Report (31)�DESIGNZ a�STa-bl(0 —Jb FIELD REPORT Paae 1 of 1 _____ GDI Project: ............... ... _ Polygon -130-05 Prepared By: Bret Moskal Project Name:River __ Terrace Northwest Date: 12/05/16 Location: Scholls Ferry Road and Roy Rogers Report #: 147 Arrival: 1500 Departure: 1530 Weather:Overcast, 30's Permit #: TBA _....._..........._......_..............___..._ ....... Site Visit Requested By: Tom (polygon) Met With (on site): Tom (polygon), onsite crews Purpose: ; Evaluate lot 96 Outstanding Issues: FR 51 (01/14/16) Lot 122 to 123 retaining wall FR -1 36 (9/14) Low density pavement j FR -145 (1 1 /15) low compaction granular fill / soft subgrade Lot 93 *RESOLVED* Upon arrival, I met with Tom and was directed to the area noted on attached site plan where I observed two prepared footing subgrades. Tom informed me that lower footing and stem wall had been designed and was being constructed as a retaining wall due to the steep cut near the edge of the upper footing. I was informed the crew planned to backfill the retaining wall with crushed rock. We understand the upper footing is below a 1 horizontal to 1 vertical (1 h:1 v) projection from the base of the retaining wall below and the upper footing is approximately 4 feet higher than the top of the footing for the lower retaining wall. The footings can be constructed as planned provided the upper footing is outside a 1 h:l v projection from the lower wall and crushed rock backfill is compacted as recommended for structural fill behind the retaining wall. Based on our observation, it is our opinion that Lot 96 observed today is being prepared in general accordance with our geotechnical recommendations. Distribution: Attachments: Site Plan (1); Reviewed by: SMD This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services. We rely on the contractor to comply with the plans and specifications throughout the duration of the project irrespective of the presence of our representative. Our work does not include supervision or direction of the contractor, the contractor's employees or agents. Our firm is not responsible for site safety. This field report is a DRAFT representation of our field observations, testing, and preliminary recommendations. The report can only be considered final upon review of the GeoDesign project manager, as indicated by initials in the "Reviewed By" section. Signature: Shawn Dimke for BM 15575 SW Sequoia Parkway, Suite 100 1 Portland, OR 97224 1 Off 503.968.8787 I Fax 503.968.3068