Loading...
PFI2016-00231 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT COMMUNITY DEVELOPMENT Permit#: PF12016-00231 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 11/01/2016 Parcel: SEG3044 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: Electric Lightwave Project Description: Adjacent to 12559 SW 69th Ave. Electric Lightwave proposes to place new underground facilities by means of bore(S)along SW 69th Ave within the City of Tigard ROW. SEG 3044/3569/ 1172 Owner: FEES Description Date Amount PFI Permit Fee 11/01/2016 $300.00 PHONE: Contractor: STANDARD UTILITY 12094 EHLEN RD AURORA, OR 97002 PHONE: 503-849-4828 FAX: 503-678-2721 Applicant: DAVID MINER 18110 SE 34TH STREET, BUILDING ONE, #100 VANCOUVER, WA 98683 PHONE: 360-558-4213 Total $300.00 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant / Signature: ----- � Issued By: Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PF12016-00231 Type: Condition Name: Status: Severity: PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be reinstalled or replaced,with like kind of material. Obtain City approval of restoration work. PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition,American Traffic Safety Services Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area. Traffic control devices, flag persons, etc., shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic. at any time,without obtaining written approval from the City Engineer The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept., Tualatin Fire& Rescue)and to 503-962-8140(Tri-Met) and 503-431-2345(Tigard School District)and other service providers impacted by such closure. PFI_Utilities 08-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City approval of any access closures. PFI_Utilities 09-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m. to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI_Utilities 10-TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m. to 9:00 a.m. unless authorized by the City Engineer. PFI_Utilities 11 -TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Utilities 12-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules, contact the Center. NOTE Damage to utilities shall be corrected at the permit holder's expense. PFI_Utilities 13-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI Utilities 14-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Utilities 15-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads, ditches, etc.)as may be necessary, as determined by the Inspector, to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 16-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity, the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert Phone#>, to establish a preconstruction meeting. PFI_Utilities 17-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24) hours prior to commencing work, prior to any staged inspection, and after completing work covered by the permit. call ken fisher 503-816-6146 or Kenny@tigard-or.gov PFI_Utilities 18-PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 19-MONUMENT PROTECTION Applied Notice Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Utilities 20-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have authority to resolve problems, take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing, of any/all assignment changes. PFI_Utilities 21 -OTHER Applied Notice RECEIVED City of Tigard OCT 18 2016 N PUBLIC WORKS —ENGINEERING OF TIGARD Public Facility Improvement (PFJ��ft&EEIIING DESCRIPTION OF WORK(in the right-of-way) TYPE OF WORK Check one: R Utility Connection 8 TYPE 1—Franchise Utility Work ❑ Sidewalk/driveway approach Work performed by NWN,PGE ❑ Street improvements and/or utility agency. Detailed description: Electric Lightwave proposes to place new underground ❑ TYPE 2—Sidewalk/Driveway/Sewer facilities by means of bore(S)along SW 69th Ave within the city of Tigard ROW. Work performed for the purpose of- See attached drawing for more detail. • Sidewalk installation or repair. • Driveway approach installation Pro er address/lo ation(s): 12559 SW 69th Ave, Tigard, OR 97223 and/or repair 'Z • Sanitary sewer lateral installation and/or main line tap ❑ TYPE 3—Full scale Development Applicant: Electric Lightwave Work performed with Land use Address: 18110 SE 34th Street, Building One, Suite 100 approval which includes any of City/state: Vancouver,WA Zi 98683 the following: P. • Subdivisions or Partitions Phone: (360)558-4213 Email: David.Miner@electriclightwave.com • Street widening Contact name: David Miner Phone: (503)710-6296 • Mainline installation for Sanitary sewer,Storm sewer,Tigard water Contractor: Standard Utility Contractors and/or Tigard Water Service Area CCB#: 66948 Expiration: 5/29/2017 SUBMIT COMPLETED APPLICATION TO: Address: PO Box 1008 City of Tigard City/state: Salem, OR Zip: 97308 Planning/Engineering Phone: (503)678-3030 Email: darrel@standardutility.com 13125 SW Hall Blvd. Contact name: Darrel Williams Phone: (503)849-4828 Tigard,OR 97223 Applications for"minor work in right-of-way" only may be emailed to: Engineer: K&B Technical Solutions rQmFermits .tjgard-or. Address: 6566 SE Lake Rd City/state: Milwaukie, OR Zip: 97222 Phone: (503)650-6041 Email: Justen_Phillips@kbmail.net Case No.: Contact name: Justen Phillips Application submittal fee: 3OO •oy Additional fees: Estimated value of work is required(if over$5,000):$ Application accepted: (within the public right-of-way) By: AM= Date:W V Application reviewed: Is work related to a LAND-USE DECISION? El Yes 8 No By:J(e�1` Date: la leo�l b If so, please specify (MLP,SDR,SUB,etc.) case #: Applicant notified: Is work related to a BUILDING PERMIT? ❑ Yes @ No By: Date: If so,please specify(BUILDING PERMIT)case#: 1acURPLN\Masters\Land use Appl"tions Rev 07/09/2015 City of Tigard - 13125 SW Hall Blvd. • Tigard,Oregon 97223 - www.tigard-or.gov 503-718-2421 • Page 1 of 4 APPLICANTS NOTE: Person specified as"Applicant"shall be designated"Permittee"and shall provide financial assurance for work. * When the owner and the applicant are different people,the applicant must be the purchaser of record ora lessee in possession with written authorization from the owner or an agent of the owner. The owner(s)must sign this application in the space provided or submit a written authorization with this application. BY SIGNING BELOW,THE APPLICANT(S) SHALL CERTIFY THAT: • The above tequcst docs not violate any decd restrictions that may be attached to or imposed upon the subject proper • If the application is granted,the applicant will exercise the rights granted ui accordance with the terms and subject to all the conditions and limitations of the approval. • All of the above statements and the statements in the plot plan,attachments,and exhibits transmitted herewith,are true;and the applicants so acknowledge that any permit issued,based on this application,may be revoked if it is found that any such statements are false. • The applicant has read the entire contents of the application,including the policies and criteria,and understands the requirements for approving or denying the application. SIGNATURES of gach owner of the subject property required. E"�� Brad Rollins for David Miner 10/18/2016 Applicant/Authorized Agent's signature Print name Date Owner's signature Print name Date Owner's signature Print name Date Owner's signature Print name Date L z.. T..fi."".':`Ji]:-Fl S.`£�!"S:<_if-.•'Lt��'f^`.i.-Y TG-n'.—_..1.4:h:•i...->$�?".iT.L!:.rr"4.-:.L S.��Y"`J.^""^�V-.3!:3iR T...:`:F'iC"YPS'•S!�.� .a .. _. Z.��_—S.S1�lF_L� PUBLIC FACILITY IMPROVEMENT PERMIT City of Tigard 13125 SW Hall Blvd. • Tigard,Oregon 97223 • -,v«%vtigard-or.gov 503-718-2421 Page 2 of 4 DEVELOPMENT ENGINEERING FEES Public Facility Improvement(PFI) Permit: APPLICATION FEE Part 1: Required submittal fee$300.00 FRANCHISE UTILITY AND SIDEWALK/ PERMIT FEE DRIVEWAY AND UTILITY Part 2: All non-water system improvements CONNECTIONS,ETC. Engineer's estimate X 5% (less $300.00 submittal fee) (work in the right of way) Engineer's estimate X 2%Plan Review Sketch (including information below) WATER SYSTEM FEE ❑ Dimensions Part 3: All public water system improvements Engineer's estimate X 12% ❑ Street Name ❑ Site Address PFI Permit Fee Exemptions: There will be no permit fee charged,or assurance required FULL SCALE DEVELOPMENT for the following types of work: (Subdivisions/Partitions and Street Improvements) • Sidewalk repair(less than 20 lineal feet) • Relocate or replace mailbox Design Plans • Ditch cleaning that does not involve regrading. (6 sets,2406 or 22x34) • Weephole repair ❑ Cover—Site,Vicinity,Abbreviation,Legend • Curb repair or replacement(less than 20 lineal feet) ❑ General Notes(City,Water,Sewer,etc.) • Lawn sprinkler system installation or repair ❑ Street(Plan,Profile) • Street tree pruning or planting ❑ Water,Storm and Sanitary(Plan Profile) • Planter strip landscape maintenance ❑ Water Quality Facilities • Test wells ❑ Grading ❑ Landscaping/Tree Plan ❑ Composite Utility Plan(Electrical,Phone,Gas, Note: A cash assurance maybe required per Storm,Sanitary,Water,Signage,Street Lights,etc) TMC 15.04.140.(customer deposit) ❑ Details ❑ Traffic Sight Distance ❑ Signing and Striping ❑ Street Light Plan and Photometric ❑ Engineers seal/signature ❑ Sheet label(project land use name,revision and plan log block,dates and sheet numbers.) Additional Submittals (per Land Use conditions) ❑ Traffic Report ❑ Storm water Drainage Calculations ❑ Geotechnical Report ❑ Preliminary Access Report(Sight Distance) ❑ Proposed Plat ❑ Pathway Design(if applicable) ❑ Water Department Approval PUBLIC FACILITY IMPROVEMENT PERMIT City of Tigard 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 Page 3 of 4 { CONSTRUCTION NOTES T xL{ora wr)s TO a{maim TO UE OR BETTER • caranq+. -- x ummS ARE EMEO m cww mar.TTS 12259 as�mm munuEs. n...asao BECNI UIWvRoXTD t LEGEND CGNSTR OCTON Al EXISIM VAULT N CRY Of 7E/aD ROW.� _.. B RE EX6TWG VAUIi QY E EXSiNG SEWER DISRNG WATER .I MIT OF WAY --� R FACE OF ally -ro BORE m PLACE()}2- ' EXsuc SN FWvx CONMrLOCATE WRE. FM A MN.OF 36' i I SW FRO"ST E- t A E L E C T R I C LIGHTWAVE C—n 0.1E{MNr 12447 TNM:S.OSP Er0- 0:13{O)55B-E213 ae� 1509)71=r Mw aL Eciwc wnTwnvEw ar..E alma 'I t � } � wlWi Wy:lf{{WaINNM{II • 1 125{0 TEGHNICAA BOLUilONS Enw.�.ie..n w nn ac�vl a.uw m E IV114/14/161 CM R WdM FM EMIT I BA I t1. • E ( i•=20' ICERT41948 SHEET HUMBER � t � Flber EMIBrICWTrI{M Pro(sc1 12559 SW 691M p� 27 4W Tigard,OR 87233 SCALE:1••M ' I t 3 ELFB0626263 ' ItI t • CONSTRUCTION NOTES WM NFAS TO r RMOM M u¢w OEM f w OROsrft E MR 6ASE0 wE treuLSiNC lDGl6 on idem cneas. ~rY�r 3.R 6 TfE WIti IRICfIOx CORrRItlg6%SPEY�IIrY 0' 20' 40' t I _I e•w to fNl FOR t A1CS 860rR Oncsw. 1 SCALE:1'.20' I{ I1 yJ I LEGEND f BORE j E FJRS SEWER IS7IHG MAIEit NG WATER r •:.^ I- ?� j IX ...___ .01. f _. FADE OF CIIRB EYJSIVIG SIOEMWK 11147 �1 f 13oRE,o RUGE f,j-r� , COHRULOCATE N,RC IID I� FIBER A A MN.OF 76'DEEP. ELECTRIC' f f LIGHTWAVE ` TWO.6r.O8R EnpinRRr f \ Ge:178016 413 7,0 TlOd49e --�«— M�e:L NAY @L LCIH MIVVAV SW KYEIAND ST I Gil gMRri3 � f � ISHEETNMOER MUTg S O AGMD POW owiawICERT-31948 F,Der Enhancement Project12559 SW 691h AveTigard,OR 97223 EL480523463 ' E CONSTRUCTION NOTES CO wus ro ff usa®ro ua as eEnw VmlunnnN ona MMES ANL 9ASEc 0EE EaMC L0 ,,.o•.,...� a�n1n srEULTu�. S TIE owcra TOe owrNACTdiS%3[9M- LEGEND BORE BORE TO PULE(1)-2' PROPOSED N VAtILI CONOIWf,LOCATE INE.N1D i En6'191G W5 EIBEA A MN.OF 36'DEEP, D0SW SE'W'ER FACE Of WAY UR NCE of CONS E1aSIN0 soprLA j i � R 12579 LIGHTWAVE j Cm WY D.vq NY�Nr T6:Sr.OSP En9NMM 1lEEB yr ,� Pk1360)5614213 ' Na 11)7106296 6. I NMY:t/nvkl.Mx-a.i xGI RIGLIGM I WAVE.wn: '� I ! � fAArYww.Ce NTOiW I' : + � Pwipn ev:MW910DI1NpW011 it b �� I TEGNNIOAL SOLIlTgN3 ?' �•.1 tA`11 Lm or Tom La9n 01vo, f I Iva(t}49'9]{'ww. i E T 2---!f >• 1—2010ERT 48 1 Y SHEET Nu"EA 1 FIWr Enhancement Project O1D 1910ERGROl9O ' 12559 S W 69th Ave COLISMVIOM N _ Tigard,OR 97223 e0' CRY M WAM I10N. - . 12625 E 12153 SCALE:1-•201 {- - 3 3 EL"052L263 Page 84 2011 Edition Stationary Lane Closure with Flagging Diagram 320 Diagram 320 covers total closure of one lane of a two-lane, two-way roadway. See the detail inset for the layout if using a single flagger to control both directions of traffic on low volume roads (less than 400 ADT) with good sight distance as discussed below. 1. Use truck-mounted flashing warning lights on work and protection vehicles. See Section 4.3— Lights and Lighted Signs for exceptions. 2. For added visibility, a truck-mounted arrow board or PCMS in caution mode may be used. 3. Flaggers at each approach are required if any of the following conditions exist: a. Night Operations. b. Work space is over 200 feet in length. c. Sight distance is less than 750 feet from each approach through the lane closure. d. Traffic volumes are greater than 400 ADT. 4. The length between the Flagger Ahead signs shall not exceed one mile. Use Diagram 340—Lane Closure with Pilot Car if exceeding one mile. 5. Cones should be used to outline the work space when curves or other roadway alignments prevent clear direction for the motorists to pass the work space safely. 6. Cones along the work space are recommended when posted speeds are 45 mph or greater, when working under heavy traffic or when travel lanes are narrower than 11 feet. 7. Extended queue signing (see Diagram 5-4) should be used when traffic queues extend beyond the initial advance warning sign. 8. When flagging near an intersection, the "Flagger Ahead" (CW23-2) sign should be visible to traffic entering from any side road. Additional advance warning and Flagger Ahead symbol signs may be placed on the side road(s). 9. Sign set-up and flagger placement shown may be used for intermittent full road closures of 20 minutes or less. 10. The "ONE LANE ROAD AHEAD" (W20-4) sign is optional and should be considered on high volume or high speed roads, or when extended queues are expected. Chapter 5 December 2011 2011 Edition Page 85 Stationary Lane Closure with Flagging Diagram 320 S¢� I C ALA`` ui \� W O0 O p¢� W I CMj 1 fti 00 Uj J� LL J p LU CL~ c m r----------------- •a• `oa O I I I o °�v I I I I I • oL. I LLL Y� r R IE L -it,/ I _ j j nip 111 M I Cl) I I_ ----- Sign Spacing and Buffer Lengths(feet) I t ERRATA: Posted S acin Between Signs Buffer M Speed A B C Space - 20 50 Supplement Table 25 100 100 100 75 30 100 35 125 Y Updeted'feewryt3. 350 350 350 3016 40 150 W:oorn W dk a.-wy 45 180 Section 50 500 500 500 210 55 250 Si n 5 acin z and Buffer Lengths(feetl Su lenient Posted S acin Between Si ns "Buffer" Chapter 5 December 2011 Speed A B C Space 60 285 65 700700 700 325 70 365 Page 118 2011 Edition Lane Closure at Intersection with Flagging Diagram 620 Diagram 620 covers work within an intersection when normal traffic control must be interrupted. Work vehicles may or may not be in the work space. 1. During flagging, traffic signals shall be turned off. Contact the road jurisdiction for approval and assistance (see Chapter 3). 2. For multi-lane facilities, traffic approaching the intersection shall be reduced to a single lane on each approach. See Chapter 3 for information on flagging through intersections. 3. There should be one flagger for each approach. One flagger may control two adjacent approaches if sight distance, low volumes on side roads, and flagger position allows for safe operation and clear direction to motorists. For low traffic volume intersections (fewer than 400 entering vehicles per day), one flagger may be used. 4. The "ONE LANE ROAD AHEAD" (W20-4) sign is optional and should be considered on high volume or high speed roads, or when extended queues may be expected. Sign Spacing and Buffer Lengths(feet) Posted Spacing Between Signs Buffer Speed A B c Space 20 50 MATH: 25 100 100 100 75 30 100 Supplement Table 35 125 40 350 350 350 150 up&tbd.rab.,wV12. 45 180 2016 50 500 500 500 210 ry.00braa6� away 55 1 1 250 Si in Spacinit and Buffer Len the feet Supplernent Posted SpaclinR Between Signs "Buffer" Speed I A B C Space 60 285 65 700 700 700 325 70 365 Chapter 5 December 2011 2011 Edition Page 119 Lane Closure at Intersection with Flagging Diagram 620 ROAD WDRK AHEAD 1 t FAMD AHEAD BE B PREP B A (OPO-A RDAU 1001 MM PREPARED �� ROM • TO 6rOP IE WORK AlIFM A B B C Buffer 4— 4— K fODft.Mec+i c B B A ROM BE WOAD PREP AHEAD 7O yTOp 10011 Ma Tt FAVD AHEAD •• 1 C A I tDvwsn B .E PREPAiED TO 6 OP B "Pdow 1 t } MMD c ROM WOW( AHEAD December 2011 Chapter 5