Loading...
Plans (42) ,I DESIGN CRITERIA: 2014 OSSC/ASCE 7-10 J l r ( � ��� 1��� f' OCCUPANCY CATEGORY II Z�7 7 S6- /J-r ir ALLOWABLE BEARING PRESSURE = 1500 PSF(ASSUMED)WITH 3 INCREASE FOR WIND OR SEISMIC, -1— FOOTINGS TO BEAR ON UNDISTURBED NATIVE SOILS, MIN. FROST DEPTH 18"BELOW FINISH GRADE CONCRETE STRENGTH = 3000 PSF (CALCULATIONS BASED ON 2500 PSI CONCRETE,SPECIAL INSPECTION OF CONCRETE CAN BE WAVED IF DEEMED ACCEPTABLE W/BLDG DEPT.) MIX CONCRETE IN ACCORDANCE W/ASTM C94 `� FLY ASH ALLOWED PER ASTM C618 UP TO 20%OF REQ'D CEMENT CONTENT(470 LBS/CY). MAX.WATER/CEMENT RATIO: 1 —.__-- 0.55 WITHOUT AIR 0.50 WITH AIR /I AIR ENTRAINMENT 5% (+/-1%@ DELIVERY) /f, SLUMP = 4", OR 4'-6"IF WATER REDUCER PER ASTM C494 IS USED(NO CALCIUM CHLORIDE) (E) I-JOISTS ..... I III REINFORCING STEEL PER ASTM A615 GRADE 60 (BARS#4&SMALLER CAN BE GRADE 40) y:II I LAP SPLICE ALL BARS MIN.66db EXTERIOR FACE REINF: MIN. 1 'CLEAR COVER ABOVE GRADE,3"CLEAR FOR FOOTINGS 8"WALL: #6 VERT. @ 10" / I #4 X 8"HORIZ LEG HORIZ. #4 @ 12"0/Cy/ f'— X 12"VERT. LEG- WOOD IN CONTACT W/CONCRETE: #2 P.T. HEM FIR (EA. FACE) — EMBED INTO(E) ALL OTHER DIMENSIONAL LUMBER: #2 DF-L ♦ / I _ FTG W/ $°18X" X 5" USE Z-MAX FOR SIMPSON HARDWARE 12- - ' — HOLES @ 18"O/C SPECIAL INSPECTIONS: INTERIOR-FACE REINF:#4 VERT. CLR j W/EPDXY 12 CONCRETE: DURING TAKING OF TEST SPECIMENS AND PLACING OF REINFORCED CONCRETE 0/C ENV — , (EXCEPT CONCRETE P0=2500 PSI) w _ TRANS.TOP FOOTING REINF: 8"OR 10" / 00 G F —1 REINFORCING STEEL: INSPECTOR NEED NOT BE CONTINUOUSLY PRESENT DURING PLACING OF #4 @ 12"O/C 1.5"CLR TOP � A° � 11 ( I I REINFORCING STEEL PROVIDED REINFORCING IS INSPECTED PRIOR TO DELIVERY OF CONCRETE TO x _y 2" JOBSITE LONGIT. FOOTING REINF: /ta, CLR' — ' PROVIDE BENTONITE iL�ir #4 @ 12"0/C TOP&BOTT. I — = WATER-PROOFING PANELS a PRODUCT OR COMPARABLE 0;nIO PROp8 I ( P _° WATERPROOFING BETW. ����4 t N��.'�io l - l d a — — RETAINED SOIL AND hep . . . 4) S -- -Q a ;^ \ ♦ ° - °�Q ° << CONCRETE WALL-REF - -�; t" I "I-21 e '�P ° _ • v n - • ° SPECIFICATIONS " ° a a lC'1 • GOP v T — a e Q°.-. \''' 4"PERF. DRAIN AT O • ' �V4 PERIMETER AS ("+ �j1�' , 1 III III III III IIIIREQ'D 4'-GNOTE: CONTRACTOR IS RESPONSIBLE FOR SAFE CONDITIONS AT THE 0 . TIE (N) FTG TO (E) FOUNDATION AND FOR TEMPORARY SUPPORT OF THE BUILDING PRIOR TO COMPLE W/#4"DOWELS INTO to X 4' _ THE WORK SHOWN HEREIN. #6 XI @ 10"0/C 3"CLR BOTT. OF FTG HOLES W/EPDXY @ 12"0/C 48" 1 NE CORNER @ BASEMENT LEVEL -__ 2 RETAINING WALL SECTION RE NFIN.42'W/EXT.-FACE WALL S1 _ 3/16"=1'-0" N s1 _ 3/4"=1'-0" ARCH. REF. � - ARCH. REF. - r *Cr 'AL Y Project Name: Project No.(if apilicable): HUNEKE RESIDENCE Consulting Structural Engineering Project Location: Date: 1111 Ryan Court 12797 SW DA VINCI TIGARD, OREGON 08/31/2016 West Linn,0R 97068 Client Name: Page: t: 503-887-0536 S1 NEIL KELLY COMPANY 2 6b'orllystructural.com