Loading...
Plans (3) MILBRANDT ARCHITECTS Bulletin 25 Central Way, Suite 210 • Kirkland, WA 98033 Tel: (425) 454-7130 • Fax: (425) 646-0945 Bulletin#: MA-12 Date: 8-17-2016 ATTACHMENTS: MA-12 Job Name: RIVER TERRACE Job No: 15-03 This bulletin is in response to a request from the City of Tigard regarding a 1/2"P.T. plywood spacer strip being installed behind the deck ledger as shown on the attached MA-12 detail. The attached MA-12 detail is approved by Milbrandt Architects to be used for the deck ledger installation on the River Terrace project. CITY OP TIGARD REVIEWED FOR CODE COMPLIANCE Approved: I OTC: [ Permit #: )71v-j-an 1 (, — nn S Address: isa3 n . , se.; d r- Suite#: By: Date: q-al - 16 Distribution: From: David Burnett Polygon Northwest Attn: Chris Walther Phone: (360)695-7700 OFFICE COPY BUILDING PAPER PRE—FLASHING, EXTEND 6" ABOVE LEDGER, MIN. METAL Z—FLASHING TYPE B ��� SEE DETAIL 19/15 :""1 ' : SPACED DECKING I I '. ,2 i P7T7TT� in—r--).„1 r7 �� c A SEE STRUC. P.T.FOR 2x JOISTS I CONNECTION DETAILS �_ —1P.T. 2x LEDGER 4 ' 'P:T. PLYWOOD FURS STRIPS I Y2" x 1Y2"-2" AT EVERY LAG. TYPE A FLASHING N SEE DETAIL 19/15 PRE—FLASHING, EXTEND 2" BELOW LEDGER, MIN. SIDING BUILDING PAPER OR PRE—FLASHING; EXTEND TO ABOVE DECK—TO—WALL FLASHING DECK TO WALL FLASHING CDSPACED DECKING 1-1/2" = 1'-0" SECTION \ R317.1.1.1 Field treatment/ Field-cut ends, notches and drilled holes of preservative-treated wood shall be treated in the field in accordance with AWPA M4 PROJECT NAME: RIVER TERRACE ARCH. JOB NO.: 1503 BULLETIN DATE: 08-16-16 SCALE: 1 1/2" = 1'-0" PAGE: PREPARED BY: DAVID BURNETT REF. SHEETS: DETAILS MA-12 This bulletin is a stand-alone document. Referenced sheets posted at online plan center have NOT been updated typically. CT ENGINEERING 1 C 180 Nickerson St. NSuite 302 Seattle,WA 98109 (206)285-4512(V) (206)285-0618(F) asolomon@ctengineering.com BULLETIN Date: August 17,2016 Number:CT-11 Project#: 15238 Project Name: River Terrace Attached: None Subject: Deck Connection Detail(Spaced Decking) Drawings Affected: Description/Action: This bulletin provides response to RFI, design clarifications and/or variation requests for the `River Terrace' project located in Tigard, Oregon. Based on our review of Bulletin MA-12 (Deck to Wall Flashing—Spaced Decking), this is an acceptable deck connection detail provided the fasteners attaching the ledger to the structure have the required penetration to the rim/blocking per the structural deck details. FRo .<c>.-'‘,4GNE�f --c2 C •; 60 0 1 �'VA' �, �REG�iNA`� �' 2 2 ,Ne'1<c<c� :4FS T Ok\F 08/17/2016 CALL WITH ANY QUESTIONS Issued by: Arnold R. Solomon Date: Aug. 17,2016 Distribution: Contact Information: Chris Walther Polygon Northwest Company • Angela Graiewski Polygon Northwest Company David Burnett Milbrandt Architects R:\15238 River Terrace\Bulletins\15238_2016.08.17 CT11_Deck Connection Detail(Spaced Decking).doc Structural Engineers FOR OFFICE USE ONLY—SITE ADDRESS: This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT lil 1 Transmittal Letter Tit, k i-1 13125 SW Hall Blvd. •Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov TO: Tom H. DATE RECEIVED: DEPT: BUILDING DIVISIONAiLr ,; FROM: Angela Grajewski f 4,.)ppG AUG 2 2016 {y 4x nG AR'L. COMPANY: Polygon Northwest 8 i I LI)!N a ri, 1 )'e v`' CI PHONE: 971-212-2144 EC RE: � )] 5W eii9I2„ Wk-r)9) MST201Co- Co, 5-5- (Site Address) (Permit Number) Polygon at Bull Mountain (Project name or subdivision name and lot number) ATTACHED ARE THE FOLLOWING ITEMS: 0 Additional set(s) of plans. 0 Revisions: 0 Cross section(s) and details. 0 Wall bracing and/or lateral analysis. 0 Floor/roof framing. 0 Basement and retaining walls. 0 Beam calculations. 0 Engineer's calculations. 3 Other(explain): Additional deck details requested by inspector REMARKS: Routed to Permit Technician: Date: ` - a, - • Initials: /MEI Fees Due: aI Yes • No Fee Descri.tion: Amount Due:�;aerAMMIll '.7 ''" - s `' ate r��t�`` 4� 0..y, 1 - ' $ w s .e $ $ Special Instructions: Re•rint Permit •er PE): ❑ Yes ! No ❑ Done A.plicant Notified: .9-A /E Date: ' d_r Initials: , L; I:\BuildingTorms\TransmitralLetter-Revisions.doc 05/25/2012 t:/f"-7 :C. 't "