Loading...
10535 SW CENTURY OAK DRIVE ADDRESS: 11�f3.�' SLS cep 1 r is\records\microflm\targets\building.doc ori CITY OF TIGARD BUILDING INSPECTION NOTICE Inspectiun Line (Rec-O-Phone). 639-4175 Business Pf.,�e� V-41 Inspection: � ( �-0–�Q (`---- -- Footing Susp. Ceiling Sprink, Rough-in Appr/Sdwlk Foundation Plbg Underslab Mach. Rough-in Fireplace PostlBeam ;;trust. Plbg. Too Out Elec. Rough-in MAL: 1 Post/Paam Mach. San. Jewor Gas Line C---Bldg. Plbo. Underfloor Rain Drain Framing -Plumb. Alarm Water Line Insulation c_ eeh. ) Undertir. Insul. Shear Wall Gyp. Bd. -Elect. r Date Requested:,, �� C� / I --� Time: AM PM/- Address:—L' 9– Permit C (J Ll– THE rTHE FOLLOWING, CORRECTIONS APE REQUIRED: r Ina ecl P >x_ _APPROVED _.DISAPPROVED _APPROVED SUBJECT TO ABOVE _Call For Reinsp. s.ssus DEPARTMENT OF LAND USE 6 TRANSPORTATION WASHINGTON LAND DEVELOPMENT SERVICES DIVISION 155 NORTH FIRST,HILLSBORO,OR 97124 COUNTY, INSPECTION REOLIESTS: 503/640-3561/893-1415 OREGON XXXXXXXXX--> 640-3470 le Page 1 of 1 Date 02/24/95 'Time 13 : 5 L-'ermit '1.'ype Residential Lil.e(-t.rical Permit Permit # 05064383 Permit Status APPROVED Applie3 07./24/95 bit.us Address 10b3b SW CEN'1't)HY OAK DR '1'l .Issuec, 02/24/95 Perwi t Title SNR - BURGLAR ALARM Completes; Permit Uescr . 'I'o Expire 8/23/gb Project 'Title SE'R - BURGLAR ALARM Project # P0047840 Project Uescr. . * EROSION PL rcel Number 2S1'1'1 - Land Use District Valuation 0 Legal Uescr . Owner .INSPECTION - TiGARD Construction CTH Applicant Name AD'1' Classification 900 Applicant Addr . : 703 NE HANCOCK Occupancy POR'I'LAND, OR 97212 Validated by PH Applicant Phone- '1134-3'lb5 X35 lnspector Area t'ee description Units Fee /Unit Ext fee Data ------------------------------------------------------------------ Limited Energy/Alter ./Extension 1 40 . 00 40 . 00 Subtotal Electrical k'ees : 40 . 00 State Surcharge of b% 2 . 00 Total Electrical Fees , 4'2 . 00 *** tees Required Fees Collected & Credits +. >` Method Check # Receipt No. Date Payment 'DEW 02/, 4/95 42 . 00 TOTAL THIS UA'1'E ********* 42 . UO Fees : 42 . 00 Adjustments : . 00 Total Credits : . 00 Total Fees : 42 . 00 'Total Payments : 42 . 00 Balance Oue: . 00 NOTICE: This permit becomes null and vola If the work or construction for which It In Issued Is not commenced within 1110 days. Once construction has started, ' s permit becomes null and void I,construction Is Interrupted for a period of 1110 days. I certify that the Information presented by the sppll�ant and ..1s agent or agents In support of this oermit Is true and correct to the best of our knowledge. I acknowledge that the Building Department's rellenre upon false and misleading h.formatlon may Invalidate thla permit. All provisions of applicable laws and ordinances 9.,;erring the constructlon and use of this building or structure x,111 be compiled with whether or not specified on the plans or noted on the plans correction shoots. 1 scirnowledge that the granting of a permit does not grant authority to access private property or to use easements. I further acknowledge that the use or ocrupency of the structure or building p,rmitted depends upon my nailing for Inspections at vadoue Limes during the process of construction and the t.,ullding Inspection staff verifying compllance with the various codes. Use or occupancy of the building or structure pen..4ted prior to approval by the Building Department Is r.olnly at the risk of the applicant and such use or occupenCr is revo,able until all Inspection requirements are satisfied sad approval is given by 0* tsullding Official. 1 further acknowledge that a lien may be placed on the title of the property upon which the permit Is Issued specifying that the tor or occupancy of the building or structure Is provisional and revocable until the satisfaction of all Inspection requirements. APPLI'CANT'S SIANATUIIE Department COUNTY RESTRICTED Department of Lend Use&Transportation Electrical Inspection Section • 155 North First Avenue,#350-12 E LECT R I CA L ENERGY Hillsboro, 97124 Information: 503 640-3470 Fax: (503)6934412APPLICATION PRINTPLEASE _ Please complete . . . Permit No. _- - 1. Location of lnstallatipn Date 9 Addressa 3.i CLQ o' t (010 'c ,---- --- City— Zip Code— _ 4. Type of work: Map No._ � Tax Lot RESIDENTIAL Restricted Energy Fee $40.00 Thomas Map Book: Pag (yam Section (for all systems) ) Check type of work Involved: Directions ` _� -A" 1. � —V Auoiaand Stereo Systems' Commercial L_ Resj'd ntial lfl�urglar Alarm Telephone Systems" Tenant Name -''� Garage Door Opener* (if commercial) �' ____,__ .____...�____ Fire Alarm Heating.Ventilation and Air Conditioning System.' 2. Contractor application: Vacuum Systems* Electrical Contractor ElOther Address �y _ —_ COMMERCIAL Fee fcx each system $40.00 City.._—� _A_ State a/1 Zip .Q �L_?- (s se OAR 91 C-2e0-260) Date 2 - JQb Nu)T,ber._ --- _ Check type of word. Involved: Property Owner Contractor's License No. _ L 0 —_ Contractor's Board Re No. -I- (� Boiler Controls Reg. ^x Clock Systems �^ Phone NO. .� '� y / Data Telero,nmunications Installations 3. Owner application: r lJ� Fire Alarm Installation � �" HVAC 3 q Instrumrntation Print Owner's Name _ Phone No. Interco n and Paging System Lan&,;ape Irrigation Control" Address Medical Nurse Calls City State Zip _ Outdoor Landscape Lighting" This permit Is Issued under OAR 918-920-370. The applicant agrees Protective Signaling to make only restricted energy Installations(100 volt amps or less) Othnr under this permit end to do the following: 1. Only use electrical licensed peranns to do lristailatiens where required. (Certain residential and other transactions are exempt Number of Systems from licensing. These have ssierisks('). All others need licens- ---- Ing.) 2. Call for an Inspi .tion when all the Installations under this permit "No licenses are required. Licenses are required fnr all other installations. are ready for Inspection. 3. Purchase separate permits for all Installations that are not ready S• Fees for Inspection when the Inspector Is out to Inspect under this L Fsrmir. inter fees $ _ 4. Assume responsibility for assuming(list all corrections regMred by the Inspector ere done,and ha $ S. Assume responsibility for calling fo 5% Surcharge .05 X total above s lira!Inspection when all of g _� � — the corrections ure completed.' /� The person signing this or uspfia the applicant or a person ` t rUSt ACCOUnt $ authorized b!n h pl ant Signatur, Authorih, it other than applicant —.____ —_.—________—.__ This permit becomes null and void If the work author wed by the permit Is not commenced within 1 so days from date of Issuance For Inspections call of such permit or If the work authorized Is suspended or abandoned any time after work to commenced fora period of l so days. 640-3561 or 693-4415 Electrical Permits are non-refundable and non-transferable. 24-hour recorder, one wo:;•ing day In advance of need BL24-114 INSPECTION NOTICE j39-4171 City of Tigard Building Departmont13125 SW Ball Blvd. Tigard, Oregon 97223 Inspection Line (Rsc-O-P',one)s 639-4175 Businene Pho Inspections Footing Plbg. Underalab Mech. Rough-in Appr/Sdwlk Found. Plbg. Tap Out Can Line FINAL- Post;Beam struct. San. Sewer Framing -Bldg. Poet/Ream Hech. Rain Drain ?naulation -Plumb. Plbg. Underfloor Nater Line B -Meeh. Date Requenteds (,� ` Times _AM pM Addreea s1 j 7 1 7 Pas!`QL, I s / T ` Builds^s_,�-31� _�fl �1 THE FOLLOWING COMMMIONS ARE REQUIRED: Inspectors __�AFR6YFD DISAPPROVED APPROVED SUBJECT TO -_-__ ABOVE -Call For Reinep. MMMVj,seesraeeaeeae�ewn ��fSPKCT1Oii ::vi.'ICE City or Tigard Building Department 13125 dw Hall Bltrf. Tigard, Oregon 97223 Inspection Line (Rea-O-Phone)t 639-4175 Business Ph 39-4111 Inspectiont Footing Plbg. Underslab Mach. Rough-in Appr/Sdwlk Pound. _ T Oas Line FINALS Post/Beam Struct. San. Sewer Framing -Bldg. Post/Beam Hoch. Rain Drain In�iolation S -Plumb. Plbg. Underfloor Nater Line/ � _..__Gyp. Bd. -Meeh. / /qDate Requested i_ / Tlme: �AM /P,N Addres•clD��S—�G(/C��:yT ,/ Oq �1►sr i - son it �yL/�c2Y"�r / / ': Bu i ldor t Per �U� j�El�lL TBE FOLLOWING CORRECTIONS ARE REQUIRICDt Inepectocs _ Dat.et—/2 �/ //� _PROVED bIBAPPROVED — - APPROVEL` SUBJECT TO AAOVE ____Call For Reinsp. r IN$kEC!rION NOTICE City of Tigard Building Department 13125 811 Ball Blvd. Tigard, Oregon 97223 Inspection Line (Rec-O-Phone)s 639-4175 Businesu Phone: 63!-4171 Inepssations_ Footing Plbg. D.st.erelab `'sch. Rough-in Appr/Sdwlk F,,und. Plbg. Top Out Gas Line FINAL- Post/Beam Struct. San. Sewer Framing -Bldg. Post/Beam Hoch. Rain Drain :nsulition -plumb. Plbg. Underfloor Nater Line Gyp. Rd. -Mach. Date Rsequesteds �2/ � �Timet _ AM _ PH Addresss _� _���SLYT �'e!`JS�1s Builders ----- TRE FOLLOWING CORRECTIONS ARE REQUIREDs ihe�ectors ROVED DISAPPROVED APPROVED SUBJECT 'ro AAOVE ----Call For Reinap CITY OF TIGARD COMMUNITY DEVELOPMENT DEPARTMENT MASTER PERNIT 13125 SW Hall Blvd.Tigard,Oregon 97223*8199 (503)639-4171 11 #. . . . . . . : MST 94­0436 9--4 1"11 DATE ISSUED: 12/14/94 PARCEL: ""C)11.0Dri--@ 7BOIZi SITE FDDRE SS. . . : 10535 SW CENTURY OAK E J SUBDIVISION. . . . a SUMMERFIELD, NO. 6 ZONING: R-7 BLOCK. . . . . . . . . . . L(-J,T. . . . . . . . . . . . . BUIL.DING REISSUE: DWELLING LJNITc3: 1 BASE M E N T. . . . . . . . :0 S f CLASS OF WORK. cADP BEDRMS:@ BATHSiO GARAGE. . . . . . . . . . ..0 Sf TYPE OF' USE. . . :!r' FLOOR REQUIRED SETBACKS-----..______ TYPE OF CONST. 5N F I R'ST. . . . :665 s LEFT. . -0 f t R I G HJ'. -0 ft OCCUPANCY GRP. R3 SECOND. . . :0 S f FRONT. .0 ft REOR-0 ft STORIES. . . . . . . : 1 FINBSMENT*tO S f REQUIRED------ --- --- - _..___._._.__ FIE EQUIRED----14E I Gi'T. . . . . . . . : 16 fTOTAL----------6 S 5 s f SMOKE DETECTOR�. :Y FLOOR LOAD. . . . : 40 psf VALUE. . . . . $ : 3600171 PARKING SPACES. . : I Remar,ks. redoing hug-tse 665 sq/ft ---------- PLUMBING S I NKS. . . . . . . . . . : 1 FLOOR DRAINS. . . . -C-l' BAC UFLOW PREVNTRS. I LAVATORIES. . . . . :2 WATER HEATERS. . . :0 -rRAPS. . . . . . . . . . . . . . :0 TUB/SHOWERS. . . . -.0 LAU1\JDRY TRAYS. . . :0 CATCH BASINS. . . . . . . :0 WAJLR CLOSE'TS. . :171 SEWER LINE (ft ) . : iOO GREASE TRAP'S. . . . . . . :0 UISHWPSHERS. . . . :0 WATER LINE (ft) . :0 OTHER FIXTURES. . . . . :171 GARBAGE DISP. . . iO RAIN DRAIN ( ft ) . :0 WASH I NG MACH. . . : 1 SF RAIN DRAINS. ­-- ----------- MECHANICAL FEES FUEL TYP1ES----- ----­--­ UNIT HTRG. . .0 type amol-Int by date V,er-pt /GA5/ VEN75 . . . . . .6 BPRT $ 2'20. 00 JG 12/13/94 MAX INP11JT:0 PTU JI NT FANS. . : 1 BPLC $ 143. 00 JG 12/13/94 FURN ( 100K . . :0 HOODS. . . . . . . I B5PC $ It- V-121 Jr 12/13/94 FURN ) =1001-1 . . :0 WOODSTOVES. -O PPRT $ 105. 00 JG 12/13/94 FLUOR FURN. . . . :0 CLO DRYERS. : 1 P15FIC $ 5. 25 JG 12/13/94 BOTL/CMP OTHER UHITS:0 11PRT 41. 0111 ,I Ej 12/13/94 GAS OUTLcTS: l MPLC 10. 50 JG 12/13/94 ljwner-: $ 2. 10 JC 12/13/94 ROBERT HART 10535 SW 'CENTURY OAK DR. TIG"RD OR 97224 Phone #: Cont Tact orr BRUCE PBAHAMSON 12735 SW MARIE CT 1IGARD OR 97223 Phone #.- 590--9400 1teq #. . : 102637 537. 67:, rol'AL This persit is issued subject to the regulations contained in the ------- REPUIRED INSPECTIONS Tigard Amicipal Code, State of Ore. Specialty Coles and all other Foot/IoL.,nd Insp Fir-eplace 1,1sp applicable laws. Ali work will be done in accordance with approved Post/Beam St;t-1_(C,t Gas Line Insp plans. This pereit will expire if work is not started within lU Post/Ream Mec-han Insulation Iiisp days of issuance, or if work is susp@ndeo avorethan 0 ays. Pllm/�tndslab Insp Gyp Hoard Insp 1�1_M/Under floor Rain drain Insp In7,p Watet, Line Insp PlLimb Top 0,.1t Appt-/Sdwlk Insp Issi.ted By . FV-Alniny I.Tlc;p Mer-hancal final CA11 for inspection 639-4175 I I(ioHL) HELAIP I UP' PHYMF N I W.J. t 94-259651 L;HEC;K 111t.)ILIN 1 3 .3144. 85 NAME a ASAHANSON, BRUCE CHUH I 1 0.00 AL)DRESS PAYMFNI DHIF A le/14/94 4 sUlAD I V L IS I LIN P IGHHD, LIRE BUN 9 1223- I--,uPP(JSF. OF Pt4YMf--'Nl AM(,(JNI PAIL) 1—'U141A.)kiK Us" t-'H'YMI-.Nl HMUUN I PA I IJ 0 LA �UiLVINU PFRM MST94-104,36 ?201. 00 PLUMPINH PERM IvIRCHANICAI_ PE 41. 001 PLAN CHECK FE 5kl bl'. BUILD P-k'-R IS. Sh 101535 SW CENTURY OAK OR #6 LOT K Tl)l-()I. AMOUNT PAID iXNNSPECTY,N NOTICE I City of Tigard Building Department 13125 SW Ball Blvd_ Tigard, Oregon 97223 Ine.3ection Li//ne�(1Rea-O-Phone): 639-4175 Business Phone: 639-4171 Inspection:___�_f- Dotik Plbg. Underel Hoch. Rough-in Appr dwlk Found. Plbg. Top Out Gas Line FINAL: Post/Beam Struet.`�) San. Sewer Framing -Bldg. !., /Beam Nec1�) Rain Drain J insulation -Plumb. Plbg. UndertloorC`ater LL�.�7 Gyp. Rd. -Meeh. Date Requested,�� lr.J r _ Ttme: _ All PM Address:�� C` -ermit h l_S. .S 1, .�rust .Y nU THE FOLLOWING CORRECTIONS ARE REQUIRED: Inepector: .� - Date:_/��/�� — APPROVED DISAPPROVED APPROVED SUBJECT TO ABOVE ----Call For Reinep. ate•----. _� ... 1 � • Residential Building Permit Application City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 (503) 639-4171 Jobsite Address: _., ., �.a U) — c4e Subdivtston: ,,�1 w�M Pr �t 1 ( c% Lot# Office Use Only n dc, _ P'arck/Rec#–`i Lie Valuation: - Corner Lot? Y N Permit# 1'113 IAV^O Reissue of Flag Lot? Y N Map &TL# -0Z.Lcv Owner: - Approvals Required Addrens: 1CV f`� � Planning g _. Engineering Phone: _1 Other Contractor: _ =� v6`-•�'� -- Items Required Address: W Subcontractors Cj Z Z- Truss Details ' C` — Phone: �--� Other Contractor's License #_ 1 � _ (attach cop of cu nt Oregon license) Contact Name & Phone: L ^�-�Y`�L� '�1170 Subcontractors: Architect/Engineer: Plumbing: �„1,!yZ_t� � )��. Address: r S 1 Mechanical: -�A j,-vx (attach copy of current OR Contractor's License) ( jai Phone: JOB DESCRIPTION: .4-laxa— Applicant Signature & Phone number Received by: _ ` �_-- Cite Rer..eived. _— I ( / _> 2 J — N%WORDICOMI)E.VIRF.SAPP Permit# Account Description amount Amt. Pd. Bal. Due a .. jn y f v-0 3`f' Bldg. Permit (BUILD) 22 0 Plumb. Permit (PLUMB) GS 0 S Mect. Permit (MECH) _ ' State Tax (TAX) Mech: Plan Check (PLANCK) 5 ®r ��0 /0 -10 Bldg: Plumb: Mvch: Sewer Connection (SWUSA) Sew,dr Inspection (SWINSP) Parka Dev C hii-ge (PKSDC) Storm Drainage Chg (SDSDC) Residential TIF (TIF-R) Mass Transit TIF (TIF-MT) Commercial TIF (TIF-C) Industrial TIF (TIF-1) Institutional TIF (TIF-IS) Office TIF (TIF-0) �- Water Quality (WQUAL) Water Quantity (WQUANT) Fire District (FIRE) Erosion Cntrl Permit (ERrRMT) Erosion Planck/USr\ (ERPLAN) Erosion Planck/COT (EROSN) TOTALS: J3 .�� �7 3 r 39= J f 1"lic FOLLOWING DOCUMENT I.. kS OF POOR ORIGINAL VUALITY 1 , "77 • R2� i - •� V 1 y} � � - I i.�l• N3� �q1 Al i � � .�N•a�t.e .r 7� '» .. } ,, fTer �. � "." .•,, Y 2.; •t. 24 e, `.' moi, � ��„ �� -' 4 d' K j5'p' g 123 6Z 10'1- 79.97'- Ot 1(5-1U LO g� a N 00.43'28 W i� •N 00•43'30' w � 0 0 tt�11 4 � nn '4 �c1 �. V U WW I v — • .E �NII , CIAY OF IMANU REf- too, 14A AMOUNT NOMIF L"Wil-I t-MOLIN I" a oil. 041 PO4YMFNI DAI[: a 11.i 5/9,4 t..31J B D I V I r31 ON PIJRPDSF Or- PA MEN 1 01111 IN 1 PHI 0 Of. PAYOU'41 11,41 Pf) 11/1'535 SW CIP.NTURY OAK 1141.1,4. INSPECTION NOTA /�Y1 City of Tigard Building Department 13125 SW Ball Blvd. Tigard, Oregon 97223 (:��_ Inspection Line (Rec-O-Phone): 639-4375 Buainucs ',"not 639-4171 r Inspection: �/ ��/ � tai Plbg. Underal Mach. Rough-in Appr/Sdwlk Pound. Plbg. Top Out Can Line FINALt Post/Beam Struct. San. Smear Framing -Bldg. Post/Beam Hach. Rain Drain Insulation -Plumb. Plbg. Underfloor Nater Line Gyp. Rd. -Heuh. Date Requestedt TimazNN _ PM Addressi& s 3s: Builders T THE FOLLOWING CORRECTIONS ARE REQUIRED: i Inspectors Date:_ / _APPROVED DISAPPROVED �- APPROVED SUBJECT TO ABOVE Call For Reinnp. SP>✓C I F' I CAT I ONS RESIDENCE REMODEL !or BOB & CAROLEE HART ARCHITECT GLENN F. CHILCOTE A. I .A. 17125 S .W. BOONES FERRY ROAD LAKE OSWEGO, OREGON 97035 PH. (503)636-3668 939 September 15, 1994 LNtEM10.0P L GF OP • 1 HART RFSIDENCE INVITATION TO PID/DESCRIPTION OF WORK Selected contractors have been asked to provide a lump sum bid for this project. Review thea general project, description of .pork, instructions to bidders, contract documents and specifi - cations . Two sets of Drawings will be provided to each prospective prime Contractor upon deposit of $30. 00. Deposits will be refunded for complete sets returned in good condition within ten ( 10) days after bid opening. Additional sets will be made available upon request at cost of $20/set, which is not re `undable. Bids received after the time fixed for opening will not be considered GENERAL Proiect Description : A. The following is a brief o,itline of work to be completed but shall not be construed as complete. North side — enclose area under roof overhang. Remove wall and windows at north elevation to enlarge living room. Extend floor , walls and ceiling, add new windows and exterior door . Remove concrete- - !ab section. South side — cover over and enclose a portion existing entry atrium. Add new entry door and planter . Roof over with skylight . New spa/exercise room -- laundry and den — build to details as shown connecting to new entry and master bedroom, all enclosed . Master Bedroom/Bathroom Install two new windows in existing master bedroom, west wall . Remodel existing master bathroom as shown with new fiberglas shower furnished by owner , Alt. No. l . Close in existing bath window. Kitchen and eating area — existing cabinets are removed. Clean out space down to gypboard walls . Remove walls where shown and add new walls. Add new pocket door . Add electrical etc. New cabinets N. I . C. , by Owner. Finish as shown and required. Re-Rooting Remove fiberglas shingles and vapor barrier down to existing plywood sheathing from entire roof . Install new felt vapor barrier , fiberglas roofing and flashing as specified. See specifications. Alt . No. 4 Reroofing existing roof . See Division 7. General : Remove furred down ceiling in entry and hall . Revise electrical lighting and power in all spaces. Adjust and add to roof framing as s;iown or required if framing is not existing as shown. ' T B. Items furnished and installed by Owner ; (NIC) Not In Contract 1 . interior painting and wallpapering. Contractor- shall have all surfaces prepared ready to accept finish. All gypsumboard shall be textured or smooth. Verify smooth finish areas for wallpaper with owner . All wood trim installed and sanded by contractor , ready for finish. Do not putty fi ! l nail holes . 2. All underlayment and finish flooring materials , including carpet , sheet vinyl and ceramic tile. Include particle board underlayment over new and existing subfloor and cement board at locations designated for ceramic tile (entry/kitchen area ) Coordinate installation with owner . Contractor to furnish and install subfloor at all new areas over framing. 3. Removal of plantings for access. Contractor to prepare and protect areas surrounding wo-k from damage or other effects of construction after removal of plant material . G. All cabinets, countertops -nd backsplash finish, kitchen, eating and master bath. Contractor to remove all existing cabinets , counters, backsplash material at all three locations not previously removed. Determine on site. Prepare space to receive new cabinets . Contractor to provide electrical rough- in for connection at locations shown affected by cabinet installation. Schedule and coordinate construction and finishing to allow for owners installation. S. Applicances Ccntractor to provide electrical , plumbing, sewer and gas line rough- in and finish connection for• appliances as required to achieve final hook-up. 6. Telephone rough- in Contractor to coordinate timing to allow owners installer access before finish work begins. 7. Surface mount light fixtures purchased and installed by Owner . All other electric rough- in, recessed light fixtures , outlets, wiring, etc. installed by contractor . C. Following hall be selected by owner , purchased and installr--d by contractor : -.jof shingles glass block iioerglas master bath shower and plumbing. D. Following shall be selected and purchased by owner , installed by contractor recessed light fixtures ceiling fan/ light combination entry door all doors, windows and skylights I HART RESIDENCE INSTRUCTIONS TO BIDDERS INSTRUCTIONS TO BIDDERS i . SCOPE Owner is providing some interior demolition and construction work prior to this contract being implemented. Determine scope with Owner . This construction as described on Drawings and outline Specifica- tions will be carried out under one General Construction Agreement covering the construction work for this project. " :he General Conditions of the Contract for Construction" AIA Document A201 , 14th Edition 1987 is considered a part of this specification, to be referred to as the "General Conditions" throughout these Specifications. This agreement includes all labor , materials, transportation, equipment and services necessary for and reasonably incidental to the completion of all work in connection with the project described in this document, the outline specifications and Drawings. 1 . SITE & CONSTRUCTION CONDITIONS The Contractor or his authorized agent are to .nspect the site of the work. The signing of this bid by the Contractor is an acceptance of the conditions at the site of the work upon which he is bidding. All attic and below floor crawl spaces are considered accessible. The contractor will be held responsible for the completion of ^II the necessary work in accordance with the Drawings and Specifications including framing adjustments required, If any, in attic or crawl spaces. Non-accessible spaces exempt. 3. APPROVAL OF MATERIALS Each bidder represents that his bid is based jpon the materials and equipment described in the bidding documents or equal materials. Substitution Request : each such request shall include a complete description of the proposed substitute, the name of the material , or equiprr-r -, for w',ich it is to be substituted, drawings, cuts, performar- -id Lest data, cost savings and any other data or informatioti, necessary for evaluation. The Owner has the right to accept or reject any substitution after evaluation. 4. SUBMISSION OF BID All bids must be prepared on the forms bound herein. A bid is invalid if it has not been deposited at the designated location prior to the time and date for receipt of bids indicated or prior to &ny extension thereof issued to Bidders. Unless otherwise provided in any supplement to these Instructions to Bidders, no bidder shall modify, withdraw, or cancel his bid of any part thereof for forty five (45) days after the time designated for the receipt of bids in the invitation to Bid. Prior to the receipt of bids, Addenda will be mailed or delivered to each Contractor which has received the bidding documents and will be available for inspection wherever the bidding documents are kept available for that purpose. Enclose one copy of the proposal with attachments and conditions in a sealed envelop with project name identification on the face and contractor ' s name and address . 5. METHOD OF AWARD The Owner reserves the righ to request examination of any bidders subcontractors for approval before awarding contract. The Owner reserves the right to select or reject any and/or all bids. 6. FORM OF AGREEMENT The "Standard Form of Agreement Botween Owner and Contractor" , A. I . A. Document A101 , 1987 Edition shall be used in executing this Contract. Lien rel .?ases may be required and shall be furnished upon request from subcontractors prior to final payment. 7. PAYMENT & SCHEDULE APPLICATION With each month-end application for payment, the Contractor shall furnish a statement comprising various listed items which represent the total amount of work completed to the date upon which application for payment is made. No application for payment will be considered unless accompanied by a satisfactory list without the percent of work completed and percent of work remaining properly and fully completed, 3 copies each. The owner shall retain five percent (5%) of the certified contract payments due until final ac:eptance of the work. in no case will retainage be less than 200% of the estimated value of uncompleted work and work requiring corrections, or $1 , 000 whichever is the larger amount. 6. PERMITS, FEES & BONDS Owner will pay architectural plan examining fees only. Contractor shall be responsible for and include in his contract all other permits and fees including building, mechanical , electrical , etc. , assessments, systems development charges, street or curb bonds , utility hook-up f'ees, legal fees etc. The contractor shall obtain all permits, pay all legal fees and comply with all applicable codes, laws, ord+nances, rules , regulations and orders relating to building and preservation of public health and safety. Contractor shall secure all certificates of inspection and of occupancy as required by the public authority. 9. INSURANCE Contractor shall carry all liability, bodily injury, Broadform Property Damage insurance sufficient to protect the Owner and project. Ccnform to all state and local codes, laws and regulations. 10. CONTRACT DOCUMENTS FURNISHED Architect. will furnish five (5) sets of drawings to the contractor upon award of the contract. Additional returned bid sets, if available will be proviraed. Additional requested sets , if not available will be furnished at cost of $20/set. f HART RESIDENCE PROPOSAL FORM Page 1 Contractor_ Date — PROPOSAL FORM GENTLEMEN: Having carefully examined the Drawings and outline Specifications entitled Residence Revisions for Mr . and Mrs. Robert Hart as prepared by Glenn E. Chilcote & Associates Architects as well as the premises and conditions affecting the work, the undersigned proposed to furnish all plant , labor and material caffed for in the documents for the total basic bid sum of : $ dollars ( $ In addition the following options will be completed upon owner' s approval for the bid amount indicated. ADD tho following : Alt. No. 1 Fiberglas shower : Install owner furnished new fiberglas shower enclosure in master bathroom. Include all plumbing rough-in and finish, all other patching and finish.ng required for complete installation. install shower door furnished by owner . Remove existing tub/shower - nd prepare space for new. See drawings for location. Remove existing section wall as required for access. Replace and finish wall section after installation. ADD: $ dollars ( $ > Alt. No. 2 Painting: All exterior painting including soffits, siding and trim, 2 colors to match existing . Include all new and remodeled areas . Re-paint existing affected surfaces. Extend siding paint to nearest existing trim or corner beyond areas affected. Provide all preparation as necessary including caulking, scraping, protection, etc. before application. Provide 2-coat coverage. ADD : $ _ dollars ( $ Alt No. 3 Insulation Additional cost to install R-25 Batt insulation under floor and add 6" batt insulation in attic space to existing. See Specs. Division 7. ADD : $ __-dollars ( $ All insulation required per C'nde and shown in new areas to remain in Basic Contract . DEDUCT the follow- ng : Alt No 4. Roof Shingles Delete tear off and re-shingling -kt existing roof areas. New iiofing to weave into existing at all new to existingroo° except install valley flashing at all new to existing valleys in Basic Contract. Delete vent replacement at exio} ing roof . Integrate valley flashing @ new to existing roofs. DEDUCT: $ dollars ( $ ) Basic Contract to include complete re-roofing and flashing, at new and affected existing roof , including all roof vents to meet code requirements . See Specs. Division 7. ACKNOWLEDGMENrS : The undersigned has : A. Reviewed the Drawings and outline specifications. B. Examined the existing dwelling and Site and reviewed any obser%lable difficulties or drawing conflicts. C. Is licensed to perform this work in City of Tigard, OR. BID AGREEMENTS : The Undersigned agrees : A. To holt: this Bid open for 45 days subject to provisions in Instruct4ons to Bidders . S. That no initial payments will be made and that payments will be made at }.he end of the month for labor and materials completed that month. C. That an ? temizod payment request will be submitted to the architect for review before month-end payment is approved. D. That lien releasee will be provided before final payment if and when requested for various subcontractors. OWNER' S RIGHT RESERVED: To reject all bids, to weive informalities, and to accept only such bids as may appear in the Joest interests of the Owner . AWARD AGREEMENTS : Time is of the essence. This project ? j located within a Homeowners' Association requiring project completion within 120 days after permit is obtained. Time mai Le a factor in determining bid award. If awarded a co,itra :t, the undersigned agrees : A. "o enter into and execute a Contract on the basis of this Proposal on AIA Document No. A101 ; Standai ' Form of Agreement between Owner and Contractor . B. To complete the work in accordance with the Contract Documents for the amounts set forth in this Prop-isal . C. To commerce :he work no later Shan 10 working days after date of the award. E. To complete t'ne work within calendar days . BID OPENING: Deliver to Architect' s Office Glenn E. Chilcote & Associates Architects 17125 S. W. Boones Ferry Road Lake Oswego, OR 97035 Deliver bids on or before CERTIFICATION: The undersigned certifies that this bid is complete including all labor and materials . Name of Individual Business Owner, Partnership or Corporation: Address : Telephone : ___ ( signature) . t GENERAL REQUIREMENTS & SITEWORK DIVISION 1 & 2 1 . Protection : A. New Construction : Protect all construction and materials from damage including water damage, constructiun damage, vandalism etc. Cover all building materials from elements when exposed. Repair and replace all underground utilities damaged during construction. B. Existing exposed construction : Protect and cover watertight at end of each day' s construc- tion. Replace all damaged materials or surfaces rain, cun- struction or otherwise damaged. 2. Guarantee : Provide a 1 year letter of guarantee to Owner for all construction materials , labor and workmanship at conclusion of project, and to include assurance that all sub-trades have been paid and there are no liens against the project. This letter to be issued at substantial completion of project as determined by 4rchitect per AIA A201 Document definiti,�n. 3. Excavation : Excavate as required for footings, foundation work and crawl spaces. Remove all material and dispose of off -site. All foundations shall be excavated minimum 38" into existing grade and as shown. After forms are set, remove soft or mushy material from bottom of footing trench before pouring. Architect' s option with extremely wet weather to request installation and compaction of 4" deep 3/4" minus crushed rock in forms at no additional expense after removal of mud. 4. Construction area : Confine all construction materials within the boundary of the existing site. Cleanup offsite : Maintain clear right-of-ways at existing street. Remove mud or debris collected on street each day. All city regulations shall be adhered to concerning street blockage, street clean- up etc. Any costs incurred due to city required cleanup shag be at the expense of the contractor . 5. Cleanup onsite : Refer to AIA General Conditions, Section 4. 15 Provide proper removal of all debris and accumulated trash at interior and exterior work at the ens' of each working day and cleanup work spaces by sweeping, raking etc. Provide dumpster as necessary to haul accumulated debris from thp site and dispose of at approved landfill disposal site. Under no circumstances will debris be allowed to accumulate. Protect all lawn and shrubbery areas . Confine all constr�,ction materials to interior of existing space, principaliv garage. 6. Restoration Backfill and smooth finish grade at all affected areas. Blend restored grades with surrounding grades. Leave site ready for owner' s replanting and seeding. CONCRETE DIVISION 3 1 . General .All concret? shall be minimum 2500 PSI compressive strength at 28 days, readymix material to conform to ASTM G 94 with maximum slump of 4". Cement content to be 5 sacks per yard. Concrete when placed shall have a temperature between 500 and 700. Do not install concrete if air temperature is likely to drop below 380 within 24 hours. Verify with Architect. Concrete frozen or rain pocked will be removed at contractor' s expense. All footings to bear on firm undisturbed soil . Notify Architect before proceeding if any unusual conditions are encountered in footing excavations. 2. Interior Floors Troweled Finish Screed to indicated elevations, remove excess water and foreign r;aterial , float level . Trowel to hard, dense, uniform surface, with 1/8" maximum variation in 10' . Present uniform surface, suitable for indicated finish products. 3. Saw Cutting Saw cut concrete at locations shown with power cutter machine on wheels in utraight lines. Mark locations and use laser beam or chalk line. 4. Undersiab Backfill Install structural granular backfill under concrete slabs and as required. Structural granular fill shall be placed and compacted under controlled conditions in lifts. Compact fill to 95% of maximum density with ASTM method D-1557. Fill placed in lifts not exceeding eight (8) inches loose thickness. Top 6" shall be clean sand or gravel fill . install vapor barrier over, 6 mil . visqueen. 5. Backfilling, exterior flatwork Install 3" of 3/4" minus crushed rock under all exterior concrete walks and siabs. Compact to 95% density requirements. Achieve final subslab grades. CARPENTRY DIVISION 6 1 . Framing All products in accordance with standard grading rules Western Wood Products Assoc. (WWPA) & American Plywood Assoc. (APA) a. Glulam beam, concealed, Type 24F-V4 Waterproof glue. b. Joists, beams and stringers — Douglas Fir No. 2 and btr . C. Floor & roof framing, rafters and ridges — Douglas Fir No. 1 d. Beams and stringers 4 X 8 and larger — Douglas Fir No. 3 (no heart wood) e. Bucks, Blocking, bridging and misc. — Hem/Fir No. 3 f . Studs — Douglas Fir or Hem/Fir No. 2 or btr. g. Sills, sleepers, plates and nailing blocks embedded in concrete — Pressuie treated Douglas Fir. h. Posts and timbers — Douglas Fir No. 1 J . Roof — 5/8" CDX plywood sheathing J . Wa ' I 1/2" CDX plywood sheathing. k. Subfloor — 1-1/8" T&G plywood subfloor 1 . By Owner . Information only: Underlayment — 1/2" underlayment grade particle board or 1/2" cement board. Prepare for carpet, sheet vinyl and/or ceramic tile. Fill and smooth all edges, joints, voids and rough areas. Cement board used at ceramic tile. 2. All wood in contact with concrete or masonry shall be pressure treated per UBC 25-12. 3. Option : Floor and roof framing : ' I ' joists with tip and bottom chord, plywood or oriented strand board (OSB) webs. Provide structural data backup. Approved trus joist - TJI ' , Louisiana Pacific ' Inner-Seal I -Joist' or equal . 4. Connections shall be with common or sinks nails as follows, except where otherwise noted : 1 . Joist laps over partitions (4) 16d fare nail 2. Beams and headers to studs (6) 8d toe nail 3. Solid bridging to joist (each end ) (2) 16d face nail 4. Stud to bottom plate (4) 16d toe nail plus one A35N anchor 4' -0" o. c. 5. Pit. to rim joist, blocking or 16d @ 16" o. c. face nail sole plate. 6. Top Plate to stud (2) 16d face nail plus one H-6 anchor 2.4" o. c. 7. Doubled top pit. continuous 16d 16" o. c. face nail along length 8. Doubled top pit. at intersections (2) 16d face nail 9. Doubled top plate at laps and (4) 16d face nail splices 10. Rafters to top plate one huzricane clip H-1 each end NOTE: All metal framing anchors and hurricane clips, Reference Simpson N' s . 11 . Sheathing : A. Roof plywood — 8d common @ 6" o. c. @ all supported edges and 12" o. c. @ interior suports . B. Floor plywood — subfloor — 10d common @ 6" o. c. @ all supported edges and 12" o. c. to interior supports. Glue all edges and field supports. C. Roof and Floor plywood option — 2" glue tipped, power applied staples spacing per above, approved option. Set stapler for proper depth. D. By Owner. Information only: Particleboard underlayment glue and screw to subfloor Continuous-glue strip @ each support and edges, 1-1/2" screws, counter sink at 8" o. c. edges and field. 4. Method 1 . All walls 2X4s stud at 16" o. c. or 2X6 stud @ 24" o. c. See Drawings for location. 2. Top plates shall be doubleo on all stud walls and clipped or anchored as noted above. 3. Cripples under headers shall be continuous to the sole plate, 4. Blocking 1 -1/2" wide of equal depth of the members shall be provided between all joists and rafters at their supports, unless members are nailed to rim joist or as detailed. 5. Install all horizontal members with the crown up. 6. All members in bearing shall be accurately out and aligned so that full bearing is provided without the use of shims. 7. All rafters shall be notched for full bearing at all supports. u. All joists shall have a minimum of 2" bearing at supports . Lapping joists sha ! l have 6" laps centered over interior supports. 9. Ledgers ai:a stud wall foundation sole plates shall be bolted to concrete with 1/2" X 10" anchor bo'. :s, maximum spacing 4 0". At least two bolts shall be provided for each sole plate with one bolt within 1 ' 0" of each cnd. 10. All roof and floor sheathing shall be applied as follows : Center panel end joints over joists or rafters, using half panel staggered pattern, 11 . Wall sheathing half-panel staggered. Ends shall be supported with framing or blocking. 5. Finish Carpentry Wood Trim: All finish wood trim, mouldings, door/window casings interior and exterior to match existing. Wood b:�Ge installation by Owner . All material installed shall be 450 mitered at joints unless shown otherwise. Edges shall fit snugly, joints flush and grain shall be finished smooth and sanded. All trim not flush, smooth, tight jointed, of good workmanship prepared for stain or paint shall be rejected. All nailing in wood trim shall bo done with finish or casing nails depending on circumstance and shall be set to receive put ;:y. Use only galvanized nails at exterior . Interior painting and putty work N. I . C. 6. Exterior Siding : Horizontal lap, Western Red Cedar , to match existing. Provide in continuous lengths , no butt or bevel joints in field of wall between vertical trim pieces. Clear vertical grain. No splits or skips allowed. Cut to tight fit. 7. Exterior Trim: Westerr Red Cedar, V. G. , C & Btr . No splits or skips allowed, smooth surface for stain or paint. install as shown and required to match existing. Use preformed metal edges at siding at building corners. THERMAL & MOISTURE PROTECTION DIVISION 7 1 . Insulation: Walls R-21 foil -faced high density Floor (new) R-25 ba:-.t, kraft face Floor (existing) R-25 batt ( part Alt. No. 3) See Bid Form. Flat ceilings (new) R-38 batt Flat ceilings (existing ) Add 6" fiberglas batts existing. (Part Alt. No. 3) See Bid Form. Vault ceilings R-30 batt Slab floor edge R-15 rigid extruded polystyrene fcam board 6 mil vapor barrier on ground in crawl space ; new areas only. Staple netting under floor joists to support floor insulation. Maintain clear venting at eaves and ridges in existing and new attic spaces after installation of insulation. 2. Gutters, Downspouts & Flashing Gutters : 0. 032" prefinished aluminum or 24 ga. prefinished galvanized to match existing. Match existing profile. Downspouts : 0. 032" primed aluminum or 24 ga. primed galvanized. Paint to match existing siding color . 3 straps per downspout minimum. Drainage : connect to existing underground drainage system. Verify drainage capability. Cleanout as required. Flashing : valley : 40 Ib. felt and 1.2" wide preformed and prefinished to match existing 26 ga. aluminum valley flashing )`. 12" wide minimum. edge : min. 3" lap under roofing on sheathing at roof edge and down 2" with drip edge into gutter . Prefinished aluminum or galvanized to match existing. Provide miscellaneous other flashings as required for water- tight construction. 3. Ridge vents : concealed certainteed, air vent inc. ridge top ' shingle vent II ' , 12" wide 4. Roof shingles ReLova 1._ Remove all shingles and felt down to existing wood sheathing. Remove all nails or staples . Check for dryrot and replace sheathing at dryrot locations. Retain all edge flashing at existing gutters . Remove all other flashings. Check entire roof and renail sheathing to substructure. Set nails flush due to previous wood shrinkage. Installation Underlayment — 30 Ib. asphalt saturated unperforated felt. Staple to plywood sheathing. Install valley flashing over felt, all valleys and as shown on Dr-iwings . Shingles : glass fiber 3-tab strip, self sealing, UL Class A, 30 year limited warranty, minimum 280 lb. /sq. Heavy shadow line style, GAF ' Timberline' Series or equal . Color as selected. install per manufacturer' s directions. See Alt. No. 4 Bid Form Install ridge vents continuous on all new and existing ridges. Sawcut roof sheathing as required for ridge vents at roof ridges new and existing. See Alternate No. 4 Bid Form. DOORS, WINDOWS, GLASS & GLAZING DIVISION 8 Genera! Coors, windows and skylights provided by Owner, installed by Contractor. Refer to Drawings for quantity and locations. All glass clear , insulated double paned, thickness for wind resistance as required for opening size. Install doors, windows and skylights complete with trim and fleshing as required. Provide building sealant at exterior frame, foam spray seal at interior around all window and door and skylight frames before trim installed. Provide all necessary hardware and screens. All window screens shall be fiberglass cloth set in bronze tone aluminum frames with built in catches set on interior. DOORS Prepare opening to receive pre-hung door/frame assembly. Install straight and true complete with hardware. Meet energy code requirements where applicable. See General Notes SHEET 3. All doors pre-packaged with prehung frame and hardware. DOOR SCHEDULE No. Size Description Hardwire iVotes 1 310" X 6' 8" Entry door . Owner entry lockset 1-3/4" thick selected decorative with integral solid wood or metal inside thumb- with foam core for turn dead 2X6 frame wall . bolt. 2 PR 216"X 618" Living room/patio mortised and glazing : 1-3/4" Thick In-swing French keyed 3-pt. ' smart sash 11 ' doors, Pella locking system system 1/8" ' Designer ' Series Solid polished c1r . /1/8" for 2X6 frame wall . brass interior Low E gloss and exterior Armorcoac handles film on ext. side . Incl Ude interior pleated shades . Include outswing pr. screen doors. 3. 2' 8"X 618" Laundry/Den Bedroom Provide 1-3/4" Thick solid wood lockset. complete fcr 2X4 frame Match funs— with hard- wall tion, style, ware and and finish wall stop to existing. 4. 218"X 698" Spa/Laundry latchset. Provide 1-3/4" Thick solid mood match style complete for 2X4 frame and finish with wall to existing. hardware and wall stop. S. PR 2' 6"X 618" Entry/Exercise Rm. 2 latchsets Provide 1-3/4" Thick solid wood for (one dummy_ complete 2 X 4 frame flush bolts with hard- T&B 0 inact— ware and ive leaf . one wall stop one floor stop 6. PR 2' 6"X 6' 8" Master Bd. Rm/ 1 lockset Provide 1-3/4" Thick Exercise Rm. 1 latchset complete (dummy) with hard- flushbolts ware & T&B in inact— wall stops ive leaf . 7. 3' 0"X6' r'" Coat closet . latchset Provide 1-3/4" Chick solid wood match style complete for 2X4 frame and finish with hard- wall . to existing. ware and wall stop. 8. 2' 8"X6' 8" Living Rm/ Lawrence 1'F Provide 1-3/8" Thick Kitchen 413 metal complete pocket door Universal with pulls solid wood for pocket frame and hardware 2X4 frame wall set or equal WINDOWS Aluminum clad exterior , Kyna.r 500 finish, dark brown. Wood interior unfinished ready for paint or stain. All frame members preservative treated, select softwood. Interior exposed surfaces clear Western pine. Glazing assembly and size as noted in Schedule. Dimensions are cut to out of frame. Field verify dimensions. Manufacturer : Pella ' Designer Series' fixed and casement units. Approved equal as determined by Owner . Type Unit Size Type Glazing Notes _ (horiz. X vert. ) A 41311X 315-3/4" Pella Clad ^:vlla Designer Smart Sash 11 casement with single sash Low E coating B 4' 0"X 2' 0" Pella Clad Pella Designer insulshieid 2 units— with single fixed sash Low E coating 1 unit — tempered. sliding sash Armorcoat fiim o-i exterior . C 2'6"X 4' S" Pella clad Pella Eedroom casement Designer Smart Sash 11 for code egress Sash with single casement Low E coating tempered. Armorcoat film on exterior D 5' 0"X 6' 0" Pella clad Pella center mullion Designer single glazed with (2) Fixed sash. relilte, clear 2' 6"X 590" +/— glass units E 6 equal Pella clad Fella Provide separate units +/— Designer Smart Sash 11 cost savings 2' 491X 690" fixed sash with single to raise sill verify. Field Low E coating to 18" to avoid measurements tempered. tempered glazing to maximize Armorcoat film window widths. on exterior . F Size as required Garden clear insulated Install in to fit existing window vents as select— existing window opening. @ kitchen ed opening Approx. 48"X46" NOTE : Armorcoat film used for protection against errant golf balls from adjacent golf course_ . SKYLICHTS Manufacturer : Velux roof windows and skylights or equal . Provide with all hardware and flashing for complete assembly. Approximat:z Frame Size : G 30-5/8" X 55" Velux clear tempered interior use Mod. FSF Low E Argon gas to meet No. 308 filled glaze energ, code code 75 (VHH) requirements U = 0. 28 H 21-1/2" X 55" Velux Clear tempered. interior use Mod. FSF Low E Argon gas _o meet energy No. 108 filled. code require- Glaze Code 75 (VHH) ments. U = 0. 28 1 21-1/2" X Velux Clear, tempered interior use 38-1/2" Mod FSF Low F. argon gas to meet energy No. 104 filled. code require- Glaze Code 75 (VHH) ments. U - 0. 28 GLASS BLOCK General Interior decorative glass wall insert as shown on interior elevations between dining and kitchen. Provide complete installation. Review with owner scope, size, type of glass block and installation. aterial Pittsburg Corning PC glass block products or equal . thin line series (3-1 /8" thick ) ' Decora' or ' Dailphi ' pattern as selected by owner . Installation Install all block even, true and square. Use experienced workmen only with at least 20 project experience. Install with mortar free PC ' Kwik' N Ez' silicone system using rigid plastic frame channels, rolls of flexible plastic between block spacers, and gun applied silicone sealant, suitable for interior and weather protected use. • r FINISHES DIVISION 9 Gypsum Wallboard Install at all remodeled and new locations affected, walls and ceilings, 1 .2" thick, tapered edge. Use water r-sistant board at high moisture areas including bathroom remodeling. Spa/exercise room interior walls and ceiling see under plaster assembly. Do not exceed 1/4" variation in 810" from plumb, level and true Iines. Glue all board with double sheetrock nail method or 1-1/4" dry wall screws. Finish: All wall surfaces to receive textured finish shall blend to and match existing. Prime adjacent existing surfaces for proper adhesion. NOTE: Coordinate with owner locations with smooth finish for enamel or wallpaper cover. Ceilings : Existin¢. Existing ceiling texture has been removed. Add new brocade texture to all ceilings except kitchen and bathrooms. Provide sample for owner ' s review. New, Texture all new ceilings to match approved brocade texture applied to existing ceilings except spa and exercise room which will have specified smooth plaster assembly finish. Spa/exercise room Plaster assembly. Install gypsumboard veneer base v ..th double nail mathod or 1- 1/4" drywall screws/glued, walls and ceiling. Veneer plaster system applied over compatible gypsumboard base. Prer2.ro subsurface to receive veneer plaster. Correct any deficiencies or imperfections before application. Verify veneer system is compatible with gypsum wallboard base. Install a one-coat system 3/32" thick entire wall and ceiling areas, smooth ready for enamel . Mixing, proportions , application in strict accordance with manufacturer ' s directions. Other finishes All flooring materials, carpet, sheet vinyl , ceramic tile furnished and installed by owner on owner installed underlayment surfaces. Contractor install all subflnor plywood. All interior painting and wallpapering completed by owner . A MECHANICAL DIVISION 15 Plumbing All plumbing work to conform to all applicable codes and regulations . Route all work concealed below floor or above ceilings in joist space. Install all other rough- in or finish plumbing as required for various fixtures installed in this contract or separately by owner, entire residence. Heating/Ventilating/Air Conditioning All heating revisions to ,-.or"orm to all applicable codes and regulations. Provide design calculations for determination that existing furnace has capacity and volume for duct extensions and heating of additional space, both on the north and south sides. Extend crawl space insulation wrapped sheet metal duct or fiberglas flex duct to relocated or added floor register locations as shown on Drawings. Insulate ducts to meet energy codes . Size ducts for proper HVAC transfer . Avoid sharp bends or kinks in duct runs. Provide 450 angles at all connections with smooth runs. Entire system balanced for even, equal air flow at all locations . Include return air registers and ducting if required for proper air circulation. Provide access to crawl space through existing concrete foundaiton fcr supply ducts. ELECTRICAL DIVISION 16 Conform to all applicable codes and regulations. Drawings are diagrammatic. Install all rough wiring, recessed light fixtures, receptacle and switch boxes with wiring, recessed wall heaters appliance wiring, etc. required for proper operation of appliances, receptacle switches etc. with proper ampherage loads. Surface light fixtures, switches, receptacles furnished and installed by Owner. Spa/Exercise Room Install forced air zonal in-wall heaters @ locations shown on Drawings. Heater A Cadet ' The Register ' model Z.A 151 or equal 1500 W. 120V. 12. 5 amp. in-wall unit with remote thermostat. Heater D Cadet ' The Register ' Model Z.A 101 or equal 1000 W. 120 V. 8. 3 amp. in-wall unit with remote thermostat. Overhead flan/Light Rough- in for 120 volt 52" blade, ceiling stem mount fan with integral light fixture unit as selected by owner with rough-in for wall switch.