Report (43) DESIGNS FIELD REPORT Page el of 2 GDI Project: Polygon-122.04 Prepared By: Tyler Oathes Project Name: Polygon at Bull Mountain Date: 10/18/16 Location: 4�W Seine Court, Tigard, Report#: 131 _ Oregon Arrival: 1530 Departure: 1600 _,....,_...._.. _._...._................................................_........................ .................__...__,. ,,,.,.._ Weather: Overcast, 50's Permit#: MST2016-00025 ........_ _ _. _...._.__................... Site Visit Requested By: Jason (Polygon) Met With (on site): Jason .....____._._._...................T...__._.__._..__.____ Purpose: Discuss Lot 51 footing backfill and slope Outstanding Issues: FR-127 (9/8/16) Loose soil directly behind planned wall reinforced zone Upon arrival I met with Jason with Polygon. I was directed to a series of formwork that had been constructed in the northwest corner of lot 51. 1 was informed that the city inspector had concerns about the slope between footings not being a 1:1 slope. Jason informed me that crews plan was to pour the footings and then backfill with crushed rock after the formwork has been stripped to the desired slope.There will be approximately 2' of crushed rock placed at the bottom of the slope (south side) and will taper to close to 0' near the top of the slope (north side). I was informed that the slope will be approximately 2:1 when finished. The overall height of the slope appears to be approximately 5' from north to south. After speaking with Sean Dimke (GeoDesign) it was determined that this is an adequate way to repair the slope. At T y A' of View of footing and slope from south looking north Southern Portion of slope and footing 15575 SW Sequoia Parkway,Suite 100 1 Portland,OR 97224 1 Off 503.968.8787 1 Fax 503.968.3068 DESIGN- FIELD REPORT An x 1` IIS'" 'III�'ll' I ql a I uF i�ri N r; I E 4 j 1 f�� 4 y � I I fl + I � r a s i View of north portion of slope and footings View of central portion of slope and footings Distribution: Attachments: Picture (4) Reviewed by: This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services.We rely on the contractor to comply with the plans and specifications throughout the duration of the project irrespective of the presence of our representative. Our work does not include supervision or direction of the contractor,the contractor's employees or agents. Our firm is not responsible for site safety.This field report is a DRAFT representation of our field observations,testing,jind preliminary recommendations.The report can only be considered final upon review of the GeoDesign project manager,as indicated by initials in the"Reviewed Hy'section Signature: 15575 SW Sequoia Parkway,Suite 100 1 Portland,OR 97224 1 Off 503.968.8787 1 Fax 503.968.3068