Loading...
Plans ,, AG Rolin Consulting, LLC RAr11011— OFFICE COPY ii3oo SE Linny Lane, Boring,OR 97009 ill (503)663-9960 AGROLIN@a AOL.COM STRUCTURAL DESIGN. ENGINEERING&CONSULTING M/ ill G To: Stephen Gemmell Earthquake Tech in 2 November 2016 It ECEIV NOV 14 2016 Re: Murphy Residence -Tigard, Or CITY Ta Dear Stephen; BUILDING DWI ON To upgrade the seismic stability of the residence at 13430 Village Glenn Court add the following connectors; • Use custom plate 3/16x14"xlo", as applicable at 6' on center with (5) SDS % x 1 1/2" @ 3" o.c. to sill plate and (2) %" diameter Hilti TZ anchors @ 8" o.c., with a minimum embedment of 3 1/2" to the foundation wall. • Connect sill plate to rim joist with Simpson "HGA1o" at 6' on center. Alternate • Use Hilti HY 200 with a minimum embedment of 4" in place of the Hilti TZ anchors. Engineer does not require special inspection of the epoxy installation. If you have any other questions or concerns please call me to discuss r them. SucruRgc OFFICE COPY tR Very Truly Yours, .c4aED PROP s CITY OF TIGARD ' t,,t, ,. I N FR•, l[•� .. VIEWED FOR CODE COMPLIANCE t. f /18122 9r - Approved: 3 .„,„0O C: I j . / PP J� Adam G. Rolin, P.E. S.E. f , O GON 'ermit#: ms-I- c I c- on 7C, M1658 yO Fig 18. A9°' _ Address: 3 c 0 s,.. vc..�k..j Glc n u *141 G. CO‘' Suite#: p By: -�-} Data 1 I- l LJ -14 EXPIRES: 12/31/20 ia EARTHQUAKE EAU1'i QUAKEP FOUNDATION RETROFITTING EarthQuake Tech hereby proposes to furnish labor and materials for the following project(s): Murphy ResidenceRECEIV 13430 SW Village Glenn Ct Tigard,OR 97223 NOV 1 4 1016 Voluntary Seismic Retrofit a� F MARI) 1)Provide permit and engineering schedule for straps:specifying anchor method and location "`' T ^ 2) Remove all sheetrock,paneling and siding as necessary at the following locations: ��. 1DTVISIO ia Sheetrock in garage for installation of sill bolts/No Reinstallation. 3)Following the exterior of the foundation install heavy gauge steel Simpson brand strapping connecting the floor joists of the first floor and the sill plate to the foundation using: In Crawl Space: (29)S4pseir hs C . vS"d't7,1I 4)Continue Shear connections from sill plate to rim joist with Tie Plates or Angle Clips where UFPs or FAPs are used to tie into the joist system ensuring that the connections tie all the way from the foundation into the joist system and floor of the house 5)Attached garage:(10)Sill bolts 6)Strap Down Water Heater to foundation walls-NA Old Water Heaters run a risk of leaking if moved—we can't take on responsibility for replacement 7)Provide homeowner with permit, ins urance certificate&engineering records Total for the above Work Required to Qualify the Residence for Earthquake Insurance $4,880 (confirm insurance requirements with your agent—get it in writing!) If epoxy is required for securing the anchor bolts into the foundation add $N_A Payment:1/2 down,final 1/2 upon substantial completion(5%retainage until last nut&bolt are in place). Please note that this process does create some dust-Home Owner has Sole Responsibility for clearing protecting and tarping off all belongings as necessary(min.3'around perimeter of basement&load bearing posts. Gemmell Construction LLC does not bear any responsibility for clean up beyond localized dust control during the process and (1)pass around the job site with a vacuum after the project is complete. Sind: g e (CCB#106780) Date: Signed:' ^- Date:/ca 3/ Specifically Insured, Licensed, Bonded and Trained Retrofit Technicians GIIMINELL Taylor Pease 210 SE Madison St, Unit 1 Licensed I Bonded I Insured O O N S R u C T I J ; l C d:(971) 804-4516 Portland, OR 97214 CCB#106780 to ' ea-thq a+:et F.corn o: (503) 282-4424 wy,.ea't gcake-a, h Additionally Recommended Supplementary Procedures These are please initial the ones you would Eike performed and add this I) Install emergency gas shut off valve on gas line : ( $400 Includes required additional manual shut off valve, brace back to house and extra t i Price increases$100 if not done with retrofit 2)Connect all accessible load bearing post&beam work to each other and the foundation: Post to beam&post to floor connections w/Simpson HGs& LTTs In crawl spaces: (32)posts to beam/footing $1600 (8)beam ends to foundation $450 Total for Supplementary Procedures: $ Grand Total for First Page +$4,880 (without the"additional cost of interior epoxy"if required) -1` Li OD Grand Total for all Work to be Performed: =$52,80 Be sure to initial all the supplementary procedures you would like to include in your proposal Payment:1/2 down,final 1/2 upon substantial completion(5%retainage until last nut&bolt are in place) Please Note That This Process Does Create Some Dust-Home Owner has Sole Responsibility For Clearing,Protecting and Tarping off All Belongings As Necessary.(min.3'around perimeter of basement&load bearing posts. Gemmell Construction LLC does not bear any responsibility for clean up beyond localized dust control during the process and (1)pass around the job site with a vacuum after the project is complete. Signed: (CCB#106780) Date: Signed: --yDate: 13/4> /� A. E E. NOV 1 4 2016 OF T IGA :D BUILDING DMSION Taylor Pease 210 SE Madison St, Unit 1 Licensed I Bonded Insured CONSTRUCTION vLC d:(971) 804-4516 Portland, OR 97214 CCB#106780 ear to��Ion q east 1 uaKe# c°�co-,-, O: (503) uaKe 282-4424 4vw1�. th *_ �kL.£t..v�ct .'Lobi �(QMi}-'f ►'C}20 s‘xl vt tktt cAt_44 Ck -75c,4 OR_ 11213 / vtxK )( X x X X K X, X i3� X x RECEIVED • `— `� � �L NOV 14 2016 X I SPA ce CITY OF TIGARD BUILDING DIVISION o i X • 'xxx x X X x ,� t \ . . r1 =2' 12' X' CUs t wt p\a.-e-s a el io's. 2i\b" • sf11 bs1S