: Beginning at the Northeast corner of Section 12, Township 1 South, Range 1 West, of the Willamette Meridian, Washington County, Oregon; thence South 659.9 feet along the East line thereof and along the center line of State Highway; thence south 890 491 West 746.65 feet to an iron pipe at the true point of beginning of the Bract herein described; thence continuing South 890 491 West 528.4 feet to a pipe on the East line of the County Road No. 126; thence S)uth 0° 09, West 626.97 feet along the East line of said road to a pipe at the intersection with the North line of County Road 420; thence North 89° 46+x , East 528.4 feet along the North line c` said road No. 420 to a pipe; thence North 00 09, East 626.53 feet to the true point of beginning, EXCEPTING a 30 foot strip on the East side of the above-described property deeded to A.F. Knudsen and Marguerite A. Knudsen, husband and wife, by deed recorded in book 295, Page 474, dated May 31, 1949, and recorded June 1, 1949 and ALSO EXCEPTING the Northerly 324 feet conveyed to B.L. Meyers, et ux, in Book 447, Page 500, recorded August 4, 1961 . MM\0]]1\It•Yort.Y]. ATTACHMENT - SECOND PARTY A : •act of land situated in the Northeast one-quarter (NE 1/4) Section 12, Township 2 South, Range 1 West of the Willamette Meridian, Washington County, Oregon, being Parcels II and I1I, recorded November 28, 1975 in Book 1056, page 240, Washington County Deed Records, more particularly described as follows: Beginning at a point in the west line of that certain strip of land deeded to the State of Oregon, for highway right of way purposes (Interstate 5) , by and through its State Highway Commission, said point bears South 659.9 feet along the east line of Section 12, aforesaid and South 89°49'00" West 130.00 feet from the northeast corner of said Section 12; thence South along said west right of way line 541.57 feet; thence South 89045145" West 245.00 feet; thence South 79012121" West 293.52 feet to a point which bears North 00°09100" East 45.00 feet from the centerline of S.W. Bonita Road; thence North 00009100" East 598.03 feet; thence North 89049100" East 646.50 feet to the point of beginning. CONTAINING THEREIN an area of 8.245 acres. (359,167 square feet) . STATE OF OREGON County of Washington SS I,Donald W.Mason.Director of Assessment and Taxation and.,Ex-Off ecorder of Con- veyances for said•oourgf tube:, certify that rmr�` 1 the within U0ruqi ttg V received and recor +i'boMc of teootds 6y county. or ofJ + i axa n, Ex- ,Doc 90043810 Rect: 38609 48. 00 08/14/1990 03: 35: 25PM nuu-1 i-tlU ral U 40 11.Jt1/IICI rnn IYV, juicc-olLUD 1 , ul 72k A Vt Z • ' fgCSIM1�E TRAeSN(r;.,4 \4AMNZIE ENGINEERING INCoRrORATf t) NEW MACKENZIE/ SAITO k ASSOCIATES, P.C. 0690 SW socrvn•Po.ec.49039 PORTLANO,C)nEGON 97201 (5011124-95"•(S031224, ifl•FIX(5031228-17M H, Dart Jae 4 v PROJECT _ S TO .JOH -- - M�l FAX PAGE����~���' _ MACKt1�ZIt/SAITO A ASSOCIATES, RC. COWENTS �— — ORFpUN(503) inP4 o5-,O VVASHINQTUN(200)451-1005 MACKtNZIt EWOINStA!"INCORPORATF0 OREGON(503)224 gSfSQ WAS41NtiTDN M45t 1430 - MACKE.NZIE ENGINEE 413 INCORPORATED �l �Ln� 00 IF ���������° MACKENZIE/SAITO&ASSOCIATES, P.0 J 0690 S.W. BANCROFT STREET a P.O. BOX 69039 PORTLAND,OREGON 97201-0039 (503)2249560 (503)2249570 FAX(503)2281285 Date: August 8, 1991 Pr^;:;ct Number 290231 v To: City of Tigard ^ -- - - - - - Attention: Project Name: Nelson Business Center Please find attached: _shop drawings pians _ samples ^_specifications — copy of latter _ change order details T calculations Number of copies: Description: _ (3) Sets sheets_ ,S02i -- For your use For your review For approval As requested REMARKS Copy to: ----- Signed: Ind - _ Mailed -1- Delivered (TG) To be picked up y',C. W'�I k�-1 I 11 01100SUIM still nor 88 noted,kindly notify us of onto. CITY OF TIGARD NOTICE OF DECISION SITE DF . . c.OPMENT REVIEW - SDR 90-0014 SPIEKER PARTNERS APPLICATION: A request by Spieker Partners for Site Development Review approval to allow construction of two flex-space industrial buildings of approximately 80,000 and 78,750 square feet to be known as the Nelson Business renter. Zoniny Desiynation: I-L (Light Industrial) . Location: Northwest quadrant c.f the .intersection of Bonita Road and I —erstate Highway 5 (WCTM 2S1 12AA, Tax L-)ts 600, 700 and 800) . DECISION: Notice is hereby given that the Planning Dirc-ctor's designee for the City of Tigard has APPROVED the above request Eiubject to certain conditions. The findings and conclusions on which the decision is based are noted below: A. FINDING OF FACT 1. Background No land use or development applications regarding these parcels have been reviewed by the City of Tigard. 2. Vicinity Information The 8.24 acre site is located on the north side of SW Bonita Road, abutting Interstate Highway 5. Two industrial buildings formerly occupied by Ted Nelson Steel Company are located immediately west of the subject site on a 7.63 acre darcel which i.s zoned both t-H (Heavy Industrial) and I-L (Light Indust.rial) . Redevelopment of this parcel is noted on the site area plan as a future phase of the Nelson Business Center. Redevelopment_ of this property is not subject to the current review. Properties to the north of the subject site include the manufacturing operations of Willi.amu Air Control and Gerber Legendary Blades. These properties are zoned I-H (Heavy Indust.r.ial) . Parcels to the south across SW Bonita Road contain Rogers Machinery Company, Smetco Company and Gevurtz Furniture Store. These properties are zoned I-L. SW Bonita Road is functionally classified as a major collector street by the City of Tigard Transportation Plan Map. SW Bonita Road contains app,,oximatel.y 40 feet -3f pavement, curbs, and storm sewers. Sidewalk is not present on either side of the road. Interstate Highway 5 is functionally classified as an arterial. -CA Cf, �l��L The Oregon State Highway Division has been developing plans for A.C. improvement of the I-5/Highway 217 intersection that potentially Ck `roe could impact the subjo-t. site. However, no Improvement plans for 4vs this int,=Lgection have yet been adopted. NOTICE OF DECISION - SDR 50-0014 - SPIEKER PARTNERS PAGE 1 t 3. Site Information and Proposal Description The site is presently vacant and has undergone substantial site clearing and grading in the past few months. The site lies approximately 30 to 40 feet below the elevation of the Bonita Road overpass and approximately 20 feet lower than I-5. The applicant requests Site Development Review approval of a plan to construct two flex-space industrial buildings on the site. The buildings would be oriented parallel to SW Bonita Road. Proposed Building C would be located on the north portion of the site. Building C would include 80,000 square feet of flex-apace industrial warehouse area. Building D would be located on the southern portion of the site and would include 78,750 square feet. Both buildings would be served by a number or loading docks and at-grade overhead doors opening to a central driveway/loading area. Automobile p ,.-king for 213 automobiles wju:ld be provided along the perimeter of the site. The development would be served by a 40-foot wide driveway to be located opposite the intersection of SW Sequoia Parkway with Bonita Rodd. In addition, a driveway connection would be provi.red to the former Ted Nelson Steel Company site to the west to provide access to SW 72nd Avenue. Site development would require removal of '7 fir and widow trees along the southern edge of this site. A number- of other existing fir trees along the southern, edge of the property and within the public right-of-way just south of th(, parcel would be retained. In addition, two oak trees on the site's eastern onundary with the Interstate 5 right-of-way would be retaiv.. i. Site landscaping would include a variety of deciduous trees to be located throughout the site, planting of several Douglas fir treeN along the southern edge of the s. te adjacent to existing trees, and planting of a variety of shri.as and ground covers throughout the site. 4. Agency and NIO Comments The Engineering Department has reviewed the proposal and har offered the following comments: a. The applicant has submitted a site .nd pr"i,.r,i,iary utility plan showing the proposed buildings. b. Thio site abuts SW Bon .a Road, a major collector street. This street is improved with full width pavement and curbs, bat no sidewalk. The existing 60 foot wide right-of-way is adequate for a major collector street. C. Access it tr, be provided by a 40-foot wide driveway from SW Bonita Roa,i that meets the requirements of subsection NOTICE; OF DECISION - SDR 90 -0014 - SPIERER PARTNER3 PAGE 2 l 18.108.080.A of the Code. A driveway connection to the adjacent parcel. to the went has also been provided. A joint use rnd maintenance agreement for the driveway will be required guaranteeing access through this parcel. d. Sanitary sewer service is available from a 21. inch Unified Sewerage Agency line that passes through the site. e. Ball Creek passes through this site within an existing 90 inch culvert. Proposec. storm drains are connected to the culvert. The Tualatin Valley Fire and Rescue District has reviewed the proposal and has commented that the proposed development must be served by no less than two accesses as per Uniform Fire Code Section 10.207. In addition, fire hydrants must be installed as per Uniform Fire Code. Placement of hydrants must be coordtna'.ed with the Fire District and Tigard Water District. The Oregon State Highway Division has reviewed the proposal and has commented that potential I-5/217/Kruse Way intetcnange improvements may be dramatically impacted by the propc9ed develt-,-nent. Preliminary alternatives A end B of the Interchange Impeovement Project would require right-of-way to be obtained from this site. The final env+.ronmentsl impact statement for the proposed interchange project is due in late 1990 with construction tentatively slated for 1.993. The City of Tigard has responded to the Highway Division that the City is not in a pok•ition to require right-of-way dedication or require modifications to i submitted developnint plan based upon potential right-of-way needs that are .iot identified in in adopted roadway improvement plan. The City of. Tigard Buil.ding Division, "igard Water District, Columbia Cable Television, and Neighborhood Planning Organization NPO #5 have reviewed the proposal and offc.-PO no comments or objections. No other comments have been received. ll. ANALYSIS AND CONCLUSION The proposal. for development of the two flex-Brace industrial buildings conforms with Community DeNrelopment Co,e f-L (Light Industrial) zoning district requirements for minimum setbacks from property boundaries, building height (45 feet maximum allowed; 28 feet maximum building height proposed), site coverage (85 percent maximum coverage allowed; 85 percent coverage proposed); and site landscaping (15 percent minimum landscaping; 1.5 percent landscaping proposed) . The buildings are designed to accommodate uses permitted in the I-L zoning district. NOTICE OF DECISION - SDR 90-0014 - SPIEKER PAkrKERS PAGE 3 The proposal complies w�;ti Community Development Code requirements for parking area trees, street trees and other site landscaping requirements. The plans also are consistent with Code standards related to vision clearance at driveway/road intersections, minimum access and aisleway widths and availability of necessary public services (water, sewer, and storm newer) . 1he site plan provides an adequate number of parking spacers to satisfy tt.e Ccde parking requirements for uses likely to locate in the proposed flex space buildings (213 spaces provided, or 1 epace per 750 square feet of proposed building area; the Code requires that warehouse uses be provided with at least 1 parking spaces per 1,000 square feet) . The site plan does not, however, designate handicapped parking spaces or bicycle parking facilities. The site plan will need to be revised prior to building permit issuance to provide for a minimum of 5 appropriately located and sized designated handicapped parking spaces, as well as 7 bicycle parking spaces within a bicycle rack. Ttie site plan satisfies minimum access standards through the provision of the two proposed access driveways. Code Section 18.108.080.A requires that industrial use parking areas in excess of 100 parking spaces be provided with either two 24-foot minimum wide access drives or one 40-foot wide access d•-ive. One 40-foot vide access driveway to 3W Bonita Road is shown on the plan. Another 49-foot wide access driveway connection is provided to the former Ted Nelson Steel Company site. The applicant will need to slow that an easement has been recorded across the former Ted Nelson Company site to SW 72nd Avenue, so an to guarantee 72nd Avenue access for the proposed development. C. DECISION The Director's designee approves Site Development Review SDR 90-0014 subject to the following conditions: BUILDING PERMITS WILL NOT BE ISSUED UNTIL THE FOLLOWING CONDITIONS ARE. FULLY SATISFIED OR A SATISFACTORY PERFORMANCE ASSURANCE 1S POSTED GUARANTEEING COMPLETION OF IMPROVEMENTS. , i�d W ,' r /�• �The si e plan shall be revised to provide for a minimum of 5 �i Appro iatel.y located and sized designated handicas pped parkin l ?apacVs, as well as 7 bicycle parking spaces within a bicycle ra t'c. STAFF CONTACT: Jerry Offer, Planning Division, (639- 71) . 777 A concrete sidewalk and driveway apron Ehall be inst.tlled along WE.fi {t.Q.K. I the SW Bonita Road frontage. Improvements shall he designed and otp'x 'A t,� ID constructed to major collector street standards and shall conform �� ZO ��tt t 1F to alignment of existing adjacent Improvements or to an alignment ok iq� IM El"'�c NOTICE OF DECISION - SDR 90-001.1 - SPIEKER PARTNERS PAGE 4 E�.4\oF���pf �. Tt5 I approved the Engineering Department. STAFF CONTACT: Gary r Alfson, Engineering Division, (639-4171 ) . BLilding permits will not be issupd And c,znstruction of the sidewalk, and drivewayapron p ron s hall not commence until the Engineering Department has issued a : tie^f- opening permit. A inn percent performance assurance or lr_tter of commitment and the payment of a permit fee are required. STAFF CONTACT: John Hagman, Engineering Division, (639-4171) . Q) 4. The applicant shall provide for roof and pavement rain drainage (� to the public stormwater drainage system or by an on-site system designed to prevent runoff onto the adjacent property. STAFF CONTACT: Brad Roast, Fuilding Division (639-4171) . -� 5. The applicant shall provide connection of proposed buildings L-) the public sanitary sewerage system. A connection permit is -equired to connect to the existing public sanitary fewer system. STAFF CONTACT: Brad Roast, Building Division (639-4171) . 6. The applicant shall obtain written approval fr0r4 ' ttyOIUnnified Sewerage Agency of Washington County to connect to tae e*isting 21-inch sanitary sewer l ine Drior to if3suance of a Street Opening Permit. STAFF CONTACT: John Hagman, Engineering Department (631.- 41.71) . L 7. An erosion control plan shall be provided as part of the building permit submittal. The plan shall conform to "Erosion Control Plans - Technical Guidance Hanibook, November 1989." STAFF CONTACT: Brad Roast, Engineering Division, (639-4171) . 8. A joint use and maintenance agreement shall be executed and recorded on City forms for all common driveways. The agree,.nent shall be referenced on and become a part of all applicable parcel deeds. The agreement shall be approved by the Engineering Division prior to recording. STAFF CONTACT: John Hagman, Engineering Department (639-4171) . UNLESS A SATISFACTORY PERFORMANCE ASSURANCE IS POSTED, THE FOLLOWING CONDITIONS SHALL BE SATISFIED PRIOR TO THE ISSUANCE OF AN OCCUPANCY PERMIT: 9. The proposed landscaping materials and other proposed site improvements shall be installed in conformance of the approved site plan. STAFF CONTACT: Jerry Offer, Planning Division, (639- 4171) . THIS APPROVAL SHALL BE VALID IF EXERCISFn WITHIN EIGHTEEN (18) MONTHS OF THE DATE OF FINAL DECISION NOTED BELOW. NOTICE. OF DECISION - SDR 90-001.4 - SPIERF.R PARTNERS l F 1). PROCEDURE 1. Notice: Notice was published in the nel•dpaper, posted at City Hall and mailed to: _ X The appiicant and owners X Owners of record within the required distance _ X The affected Neighborhood Planning Organization __Affected government agencies 2. Final Decision: THE DECISION SHALL BE FINAL ON 8/7/90 UNLESS AN �APPFi\L IS FILED. 3. Appeal: Any party tc the decision may appeal this decieion in accordance with Section 18.32.290(A) and Section 18.32.370 of the Community Development Code whish provides that a written appeal must: be filed with the City Recorder within 10 days after notice is given and sent. Appeal fee schedule and forms are available at Tigard City Nall, 1.3125 SW Hall Blvd. , Tigard, Oregon. The deadline for filing of an appeal is 3:30 p.m. „9,,,,;r 7, lc)c)C)_ 4. Questions: If you have questions, please call City of Tigard Planning Department, City of Tigard City Hall, 13125 SW Hall Blvd. , Tigard, Orego► . r -1.- _ --/,�J O P .P ED =Offer p�E ate Pidnner /'Ze Yz APPROVED BY: Keith Liden DATE Senior Plenner n Al 1jj m nJ SATE I_ - - -- i NO`PICE OF DECISION - SDR 90-0014 - SPiEKER PARTNERS PAaj 6 PC/PT -- 5MIN. 8*MAX. I �s- i 1/26 P c� aJ��4 5 MSN• 9!1 5 8 y,Ax - -- - -- — PC/PT PLA VIEW 2% -� 2%— 100 -a 1/2"MAX. 4"PC.CONCRETE " �1 2 3/4"-0AGG.BASEROCK SECTION A-A NOTES 1. CONCRETE SHALL ATTAIN A MINIMUM COMPRESSIVE STRENGTH OF 3000 P.S.1. IN 28 DAYS. - 2. JOINTS SHALL BE SCRIBED 3/4" DEEP AND RAMP PANELS SHALL BE EDGED ON 4 SIDES AND HAVE A LIGHT BROOM FINISH. STANDARD CORNER CIWOF TIFARD WHEELCHAIR RAMP til"CW Mo-BLVD. nF.SIGN 8" APPROVED HY UHAWN BY IP+N OU 23397 TMNIM VM3 GA SRS SCALE DATE DRAWING N0. N.T.S. 5/7/90 6"x 6" 10 GA. 40' -0" MAX. 15' -0" MIN. MESH DRIVEWAY R/W LINE A 1 6" ) OPTIONAL w SIDEWALK LOCATION CONTRACTION JOINT 8 EXPANSION JOINTS 8 SIDEWALK CURB JUINT EXPANSION JOINTS --� A 13- O- _ 7' 6" MIN. 7' -6" MIN. 3' - 0" FACE OF CURB 20'-0" MAX. 20' - 0" MPX. PLAN �I I - 1/2" EXPOSURE USE EXISTING EXPANSION JOINT SAWCUT AND PLACE COLD JOINT. OR SEE DWG. N0. CS-306. ELEVATION 8-8 IW :Z STREET -' 3 1GA. MESH I-I/2" ABOVE 2" OF 3/4" MINUS / BASE SECTION A-A I. CONCRETE SHALL HAVE A MINIMUM BREAKIN; STRENGTH OF 3000 PS 1. AFTER 28 DAYS , 6 SACK MIX 2 CURB JOINT SHALL BE A TROWELED JOINT WITH A MINIMUM 1/2" RADIUS ALONG BACK OF CURB. 3. EXPANSION JOINTS SHALL BE 1/2. PRFMOLDED ASPHALT IMPREGNATED MATERIAL OR EQUAL, EXTENDING FROM SUBGRADE TO FINISHED GRADE. 4. SEE DWG. NO. CS--300 AND NO. CS-305. � DEPARTMENT OF LAND USE WASHINGTON COUNTY COMMERCIAL DRIVEWAY AND TRANSPORTATION DATE CIVIL ENGINEER DRAWN APWA NO. WASK COUNTY NQ /7 N34 >~.,, 146 wNsg NONE DW-201 R/W \ -5' MIN.- CURB JOINT SEE NGTE 5 - 2 ROAD � � e � � =2" /4"-0 SUBGRADE SIDEWALK ADJACENT TO CURB R/W 5 MIN 6• i i 2 ROAD � � 4 SEE NOTE 5 2" OF 3/4"-0 COMPACTED SUBGRADE SIDEWALK AWAY FROM CURB NOTES I CONCRETE SHALL BE 3000 PSI AT 28 DAYS , 6 SACK MIX , SLUMP RANGE OF I I/`2 TO 3 2. PANELS TO BE 5 FEET LONG 3 EXPANSION JOINTS TO BE PLACED AT SIDES OF DRIVEWAY APPROACHES , UTILITY VAULTS WHEELCHAIR RAMPS , 9 AT SPACING NOT TO EXCEED 45 FT. 4 FOR SIDEWALKS ADJACENT TO THE CURB 9 POURED AT THE SAME TIME AS THE CURB, THE JOINT BETWEEN THEM SHALL BE A TROWELED JOINT WITH A MIN 1/2"RADIUS. 5 SIDEWALK SHAD_ HAVE A MINIMUM THICKNESS OF 6 INCHES IF MOUNTABLE CURB IS USED OR IF SIDEWALK IS INTENDED AS PORTION OF DRIVEWAY . OTHERWISE 31DEWALK SHALL HAVE A MINIMUM THICKNESS OF 4 INCHES . 6 DRAIN BLOCKOUTS IN CURBS SHALL BE EXTENDED TO BACK OF SIDEWALK WITH 3' DIA. PLASTIC PIPE AT 2 % SLUPE CONTRACTION JOINT TO HE PLACED OVER PIPE WASHINGTON COUNTY — r^DEPARTMENT OF LAND USE CONCRETE SIDEWALK AND TRANSPORTATION DATE CIVIL ENGINEER DRAWN APWA NO. WASH. COUNTY NO. 17 ` L� ,t�.- .�. AM b.e2 NONE CS — 305