Report (58) ,:,. uponor
FIRE SAFETY SYSTEMS
--ti
,
r ,'
k .."\'
P .''`I \
1 , :
AQUASAFETU FLOW TEST
VERIFICATION
FORM• ' ' 't.Ak'.
, ,.,,‘,,,,, i•,, •,,,
' ' '.;" q• t ,A '''..t. 'YC '+. '
'• ,:O.*,A'TfAl'"'''''$1 ,,4"*'Itli'''s.,:`
AquaSAFEThf Flow Test Verification Form
4••••••44••••••44444/44 04 44444*•***4*•411.4***4,4 40444*4444*4.*•*.04**••••••04-444444••444•444•444*44...•44.4•4..•••••••.......d••••••••••••44.4•4
Alliance Important Installing contractor must submit this
Member ID: completed form.Failure to do so nullifies the
Company Name: 4/1 .-. . ?
1 to the Upononr tFyi.reE-SnafaelltyorDfeasxigcompleted
mform
Contact: (eOUtr1L45
L et 4e- y at tachnical.serviceseuponor.com or 952.997.1731.
Phone: _5-03 -V92 -'34i0 For questtons contact Uponor Technical Services at
sagy6 or technical.servicesflu m
ponor.ro .
Fax:
Color of test orifice used: ‘*."" ce...4.S.....%.,
, ,. _. ..,—
Job Name: CZ tv-r..„4 \e,te,....e,4„,._
Static pressure(not flowing)reading at incomin.L.,„
Project Number water supply into home or at main shutoff: '"'s. )1'
1, ,
Job Address: /‘,,4 14
es dual pressure(flowing)reading at incoming water
City:..---c‘ A
C,S1- supply into home or at main shutoff: 5 2_
State,ZIP: 9 72-42--3
What time of day was the flow test taken?
For designs not provided by Uponor,complete the
following information. Flow test method used? I;Xlucket U Flow Meter
Designer's Name:otiole." liM- Pial C'e-s"4.'2- Flow test gi3m:
\
Company; LL„edyietr,r— How many gallons of water did the design predict 1
as required? %.'"
Phone: 9.5"-2.-99 2'-5-7)3 c
Did the test meet or exceed design flow?AlYes C.:1 No
Fax. Which sprinkler did you flow?Number: 14 ./..3
Is the warning sign permanently attached dose to the Location of heat11-3.e..Aj 2 - , .'k""A- Pley.0.4-
main shutoff valve? 1817Yes Cl No
Date left in service with all valves open:
Was this system required by code?1(11Yes U No
i .......,.....-.....,............-,...........,.............,................,............... .
Test Witnessed and Verified by:
Nv-if ti, Si nature ::, Oecoation Date
.
iMi 1(4 ,e ,54‘..« .- - -940+4......e:- 1 7,.....s----ii.
1
a
g
a
Additional Explanations and Notes
Liporror,inc.
5925 148th Street West Tel:800.321,4739
Fax:952.997.1731
Apple Valley,MN 55124 USA Web:vioww.uponoP-usa.com
td
/1Ms Tza ) >d 0 0 `i �
uponor
To: Whom it May Concern
From: Evan Benedict
Re: River Terrace, Uponor Project#19816F
Date: 11/11/16
The intermediate temperature sprinkler head shown on some plans in the mechanical room for River
Terrace are not necessary. With the intermediate sprinkler head taken out of the system, the system
will not be negatively affected.
According to the NFPA 13-D Standard Chapter 8.3 Location of Sprinklers
8.3.8 Sprinklers shall not be required in closets in garages and exterior closets (regardless of size)
located on exterior balconies, exterior breezeways/corridors, or accessed from outdoors where the
closet does not have doors or unprotected penetrations directly into the dwelling unit.
Plans that show the sprinkler head in the mechanical closet accessed from the garage, and without
negatively impacting the system with its removal, can be omitted.
Sincerely,
Evan Benedict
Design Technician—Fire Safety
Uponor North America Uponor,Inc. Uponor Ltd.
5925 148th Street West 2000 Argentia Rd., Plaza 1, Ste. 200
Apple Valley, MN 55124 Mississauga, ON L5N 1W1
T 800.321.4739 T 888.994.7726
F 952.891.2008 F 800.638.9517
W www.uponor-usa.corn W www.uponor.ca