DashNumberEnd ADDRESS:
i\records\micrr, ,m\taraets\building.doc
INSPE
_ CTION—NOT I—CE
City of Tigard Building Departiment
13225 01Ba.II B rd. Tigard,
i and Or '
g , egos 97223
Inspection Llne (Rec-O-Pho )s 639-4175 Buainean Phone: 639-4171
Inspections
Footing Plbq. Fiderslab Mach. Rough-in A
9 ppr/Sdwlk
Found. Plbg. Top out Gan Line FINAL:
Poet/Beam Struct. San. Sewer Framing -Bldg.
Post./Beam hack. Rain Drain Insulation -Plumb.
Plbg. Underfloor Water Line Gyp. Bd. :- ch.
J
Date P.equestad:_—�,`_ J % Timet AM pM
Permit #s
Builders
THE FOLLOWING CORRECTION) ARE REQUIRED:
/ /7
Insper_t
Dates_
APPROVZV DISAPP APPROVRD BUB"CT TO ABOVR
_'_Call For Reinsp.
S1'ECTION NOTICE
Cit? of Tiga.•:� Building Departornt ..J
11125 OW 3ft11 :'Ivd. Tigard, Oregon 97223
Inspect or. r.i.rn (+.-7-C I :u.. ): 639-4175 Business Phone: 639-4171
xr vvac-'tong-_ — -- -- --
Foct..'N" Plbg. Undersla.o Mech. Rough-in Appr.%Sdwlk
rr,uad. 1,•V. Top Out Gas Line FINAL:
Post/Beam Struct. San. Sewer Framing -Bldg.
Post/Beam a:,.:n. Rain Drain Insulation CCt�
Plbg. Underfloor Mater Line Gyp. Bd. -Mach.
Date Requested: —5F-07 Time: AM PM
Address:— /�� Permit �
1 Lder: i
TRE FOLLOWING MRREGTIONS ARE RRQUIRED:
i
I
Inspector. - Dater r r v( �
"K APPROVED DISAPPROVED APPROVED SUBJECT TO AEOVE
Call For Reinep.
CITY OF TIGARD
OREGON
December 5, 1991
r
Renaissance Development
2098 SW 8th Street
West Linn, OR 97068
fie: 7458 SW Ashford Street Permit #MST 90-0368
Dear Sirs:
The last inspection conducted on the above project was a gypsum
board inspection on 5/31/91. The next required inspection will be
a final inspection.
:Please advise the Building Division of the status of this project
as soon as possible so the file may be kept current.
Please note that any permit«,without activity for over 180 days
becomes void. if you need additional time to complete the project,
please contact this department so that an extension can be
discussed.
Sincerely,
R.L. Thompson
Building inspector
Notice.A
13125 SW Hall Blvd,P.O.Box 23397,Tigard,Oregon 972.23 (5031634-4171- —