PFI2016-00211 r
CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT
COMMUNITY DEVELOPMENT Permit#: PF12016-00211
13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 09/26/2016
Parcel: SEG1854
Jurisdiction: Tigard
Site address:
Subdivision: Lot:
Project: PGE
Project Description: Adjacent to 7910 SW Fanno Creek Dr. Distribution OH and UG construction, replace B/0 padmount
transformer on pad#8587. PGE Job M 1450276. SEG 1854/3319
Owner: FEES
Description Date Amount
PHONE:
Contractor:
PHONE:
FAX.
Applicant:
NATHAN GRAVELLE
10800 SW AVERY STREET
TUALATIN, OR 97062
PHONE: 503-951-3714
Total $0.00
Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact
information of responsible parties before beginning work.
Permittee/Applicant r
Signature:
Issued By:
Special Conditions(See Attached)
Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY
Conditions for PF12016-00211
Type: Condition Name: Status: SeverityL
PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice
Applicant must comply with all applicable provisions of federal and state law, the Tigard Municipal Code, and the terms of
any agreement with the City of Tigard regarding work to be done pursuant to this permit.
PFI_Utilities 02-WORK SITE AREA Applied Notice
The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The
spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited
and violation shall because for immediate cancellation of the permit. The City may at anytime order immediate clean-up
and suspension of work to accomplish clean-up.
PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice
Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean
Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to
accomplish effective erosion control.
PFI_Utilities 04-WORK SITE REPAIRS Applied Notice
Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be
reinstalled or replaced, with like kind of material. Obtain City approval of restoration work.
PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice
Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices
[MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition,American Traffic Safety Services
Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH].
PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice
Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work
area. Traffic control devices, flag persons, etc., shall be in place prior to initiation of construction work and shall be
effectively maintained.
PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice
Public roadway shall not be closed to traffic, at any time, without obtaining written approval from the City Engineer. The
applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and
area wide Emergency Services: 503-629-0111 (Tigard Police Dept., Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met)
and 503-431-2345(Tigard School District)and other service providers impacted by such closure.
PFI_Utilities 08-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice
Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City
approval of any access closures.
PFI_Utilities 09-TRAFFIC CONTROL WORK HOURS Applied Notice
Work is permitted in daylight between the hours of 7:00 a.m. to 7:00 p.m. Mon-Fri unless otherwise authorized by the City.
PFI_Utilities 10-TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice
Hours of construction work on collector and arterial roads will be limited to 9.00 a.m.to 3:00 p.m. unless authorized by the
City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m. to 9:00 a.m. unless authorized
by the City Engineer.
PFI_Utilities 11 -TRAFFIC CONTROL MODIFICATION Applied Notice
The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to
assure public safety.
PFI_Utilities 12-UTILITY NOTIFICATION Applied Notice
Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR
952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987.
If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit
holder's expense.
PFI_Utilities 13-UTILITY LOCATION CONFLICT Applied Notice
Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole
before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at
the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work
with affected utility agencies.
PFI Utilities 14-TEMPORARY PATCH Applied Notice
A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance
approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is
liable for hazards or damage resulting from the prosecution of the work.
PFI_Utilities 15-REPAIR OF EXISTING FACILITIES Applied Notice
Work under this permit shall include repair of existing facilities(roads, ditches, etc.)as may be necessary, as determined by
the Inspector, to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit.
Corrective work shall be done at the applicant's expense.
PFI_Utilities 16-PRECONSTRUCTION MEETING Applied Notice
Before initiating any construction activity, the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert
Phone#>, to establish a preconstruction meeting.
PFI_Utilities 17-NOTICE TO COMMENCE WORK Applied Notice
The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work,prior to any staged
inspection, and after completing work covered by the permit. call Ken Fisher 503-816-6146 of Kenny@tigard-or.gov
PFI_Utilities 18-PERMIT/PLAN ON SITE Applied Notice
A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan
and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and
provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and
specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work
performance.
PFI_Utilities 19-MONUMENT PROTECTION Applied Notice
Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's
expense.
PFI_Utilities 20-EMERGENCY CONTACTS Applied Notice
Provide to the City inspector, in writing, the names and 24 hour emergency telephone number of two(2)persons who have
authority to resolve problems, take corrective action and, in general,will be responsible in case of any emergency. The
applicant shall notify the City Inspector, in writing, of any/all assignment changes
PFI_Utilities 21 -OTHER Applied Notice
RECEIVED
SEP 26 2016
City Of Tigard CITY OF TIGARD
PUBLIC WORKS —ENGINEERING PLANNING/ENGINEERING
Public Facility Improvement (PFI) Permit
REQUIRED SUBMITTAL
DESCRIPTION OF WORK(in the right-of-way) ELEMENTS
Check one:Vfpublic utilities(gas line,electric,data cable) JN Mirror work un right-o6-way
❑ Sidewalk/driveway approach and utilities only (sidewalk repair,curb cut,street
❑ Street improvements opening,etc.)requires:
PGE JOB M1450276 •Application form,completed
Detailed description: and signed
DISTRIBUTION OH AND UG CONSTRUCTION •Submit two(2)copies of scaled
Replace B/O Padmount Transformer on pad 8587 sketch of the proposed work to be
done
•Submit two(2)copies
Property address/location(s): 115H 13 3 19 of traffic control plan
7910 SW FANNO CREEK DR, TIGARD —OR—
E] Substantial project work requires
above items and professional
Applicant's name: Portland General Electric engineered plans for:
10800 SW Ave Street •Street widening
Address: Avery •Subdivision infrastructure
Tualatin, OR 97062 •?Main utility line extension:
City/state: Zip:
503-951-3714 Prere Coord n.com - Storrn Drain,Sanitary—Tigard-
Plnone: Email: a @P9 Water—Tigard Nater Service area
Contactperson: Nathan Gravelle Phone: 503-951-3714
Contractor's name:
CCB#: Expiration:
DELIVER APPLICATION TO:
Address: City of Tigard
City/state: Zip: Planning/Engineering
Phone: Email: 13125 SW Hall Blvd.
Tigard,OR 97223
Applications for"minor wort:in right-of-way"
Engineer's name: otily may be emailed to:
Address: tgm=rmits(&igard-or.Qov
City/state: Zip:
Phone: Email:
Case No.. IZD110-002I
Application submittal fee:
Estimated value of work is required(if over$5,000):$ application accepted:
(within the public right-of-way) By: 7110-- Date: 0112YVIRP
Is work related to a LAND-USE DECISION? ElYes If
application re-viewed:
No
If so,please specify(MLP,SDR,SUB,etc.) case#: By.-,�L%S�– Date:
N(
applicant notified:
Is work related to a BUILDING PERMIT? El Yes N0 No By. Date:
If so,please specify(BUILDING PERMIT)case#: \N%PLrnMaft•Rwnd Use AppbuUom Rev.07/16/2014
City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page I of 4
APPLICANTS
NOTE: Person specified as"Applicant"shall be designated"Permittee"and shall provide financial assurance for
work,if required by the city pursuant to the TMC 15.041.140.
With the exception of a utility operating pursuant to a valid franchise with the City of Tigard,when the owner and the applicant are
different people,the applicant must be die purchaser of record or a lessee in possession with written authorization from the owner or an
agent of the owner.The owner(s)must sign this application in the space provided or submit a written authorization with this application.
Franchised Utilities are not required to obtain the owner's signature on the application.
BY SIGNING BELOW,THE APPLICANT(S) SHALL CERTIFY THAT:
• The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject property.
• If the application is granted,the applicant will exercise the rights granted in accordance with the terms and subject to all the
conditions and limitations of the approval.
• All of the above statements and the statements in any plot plan,attachments,and exhibits transmitted herewith,are true;and
the applicants so acknowledge that any permit issued,based on this application,may be revoked if it is found that any such
statements are false.
• The applicant has read the entire contents of the application,including the policies and criteria,and understands the
rcquircments for approving or denying the application.
—72 j6
Applicant/Au horized Agent's signature Print name Date
SIGNATURES of each owner of the subject property, if required
Owner's signature Print name Date
Owner's signature Print name Date
Owner's signature Print name Date
PUBLIC FACILITY IMPROVEMENT PERMIT
City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov 503-718-2421 • Page 2 of 4
DEVELOPMENT ENGINEERING FEES
1. Public Facility Improvement(PFI)Permit:
Part 1: Required submittal fee$300.00
Part 2: All non-water system improvements
Engineer's estimate X 5%(less$300.00 submittal fee)
Engineer's estimate%2%Plan Review
Part 3: All public water system improvements
Engineer's estimate X 12%
Total Permit Fee=Part 2+Part 3
PFI Permit Fee Exemptions:
There will be no permit fee charged,or assurance required for the following types of work
• Sidewalk or driveway repair(less than 20 lineal feet)
• Relocate or replace mailbox
• Ditch cleaning that does not involve regrading.
• Weep hole repair
• Curb repair or replacement(less than 20 lineal feet)
• Lawn sprinkler system installation or repair
• Street tree pruning or planting
• Planter strip landscape maintenance
• Test wells
PUBLIC FACILITY IMPROVEMENT PERMIT
City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov 503-718-2421 Page 3 of 4
SAMPLE SKETCH:
Edge of Pavement
I ",— Ditch
St;Streetlight -
etlight I —-—-—-—-—-—-— —r---
eRain Dnin
I a 1
T"Propos d''Selw'erTine"
� I 1
N Existing House
I I I Existing
Z • Driveway
� ciino
I 1
a Io�
��o •
Existing Shop �
_
PowerpoleI 1 --
o a
I I�-------W0P d9Yne-------!---
' I
II Fire Hydrant(FH)
� � I
� I
Scale: '1"=30'
� I I
� I I
� I I
� � I
MINIMUM SKETCH REQUIREMENTS(Put"N/A"if Not Applicable):
North arrow Property lines&dimension Slope of property
Street &street name(s) Existing building,structures Utility&street light poles
Proposed work Existing curb or edge Trees
Existing S/W or of pavement Existing utility locations
D/W apron (sewer,water,storm)
PUBLIC FACILITY IMPROVEMENT PERMIT
City of Tigard - 13125 SW Ball Blvd. - Tigard,Oregon 97223 - wwwtigard-or.gov - 503-718-2421 - Page 4 of 4
Page 12 2011 Edition
CHAPTER 2 - SETTING UP THE WORK ZONE
This section provides guidelines and procedures for setting up work zone,
special event, or incidence response.
The use of additional devices, such as PCMS, arrow boards, and TMAs
during set up and taking down of the work zone may be used to enhance
worker safety.
In developing and implementing the TCP, existing devices shall be
maintained at an equivalent or better level than existed prior to project
implementation.
2.1 Work Zone Components
The work zone, as shown in Figure 2-1 below, consists of four parts and
extends from the initial advance warning signs to the last temporary traffic
control device or the END ROAD WORK sign (optional).
Figure
♦2-1:♦Work Zone Components
1 1
I I
•• ( Termination
Area
• suner speog
(Opft*
• � Work Space
r
Buffer Space
1 '
Transition
Area
•
A
Advance
8 warning
MM MM— ; Area
•• 7 t ••—{ Inial Warning
Sign
Chapter 2 December 2011
2011 Edition Page 13
1. Advance Warning Area: An advance warning area is necessary for all
work zones. It may vary from a series of signs starting a mile or more in
advance of the work space to a single sign or flashing lights on a work
vehicle.
The Advance Warning Area should give road users enough time to react
to any downstream changes occurring within the Transition area. The
length of the Advance Warning Area will vary based on the number of
advance warning signs and the posted speed. Use Table 2-4 to
determine appropriate sign spacing and specific advance warning area
lengths.
2. Transition Area: In a transition area, traffic is moved out of normal traffic
paths and into a temporary path around the work space. The transition
area commonly contains channelization tapers used to shift or close the
travel lane(s)or to close a shoulder.
3. Activity Area: The area within a work zone is comprised of the following
two sections.
a. Buffer Space: A section of closed road in advance of and
following the work space which provides an extra margin of safety
for both traffic and workers. Keep buffer spaces clear of vehicles,
equipment, materials and personnel to provide a clear recovery
area for errant vehicles. Buffer spaces should be provided when
space is available, but are optional.
b. Work Space: The portion of the roadway containing the work
activity and includes workers, materials and equipment. It should
be sufficiently delineated and protected.
4. Termination Area: The termination area provides a short distance for
traffic to clear the work space and return to normal operation. The
downstream cone taper is optional. An END ROAD WORK sign is also
optional.
2.2 Tapers
Taper lengths, calculated from the following tables or shown in Figure 2-2,
are minimum taper lengths. Longer tapers may be necessary for drivability
or to enhance driver performance (e.g. around vertical or horizontal curves or
steep grades). To determine if a taper length is adequate or needs to be
adjusted, monitor traffic as it maneuvers through the work zone.
TAPER TYPES:
Merging Taper: Merges two traffic lanes in the same direction into one lane.
Shifting Taper: Moves traffic from one path to another.
Shoulder Taper: Used to close a shoulder to traffic.
December 2011 Chapter 2
Page 14 2011 Edition
Flagger(One-Lane, Two-way) Taper: Used as part of a flagging operation.
The taper is placed across the lane beyond the Flagger Station to guide
queued vehicles into the open lane and around the Flagger Station during
two-way, one-lane operations. Taper length is 50— 100 ft. See Diagrams
320, 325, 340 and 370 for examples.
Downstream Taper: Used to guide the motorist back into their normal travel
paths after passing the work space. Taper lengths are 50— 100 ft.
Figure 2-2: Taper Types
3
� l
I (L
♦ m�
5 ci t 1 N
X m
n~ I V
1
CM • I
C m N • •
(n •
1
Q .
�CO
Mo
Go
l 1
oma
J
•
C .1
tM
O C • • C �N
o yF-
a CL
I
CL
• 2)FLcaJ
•
F-
I
1 111
Chapter 2 December 2011
2011 Edition Page 15
Table 2-1: Taper Length Formulas
POSTED or STATUTORY SPEED TAPER LENGTH, L(in feet)
2
40 MPH or Lower L= WS
60
45 MPH or Higher L=W x S
Where: L=Taper length in feet
W=Width of offset in feet
S = Posted Speed in mph
Table 2-2: Taper Types and Lengths
Taper Type Length (in feet)
Merging Taper(minimum) L
Shifting Taper(minimum) (1/2)L or L/2
Shoulder Taper(minimum) (1/3)L or L/3
Flagger(one-lane, two-way)Taper 50— 100 feet
Downstream Taper 50— 100 feet
Table 2-3: Taper Lengths and Device Quantities
Lane 10 Feet 11 Feet 12 Feet Shoulder
Width Tapers
MERGING SHIFTING MERGING SHIFTING MERGING SHIFTING SHOULDER
MPH L Cones L/2 Cones L Cones L/2 Cones L Cones L/2 Cones L/3 Cones
20 70 5 35 3 75 5 40 3 80 5 40 3 25 3
25 105 6 55 3 115 6 60 4 125 6 65 4 35 3
30 150 6 75 4 165 7 85 4 180 7 90 4 50 3
35 205 7 105 4 225 8 115 5 245 8 125 5 70 4
40 270 8 135 5 295 9 150 5 320 9 160 5 90 4
45 450 11 225 6 495 12 250 7 540 13 270 7 150 6
50 5001 11 2501 6 550 12 2751 7 16001 13 1300 7 170 6
55 550 11 275 6 605 12 305 7 660 13 330 7 185 6
60 600 11 300 ¢ 660 12 330 7 720 13 360 7 200 6
65 650 11 3251 6 715 12 370 7 780 13 390 7 220 7
70 700 11 350 6 770 12 385 7 840 13 420 7 235 7
"L"for shoulder taper equals Shoulder Width x Speed.
Figures shown are for 10'shoulders.
December 2011 Chapter 2
�,W KROESE LOOP 601234 7917 7905 7895 7889 7883 7872 786 WR CHECKLIST
30'-4 OVERHEAD L E G E N D
1985 WL 1 PD-8579: 117 ITEM YES COMMENT REMOVE/ABANDON FACILITIES INSTALL FACILITIES
'-Unknown
A2AL 7930 Install: 2004 HOLEDIGGER INSTALL ADDITIONAL FACILITIES/MODIFYFACILITIES
1 P 7.2 240/120 PM 50KVA NTLB X
7930 '27 KVA 14396 BOOM
13ACCOUNTS ❑ BACKHOE
7930 7930 * 7910-7930 SW FANNO CREEK DR APTS 1-6 D-95 PGE TRENCH
79ao 7930 7930 BARRIER POST, 8" HELIX, 7' LONG 14406
BORE
Remove: X
1P 7.2 240/120 PM 50KVA NTLB 14418 LOCATES
_ PD-93 STAKING X
VT-23 PD-72 Ua C 5&6346 14436
PD 2 119 FLAGGING
❑ PD-76 30'-Unkno n 14442 TREETRIM
PD-54 2004 LANDSCAPE X PRE/POST
7920 7908 7898 7890 7886 PD 92 EASEMENT LANDSCAPING NOTES
i
14460 14450 PERMITS X TIGARD PRE/POST
A 50 22206 1 �Q TRAFFIC PLA X
Open U CUTSHEET
C2 1-12B A 50 z4g,,0; 50 SW DUNE UG CIR.VER.
14463PD- TRANSMISSION
PD-8587 11 75331027 SHUTDOWN
PD-77 W
7910 14475 1► CUSTOMER
�21
F. 30'- nknown X 13 CUSTOMERS
7910 Q: 2004 SHUTDOWN
7920 7920 7910 14487 El Q DOOR HANGAR
14490 7920 60120 P 82j 7876 7864 7856 THINK
30'-4 Z CONTACT
1985 14491 Q. COMPANY SAFETY
PH# C#
X yDATE A TIME I FIRST
ANY DEVIA77ON FROM THIS DESIGN MUST
43
SW zow[VI JA MU ABC 750 AL 45 BE APPROVED BY THE PGE PROJECT MANAGER
25'-4
911,50 308 9891 100 Feet� 24 1991 ATTENTION: CALL 811 BEFORE YOU DIG
I ♦ I I
AB 2 AL.1,.-. 1 I I OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED
8:3 995 7947 7929 APGE BY THE OREGON UTILITY NOTIFICATION CENTER. ,
_
60123 THOSE RULES ARE SET FORTH IN OAR 952-001-0010
Vicinity Map -LINE DIAGRAM 3085 THROUGH 952-001-0090 YOU MAY OBTAIN COPIES OF
THE RULES BY CALLING THE OREGON UTILITY
RCFn'_t siy 1118 117 S NOTIFICATION CENTER ADMINISTRATION @(502-232-1987)
''' _ 30'-LYn ow Unkrygwn PD_95 TO REQUEST UTILITY LOCATES CALL THE OREGON Know what�sbelow.
l "U 1 200t-
I PD-109 2D"4— o` UTILITY NOTIFICATION CENTER, 811 AT LEAST Call before you dig.
2 BUSINESS DAYS PRIOR TO EXCAVATION
VT-23' PICKLt vrD flPI-27 PGE CONSTRUCTION DRAWING
'- mown
PD 5[] `' 120
AS-BUILT VERIFICATION&NESC VIOLATIONS CORRECTED
QIPN 30'-Unkn ow
This document accurately represents FIELD Construction
ope: J U El 20oa
C Foreman. Date:
PD-7831 P —PD-94 General Foreman: Date:
D-858
PD-7 "pp:g{ (Signature only required for field construction changes.)
PD-86--
wtsl.sc WORK A Jet, ❑ PD9 SDPM/ENGREVIEW ASBUILTBYDESIGNER:
t oot • DATE. AL A UNT W JOB
} 30'-4 SPD-82 own Ot�
JJ�4 9/6/2016 1 : 50 ft 1070001 0000016567 M1450276
C2 1-12B 1985 TITLE
SW BONITA RD ` 2014 UG FITNES- REPLACE BIO PADMOUNT TRANSFORMER
SY+RUgt1A Rp A
—g CIRCUIT SIZE
DURHAM-SATTLER Ill x17
AK,aAf+Ar� ABC 750 AL ABC PGE LOCATION
-11,110 Ll
�'� ABC ABC ABC-�A-�c� ABC
VT-19 7910 SW FANNO CREEK DR, TIGARD
nr W PD-20
C T-24 DESCRIPTION
a Q DISTRIBUTION OH AND UG CONSTRUCTION SHEET
a S'NLEISLRLN o W _�PD-25 COUNTY ISECTIONS WORK WITH
WASHINGTON I C21 - 12B 1 OF 1
w = sw m WILSONVILLE DESIGN BY PHONE DRAWN BY
N'L86F R LINE CREW CENTER
sw 2 LNN PGE NATHAN GRAVELLE 503-951-3714 RYAN WILSON
CAROLE 9 N 9680 SW BOECKMAN RD
47 w CORN.t71 PGE WILSONVILLE,OR 97071) :J GENERAL ELECTRIC CO.-ALL RIGHTS RESERVED