Report (57) /14 S j- )1 - 0 V C,?'
4-
UpOn01
1 't 14
. FIRE SAFETY SYSTEMS
t , a''':-
t' ! .: 0 AQUASAFET" FLOW TEST
/
i 1 Av, VERIFICATION
,Ate
:- ' Millininalal
-,i44,:';'`
-
AquaSAFETM Flow Test Verification Form
. , .
Alliance important Installing contractor must submit this
Member ID: completed form.Failure to do so nullifies the
.)i.,,,,,, system warranty.E-mail or fax completed form
Company Name: /CO
71t441.._ ' to the Uponor Fire Safety Design Department
Contact: & 0 ,ra .... iP A i at fechnical.serviceseuponor.corg or 952.9973731.
Phone: Co 5_qv2,....-3 ti 9,0 For questalls,contact Uponor Technical Services at
888.594.7726 or technicalsevicas,,:t ,pnor.com.
Fax: Color of test orifice used:
K u.o...cK-e_A- ,-t.,
Job Name: —(.......„ Static pressure(not flowing)reading at incomi
Project Number:
water supply into home or at main shutoff:
i11......i
Job Addres.s:
Residual pressure(flowing)reading at inconirjii water
City:711g cyr 4 supply into home or at main shutoff:
State,ZIP:
What time of day was the flow test taken?
For designs not provided by Uponor,complete the
following information. Flow test method used?ABocket LI Flow Meter
2.0 .vel.0.4,,,...Flow test gpm. kg
Designer's Name: M al?et
Company: it,r
How many gallons of water did the design predict
'"41 0 t's.
Phone:
as required? /..—.
95:2—91 '7- i1 3e)
Did the test meet or exceed design flow?.*Yes Li No
Fax:
Which sprinkler did you flow?Number: 41
is the warning sign permanently attached close to the Location of head: V2A1. '2--
main shutoff valve? Yiefes CI No
Date left in service with all valves open:
Was this system required by code? ?es LI No
Test Witnessed and Verified by:
E Signature Date
1
NiAertke-.L.tr-4—kit.tA jk ',1611 ----.4--web.-- Cili• _
---- -\-1,4.&&r.Z"-ACC / -1-4"
Ii
,
a
a
0
IAdditional Explanations and Notes
a
id
.2'
11
Uporlor,Inc.
5925 148th Street West Fax;952.997.1731
Apple Valley,MN 55124 USA Tel:80032L4739
Web:www,uportor-ina.com
d
f j Zo 1C , OO0L/ t..5
uponor
To: Whom it May Concern
From: Evan Benedict
Re: River Terrace, Uponor Project#19816F
Date: 11/11/16
The intermediate temperature sprinkler head shown on some plans in the mechanical room for River
Terrace are not necessary. With the intermediate sprinkler head taken out of the system,the system
will not be negatively affected.
According to the NFPA 13-D Standard Chapter 8.3 Location of Sprinklers
8.3.8 Sprinklers shall not be required in closets in garages and exterior closets (regardless of size)
located on exterior balconies, exterior breezeways/corridors, or accessed from outdoors where the
closet does not have doors or unprotected penetrations directly into the dwelling unit.
Plans that show the sprinkler head in the mechanical closet accessed from the garage, and without
negatively impacting the system with its removal, can be omitted.
Sincerely,
Evan Benedict
Design Technician—Fire Safety
Uponor North America Uponor,Inc. Uponor Ltd.
5925 148th Street West 2000 Argentia Rd., Plaza 1, Ste. 200
Apple Valley, MN 55124 Mississauga, ON L5N 1W1
T 800.321.4739 T 888.994.7726
F 952.891.2008 F 800.638.9517
W www.uponor-usa.com W www.uponor.ca