Plans (77) S
MILBRANDT ARCHITECTS Bulletin
25 Central Way, Suite 210 • Kirkland, WA 98033
Tel: (425) 454-7130 • Fax: (425) 646-0945
Bulletin#: MA-12 Date: 8-17-2016 ATTACHMENTS: MA-12
Job Name: RIVER TERRACE Job No: 15-03
This bulletin is in response to a request from the City of Tigard regarding a'h"P.T.plywood
spacer strip being installed behind the deck ledger as shown on the attached MA-12 detail.
The attached MA-12 detail is approved by Milbrandt Architects to be used for the deck ledger
installation on the River Terrace project.
CITY OF TIGARD
REVIEWED FOR CODE COMPLIANCE
Approved: t I
OTC: [ I
Permit#: n b L c`1
Address: l S I R S S w S .; neer—
Suite#:
Br } I Date: )
OFFICE COPY
Distribution: From: David Burnett
Polygon Northwest
Attn: Chris Walther
Phone: (360)695-7700
REVISION:
BUILDING PAPER
4. PRE-FLASHING, EXTEND 6"
ABOVE LEDGER, MIN.
METAL Z-FLASHING TYPE B
4 SEE DETAIL 19/15
SPACED DECKING
IT , , p7.777-T�F'-177TTTTaL. i
P.T. 2x JOISTS
SEE STRUC. FOR
a� I CONNECTION DETAILS
F._- -1 \--P.T. 2x LEDGER
I
P.T. PLYWOOD FUR STRIPS
Y" x 1Y2"-2" AT EVERY LAG.
TYPE A FLASHING
SEE DETAIL 19/15
I PRE-FLASHING, EXTEND 2" BELOW LEDGER, MIN.
SIDING
BUILDING PAPER OR PRE-FLASHING;
EXTEND TO ABOVE DECK-TO-WALL FLASHING
DECK TO WALL FLASHING
CDSPACED DECKING
1-1/2" = 1'-o" SECTION
t
R317.1.1.1 Field treatment/ Field-cut ends, notches and
drilled holes of preservative-treated wood shall be treated in
the field in accordance with AWPA M4
PROJECT NAME: RIVER TERRACE ARCH. JOB NO.: 1503 BULLETIN
DATE: 08-16-16 SCALE: 1 1/2" = 1'-0" PAGE:
PREPARED BY: DAVID BURNETT REF. SHEETS: DETAILS MA-12
This bulletin is a stand-alone document. Referenced sheets posted at online plan center have NOT been updated typically.
•
C T ENGINEERING
1 N C 180 Nickerson St.
Suite 302
Seattle,WA 98109
(206)285-4512(V)
(206)285-0618(F)
asolomon@ctengineering.com
BULLETIN
Date: August 17,2016 Number:CT-11 Project#: 15238
Project Name: River Terrace Attached: None
Subject: Deck Connection Detail(Spaced Decking)
Drawings Affected:
Description/Action:
This bulletin provides response to RFI, design clarifications and/or variation requests for the `River
Terrace' project located in Tigard, Oregon.
Based on our review of Bulletin MA-12 (Deck to Wall Flashing—Spaced Decking), this is an
acceptable deck connection detail provided the fasteners attaching the ledger to the structure have
the required penetration to the rim/blocking per the structural deck details.
4GINE !•
W 1
44 ,
22 . _e3 x,c(c<tt
'4 S T. Go'
08/17/2016
CALL WITH ANY QUESTIONS
Issued by: Arnold R. Solomon Date: Aug. 17.2016
Distribution:
Contact Information:
Chris Walther Polygon Northwest Company
Angela Graiewski Polygon Northwest Company
David Burnett Milbrandt Architects
R:\15238 River Terrace\Bulletins 15238_2016.08.17 CT11—Deck Connection Detail(Spaced Decking).doc
Structural Engineers
i
FOR OFFICE USE ONLY—SITE ADDRESS:
This form is recognized by most building departments in the Tri-County area for transmitting information.
Please complete this form when submitting information for plan review responses and revisions.
This form and the information it provides helps the review process and response to your project.
City of Tigard ' COMMUNITY DEVELOPMENT DEPARTMENT
I Transmittal Letter
T,c-i A r?D 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
Vp
TO: Tom H. DATE ' l :
DEPT: BUILDING DIVISION NUJ G 2 2 2010
FROM: Angela Grajewski
COMPANY: Polygon Northwest
PHONE: 971-212-2144 BX _
RE: ISI 5\k) S-en I Of J O-30 MST2010 -bO ?.67
(Site Address (Permit Number)
Polygon at Bull Mountain
(Project name or subdivision name and lot number)
ATTACHED ARE THE FOLLOWING ITEMS:
0 Additional set(s)of plans. 0 Revisions:
0 Cross section(s) and details. 0 Wall bracing and/or lateral analysis.
0 Floor/roof framing. 0 Basement and retaining walls.
0 Beam calculations. 0 Engineer's calculations.
3 Other(explain): Additional deck details requested by inspector
REMARKS:
(V.V. _Iothli2d190
Routed to Permit Technician: Date: • . — Initials: Am
Fees Due: M Yes ❑No Fee Descri tion: Amount Due:
Off" ,/
i
Special
Instructions:
Re.riot Permit .er PE): ❑Yes [it No ❑ Done
Applicant Notified: t9 ';/E Date: 9 Initials:
I:1Building\Forms\Transmittals atter-Revisions.doc 05/25/2012 IVC)% S