Loading...
8095 SW CHURCHILL COURT-1 ADDRESS: i:\records\microFlm\targets\building.doc CITY OF TIGARD BUILDING INSPECTION NOTICE Inspection Line: 639-4175 Business Phone: 639-4171 Footing Rain Drain Cover/Service Foundation Water Line Ceiling -P —b. Post/Beam Mech. Shear/Sheath Framing ech. Plbg.Und/Flr/Slab Plbg. Top Out Insulation Elect. Post/Beam Struct, ec ugh-ir1 Gyp. Bd -Bldg. 9 San. Sewer Appr Sdwlk Reins. Other: _ Date: _ — A.M.--X P.M._�. Entry: — -- Address: U Tenant: Ste: MST Con/Own: cue.- <, _ - B of. d%-T THE FOLLOWING C J3RECTIONS ARE REQUIRED: ELR: In actor. Date: 'APPROVED __DISAPPROVED/CALL FOR REINSP. CF CO CITY OF TIGARD BUILDING INSPECTION NOTIC Inspection Line: 639-4175 Business Phone: 639-41� Footing Rain Drain Cover/Sentice FINAL Foundation Water Line Ceiling -Plumb. Post/Beam Mach. "hear/Sheath Framing -Meeh. Plbg.Und/Fir/Slab Pibg.Top Out Insulation -Elect. Post/Beam Struct. (9. Rough-in Gyp. Bd. -Bldg. San. Sewer Gas Line Appr/Sdv, c Reins. Other: Date: _ O - A. P.M. Entry:— Address: Is Tenant: Ste:_-_ MST: Can w b �. -�'VL � MEC: —7 ELC: — THE FOLLOWING CORRECTIONS ARE REQUIRED: ELR: `rte Inspector: - _ Date: APPROVED DISAPPROVED/CALL FOR REINSP. C CO CITY OF TIGARD BUILDING INSPECTION NOTICE Inspection Line: 639-4175 Business Phone: 639-4171 Footing Rain Drain Cover/Service FI Foundation Water Line Ceiling Plu Post/Beam Mach. Shear/Sheath Framing -Mech. Plbg.Und/Flr/Slab Plbg.Top Out Insulation -Elect. Post/Beam Struct. ech. Rough-I Gyp. Bd. -Bldg. San. Sewer as Li Appr/Sdwik Reins. Other: 0 � Date: _ A.M. P.M. Entry: Address: � Tenant: Ste: MST: _ EUP: Con/Own: �D D �� _ MEC: PLM: ELC: THE FOLLOWING CORRECTIONS ARE REQUIRED: ELR: Inspector ___ — Date: _ APPROVED ISAPPROVED/CALL FOR REINSP. CF ' CO