Loading...
Report H C E ~lOrn Consulting Engineers LLC Memo To: ©avid Jensen From: David J. HomfQ J. Ha Date; 10117/2016 ESPIM.— 6"x_0' Re: Lot 2 Medallion Meadows We have reviewed the as-built condition of the garage portal framing and find it to be acceptable (including the larger HDU8 holdowns) provided the following: A MSTC40 strap should be installed that connects the two garage headers together. 9320 SW Barbur Blvd, Ste 135 Portland, OR 97219 Phone: 503.892.5782 Email:dave@hornce.com