CITY OF TIGARD BUILDING INSPECTION NOTICE
Inspectiun Line (Rec-O-Phone). 639-4175 Business Pf.,�e� V-41
Inspection: � ( �-0–�Q (`---- --
Footing Susp. Ceiling Sprink, Rough-in Appr/Sdwlk
Foundation Plbg Underslab Mach. Rough-in Fireplace
PostlBeam ;;trust. Plbg. Too Out Elec. Rough-in MAL:
1
Post/Paam Mach. San. Jewor Gas Line C---Bldg.
Plbo. Underfloor Rain Drain Framing -Plumb.
Alarm Water Line Insulation c_ eeh. )
Undertir. Insul. Shear Wall Gyp. Bd. -Elect.
r
Date Requested:,, �� C� / I --� Time: AM PM/-
Address:—L' 9–
Permit C (J Ll–
THE
rTHE FOLLOWING, CORRECTIONS APE REQUIRED:
r
Ina ecl
P >x_
_APPROVED _.DISAPPROVED _APPROVED SUBJECT TO ABOVE
_Call For Reinsp.
s.ssus
DEPARTMENT OF LAND USE 6 TRANSPORTATION
WASHINGTON LAND DEVELOPMENT SERVICES DIVISION
155 NORTH FIRST,HILLSBORO,OR 97124
COUNTY, INSPECTION REOLIESTS: 503/640-3561/893-1415
OREGON XXXXXXXXX--> 640-3470
le Page 1 of 1
Date 02/24/95
'Time 13 : 5
L-'ermit '1.'ype Residential Lil.e(-t.rical Permit Permit # 05064383
Permit Status APPROVED Applie3 07./24/95
bit.us Address 10b3b SW CEN'1't)HY OAK DR '1'l .Issuec, 02/24/95
Perwi t Title SNR - BURGLAR ALARM Completes;
Permit Uescr . 'I'o Expire 8/23/gb
Project 'Title SE'R - BURGLAR ALARM Project # P0047840
Project Uescr. . * EROSION
PL rcel Number 2S1'1'1 - Land Use District
Valuation 0
Legal Uescr .
Owner .INSPECTION - TiGARD Construction CTH
Applicant Name AD'1' Classification 900
Applicant Addr . : 703 NE HANCOCK Occupancy
POR'I'LAND, OR 97212 Validated by PH
Applicant Phone- '1134-3'lb5 X35 lnspector Area
t'ee description Units Fee /Unit Ext fee Data
------------------------------------------------------------------
Limited Energy/Alter ./Extension 1 40 . 00 40 . 00
Subtotal Electrical k'ees : 40 . 00
State Surcharge of b% 2 . 00
Total Electrical Fees , 4'2 . 00
*** tees Required Fees Collected & Credits +. >`
Method Check # Receipt No. Date Payment
'DEW 02/, 4/95 42 . 00
TOTAL THIS UA'1'E ********* 42 . UO
Fees : 42 . 00
Adjustments : . 00 Total Credits : . 00
Total Fees : 42 . 00 'Total Payments : 42 . 00
Balance Oue: . 00
NOTICE: This permit becomes null and vola If the work or construction for which It In Issued Is not commenced within 1110 days. Once construction has started,
' s permit becomes null and void I,construction Is Interrupted for a period of 1110 days. I certify that the Information presented by the sppll�ant and
..1s agent or agents In support of this oermit Is true and correct to the best of our knowledge. I acknowledge that the Building Department's rellenre
upon false and misleading h.formatlon may Invalidate thla permit. All provisions of applicable laws and ordinances 9.,;erring the constructlon and use
of this building or structure x,111 be compiled with whether or not specified on the plans or noted on the plans correction shoots. 1 scirnowledge that
the granting of a permit does not grant authority to access private property or to use easements. I further acknowledge that the use or ocrupency of
the structure or building p,rmitted depends upon my nailing for Inspections at vadoue Limes during the process of construction and the t.,ullding
Inspection staff verifying compllance with the various codes. Use or occupancy of the building or structure pen..4ted prior to approval by the
Building Department Is r.olnly at the risk of the applicant and such use or occupenCr is revo,able until all Inspection requirements are satisfied sad
approval is given by 0* tsullding Official. 1 further acknowledge that a lien may be placed on the title of the property upon which the permit Is Issued
specifying that the tor or occupancy of the building or structure Is provisional and revocable until the satisfaction of all Inspection requirements.
APPLI'CANT'S SIANATUIIE
Department
COUNTY RESTRICTED
Department of Lend Use&Transportation
Electrical Inspection Section
• 155 North First Avenue,#350-12
E LECT R I CA L
ENERGY
Hillsboro, 97124
Information: 503 640-3470 Fax: (503)6934412APPLICATION
PRINTPLEASE _
Please complete . . . Permit No. _- -
1. Location of lnstallatipn Date 9
Addressa 3.i CLQ o' t (010 'c ,---- ---
City— Zip Code— _ 4. Type of work:
Map No._ � Tax Lot RESIDENTIAL Restricted Energy Fee $40.00
Thomas Map Book: Pag (yam Section (for all systems)
) Check type of work Involved:
Directions ` _� -A"
1. � —V Auoiaand Stereo Systems'
Commercial L_ Resj'd ntial lfl�urglar Alarm
Telephone Systems"
Tenant Name -''� Garage Door Opener*
(if commercial) �' ____,__ .____...�____ Fire Alarm
Heating.Ventilation and Air Conditioning System.'
2. Contractor application: Vacuum Systems*
Electrical Contractor
ElOther
Address �y _ —_ COMMERCIAL Fee fcx each system $40.00
City.._—� _A_ State a/1 Zip .Q �L_?- (s se OAR 91 C-2e0-260)
Date 2 - JQb Nu)T,ber._ --- _ Check type of word. Involved:
Property Owner
Contractor's License No. _ L 0 —_
Contractor's Board Re No. -I- (� Boiler Controls
Reg. ^x Clock Systems
�^
Phone NO. .� '� y / Data Telero,nmunications Installations
3. Owner application: r lJ� Fire Alarm Installation
� �" HVAC
3 q Instrumrntation
Print Owner's Name _ Phone No. Interco n and Paging System
Lan&,;ape Irrigation Control"
Address Medical
Nurse Calls
City State Zip _ Outdoor Landscape Lighting"
This permit Is Issued under OAR 918-920-370. The applicant agrees Protective Signaling
to make only restricted energy Installations(100 volt amps or less) Othnr
under this permit end to do the following:
1. Only use electrical licensed peranns to do lristailatiens where
required. (Certain residential and other transactions are exempt Number of Systems
from licensing. These have ssierisks('). All others need licens- ----
Ing.)
2. Call for an Inspi .tion when all the Installations under this permit "No licenses are required. Licenses are required fnr all other installations.
are ready for Inspection.
3. Purchase separate permits for all Installations that are not ready S• Fees
for Inspection when the Inspector Is out to Inspect under this L
Fsrmir. inter fees $ _
4. Assume responsibility for assuming(list all corrections regMred
by the Inspector ere done,and ha $
S. Assume responsibility for calling fo 5% Surcharge .05 X total above s lira!Inspection when all of g _� � —
the corrections ure completed.' /�
The person signing this or uspfia the applicant or a person ` t rUSt ACCOUnt $
authorized b!n h pl ant
Signatur,
Authorih, it other than applicant —.____ —_.—________—.__ This permit becomes null and void If the work author wed by the
permit Is not commenced within 1 so days from date of Issuance
For Inspections call of such permit or If the work authorized Is suspended or abandoned
any time after work to commenced fora period of l so days.
640-3561 or 693-4415 Electrical Permits are non-refundable and non-transferable.
24-hour recorder, one wo:;•ing day In advance of need BL24-114
INSPECTION NOTICE j39-4171
City of Tigard Building Departmont13125 SW Ball Blvd. Tigard, Oregon 97223
Inspection Line (Rsc-O-P',one)s 639-4175 Businene Pho
Inspections
Footing Plbg. Underalab Mech. Rough-in Appr/Sdwlk
Found. Plbg. Tap Out Can Line FINAL-
Post;Beam struct. San. Sewer Framing -Bldg.
Poet/Ream Hech. Rain Drain ?naulation -Plumb.
Plbg. Underfloor Nater Line B -Meeh.
Date Requenteds (,� ` Times _AM pM
Addreea s1 j 7 1 7 Pas!`QL, I s / T `
Builds^s_,�-31� _�fl �1
THE FOLLOWING COMMMIONS ARE REQUIRED:
Inspectors
__�AFR6YFD DISAPPROVED APPROVED SUBJECT TO
-_-__ ABOVE
-Call For Reinep.
MMMVj,seesraeeaeeae�ewn
��fSPKCT1Oii ::vi.'ICE
City or Tigard Building Department
13125 dw Hall Bltrf. Tigard, Oregon 97223
Inspection Line (Rea-O-Phone)t 639-4175 Business Ph 39-4111
Inspectiont
Footing Plbg. Underslab Mach. Rough-in Appr/Sdwlk
Pound. _ T Oas Line FINALS
Post/Beam Struct. San. Sewer Framing -Bldg.
Post/Beam Hoch. Rain Drain In�iolation S -Plumb.
Plbg. Underfloor Nater Line/ � _..__Gyp. Bd. -Meeh.
/ /qDate Requested i_ / Tlme: �AM /P,N
Addres•clD��S—�G(/C��:yT ,/ Oq �1►sr
i - son it �yL/�c2Y"�r
/ / ':
Bu i ldor t Per
�U� j�El�lL
TBE FOLLOWING CORRECTIONS ARE REQUIRICDt
Inepectocs _ Dat.et—/2 �/ //�
_PROVED bIBAPPROVED — - APPROVEL` SUBJECT TO AAOVE
____Call For Reinsp.
r
IN$kEC!rION NOTICE
City of Tigard Building Department
13125 811 Ball Blvd. Tigard, Oregon 97223
Inspection Line (Rec-O-Phone)s 639-4175 Businesu Phone: 63!-4171
Inepssations_
Footing Plbg. D.st.erelab `'sch. Rough-in Appr/Sdwlk
F,,und. Plbg. Top Out Gas Line FINAL-
Post/Beam Struct. San. Sewer Framing -Bldg.
Post/Beam Hoch. Rain Drain :nsulition -plumb.
Plbg. Underfloor Nater Line Gyp. Rd. -Mach.
Date Rsequesteds �2/ � �Timet _ AM _ PH
Addresss _� _���SLYT �'e!`JS�1s
Builders -----
TRE FOLLOWING CORRECTIONS ARE REQUIREDs
ihe�ectors
ROVED DISAPPROVED APPROVED SUBJECT 'ro AAOVE
----Call For Reinap
CITY OF TIGARD
COMMUNITY DEVELOPMENT DEPARTMENT MASTER PERNIT
13125 SW Hall Blvd.Tigard,Oregon 97223*8199 (503)639-4171 11 #. . . . . . . : MST 940436
9--4 1"11 DATE ISSUED: 12/14/94
PARCEL: ""C)11.0Dri--@ 7BOIZi
SITE FDDRE SS. . . : 10535 SW CENTURY OAK E
J
SUBDIVISION. . . . a SUMMERFIELD, NO. 6 ZONING: R-7
BLOCK. . . . . . . . . . . L(-J,T. . . . . . . . . . . . .
BUIL.DING
REISSUE: DWELLING LJNITc3: 1 BASE M E N T. . . . . . . . :0 S f
CLASS OF WORK. cADP BEDRMS:@ BATHSiO GARAGE. . . . . . . . . . ..0 Sf
TYPE OF' USE. . . :!r' FLOOR REQUIRED SETBACKS-----..______
TYPE OF CONST. 5N F I R'ST. . . . :665 s LEFT. . -0 f t R I G HJ'. -0 ft
OCCUPANCY GRP. R3 SECOND. . . :0 S f FRONT. .0 ft REOR-0 ft
STORIES. . . . . . . : 1 FINBSMENT*tO S f REQUIRED------ --- --- - _..___._._.__
FIE
EQUIRED----14E I Gi'T. . . . . . . . : 16 fTOTAL----------6 S 5 s f SMOKE DETECTOR�. :Y
FLOOR LOAD. . . . : 40 psf VALUE. . . . . $ : 3600171 PARKING SPACES. . : I
Remar,ks. redoing hug-tse 665 sq/ft
---------- PLUMBING
S I NKS. . . . . . . . . . : 1 FLOOR DRAINS. . . . -C-l' BAC UFLOW PREVNTRS. I
LAVATORIES. . . . . :2 WATER HEATERS. . . :0 -rRAPS. . . . . . . . . . . . . . :0
TUB/SHOWERS. . . . -.0 LAU1\JDRY TRAYS. . . :0 CATCH BASINS. . . . . . . :0
WAJLR CLOSE'TS. . :171 SEWER LINE (ft ) . : iOO GREASE TRAP'S. . . . . . . :0
UISHWPSHERS. . . . :0 WATER LINE (ft) . :0 OTHER FIXTURES. . . . . :171
GARBAGE DISP. . . iO RAIN DRAIN ( ft ) . :0
WASH I NG MACH. . . : 1 SF RAIN DRAINS.
-- ----------- MECHANICAL FEES
FUEL TYP1ES----- ------ UNIT HTRG. . .0 type amol-Int by date V,er-pt
/GA5/ VEN75 . . . . . .6 BPRT $ 2'20. 00 JG 12/13/94
MAX INP11JT:0 PTU JI NT FANS. . : 1 BPLC $ 143. 00 JG 12/13/94
FURN ( 100K . . :0 HOODS. . . . . . . I B5PC $ It- V-121 Jr 12/13/94
FURN ) =1001-1 . . :0 WOODSTOVES. -O PPRT $ 105. 00 JG 12/13/94
FLUOR FURN. . . . :0 CLO DRYERS. : 1 P15FIC $ 5. 25 JG 12/13/94
BOTL/CMP OTHER UHITS:0 11PRT 41. 0111 ,I Ej 12/13/94
GAS OUTLcTS: l MPLC 10. 50 JG 12/13/94
ljwner-: $ 2. 10 JC 12/13/94
ROBERT HART
10535 SW 'CENTURY OAK DR.
TIG"RD OR 97224
Phone #:
Cont Tact orr
BRUCE PBAHAMSON
12735 SW MARIE CT
1IGARD OR 97223
Phone #.- 590--9400
1teq #. . : 102637
537. 67:, rol'AL
This persit is issued subject to the regulations contained in the ------- REPUIRED INSPECTIONS
Tigard Amicipal Code, State of Ore. Specialty Coles and all other Foot/IoL.,nd Insp Fir-eplace 1,1sp
applicable laws. Ali work will be done in accordance with approved Post/Beam St;t-1_(C,t Gas Line Insp
plans. This pereit will expire if work is not started within lU Post/Ream Mec-han Insulation Iiisp
days of issuance, or if work is susp@ndeo avorethan 0 ays. Pllm/�tndslab Insp Gyp Hoard Insp
1�1_M/Under floor Rain drain Insp
In7,p Watet, Line Insp
PlLimb Top 0,.1t Appt-/Sdwlk Insp
Issi.ted By . FV-Alniny I.Tlc;p Mer-hancal final
CA11 for inspection 639-4175
I I(ioHL) HELAIP I UP' PHYMF N I W.J. t 94-259651
L;HEC;K 111t.)ILIN 1 3 .3144. 85
NAME a ASAHANSON, BRUCE CHUH I 1 0.00
AL)DRESS PAYMFNI DHIF A le/14/94
4
sUlAD I V L IS I LIN
P IGHHD, LIRE BUN 9 1223-
I--,uPP(JSF. OF Pt4YMf--'Nl AM(,(JNI PAIL) 1—'U141A.)kiK Us" t-'H'YMI-.Nl HMUUN I PA I IJ
0 LA
�UiLVINU PFRM MST94-104,36 ?201. 00 PLUMPINH PERM
IvIRCHANICAI_ PE 41. 001 PLAN CHECK FE 5kl
bl'. BUILD P-k'-R IS. Sh
101535 SW CENTURY OAK OR
#6 LOT K
Tl)l-()I. AMOUNT PAID
iXNNSPECTY,N NOTICE I
City of Tigard Building Department
13125 SW Ball Blvd_ Tigard, Oregon 97223
Ine.3ection Li//ne�(1Rea-O-Phone): 639-4175 Business Phone: 639-4171
Inspection:___�_f-
Dotik Plbg. Underel Hoch. Rough-in Appr dwlk
Found. Plbg. Top Out Gas Line FINAL:
Post/Beam Struet.`�) San. Sewer Framing -Bldg.
!., /Beam Nec1�) Rain Drain J insulation -Plumb.
Plbg. UndertloorC`ater LL�.�7 Gyp. Rd. -Meeh.
Date Requested,�� lr.J r _ Ttme: _ All PM
Address:�� C` -ermit h
l_S. .S 1, .�rust .Y nU
THE FOLLOWING CORRECTIONS ARE REQUIRED:
Inepector: .� - Date:_/��/�� —
APPROVED DISAPPROVED APPROVED SUBJECT TO ABOVE
----Call For Reinep.
ate•----. _� ...
1 �
•
Residential Building Permit Application
City of Tigard
13125 SW Hall Blvd.
Tigard, OR 97223
(503) 639-4171
Jobsite Address: _., ., �.a U) — c4e
Subdivtston: ,,�1 w�M Pr �t 1 ( c% Lot# Office Use Only
n dc, _ P'arck/Rec#–`i Lie
Valuation: -
Corner Lot? Y N Permit# 1'113 IAV^O
Reissue of
Flag Lot? Y N
Map &TL# -0Z.Lcv
Owner: - Approvals Required
Addrens: 1CV
f`� � Planning
g _.
Engineering
Phone: _1 Other
Contractor: _ =� v6`-•�'�
-- Items Required
Address: W Subcontractors
Cj Z Z-
Truss Details
' C` —
Phone: �--� Other
Contractor's License #_ 1 � _
(attach cop of cu nt Oregon license)
Contact Name & Phone: L ^�-�Y`�L� '�1170
Subcontractors: Architect/Engineer:
Plumbing: �„1,!yZ_t� � )��. Address:
r S 1
Mechanical: -�A j,-vx
(attach copy of current OR Contractor's License) ( jai
Phone:
JOB DESCRIPTION:
.4-laxa—
Applicant Signature & Phone number
Received by: _ ` �_-- Cite Rer..eived. _— I ( / _> 2 J —
N%WORDICOMI)E.VIRF.SAPP
Permit# Account Description amount Amt. Pd. Bal. Due a ..
jn y f v-0 3`f' Bldg. Permit (BUILD) 22 0
Plumb. Permit (PLUMB) GS 0 S
Mect. Permit (MECH) _ '
State Tax (TAX)
Mech:
Plan Check (PLANCK) 5 ®r ��0 /0 -10
Bldg:
Plumb:
Mvch:
Sewer Connection (SWUSA)
Sew,dr Inspection (SWINSP)
Parka Dev C hii-ge (PKSDC)
Storm Drainage Chg (SDSDC)
Residential TIF (TIF-R)
Mass Transit TIF (TIF-MT)
Commercial TIF (TIF-C)
Industrial TIF (TIF-1)
Institutional TIF (TIF-IS)
Office TIF (TIF-0) �-
Water Quality (WQUAL)
Water Quantity (WQUANT)
Fire District (FIRE)
Erosion Cntrl Permit (ERrRMT)
Erosion Planck/USr\ (ERPLAN)
Erosion Planck/COT (EROSN)
TOTALS: J3 .�� �7 3 r 39= J
f
1"lic FOLLOWING
DOCUMENT
I.. kS OF POOR
ORIGINAL
VUALITY
1 ,
"77
• R2�
i -
•� V
1 y} � � - I i.�l• N3� �q1
Al
i
� � .�N•a�t.e
.r
7�
'» .. } ,,
fTer �. � "." .•,, Y
2.;
•t. 24 e, `.' moi, � ��„ �� -' 4
d' K
j5'p'
g 123 6Z 10'1-
79.97'- Ot 1(5-1U
LO g� a N 00.43'28 W
i� •N 00•43'30' w �
0 0 tt�11
4 � nn '4 �c1
�.
V U
WW
I v —
• .E �NII ,
CIAY OF IMANU REf- too, 14A
AMOUNT
NOMIF L"Wil-I t-MOLIN I" a oil. 041
PO4YMFNI DAI[: a 11.i 5/9,4
t..31J B D I V I r31 ON
PIJRPDSF Or- PA MEN 1 01111 IN 1 PHI 0 Of. PAYOU'41 11,41 Pf)
11/1'535 SW CIP.NTURY OAK 1141.1,4.
INSPECTION NOTA /�Y1
City of Tigard Building Department
13125 SW Ball Blvd. Tigard, Oregon 97223
(:��_
Inspection Line (Rec-O-Phone): 639-4375 Buainucs ',"not 639-4171
r
Inspection: �/ ��/ �
tai Plbg. Underal Mach. Rough-in Appr/Sdwlk
Pound. Plbg. Top Out Can Line FINALt
Post/Beam Struct. San. Smear Framing -Bldg.
Post/Beam Hach. Rain Drain Insulation -Plumb.
Plbg. Underfloor Nater Line Gyp. Rd. -Heuh.
Date Requestedt TimazNN _ PM
Addressi& s 3s:
Builders T
THE FOLLOWING CORRECTIONS ARE REQUIRED:
i
Inspectors Date:_ /
_APPROVED DISAPPROVED �- APPROVED SUBJECT TO ABOVE
Call
For Reinnp.
SP>✓C I F' I CAT I ONS
RESIDENCE REMODEL
!or
BOB & CAROLEE HART
ARCHITECT
GLENN F. CHILCOTE A. I .A.
17125 S .W. BOONES FERRY ROAD
LAKE OSWEGO, OREGON 97035
PH. (503)636-3668
939
September 15, 1994 LNtEM10.0P
L GF OP
• 1
HART RFSIDENCE
INVITATION TO PID/DESCRIPTION OF WORK
Selected contractors have been asked to provide a lump sum bid
for this project. Review thea general project, description of
.pork, instructions to bidders, contract documents and specifi -
cations .
Two sets of Drawings will be provided to each prospective prime
Contractor upon deposit of $30. 00. Deposits will be refunded
for complete sets returned in good condition within ten ( 10)
days after bid opening. Additional sets will be made available
upon request at cost of $20/set, which is not re `undable.
Bids received after the time fixed for opening will not be
considered
GENERAL
Proiect Description :
A. The following is a brief o,itline of work to be completed
but shall not be construed as complete.
North side — enclose area under roof overhang. Remove wall
and windows at north elevation to enlarge living room.
Extend floor , walls and ceiling, add new windows and
exterior door . Remove concrete- - !ab section.
South side — cover over and enclose a portion existing
entry atrium. Add new entry door and planter . Roof over
with skylight .
New spa/exercise room -- laundry and den — build to details
as shown connecting to new entry and master bedroom, all
enclosed .
Master Bedroom/Bathroom
Install two new windows in existing master bedroom, west
wall . Remodel existing master bathroom as shown with new
fiberglas shower furnished by owner , Alt. No. l . Close in
existing bath window.
Kitchen and eating area — existing cabinets are removed.
Clean out space down to gypboard walls . Remove walls where
shown and add new walls. Add new pocket door . Add
electrical etc. New cabinets N. I . C. , by Owner. Finish as
shown and required.
Re-Rooting
Remove fiberglas shingles and vapor barrier down to
existing plywood sheathing from entire roof . Install new
felt vapor barrier , fiberglas roofing and flashing as
specified. See specifications.
Alt . No. 4 Reroofing existing roof . See Division 7.
General : Remove furred down ceiling in entry and hall .
Revise electrical lighting and power in all spaces.
Adjust and add to roof framing as s;iown or required if
framing is not existing as shown.
' T
B. Items furnished and installed by Owner ; (NIC) Not In Contract
1 . interior painting and wallpapering.
Contractor- shall have all surfaces prepared ready to
accept finish. All gypsumboard shall be textured or
smooth. Verify smooth finish areas for wallpaper with
owner . All wood trim installed and sanded by
contractor , ready for finish. Do not putty fi ! l nail
holes .
2. All underlayment and finish flooring materials ,
including carpet , sheet vinyl and ceramic tile.
Include particle board underlayment over new and
existing subfloor and cement board at locations
designated for ceramic tile (entry/kitchen area )
Coordinate installation with owner .
Contractor to furnish and install subfloor at all new
areas over framing.
3. Removal of plantings for access.
Contractor to prepare and protect areas surrounding
wo-k from damage or other effects of construction after
removal of plant material .
G. All cabinets, countertops -nd backsplash finish, kitchen,
eating and master bath.
Contractor to remove all existing cabinets , counters,
backsplash material at all three locations not
previously removed. Determine on site. Prepare space
to receive new cabinets .
Contractor to provide electrical rough- in for
connection at locations shown affected by cabinet
installation. Schedule and coordinate construction and
finishing to allow for owners installation.
S. Applicances
Ccntractor to provide electrical , plumbing, sewer and
gas line rough- in and finish connection for• appliances
as required to achieve final hook-up.
6. Telephone rough- in
Contractor to coordinate timing to allow owners
installer access before finish work begins.
7. Surface mount light fixtures purchased and installed
by Owner . All other electric rough- in, recessed light
fixtures , outlets, wiring, etc. installed by
contractor .
C. Following hall be selected by owner , purchased and
installr--d by contractor :
-.jof shingles
glass block
iioerglas master bath shower and plumbing.
D. Following shall be selected and purchased by owner ,
installed by contractor
recessed light fixtures
ceiling fan/ light combination
entry door
all doors, windows and skylights
I
HART RESIDENCE INSTRUCTIONS TO BIDDERS
INSTRUCTIONS TO BIDDERS
i . SCOPE
Owner is providing some interior demolition and construction work
prior to this contract being implemented. Determine scope with
Owner .
This construction as described on Drawings and outline Specifica-
tions will be carried out under one General Construction Agreement
covering the construction work for this project. " :he General
Conditions of the Contract for Construction" AIA Document A201 ,
14th Edition 1987 is considered a part of this specification, to
be referred to as the "General Conditions" throughout these
Specifications.
This agreement includes all labor , materials, transportation,
equipment and services necessary for and reasonably incidental to
the completion of all work in connection with the project
described in this document, the outline specifications and
Drawings.
1 . SITE & CONSTRUCTION
CONDITIONS
The Contractor or his authorized agent are to .nspect the site of
the work. The signing of this bid by the Contractor is an
acceptance of the conditions at the site of the work upon which he
is bidding. All attic and below floor crawl spaces are considered
accessible. The contractor will be held responsible for the
completion of ^II the necessary work in accordance with the
Drawings and Specifications including framing adjustments required,
If any, in attic or crawl spaces. Non-accessible spaces exempt.
3. APPROVAL OF
MATERIALS
Each bidder represents that his bid is based jpon the materials
and equipment described in the bidding documents or
equal materials.
Substitution Request : each such request shall include a complete
description of the proposed substitute, the name of the material ,
or equiprr-r -, for w',ich it is to be substituted, drawings, cuts,
performar- -id Lest data, cost savings and any other data or
informatioti, necessary for evaluation. The Owner has the right to
accept or reject any substitution after evaluation.
4. SUBMISSION OF BID
All bids must be prepared on the forms bound herein. A bid is
invalid if it has not been deposited at the designated location
prior to the time and date for receipt of bids indicated or prior
to &ny extension thereof issued to Bidders.
Unless otherwise provided in any supplement to these Instructions
to Bidders, no bidder shall modify, withdraw, or cancel his bid of
any part thereof for forty five (45) days after the time
designated for the receipt of bids in the invitation to Bid. Prior
to the receipt of bids, Addenda will be mailed or delivered to
each Contractor which has received the bidding documents and will
be available for inspection wherever the bidding documents are
kept available for that purpose.
Enclose one copy of the proposal with attachments and conditions
in a sealed envelop with project name identification on the face
and contractor ' s name and address .
5. METHOD OF AWARD
The Owner reserves the righ to request examination of any bidders
subcontractors for approval before awarding contract.
The Owner reserves the right to select or reject any and/or all
bids.
6. FORM OF AGREEMENT
The "Standard Form of Agreement Botween Owner and Contractor" ,
A. I . A. Document A101 , 1987 Edition shall be used in executing this
Contract.
Lien rel .?ases may be required and shall be furnished upon request
from subcontractors prior to final payment.
7. PAYMENT & SCHEDULE
APPLICATION
With each month-end application for payment, the Contractor shall
furnish a statement comprising various listed items which
represent the total amount of work completed to the date upon
which application for payment is made. No application for payment
will be considered unless accompanied by a satisfactory list
without the percent of work completed and percent of work
remaining properly and fully completed, 3 copies each.
The owner shall retain five percent (5%) of the certified contract
payments due until final ac:eptance of the work. in no case will
retainage be less than 200% of the estimated value of uncompleted
work and work requiring corrections, or $1 , 000 whichever is the
larger amount.
6. PERMITS, FEES &
BONDS
Owner will pay architectural plan examining fees only.
Contractor shall be responsible for and include in his contract
all other permits and fees including building, mechanical ,
electrical , etc. , assessments, systems development charges, street
or curb bonds , utility hook-up f'ees, legal fees etc.
The contractor shall obtain all permits, pay all legal fees and
comply with all applicable codes, laws, ord+nances, rules ,
regulations and orders relating to building and preservation of
public health and safety.
Contractor shall secure all certificates of inspection and of
occupancy as required by the public authority.
9. INSURANCE
Contractor shall carry all liability, bodily injury, Broadform
Property Damage insurance sufficient to protect the Owner and
project. Ccnform to all state and local codes, laws and
regulations.
10. CONTRACT DOCUMENTS
FURNISHED
Architect. will furnish five (5) sets of drawings to the contractor
upon award of the contract. Additional returned bid sets, if
available will be proviraed. Additional requested sets , if not
available will be furnished at cost of $20/set.
f
HART RESIDENCE PROPOSAL FORM
Page 1
Contractor_
Date —
PROPOSAL FORM
GENTLEMEN:
Having carefully examined the Drawings and outline Specifications
entitled Residence Revisions for Mr . and Mrs. Robert Hart as
prepared by Glenn E. Chilcote & Associates Architects as well as
the premises and conditions affecting the work, the undersigned
proposed to furnish all plant , labor and material caffed for in
the documents for the total basic bid sum of :
$ dollars ( $
In addition the following options will be completed upon owner' s
approval for the bid amount indicated.
ADD tho following :
Alt. No. 1 Fiberglas shower :
Install owner furnished new fiberglas shower enclosure
in master bathroom. Include all plumbing rough-in and
finish, all other patching and finish.ng required for
complete installation. install shower door furnished by
owner . Remove existing tub/shower - nd prepare space for
new. See drawings for location. Remove existing
section wall as required for access. Replace and finish
wall section after installation.
ADD: $ dollars ( $ >
Alt. No. 2 Painting:
All exterior painting including soffits, siding and
trim, 2 colors to match existing . Include all new and
remodeled areas . Re-paint existing affected surfaces.
Extend siding paint to nearest existing trim or corner
beyond areas affected. Provide all preparation as
necessary including caulking, scraping, protection,
etc. before application. Provide 2-coat coverage.
ADD : $ _ dollars ( $
Alt No. 3 Insulation
Additional cost to install R-25 Batt insulation under
floor and add 6" batt insulation in attic space to
existing. See Specs. Division 7.
ADD : $ __-dollars ( $
All insulation required per C'nde and shown in new areas
to remain in Basic Contract .
DEDUCT the follow- ng :
Alt No 4. Roof Shingles
Delete tear off and re-shingling -kt existing roof
areas. New iiofing to weave into existing at all new
to existingroo° except install valley flashing at all
new to existing valleys in Basic Contract. Delete vent
replacement at exio} ing roof . Integrate valley
flashing @ new to existing roofs.
DEDUCT: $ dollars ( $ )
Basic Contract to include complete re-roofing and
flashing, at new and affected existing roof , including
all roof vents to meet code requirements . See Specs.
Division 7.
ACKNOWLEDGMENrS : The undersigned has :
A. Reviewed the Drawings and outline specifications.
B. Examined the existing dwelling and Site and reviewed any
obser%lable difficulties or drawing conflicts.
C. Is licensed to perform this work in City of Tigard, OR.
BID AGREEMENTS : The Undersigned agrees :
A. To holt: this Bid open for 45 days subject to provisions in
Instruct4ons to Bidders .
S. That no initial payments will be made and that payments will
be made at }.he end of the month for labor and materials
completed that month.
C. That an ? temizod payment request will be submitted to the
architect for review before month-end payment is approved.
D. That lien releasee will be provided before final payment if
and when requested for various subcontractors.
OWNER' S RIGHT RESERVED:
To reject all bids, to weive informalities, and to accept
only such bids as may appear in the Joest interests of the
Owner .
AWARD AGREEMENTS :
Time is of the essence. This project ? j located within a
Homeowners' Association requiring project completion within 120
days after permit is obtained. Time mai Le a factor in
determining bid award. If awarded a co,itra :t, the undersigned
agrees :
A. "o enter into and execute a Contract on the basis of this
Proposal on AIA Document No. A101 ; Standai ' Form of
Agreement between Owner and Contractor .
B. To complete the work in accordance with the Contract
Documents for the amounts set forth in this Prop-isal .
C. To commerce :he work no later Shan 10 working days after date
of the award.
E. To complete t'ne work within calendar days .
BID OPENING: Deliver to Architect' s Office
Glenn E. Chilcote & Associates Architects
17125 S. W. Boones Ferry Road
Lake Oswego, OR 97035
Deliver bids on or before
CERTIFICATION:
The undersigned certifies that this bid is complete including all
labor and materials .
Name of Individual Business Owner,
Partnership or Corporation:
Address :
Telephone :
___ ( signature)
. t
GENERAL REQUIREMENTS & SITEWORK DIVISION 1 & 2
1 . Protection :
A. New Construction :
Protect all construction and materials from damage
including water damage, constructiun damage, vandalism etc.
Cover all building materials from elements when exposed.
Repair and replace all underground utilities damaged during
construction.
B. Existing exposed construction :
Protect and cover watertight at end of each day' s construc-
tion. Replace all damaged materials or surfaces rain, cun-
struction or otherwise damaged.
2. Guarantee :
Provide a 1 year letter of guarantee to Owner for all
construction materials , labor and workmanship at conclusion
of project, and to include assurance that all sub-trades have
been paid and there are no liens against the project. This
letter to be issued at substantial completion of project as
determined by 4rchitect per AIA A201 Document definiti,�n.
3. Excavation :
Excavate as required for footings, foundation work and crawl
spaces. Remove all material and dispose of off -site. All
foundations shall be excavated minimum 38" into existing
grade and as shown. After forms are set, remove soft or mushy
material from bottom of footing trench before pouring.
Architect' s option with extremely wet weather to request
installation and compaction of 4" deep 3/4" minus crushed rock
in forms at no additional expense after removal of mud.
4. Construction area :
Confine all construction materials within the boundary of
the existing site.
Cleanup offsite :
Maintain clear right-of-ways at existing street. Remove mud
or debris collected on street each day. All city regulations
shall be adhered to concerning street blockage, street clean-
up etc. Any costs incurred due to city required cleanup
shag be at the expense of the contractor .
5. Cleanup onsite :
Refer to AIA General Conditions, Section 4. 15
Provide proper removal of all debris and accumulated trash at
interior and exterior work at the ens' of each working day and
cleanup work spaces by sweeping, raking etc. Provide dumpster
as necessary to haul accumulated debris from thp site and
dispose of at approved landfill disposal site. Under no
circumstances will debris be allowed to accumulate. Protect
all lawn and shrubbery areas . Confine all constr�,ction
materials to interior of existing space, principaliv garage.
6. Restoration
Backfill and smooth finish grade at all affected areas. Blend
restored grades with surrounding grades. Leave site ready for
owner' s replanting and seeding.
CONCRETE DIVISION 3
1 . General
.All concret? shall be minimum 2500 PSI compressive strength at 28
days, readymix material to conform to ASTM G 94 with maximum slump
of 4". Cement content to be 5 sacks per yard. Concrete when
placed shall have a temperature between 500 and 700. Do not
install concrete if air temperature is likely to drop below 380
within 24 hours. Verify with Architect.
Concrete frozen or rain pocked will be removed at contractor' s
expense. All footings to bear on firm undisturbed soil . Notify
Architect before proceeding if any unusual conditions are
encountered in footing excavations.
2. Interior Floors Troweled Finish
Screed to indicated elevations, remove excess water and foreign
r;aterial , float level . Trowel to hard, dense, uniform surface,
with 1/8" maximum variation in 10' .
Present uniform surface, suitable for indicated finish products.
3. Saw Cutting
Saw cut concrete at locations shown with power cutter machine on
wheels in utraight lines. Mark locations and use laser beam or
chalk line.
4. Undersiab Backfill
Install structural granular backfill under concrete slabs and as
required. Structural granular fill shall be placed and compacted
under controlled conditions in lifts.
Compact fill to 95% of maximum density with ASTM method D-1557.
Fill placed in lifts not exceeding eight (8) inches loose
thickness. Top 6" shall be clean sand or gravel fill . install
vapor barrier over, 6 mil . visqueen.
5. Backfilling, exterior flatwork
Install 3" of 3/4" minus crushed rock under all exterior concrete
walks and siabs. Compact to 95% density requirements. Achieve
final subslab grades.
CARPENTRY DIVISION 6
1 . Framing
All products in accordance with standard grading rules Western
Wood Products Assoc. (WWPA) & American Plywood Assoc. (APA)
a. Glulam beam, concealed, Type 24F-V4 Waterproof glue.
b. Joists, beams and stringers — Douglas Fir No. 2 and btr .
C. Floor & roof framing, rafters and ridges — Douglas Fir No. 1
d. Beams and stringers 4 X 8 and larger — Douglas Fir No. 3
(no heart wood)
e. Bucks, Blocking, bridging and misc. — Hem/Fir No. 3
f . Studs — Douglas Fir or Hem/Fir No. 2 or btr.
g. Sills, sleepers, plates and nailing blocks embedded in
concrete — Pressuie treated Douglas Fir.
h. Posts and timbers — Douglas Fir No. 1
J . Roof — 5/8" CDX plywood sheathing
J . Wa ' I 1/2" CDX plywood sheathing.
k. Subfloor — 1-1/8" T&G plywood subfloor
1 . By Owner . Information only:
Underlayment — 1/2" underlayment grade particle board or
1/2" cement board. Prepare for carpet, sheet vinyl and/or
ceramic tile. Fill and smooth all edges, joints, voids and
rough areas. Cement board used at ceramic tile.
2. All wood in contact with concrete or masonry shall be pressure
treated per UBC 25-12.
3. Option : Floor and roof framing : ' I ' joists with tip and
bottom chord, plywood or oriented strand board (OSB) webs.
Provide structural data backup. Approved trus joist - TJI ' ,
Louisiana Pacific ' Inner-Seal I -Joist' or equal .
4. Connections shall be with common or sinks nails as follows,
except where otherwise noted :
1 . Joist laps over partitions (4) 16d fare nail
2. Beams and headers to studs (6) 8d toe nail
3. Solid bridging to joist (each end ) (2) 16d face nail
4. Stud to bottom plate (4) 16d toe nail plus
one A35N anchor 4' -0" o. c.
5. Pit. to rim joist, blocking or 16d @ 16" o. c. face nail
sole plate.
6. Top Plate to stud (2) 16d face nail plus
one H-6 anchor 2.4" o. c.
7. Doubled top pit. continuous 16d 16" o. c. face nail
along length
8. Doubled top pit. at intersections (2) 16d face nail
9. Doubled top plate at laps and (4) 16d face nail
splices
10. Rafters to top plate one huzricane clip H-1
each end
NOTE: All metal framing anchors and hurricane clips,
Reference Simpson N' s .
11 . Sheathing :
A. Roof plywood — 8d common @ 6" o. c. @ all supported
edges and 12" o. c. @ interior suports .
B. Floor plywood — subfloor — 10d common @ 6" o. c. @ all
supported edges and 12" o. c. to interior supports. Glue
all edges and field supports.
C. Roof and Floor plywood option — 2" glue tipped, power
applied staples spacing per above, approved option.
Set stapler for proper depth.
D. By Owner. Information only:
Particleboard underlayment glue and screw to subfloor
Continuous-glue strip @ each support and edges, 1-1/2"
screws, counter sink at 8" o. c. edges and field.
4. Method
1 . All walls 2X4s stud at 16" o. c. or 2X6 stud @ 24" o. c.
See Drawings for location.
2. Top plates shall be doubleo on all stud walls and clipped
or anchored as noted above.
3. Cripples under headers shall be continuous to the sole
plate,
4. Blocking 1 -1/2" wide of equal depth of the members shall be
provided between all joists and rafters at their supports,
unless members are nailed to rim joist or as detailed.
5. Install all horizontal members with the crown up.
6. All members in bearing shall be accurately out and aligned
so that full bearing is provided without the use of shims.
7. All rafters shall be notched for full bearing at all
supports.
u. All joists shall have a minimum of 2" bearing at supports .
Lapping joists sha ! l have 6" laps centered over interior
supports.
9. Ledgers ai:a stud wall foundation sole plates shall be
bolted to concrete with 1/2" X 10" anchor bo'. :s, maximum
spacing 4 0". At least two bolts shall be provided for
each sole plate with one bolt within 1 ' 0" of each cnd.
10. All roof and floor sheathing shall be applied as follows :
Center panel end joints over joists or rafters, using half
panel staggered pattern,
11 . Wall sheathing half-panel staggered. Ends shall be
supported with framing or blocking.
5. Finish Carpentry
Wood Trim:
All finish wood trim, mouldings, door/window casings interior
and exterior to match existing. Wood b:�Ge installation by
Owner . All material installed shall be 450 mitered at joints
unless shown otherwise. Edges shall fit snugly, joints flush
and grain shall be finished smooth and sanded. All trim not
flush, smooth, tight jointed, of good workmanship prepared for
stain or paint shall be rejected. All nailing in wood trim
shall bo done with finish or casing nails depending on
circumstance and shall be set to receive put ;:y. Use only
galvanized nails at exterior .
Interior painting and putty work N. I . C.
6. Exterior Siding :
Horizontal lap, Western Red Cedar , to match existing. Provide
in continuous lengths , no butt or bevel joints in field of wall
between vertical trim pieces. Clear vertical grain. No splits
or skips allowed. Cut to tight fit.
7. Exterior Trim:
Westerr Red Cedar, V. G. , C & Btr . No splits or skips allowed,
smooth surface for stain or paint. install as shown and
required to match existing. Use preformed metal edges at
siding at building corners.
THERMAL & MOISTURE PROTECTION DIVISION 7
1 . Insulation:
Walls R-21 foil -faced high density
Floor (new) R-25 ba:-.t, kraft face
Floor (existing) R-25 batt ( part Alt. No. 3) See Bid Form.
Flat ceilings (new) R-38 batt
Flat ceilings (existing ) Add 6" fiberglas batts existing.
(Part Alt. No. 3) See Bid Form.
Vault ceilings R-30 batt
Slab floor edge R-15 rigid extruded polystyrene fcam board
6 mil vapor barrier on ground in crawl space ; new areas only.
Staple netting under floor joists to support floor insulation.
Maintain clear venting at eaves and ridges in existing and new
attic spaces after installation of insulation.
2. Gutters, Downspouts & Flashing
Gutters : 0. 032" prefinished aluminum or 24 ga. prefinished
galvanized to match existing. Match existing profile.
Downspouts : 0. 032" primed aluminum or 24 ga. primed galvanized.
Paint to match existing siding color . 3 straps
per downspout minimum.
Drainage : connect to existing underground drainage system.
Verify drainage capability. Cleanout as required.
Flashing :
valley : 40 Ib. felt and 1.2" wide preformed and prefinished
to match existing 26 ga. aluminum valley flashing )`.
12" wide minimum.
edge : min. 3" lap under roofing on sheathing at roof edge
and down 2" with drip edge into gutter . Prefinished
aluminum or galvanized to match existing.
Provide miscellaneous other flashings as required for water-
tight construction.
3. Ridge vents : concealed certainteed, air vent inc. ridge top
' shingle vent II ' , 12" wide
4. Roof shingles
ReLova 1._
Remove all shingles and felt down to existing wood sheathing.
Remove all nails or staples .
Check for dryrot and replace sheathing at dryrot locations.
Retain all edge flashing at existing gutters . Remove all other
flashings.
Check entire roof and renail sheathing to substructure. Set
nails flush due to previous wood shrinkage.
Installation
Underlayment — 30 Ib. asphalt saturated unperforated felt.
Staple to plywood sheathing.
Install valley flashing over felt, all valleys and as shown
on Dr-iwings .
Shingles :
glass fiber 3-tab strip, self sealing, UL Class A, 30 year
limited warranty, minimum 280 lb. /sq. Heavy shadow line style,
GAF ' Timberline' Series or equal . Color as selected. install
per manufacturer' s directions.
See Alt. No. 4 Bid Form
Install ridge vents continuous on all new and existing ridges.
Sawcut roof sheathing as required for ridge vents at roof
ridges new and existing.
See Alternate No. 4 Bid Form.
DOORS, WINDOWS, GLASS & GLAZING DIVISION 8
Genera!
Coors, windows and skylights provided by Owner, installed by
Contractor.
Refer to Drawings for quantity and locations.
All glass clear , insulated double paned, thickness for wind
resistance as required for opening size. Install doors, windows
and skylights complete with trim and fleshing as required. Provide
building sealant at exterior frame, foam spray seal at interior
around all window and door and skylight frames before trim
installed.
Provide all necessary hardware and screens. All window screens
shall be fiberglass cloth set in bronze tone aluminum frames with
built in catches set on interior.
DOORS
Prepare opening to receive pre-hung door/frame assembly. Install
straight and true complete with hardware. Meet energy code
requirements where applicable. See General Notes SHEET 3. All
doors pre-packaged with prehung frame and hardware.
DOOR SCHEDULE
No. Size Description Hardwire iVotes
1 310" X 6' 8" Entry door . Owner entry lockset
1-3/4" thick selected decorative with integral
solid wood or metal inside thumb-
with foam core for turn dead
2X6 frame wall . bolt.
2 PR 216"X 618" Living room/patio mortised and glazing :
1-3/4" Thick In-swing French keyed 3-pt. ' smart sash 11 '
doors, Pella locking system system 1/8"
' Designer ' Series Solid polished c1r . /1/8"
for 2X6 frame wall . brass interior Low E gloss
and exterior Armorcoac
handles film on ext.
side .
Incl Ude
interior
pleated
shades .
Include
outswing
pr. screen
doors.
3. 2' 8"X 618" Laundry/Den Bedroom Provide
1-3/4" Thick solid wood lockset. complete
fcr 2X4 frame Match funs— with hard-
wall tion, style, ware and
and finish wall stop
to existing.
4. 218"X 698" Spa/Laundry latchset. Provide
1-3/4" Thick solid mood match style complete
for 2X4 frame and finish with
wall to existing. hardware
and wall
stop.
S. PR 2' 6"X 618" Entry/Exercise Rm. 2 latchsets Provide
1-3/4" Thick solid wood for (one dummy_ complete
2 X 4 frame flush bolts with hard-
T&B 0 inact— ware and
ive leaf . one wall
stop
one floor
stop
6. PR 2' 6"X 6' 8" Master Bd. Rm/ 1 lockset Provide
1-3/4" Thick Exercise Rm. 1 latchset complete
(dummy) with hard-
flushbolts ware &
T&B in inact— wall stops
ive leaf .
7. 3' 0"X6' r'" Coat closet . latchset Provide
1-3/4" Chick solid wood match style complete
for 2X4 frame and finish with hard-
wall . to existing. ware and
wall stop.
8. 2' 8"X6' 8" Living Rm/ Lawrence 1'F Provide
1-3/8" Thick Kitchen 413 metal complete
pocket door Universal with pulls
solid wood for pocket frame and hardware
2X4 frame wall set or equal
WINDOWS
Aluminum clad exterior , Kyna.r 500 finish, dark brown.
Wood interior unfinished ready for paint or stain.
All frame members preservative treated, select softwood.
Interior exposed surfaces clear Western pine.
Glazing assembly and size as noted in Schedule. Dimensions are cut
to out of frame. Field verify dimensions.
Manufacturer : Pella ' Designer Series' fixed and casement units.
Approved equal as determined by Owner .
Type Unit Size Type Glazing Notes _
(horiz. X vert. )
A 41311X 315-3/4" Pella Clad ^:vlla
Designer Smart Sash 11
casement with single
sash Low E coating
B 4' 0"X 2' 0" Pella Clad Pella
Designer insulshieid
2 units— with single
fixed sash Low E coating
1 unit — tempered.
sliding sash Armorcoat fiim
o-i exterior .
C 2'6"X 4' S" Pella clad Pella Eedroom casement
Designer Smart Sash 11 for code egress
Sash with single
casement Low E coating
tempered.
Armorcoat film
on exterior
D 5' 0"X 6' 0" Pella clad Pella center mullion
Designer single glazed with (2)
Fixed sash. relilte, clear 2' 6"X 590" +/—
glass units
E 6 equal Pella clad Fella Provide separate
units +/— Designer Smart Sash 11 cost savings
2' 491X 690" fixed sash with single to raise sill
verify. Field Low E coating to 18" to avoid
measurements tempered. tempered glazing
to maximize Armorcoat film
window widths. on exterior .
F Size as required Garden clear insulated Install in
to fit existing window vents as select— existing window
opening. @ kitchen ed opening
Approx. 48"X46"
NOTE : Armorcoat film used for protection against errant golf balls
from adjacent golf course_ .
SKYLICHTS
Manufacturer : Velux roof windows and skylights or equal .
Provide with all hardware and flashing for complete assembly.
Approximat:z Frame Size :
G 30-5/8" X 55" Velux clear tempered interior use
Mod. FSF Low E Argon gas to meet
No. 308 filled glaze energ, code
code 75 (VHH) requirements
U = 0. 28
H 21-1/2" X 55" Velux Clear tempered. interior use
Mod. FSF Low E Argon gas _o meet energy
No. 108 filled. code require-
Glaze Code 75 (VHH) ments.
U = 0. 28
1 21-1/2" X Velux Clear, tempered interior use
38-1/2" Mod FSF Low F. argon gas to meet energy
No. 104 filled. code require-
Glaze Code 75 (VHH) ments.
U - 0. 28
GLASS BLOCK
General
Interior decorative glass wall insert as shown on interior
elevations between dining and kitchen.
Provide complete installation. Review with owner scope,
size, type of glass block and installation.
aterial
Pittsburg Corning PC glass block products or equal . thin line
series (3-1 /8" thick ) ' Decora' or ' Dailphi ' pattern as selected by
owner .
Installation
Install all block even, true and square. Use experienced workmen
only with at least 20 project experience. Install with mortar free
PC ' Kwik' N Ez' silicone system using rigid plastic frame channels,
rolls of flexible plastic between block spacers, and gun applied
silicone sealant, suitable for interior and weather protected use.
• r
FINISHES DIVISION 9
Gypsum Wallboard
Install at all remodeled and new locations affected, walls and
ceilings, 1 .2" thick, tapered edge. Use water r-sistant board at
high moisture areas including bathroom remodeling.
Spa/exercise room interior walls and ceiling see under plaster
assembly.
Do not exceed 1/4" variation in 810" from plumb, level and true
Iines.
Glue all board with double sheetrock nail method or 1-1/4" dry wall
screws.
Finish:
All wall surfaces to receive textured finish shall blend to and
match existing. Prime adjacent existing surfaces for proper
adhesion.
NOTE:
Coordinate with owner locations with smooth finish for enamel or
wallpaper cover.
Ceilings :
Existin¢. Existing ceiling texture has been removed. Add new
brocade texture to all ceilings except kitchen and bathrooms.
Provide sample for owner ' s review.
New, Texture all new ceilings to match approved brocade texture
applied to existing ceilings except spa and exercise room which
will have specified smooth plaster assembly finish.
Spa/exercise room Plaster assembly.
Install gypsumboard veneer base v ..th double nail mathod or 1- 1/4"
drywall screws/glued, walls and ceiling. Veneer plaster system
applied over compatible gypsumboard base. Prer2.ro subsurface to
receive veneer plaster. Correct any deficiencies or imperfections
before application. Verify veneer system is compatible with gypsum
wallboard base.
Install a one-coat system 3/32" thick entire wall and ceiling
areas, smooth ready for enamel .
Mixing, proportions , application in strict accordance with
manufacturer ' s directions.
Other finishes
All flooring materials, carpet, sheet vinyl , ceramic tile furnished
and installed by owner on owner installed underlayment surfaces.
Contractor install all subflnor plywood.
All interior painting and wallpapering completed by owner .
A
MECHANICAL DIVISION 15
Plumbing
All plumbing work to conform to all applicable codes and
regulations .
Route all work concealed below floor or above ceilings in joist
space.
Install all other rough- in or finish plumbing as required for
various fixtures installed in this contract or separately by owner,
entire residence.
Heating/Ventilating/Air Conditioning
All heating revisions to ,-.or"orm to all applicable codes and
regulations.
Provide design calculations for determination that existing furnace
has capacity and volume for duct extensions and heating of
additional space, both on the north and south sides.
Extend crawl space insulation wrapped sheet metal duct or fiberglas
flex duct to relocated or added floor register locations as shown
on Drawings. Insulate ducts to meet energy codes .
Size ducts for proper HVAC transfer .
Avoid sharp bends or kinks in duct runs. Provide 450 angles at all
connections with smooth runs.
Entire system balanced for even, equal air flow at all locations .
Include return air registers and ducting if required for proper air
circulation.
Provide access to crawl space through existing concrete foundaiton
fcr supply ducts.
ELECTRICAL DIVISION 16
Conform to all applicable codes and regulations. Drawings are
diagrammatic. Install all rough wiring, recessed light fixtures,
receptacle and switch boxes with wiring, recessed wall heaters
appliance wiring, etc. required for proper operation of appliances,
receptacle switches etc. with proper ampherage loads.
Surface light fixtures, switches, receptacles furnished and
installed by Owner.
Spa/Exercise Room
Install forced air zonal in-wall heaters @ locations shown on
Drawings.
Heater A Cadet ' The Register ' model Z.A 151 or equal 1500 W.
120V. 12. 5 amp. in-wall unit with remote thermostat.
Heater D Cadet ' The Register ' Model Z.A 101 or equal 1000 W. 120
V. 8. 3 amp. in-wall unit with remote thermostat.
Overhead flan/Light
Rough- in for 120 volt 52" blade, ceiling stem mount fan with
integral light fixture unit as selected by owner with rough-in for
wall switch.