Loading...
Plans (19) a Markup Legend SPRINKLER SYMBOL DEFINITION COLOR/LINETYPE LEGEND BLUE LINES= FEED TO FIXTURES(BATH,SHOWER,ETC.). E \ / \ XXX-XX GREEN LINES=INTERLEVEL CONNECTIONS/SUPPLY. Delete Line //^\\ / v \ i U } r A�-1Y4 BLACK LINES=SPRINKLER HEAD TO SPRINKLER HEAD. O o MAXIMUM SPACING(reP) CITY OF TI�T �c� = 1/2"PIPE SIZE > Add Line SPRINKLER MODEL(TYP) Approved w HEAD SYMBOL(TYP) [ y1 —o— =3/4"PIPE SIZE Add Tee ... I—... = 1"PIPE SIZE a��� Conditionally Approved [ [ —I.— = 1-1/4"PIPE SIZE O W I w o Add Elbow See Letter to: Follow [ I O i v W L 1 Attachedu,.. 1 Add Coupling [ = Z Permit Number: 5%,� 16 06) a y c, , Add Head �1 A.z\ �.3- Addre1 � .> ',,,,,:r1..4-:',„ Wit; ,i,4`i�.u r-Fix r�,��^r+�l� o°;i-W3 Delete Head (X I By: Date: )4)-(..-2 c i y o.`n�o ,s J¢ Jim o z -.5 1 B - y a z=oo_ � 00a�.o� caw Move Head _,z �4to-o i¢1. O O z.�, , ^Jr _ . O U'J CJ S s K y O Note:All revisions must be reviewed by Uponor y ';:to'.';s s w ? u Table F002-1I: z���oza V�oNz Multipurpose Fire Safety Systems h c.c =,,8 The Uponor Residential Fire Safety System is a residential fire protections d o 3 0 o z z z o i r system installed in combination with the cold side of the domestic potable .y oo-o 5¢o o>¢ z water system. Only licensed contractors trained by Uponor can install this f o°z^o- <'z-r system. „y ¢oia o;,,,�"'zo-� What to do if Changes are Required U°Zau"2 t ,-''g'¢d If any features or obstructions require the addition or deletion of sprinkler 1"AQUAPEX INTERLEVEL 1"AQUAPEX INTERLEVEL N w.C z o J z°o 0 heads,or significant relocation of sprinkler heads,contact the Uponor Design CONNECTIONS FROM SECOND CONNECTIONS FROM FIRST C o-h p a a o C N m C 00-.�w-rzw Department to determine if observed changes require a redesign FLOOR TO THIRD FLOOR FLOOR TO SECOND FLOOR i�F o z F._o 0 0=� �, (888.594.7726). A w o z¢ ` o \ C . dE6oC¢ a 3`='K MOST HYDRAULICALLY REMOTE HEADS /' \\\ //I I\ opz¢0o _o '. HEAD# GPM PRESSURE REQ'D AT STREET �+- ,EsaE ~ '- -_ \\ L "e s F-0_h - �I ' / I \n ',.\N‘ j 0 sSo , V,0.az 1 HEAD H.1 17 47.09 II fr — / '. \ -o s-o SOFID 'NALL -El Y % I 2 d"'wr_ z v w 0 d�\ _J F tFo ¢o�w w �, e r`n a i CD4' II \ /i G7� / // I \ ` II\ L. I z>"m❑ a 2 HEAD H.13&H.12 26.09 61.96 I r i l \ 1; VSU_k t R . I iH \ N - u¢uu Co Roza / 11 0 2 1st Floor II Bedroom 2/ 1' , :' �,A N / II11�/ A l p';Cr (.ol� m 4 2nd Floor III _ \ / — 8 3rd Floor ` I,y v \ ,2'-'47';',','('-,,"Nt.,:,,,..,. la TOTAL r- _; C-�E$-18 ,l .:.,. • � N / € \ rP tit � H.1 �) \ \ RC-RES 161 r 4 P -‘1,;‘,;RECT .r rr LF SENJU SPRINKLER Model RC-RES Flat Concealed Pendent Quick Response 1 . a AF ° A^ r H MR 0 - - - 1 K=4.9,162F°,7/16"Orifice, Maximum Spacing 18'x18' III ) \ \ H 2 r , L1I� _. I \,ELF LOW rl RC-RES-18 Sprinkler head demand: 17 gpm @ 12 J / \ \ �� \ QuickResponseT15 - I �', � P_�. l OFFICE COPY f II re / T1 0 - - - 11 K=4.9, 162E ,7/16"Orifice,Maximum Spacing 16'x16' ��� j al��D >�a r � �� karro 1I AquaPEX TO SYSTEM �1 RC-RES-16 LF SENJU SPRINKLER Model -RES Flat Concealed Pendent S.1 MAIN SHUTOFF Sprinkler head demand: 13 gpm @ 7 04 \ k1 T.19 VALVE LOCATION III ; I or3oI \ I V -M . ,� 4, LF SENJU SPRINKLER Model RC-RES175 Flat Concealed Pendent Quick Response 1 1 I �,s I� D O - - - 2 K=4.9, 175F°,7/16"Orifice,Maximum Spacing 12'x12' II u z I I M 23 T.24/ -�.. l \ I illp,r RC-RES-12-175 Sprinkler head demand: 13 gpm @ 7.04 i laid'' , IRCJRE§a0 6:. \ "- IHa 11 orP mil-. �, 4L I' F.7 \ F. - - I • `• RC Rff 4 II I RE h' 1II I F _- • T Z, — I Ps I = v ( V G J 'F' 'v LQ',, J lL o L I v r� �, 3 2\ 3 , ?�n _ Fl, r 1 I iP - c ',I M `Bath' '' tea, f,/ i L.. II11 Ir:a_ f �RC}Hr - •_6 } ';' F 3 ' -- �', ' _ III' a o M m P , s / a z v, u,.. \ D �I iIRG RFS,ifi ' �R Foo III ;_ o, 1/ 1 •i I it h %, rs& -� z 1 S H II C e ---"c GELD� �I I'29 ( \.'t,(-,� ,T VW f `� ,• �I vlFr l T.33 ■� •. •r � o . EXTERIOR WALL 7 II 'F` F 5 z a RADON REi ST RESIDUAL: Sipsi ,,I IIF. 1 .38 ,rA�l<-n. 377.36 Q M a s z o z 3 eLEv=109' t SSI 11 Uuu I ilf ON STATIC: 67psi s a Tt 9 I� z u u o FLOW RATE: 3650gpm R\• •'+ 1 , .` Den I 1 \a / 1 os I li Ce 0 0 TO SYSTEM I I > S 1' AquaPEX Il g to \TO HOT WATER HEATERiil 6:1z 6.1z UW co s.l �� cH PITCHI G 16 �� RC REQS 86��a . ELEV=104' I� >/ !�,\.:(\_,1 J �� , 1Y2° 3 i 2 V ,,,!„,,,,,--,j '� H Q L.L 6 c z s 11-1-----1"FULL PORT Ku � �% i p Il H.I2,RL c r6H 5 itNrE li —4 1. r'LLOiJ r 1 �� � i _ _ LI, c F u r�ww H J ws FI R 7 d III, RC!t PSR FSF'S� NOT I 1 Iii I r � RC-RES-16' Oji m BALL VALVE I II �brR N % o n s 2C Q z o 1 r I r IlE L SPACE . / OR EOLLO 36E UIVALENTRV + —FGR�_ R C 11 �, I- o ® ® / (7PSI Q ) _ k _ .I r z-e Jr ' _. s H w f LL LOSS FLOWING 26GPM it �� -° '-FIs-F ^ s ��� g�L� ,D � =m o m` ELEV=100' ELEV=100' Y z 1"METER , ;3 THIRD FLOOR Z SECOND FLOOR % FIRST FLOOR n�UP�a F 35'OF 50'OF FIOO,/ ISHEET DESCRIPTION ,. 1"COPPER-K 1-1/4"AquaPEX = I_ n F100;I n I_ n F100 i n I_ n 1/4" l'-0" 1/4 = 11-0" 1/4 = 1'-0" ALL LEVELS m _4-- WATER S E RVI C E DETAIL SHEET NUMBER ry i s 0 s 1s „,_ _ NTS ,_ © UPONOR - CONFIDENTIAL F100 • Senju RC-RES:Open Web Truss/TJI Construction Insulation Recommendations AquaSAFETM GENERAL NOTES: In areas subject to freezing,care should be taken in unheated attic spaces See General Notes 8.2.5.7 for Architectural ProPEX LF Brass Fire to cover Uponor AquaPEX tubing completely with insulation. Insulation Feature Requirements '^ Sprinkler Adapter Tee should follow the guidelines of the insulation manufacturer. See Uponor z 1. THIS SYSTEM IS DESIGNED AS PER NFPA 13D 2016 EDITION AS A RESIDENTIAL MULTIPURPOSE SYSTEM Fire Sprinkler Adapter z ft Blocking Maybe Document"Uponor AquaSAFE Attic Insulation Guidlines"for attic SECTION 3.3.11.3. -- -Posh-on Nut ` / - O Required.If installation guidelines(Provided in Contractors Documents package or online r u Blocking is Used, `� ' 1 "Min. at www.Upon or pro.com). - 0 2. UPONOR COMPANY RESERVES THE EXCLUSIVE RIGHTS TO ALL DETAILS AND DRAWINGS AS SHOWN ON 1/40 0 ¢ti Use The 2 To z P I THIS SHEET. THESE DETAILS AND DRAWINGS ARE PROPRIETARY INFORMATION OF UPONOR COMPANY AND >rv, Screw Holes. 11/x"Max. n p UNAUTHORIZED USE MAY BE SUBJECT TO PROSECUTION TO THE FULL EXTENT OF THE LAW. �' / Bottom of Mounting Extreme Temperature Installations Planter Box Window,Bay Window or Similar Feature. ...0 _ racket to Face of Truss AquaSAFE Residential Fire Safety systems are often installed in attics or If no additinal floor area is created No Additional Sprinkler is Required. 'i-'m 2 Ou 3. THE DESIGN OF THIS SYSTEM IS DICTATED BY SPECIFIC CEILING HEIGHTS AND ROOM SIZES. IT IS THE Fire Sprinkler Adapter- _.I / other areas exposed to temperature extremes of heat and/or cold. Follow 8'-0"or less I' vi u'^ RESPONSIBILITY OF THE INSTALLING CONTRACTOR TO ENSURE THAT THE CONDITIONS SHOWN ON THESE Mounting Bracket I / the recommended extreme weather installation instructions to isolate and / of O 0'^j PLANS ARE EXACTLY AS THEY EXIST IN THE FIELD. DEVIATIONS FROM THE DESIGN MAY CAUSE THE LLL///Ill/// 3 0` a SYSTEM TO BE UNABLE TO CONTROL A FIRE.IF THE BUILDING CONSTRUCTION DIFFERS FROM THE FIRE protect system components from extreme temperatures. Because this RC-RES-16 w„u.iw z �} system also delivers domestic cold water directly to plumbing fixtures, 0 \ SPRINKLER PLAN,CONTACT THE SYSTEM DESIGNER IMMEDIATELY. 3-#10 z 1 1/2" - 9'-0"or less Q j E ry z a Full Course I 1 Uponor highly recommends that you protect the tubing with adequate / m ^O v 4. THIS SYSTEM AND THE ACCOMPANYING HYDRAULIC CALCULATIONS ARE DESIGNED IN COMPLIANCE WITH insulation in warm weather areas to minimize heating of the cold water t '.,`°,11,' ::1 3 Thread Screws \ o ' v w NFPA 13D 2016 EDITION. supply. o _ Z a o In Bottom Holes o t7 _J 5. "STAND-ALONE"OR"MULTIPURPOSE,WET PIPE"SYSTEMS ARE NOT PERMITTED TO USE ANTI-FREEZE. _\.. _ \ Installation methods include,but are not limited to: ` `°o\ / °J 71'4•a W • Tenting over the fire sprinkler piping. I \ m I-w 3 Lead-Fre=Flat• \ ` _ r _ • Additional layers of batt insulation. If additional floor area is created.Cannot exceed 18 ftz,be more than 2'-0" 6. MODIFICATIONS ARE PROHIBITED.SPRINKLERS THAT HAVE BEEN PAINTED,CAULKED,MODIFIED OR Concealed SernuI DAMAGED MUST BE REPLACED. J • f�' Concealed Flat • Increased depth of blown in insulation. deep,more than 9'-0"wide and be with in the coverage area of the -t ft m t Sprinkler Head S < , Cover Plate sprinkler.No Additional Sprinkler is Required. z o w w o >:=u< 7. WATER SHUT OFF VALVE IS NOT PERMITTED THAT ISOLATES THE SPRINKLER SYSTEM. o r z t LL z- x Caution: If you will be installing spray foam insulation,make sure to a h p¢ o z=o o tt protect all components during application.Consult with the spray foam ¢ft?o o m❑m d 8. OWNERS MANUAL MUST BE PROVIDED TO THE OWNER. Senju RC-RES:Traditional Wood Framing Construction manufacturer to ensure compatibility with all NFPA 13D Table 7.5.5.3 Distances From a<_1.- ,°,g,. a ' °o n P m p y products before application. a y z ❑z o 9. AT THE MAIN SHUT OFF VALVE,A TAG OR A SIGN STATING THE FOLLOWING IS REQUIRED;"WARNING,THE Heat Sources x NEr..,.-6'8 i o f?o,, ft WATER SYSTEM FOR THIS HOME SUPPLIES FIRE SPRINKLERS THAT REQUIRE CERTAIN FLOWS AND Consultation with local building officials is encouraged to ensure compliance z F Q,=.F o PRESSURES TO FIGHT A FIRE.DEVICES THAT RESTRICT THE FLOW OR DECREASE THE PRESSURE OR ProPEX LF'Brass Fire with local building codes. z' ".o ft u=0 3-, Sprinkler Adapter Tee Fire Sprinkler Adapter Ordinary Intermediate _ < AUTOMATICALLY SHUT OFF THE WATER TO THE FIRE SPRINKLER SYSTEM,SUCH D WATER SOFTENERS, p p -o 0 0 i z F r z FILTRATION SYSTEMS AND AUTOMATIC SHUT OFF VALVES,SHALL NOT BE ADDED TO THIS SYSTEM 1 �y�Push-on Nut Heat Source Temp. Temp. z z z ft o E.w_==z ^��� 135°-170° 175°-225° o o......_.'">.�-"" WITHOUT REVIEW OF THE FIRE SPRINKLER SYSTEM BY A FIRE PROTECTION SPECIALIST.DO NOT REMOVE --.- v x m^¢o w n z o THIS SIGN". 1 Bending PEX Tubing Side of Fireplace 36" 12" _ z z o J 1 i/q'Min. The minimum bend radius of Uponor PEX tubing in any direction is six times Front of Fireplace 60" 36" m °<g < r z 3 a 1 W °aro4 z< c`=' 10. ALL INTERIOR PIPING TO BE UPONOR"AquaPEX"UNLESS NOTED. ---„- �-� 1/'Max.Mthe outside diameter(6 x OD). z Fires rin der Adapter- - Bottom cfce of Bend supportsWood BurningStove 42" 12" f 7,e¢ ''t_. <p.z z u= p p are available for 3/8",1/2",3/4"and 1"Uponor AquaPEX M z_o a z z ¢�_ s 11. UPONOR"AquaPEX"TUBING TO BE SUPPORTED PER NFPA 13D AND MANUFACTURER'S RECOMMENDATIONS. Mounting Bracket -,.._\\_/ �J Bracket to=ace of Truss tubing to facilitate 90-degree rigid bends. Kitchen Range 18" 9" g z u o o ¢�, o Wall Oven 18" 9" e,-- ..,, 12. MINIMUM SPACING BETWEEN SPRINKLERS IS 8'-0" REFER TO SPACING CHARTS FOR MAXIMUM SPACING + ,, <ft u<"''m w 0 ft m f y 2-#10 x 1 1/2" O Recommended Tubing Length Between Fittings Hot Air Flues 18" 9" VJ o u z.z,-;`.1'''''''''' 5' u BETWEEN SPRINKLERS AND FROM WALLS.SPRINKLER HEAD MANUFACTURERS MAY HAVE MORE Full Course t w L.- ¢N s.n''-'2 a,_.2,.,,,,7; RESTRICTIVE SPACING LIMITATIONS. Thread Screws 'y I Fitting Size Minimum Tubing Length Uninsulated Heat Ducts 18" 9" O z V o ir.z r _ z z In Top Hales t_7 ' U 3/8"ProPEX Fitting 2�. Uninsulated Hot Water Pipes 12" 6" g '°o r__ o Q fi w o 13. SPRINKLERS ARE NOT NECESSARILY CENTERED IN ROOMS DUE TO LIGHT FIXTURES OR OTHER CEILING Side of Hot Air Diffuser 24" 12" ;j t z z n,1°u o R° MOUNTED OBSTRUCTIONS. - 1/2"ProPEX Fitting 2 1/2" z i d'' °C \ -w�- Front of Hot Air Diffuser 36" 18" 3 o z z F -i> , 'Q y< 14. THE PLUMBING TIE IN CONNECTIONS ARE SCHEMATIC IN NATURE AND CAN BE INSTALLED OFF THE 3/4"ProPEX Fitting 3 1/2" z°d<u o ft ft o o y Lead-Fre Flat _ Hot Water Heater 6" 3" 6 o z c1 c t 8' o 0 SPRINKLER LOOP ANYWHERE BETWEEN SPRINKLER TO SPRINKLER CONNECTION. \ - -rn .-3 1"ProPEX Fittin 4 1 2' Furnace 6" 3" t o >w z„f o<-z,,,=o Concealed Sen1u 9 / o > Concealed Flat o w,z n_ o 15. THIS SUGGESTED LAYOUT IS BASED UPON INFORMATION PROVIDED BY OTHERS. CHANGES IN Sprinkler Head Cover Plate 1 1/4"ProPEX Fitting 5 1/2" SOW-250W Light Fixture 6" 3" w o,,i l:,m C o U s z m_a yf'n<=t c,of„m CONSTRUCTION OR FIELD CONDITIONS MAY OCCUR WHICH MAY REQUIRE CHANGES TO THE LAYOUT. IT IS 250W-499W Light Fixture 12 6 u E},-3,. F z-z z, w THE RESPONSIBILITY OF THE INSTALLER TO NOTIFY UPONOR TECHNICAL SERVICES OF SUCH CHANGES. �_ z ^< ,>y.yw ZY ft,,,.aS2v..i 16. NFPA 13D 8.2.5*OBSTRUCTIONS TO RESIDENTIAL SPRINKLERS Exposed Installation Requirements. \ -,,,,01000,_0_.0SQ w • 8.2.5.6* SHADOW AREAS SHALL BE PERMITTED IN THE PROTECTION AREA OF A SPRINKLER AS LONG AS Uponor Aquatubing(white)and ProPEXrM EP Fittings and ProPEXrM \ I vai THE CUMULATIVE DRY AREAS DO NOT EXCEED 15 FT'PER SPRINKLER. Brass Fittings are approved for exposed installation where the following • 8.2.5.7 SMALL AREAS CREATED BY ARCHITECTURAL FEATURES,SUCH AS PLANTER BOX WINDOWS,BAY conditions are met.(UL 1821 Approved) WINDOWS,AND SIMILAR FEATURES,SHALL BE EVALUATED AS FOLLOWS: - co /� (1)WHERE NO ADDITIONAL FLOOR AREA IS CREATED BY THE ARCHITECTURAL FEATURE,NO Exposed Wood Joist Ceiling Assemblies. o ry // [ m ADDITIONAL SPRINKLER PROTECTION IS REQUIRED. 1. Joists are of dimensional lumber,engineered wood,wood I-joist or open ^� 01 (2)WHERE ADDITIONAL FLOOR AREA IS CREATED BY AN ARCHITECTURAL FEATURE,NO ADDITIONAL web wood joists. m SPRINKLER PROTECTION IS REQUIRED,PROVIDED ALL OF THE FOLLOWING CONDITIONS ARE MET; 2. Joist are of depths from 6-16 inches(152-204 mm). (a)THE FLOOR AREA SHALL NOT EXCEED 18 FT'(1.7 M2) 3. Joist are of spacing from 12-24 inches(305-610 mm)on center. OU (b)THE FLOOR AREA SHALL NOT BE GREATER THAN 2 FT IN DEPTH AT THE DEEPEST POINT OF 4. Joists can be exposed after installation. \ jr \ THE ARCHITECTURAL FEATURE TO THE PLANE OF THE PRIMARY WALL WHERE MEASURED 5. Metal pipe hangers spaced at maximum 24 inches(610 mm)on center 1.55" 4 / 1.66" 'I ALONG THE FINISHED FLOOR. are used. (c)THE FLOOR SHALL NOT BE GREATER THAN 9FT IN LENGTH WHERE MEASURED ALONG THE 6. Listed residential automatic sprinklers of maximum activation In -3u Hanger 1° Hanger PLANE OF THE PRIMARY WALL. temperature rating of 155°F(68°C). 2 4 9 g (d)MEASURED FROM THE DEEPEST POINT OF THE ARCHITECTURAL FEATURE TO THE SPRINKLER SHALL NOT EXCEED THE MAXIMUM LISTED SPACING OF THE SPRINKLER. Metal Tubing Support. Tubing Support Spacing: (3)THE HYDRAULIC DESIGN SHALL NOT BE REQUIRED TO CONSIDER THE AREA CREATED BY THE 1. Metal tubing supports designed for plastic tubing shall be used. (Anchor AquaPEX Tubing Securely Enough to Support the Tubing,Yet Relaxed ARCHITECTURAL FEATURE. 2. Do not use supports that will damage the tubing.Inspect metal Enough to Allow the Tubing to Expand and Contract) supports for sharp edges. Supports Every 32",if Horizontal Runs are 17. NFPA 13D 8.3 LOCATION OF SPRINKLERS. 1. AlongHorizontal Runs,Install • 8.3.1 SPRINKLERS SHALL BE INSTALLED IN ALL AREAS EXCEPT WHERE OMISSION IS PERMITTED BY 8.3.2 3. Do not rigidly anchor Uponor AquaPEXr"'tubing with supports.Allow Continuously Supported,Place Tubing Supports at Six-Foot Intervals. enough tubing for freedom of movement to expand and contract. Along Supports Every Four to Five Feet,at Each THROUGH 8.3.8. 2. Vertical Runs,Install • 8.3.2 SPRINKLERS SHALL NOT BE REQUIRED IN BATHROOMS OF 55 FT'(5.1 M2)AND LESS Floor and at a Mid-story Guide. O 8.3.3 SPRINKLERS SHALL NOT BE REQUIRED IN CLOTHES CLOSETS,LINEN CLOSETS,AND PANTRIES THAT z z E • MEET ALL OF THE FOLLOWING CONDITIONS: fd o (1)THE AREA OF THE SPACE DOES NOT EXCEED 24 FT'(2.211'). In-line Flow Test 3 G v (2)THE WALLS AND CEILINGS ARE SURFACED WITH NONCOMBUSTIBLE OR LIMITED-COMBUSTIBLEThe In-line Flow Test can be constructed on site. It performs a flow test to a High Upstream Pressureo,13 k' -. MATERIALS AS DEFINED IN NFPA 220,STANDARD ON TYPES OF BUILDING CONSTRUCTION. the ensure proper system operation and flow(see Figure F001-8). - If thupstream pressure exceeds 80 psi a pressure reducing valve may z `,°, " • 8IMIL SPRINKLERS SHALL NOT BE REQUIRED IN GARAGES,OPEN ATTACHED PORCHES,CARPORTS,AND 3 w ii y need to be installed. Some jurisdictions may require a pressure reducing . - H SIMILAR STRUCTURES 1 m p m- z valve regardless of upstream pressure. U onor A uaPEX O m • 8.3.5 SPRINKLERS SHALL NOT BE REQUIRED IN ATTICS WITH OR WITHOUT STORAGE,PENTHOUSE / P q ¢�L';',1 f-m.�. m EQUIPMENT ROOMS,ELEVATOR MACHINE ROOMS,CONCEALED SPACES DEDICATED EXCLUSIVELY TO AND Tubing j z o CONTAINING ONLY DWELLING UNIT VENTILATION EQUIPMENT,FLOOR/CEILING SPACES,ELEVATOR SHAFTS, w o CRAWL SPACES,AND OTHER CONCEALED SPACES THAT ARE NOT USED OR INTENDED FOR LIVING / f PURPOSES. • 8.3.5.1 SUCH SPACES THAT CONTAIN FUEL-FIRED EQUIPMENT SHALL ALSO COMPLY WITH 8.3.5.1.1 OR o ..w p a 8.3.5.1.2. j > n F u a Y • 8.3.5.1.1 WHERE THE FUEL-FIRED EQUIPMENT IS ABOVE ALL OF THE OCCUPIED AREAS OF THE DWELLING _ G`' a G z o UNIT,NO SPRINKLER PROTECTION SHALL BE REQUIRED IN THE CONCEALED SPACE. j \ (� z ?F w ft w • 8.3.5.1.2 WHERE FUEL-FIRED EQUIPMENT IS BELOW OR ON THE SAME LEVEL AS OCCUPIED AREAS OF THE ('V O O o a a ft ut w ft R. DWELLING UNIT,AT LEAST ONE QUICKRESPONSE INTERMEDIATE TEMPERATURE SPRINKLER SHALL BE Male Threaded Coupling ProPEX Fire a INSTALLED ABOVE THE EQUIPMENT OR AT THE WALL SEPARATING THE SPACE WITH THE FUEL-FIRED Sprinkler Adapter N uI g EQUIPMENT FROM THE OCCUPIED SPACE. w o • 8.3.6 SPRINKLERS SHALL NOT BE REQUIRED IN COVERED,UNHEATED PROJECTIONS OF THE BUILDING AT - 1"Ball Valve re o `„o ENTRANCES/EXITS AS LONG AS THE DWELLING UNIT HAS ANOTHER MEANS OF EGRESS. To Hot Water Heater Male Threaded Coupling _ LLJ ft 8.3.7 SPRINKLERS SHALL NOT BE REQUIRED FOR CEILING POCKETS THAT MEET THE FOLLOWING t�- �\ f T Female Threaded /�I CONDITIONS: S Tee with Water Q t+ ft l7 (1)THE TOTAL VOLUME OF ALL UNPROTECTED CEILING POCKETS IN A COMPARTMENT DOES NOT EXCEED t - - Pressure Gauge `�O o 0 Lc, 100 FT'(2.83 Ma) t i-}., Pressure Gauge Sprinkler Orifice -o-I (Optional) 1^ z O ri y (2)THE ENTIRE FLOOR UNDER THE UNPROTECTED CEILING POCKET IS PROTECTED BY THE SPRINKLERS � L l o . i d 0 AT THE LOWER CEILING ELEVATION. E s ,o z 4 m'E Main t Fire Sprinkler Flow Test W � (3)*THE INTERIOR FINISH OF THE UNPROTECTED CEILING POCKET EXCLUDING DECORATIVE i Y m<J w w ry Shut-off Valve To ensure[hes stem provides enough m w � TREATMENTS IS NONCOMBUSTIBLE OR LIMITED-COMBUSTIBLE MATERIAL. m - y p gh water for proper fire sprinkler ., E ut;,., (4)SKYLIGHTS NOT EXCEEDING 32 FT'(2.97 M')SHALL BE PERMITTED TO HAVE A PLASTIC COVER. performance,you should conduct a flow verification test. 00 • 8.3.8 SPRINKLERS SHALL NOT BE REQUIRED IN CLOSETS IN GARAGES AND EXTERIOR CLOSETS - LL Uponor Warning Signs > < r ft A w f LL (REGARDLESS OF SIZE)LOCATED ON EXTERIOR BALCONIES,EXTERIOR BREEZEWAYS/CORRIDORS,OR _ o Note: The NFPA 13D Installation Standard does not require flow 11 ZI-I /r'1 f y m z s LL a verification. 7 V '=m p o 72. ACCESSED FROM OUTDOORS WHERE THE CLOSET DOES NOT HAVE DOORS OR UNPROTECTED -^ Z F.,I z F o PENETRATIONS DIRECTLY INTO THE DWELLING UNIT. a Pressure Reducing D G u 8 a Before performing a flow verification test,confirm the water pressures by c • 8.3.9 SPRINKLERS SHALL BE INSTALLED IN ANY CLOSET USED FOR HEATING AND/OR AIR-CONDITIONING z Valve o w N a O-, contacting the Water and Sewer Department of your local city. Ensure the EQUIPMENT,WASHERS AND/OR DRYERS,OR WATER HEATERS EXCEPT AS ALLOWED BY 8.3.8. a al a❑ u ut z - available water pressure matches the pressure used in the system design. Note: The sprinkler plan indicates the most hydraulically remote sprinkler 18. INSULATION GUIDE LINES PER NFPA 13D. (or pair of sprinklers). For test requirements on other sprinklers,consult GENERAL DESCRIPTION DETAILS 9.1.1*WET PIPE SYSTEMS IN AREAS ABOVE 40oF. A WET PIPE SYSTEM SHALL BE PERMITTED TO BE TO BE ft USED WHERE ALL PIPING IS INSTALLED IN AREAS MAINTAINED ABOVE 40°F,INCLUDING AREAS PROPERLY < your local code. ',1:', INSULATED TO MAINTAIN 40°F. •• A.9.1.1 IN AREAS SUBJECT TO FREEZING,CARE SHOULD BE TAKEN IN UNHEATED ATTIC SPACES TO Note: It is a good idea to notify the fire inspector at least 24 hours prior to P COVER SPRINKLER PIPING COMPLETELY WITH INSULATION. INSTALLATION SHOULD FOLLOW THE performing a flow verification test. This may speed up the inspection GUIDELINES OF THE INSULATION MANUFACTURER.FIGURE A.9.1.1(A)THROUGH FIGURE A.9.1.1(F) process and eliminate the need to repeat the test for the inspector. SHEET NUMBER c SHOW SEVERAL METHODS THAT CAN BE CONSIDERED. THESE ARE FOR ILLUSTRATIVE PURPOSES ONLY. CONSULTATION WITH THE GENERAL CONTRACTOR AND/OR OWNER IS RECOMMENDED TO ENSURE Note: See"AquaSAFE Flow Test Instruction Sheet"(Provided in ft PROPER METHODS AND MATERIALS ARE USED TO MAKE SURE 40°F WILL BE MAINTAINED. Contractors Documents package or online at www.Uponorpro.com)for more information on Flow Test Setup,Assembly,Performing the Test and Troubleshooting. If there are any questions please contact Uponor. 80 psi © UPONOR - CONFIDENTIAL FO 0 1 PRV Set Pressure