FIELD REPORT
Paae 1 of 1
_____
GDI Project:
............... ... _
Polygon -130-05
Prepared By:
Bret Moskal
Project Name:River
__
Terrace Northwest
Date:
12/05/16
Location:
Scholls Ferry Road and Roy Rogers
Report #:
147
Arrival:
1500
Departure:
1530
Weather:Overcast,
30's
Permit #:
TBA
_....._..........._......_..............___..._
.......
Site Visit Requested By:
Tom (polygon)
Met With (on site):
Tom (polygon), onsite crews
Purpose:
; Evaluate lot 96
Outstanding Issues:
FR 51 (01/14/16) Lot 122 to 123 retaining
wall
FR -1 36 (9/14) Low density pavement
j FR -145 (1 1 /15) low compaction granular fill / soft subgrade Lot 93 *RESOLVED*
Upon arrival, I met with Tom and was directed to the area noted on attached site plan where I observed two
prepared footing subgrades. Tom informed me that lower footing and stem wall had been designed and was being
constructed as a retaining wall due to the steep cut near the edge of the upper footing. I was informed the crew
planned to backfill the retaining wall with crushed rock. We understand the upper footing is below a 1 horizontal to
1 vertical (1 h:1 v) projection from the base of the retaining wall below and the upper footing is approximately 4 feet
higher than the top of the footing for the lower retaining wall. The footings can be constructed as planned provided
the upper footing is outside a 1 h:l v projection from the lower wall and crushed rock backfill is compacted as
recommended for structural fill behind the retaining wall.
Based on our observation, it is our opinion that Lot 96 observed today is being prepared in general accordance with
our geotechnical recommendations.
Distribution:
Attachments: Site Plan (1);
Reviewed by: SMD
This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services. We rely on the contractor to comply with the plans and
specifications throughout the duration of the project irrespective of the presence of our representative. Our work does not include supervision or direction of the contractor, the contractor's employees
or agents. Our firm is not responsible for site safety. This field report is a DRAFT representation of our field observations, testing, and preliminary recommendations. The report can only be
considered final upon review of the GeoDesign project manager, as indicated by initials in the "Reviewed By" section.
Signature: Shawn Dimke for BM