Report (43) DESIGNS FIELD REPORT
Page el of 2
GDI Project: Polygon-122.04 Prepared By: Tyler Oathes
Project Name: Polygon at Bull Mountain Date: 10/18/16
Location: 4�W Seine Court, Tigard, Report#: 131 _
Oregon
Arrival: 1530 Departure: 1600
_,....,_...._.. _._...._................................................_........................ .................__...__,. ,,,.,.._
Weather: Overcast, 50's Permit#: MST2016-00025
........_ _ _. _...._.__...................
Site Visit Requested By: Jason (Polygon) Met With (on site): Jason
.....____._._._...................T...__._.__._..__.____
Purpose: Discuss Lot 51 footing backfill and slope
Outstanding Issues: FR-127 (9/8/16) Loose soil directly behind planned wall reinforced zone
Upon arrival I met with Jason with Polygon. I was directed to a series of formwork that had been constructed in the
northwest corner of lot 51. 1 was informed that the city inspector had concerns about the slope between footings not
being a 1:1 slope.
Jason informed me that crews plan was to pour the footings and then backfill with crushed rock after the formwork
has been stripped to the desired slope.There will be approximately 2' of crushed rock placed at the bottom of the
slope (south side) and will taper to close to 0' near the top of the slope (north side). I was informed that the slope
will be approximately 2:1 when finished. The overall height of the slope appears to be approximately 5' from north
to south. After speaking with Sean Dimke (GeoDesign) it was determined that this is an adequate way to repair the
slope.
At
T
y
A'
of
View of footing and slope from south looking north Southern Portion of slope and footing
15575 SW Sequoia Parkway,Suite 100 1 Portland,OR 97224 1 Off 503.968.8787 1 Fax 503.968.3068
DESIGN- FIELD REPORT
An
x
1`
IIS'" 'III�'ll'
I ql
a I
uF
i�ri N r;
I
E
4 j
1
f�� 4
y � I
I fl +
I
� r
a
s
i
View of north portion of slope and footings
View of central portion of slope and footings
Distribution:
Attachments: Picture (4)
Reviewed by:
This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services.We rely on the contractor to comply with the plans and
specifications throughout the duration of the project irrespective of the presence of our representative. Our work does not include supervision or direction of the contractor,the contractor's employees
or agents. Our firm is not responsible for site safety.This field report is a DRAFT representation of our field observations,testing,jind preliminary recommendations.The report can only be
considered final upon review of the GeoDesign project manager,as indicated by initials in the"Reviewed Hy'section
Signature:
15575 SW Sequoia Parkway,Suite 100 1 Portland,OR 97224 1 Off 503.968.8787 1 Fax 503.968.3068