Plans (75) •
MILBRANDT ARCHITECTS Bulletin
25 Central Way, Suite 210 • Kirkland, WA 98033
Tel: (425) 454-7130 • Fax: (425) 646-0945
Bulletin#: MA-12 Date: 8-17-2016 ATTACHMENTS: MA-12
Job Name: RIVER TERRACE Job No: 15-03
This bulletin is in response to a request from the City of Tigard regarding a 1/2"P.T. plywood
spacer strip being installed behind the deck ledger as shown on the attached MA-12 detail.
The attached MA-12 detail is approved by Milbrandt Architects to be used for the deck ledger
installation on the River Terrace project.
CITY OF TIGARD
REVIEWED FOR CODE COMPLIANCE
Approved: IN/I
OTQ [ I
Permits n, 6- on ca..6*—
Address: J sa0 Sir S c i n to c1 r
Suite#:
By: 17- Date: - ) 6
OFFICE COPY
Distribution: From: David Burnett
Polygon Northwest
Attn: Chris Walther
Phone: (360)695-7700
REVISION
BUILDING PAPER
PRE-FLASHING, EXTEND 6"
ABOVE LEDGER, MIN.
METAL Z-FLASHING TYPE B
SEE DETAIL 19/15
SPACED DECKING
3 _ .Arial iiiii� F^�TT y I If
2 _.
1 ij
P.T. 2x JOISTS
— SEE STRUC. FOR
CONNECTION DETAILS
I----. * i\ , P.T. 2x LEDGER
1 P:T. PLYWOOD FUR STRIPS
Y" x 1Y2"-2" AT EVERY LAG.
1 TYPE A FLASHING
SEE DETAIL 19/15
---01111110 I\ PRE-FLASHING, EXTEND 2" BELOW LEDGER, MIN.
SIDING
BUILDING PAPER OR PRE-FLASHING;
EXTEND TO ABOVE DECK-TO-WALL FLASHING
DECK TO WALL FLASHING
C.1SPACED DECKING
1-1/2" = 1 -0" SECTION \
;r
R317.1.1.1 Field treatment/ Field-cut ends, notches and drilled
holes of preservative-treated wood shall be treated in the
field in accordance with AWPA M4
PROJECT NAME: RIVER TERRACE ARCH. JOB NO.: 1503 BULLETIN
DATE: 08-16-16 SCALE: 1 1/2" = 1'-0" PAGE:
PREPARED BY: DAVID BURNETT REF. SHEETS: DETAILS MA-12
This bulletin is a stand-alone document. Referenced sheets posted at online plan center have NOT been updated typically.
C T ENGINEERING
INC 180 Nickerson St.
Suite 302
Seattle,WA 98109
(206)2854512(V)
(206)285-0618(F)
asolomon@ctengineering.com
BULLETIN
Date: August 17,2016 Number:CT-11 Project#: 15238
Project Name: River Terrace Attached: None
Subject: Deck Connection Detail(Spaced Decking)
Drawings Affected:
Description/Action:
This bulletin provides response to RFI, design clarifications and/or variation requests for the `River
Terrace' project located in Tigard, Oregon.
Based on our review of Bulletin MA-12 (Deck to Wall Flashing—Spaced Decking), this is an
acceptable deck connection detail provided the fasteners attaching the ledger to the structure have
the required penetration to the rim/blocking per the structural deck details.
PR°
G,`. �� N ,
tfli
� R ��N, `�' EGA�/ 22 ,x_<c<c
08/17/2016
CALL WITH ANY QUESTIONS
Issued by: Arnold R. Solomon Date: Aug. 17,2016
Distribution:
Contact Information:
Chris Walther Polygon Northwest Company •
Angela Graiewski Polygon Northwest Company
David Burnett Milbrandt Architects
R:\15238 River Terrace\Bulletins\15238_2016.08.17 CT11 Deck Connection Detail(Spaced Decking).doc
Structural Engineers
FOR OFFICE USE ONLY—SITE ADDRESS:
This form is recognized by most building departments in the Tri-County area for transmitting information.
Please complete this form when submitting information for plan review responses and revisions.
This form and the information it provides helps the review process and response to your project.
City of Tigard ' COMMUNITY DEVELOPMENT DEPARTMENT
Transmittal Letter
;.P.t) 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 •www.tigard-or.gov
TO: Tom H. DATE RECE
DEPT: BUILDING DIVISION Ry X
AUG 2 2 2016
FROM: Angela Grajewski `Y I
COMPANY: Polygon Northwest ,,,,,�,,
PHONE: 971-212-21441
RE: 1S2Ocp ,V'J SecSRA Or i UtMST201(e-06 o1S(0
(Site Address) (Permit Number)
Polygon at Bull Mountain
(Project name or subdivision name and lot number)
ATTACHED ARE THE FOLLOWING ITEMS:
t o � s € °1 1,6:1 1_
0 Additional set(s) of plans. 0 Revisions:
0 Cross section(s) and details. 0 Wall bracing and/or lateral analysis.
0 Floor/roof framing. 0 Basement and retaining walls.
0 Beam calculations. 0 Engineer's calculations.
3 Other(explain): Additional deck details requested by inspector
REMARKS:
Routed to Permit Technician: Date: — — I Initials:
Fees Due: 51 Yes • No Fee Descri'tion: Amount Due.
Y
D
Special
Instructions:
Re s riot Permit .er PE): ❑Yes lai o ❑ Done
Applicant Notified: /9/tfVi'E- Date: 5/' ,t Initials:
I:\Building\Forms\TransmittalLetter-Revisions.doc 05/25/2012 A/0% 7. 5 u i�
FOR OFFICE USE ONLY-SITE ADDRESS:
This form is recognized by most building departments in the Tri-County area for transmitting information.
Please complete this form when submitting information for plan review responses and revisions.
This form and the information it provides helps the review process and response to your project.
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
111 Transmittal Letter
T I G A R D 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
TO: Tom H. DATE R ] )T
DEPT: BUILDING DIVISION
MAY 1 7 2C15
FROM: Angela Grajewski/Chris Walther .r r/i y-{' F
1_€ JD1NG3Ih"F . IYXN
COMPANY: Polygon Northwest
PHONE: 503-312-6213
By: i,
/Lr s TAO& "CaZ S
RE: 15206 SW Seine Drive N44.120.14-000--?
(Site Address) (Permit Number)
Polygon at Bull Mountain LOT .99
(Project name or subdivision name and lot number)
ATTACHED ARE THE FOLLOWING ITEMS:
Copie : 11• 40),\,, tinopies: Description,;,„
0 Additional set(s) of plans. 3 Revisions: WIC/4th bath change
0 Cross section(s) and details. 0 Wall bracing and/or lateral analysis.
0 Floor/roof framing. 0 Basement and retaining walls.
0 Beam calculations. 0 Engineer's calculations.
0 Other(explain):
REMARKS: Removal of 4th Bedroom bathroom into Walk-in Closet
Routed to Permit Technician: Date: Initials:
Fees Due: Yes ❑No Fee Description: Amount D .
77
$ e ,,f\
$ i� . e
\� / $ ►,,,
ifi)
Special
Instructions:
Reprint Permit(per PE): ❑ Yes c,No ❑ Done
Applicant Notified: Date: Initials:
I:\Building\Forms\TransmittalLetter-Revisions.doc 05/25/2012