Loading...
Plans (34) /V1 _Q1- ;Z0zb - cm-11----70 ' - VOELKER ENGINEERING INC. "1j,9"g-e1-3't115'VBLACK WALNUT ST. 1911 116th Avenue NE SHEEr Na OF Bellevue, Washington 98004 425-451-4946 CALCULATED BY QV DSI 10Z10Z16 charles0voelkereng.com SUMMIT RIDGE 151/153 518" A00E CAP M 1/2" FROM 55 HO LI T05 SAA r-JP BEAM M13 TO COLUMN FLANGE f 1/2'STIFFENERE7 YVELD EACH SIM A V 0JF YC-LO. 5AGKINO To BE REMOVED. 1/2*BASE FLATS 5ArK0OU6E ROOT V NON-5mw AND ADD 5/16 FILLET 6ROVr(5000 P51) AELD (4) 5/4* DIAMETER, 4#4 ac. X -6 1/21041111111PROW ALL-THREAD RODS(A5*) VV NUT AT ............ 50TTOM 4#4 AT ANCHOR BOLTS 2#4 ;t tt 0 0� #4 s 24"ac, STEEL FRAME SECTION IO ycAL1=: NTS r4z- j"'GON S V0