Loading...
Report cw tiers/ COi icheck Software Version 4.0,4.1 Mechanical Compliance Certificate Section 1: Project Information e 2016 Energy Code:2014 Oregon Energy Efficiency Specialty Code Project Title:Tigard APTS 1�, r._ Project Type: New Construction 3 Construction Site: Owner/Agent: Designer/Contractor: Tigard,OR 97008 Section 2: General Information Building Location(for weather data): Tigard,Oregon Climate Zone: 4c Section 3: Mechanical Systems List Quantity System Type&_De4cription 12 HVAC System 1 (Single Zone) Packaged Terminal Heat Pump Heating Mode:Capacity=14 kBtu/h, Proposed Efficiency=3.00 COP,Required Efficiency=2.83 COP Cooling Mode:Capacity=14 kBtu/h,,No Economizer,Economizer exception:Low Capacity Residential Proposed Efficiency=9.70 EER,Required Efficiency=9.23 EER Fan System: None 12 HVAC System 2(Single Zone):Packaged Terminal Heat Pump Heating Mode:Capacity=11 kBtu/h, Proposed Efficiency=3.20 COP,Required Efficiency=2.89 COP Cooling Mode:Capacity=12 ketu/h,,No Economizer,Economizer exception:Low Capacity Residential Proposed Efficiency=10.70 EER,Required Efficiency=9.74 EER Fan System: None Section 4: Requirements Checklist In the following requirements,blank checkboxes identify requirements that the applicant has not acknowledged as being met.Checkmarks identify requirements that the applicant acknowledges are met or excepted from compliance. 'Plans reference page/section'identifies where in the plans/specs the requirement can be verified as being satisfied. Requirements Specific To: HVAC System 1 : • 1. Equipment meets minimum efficiency: Heat Pump: 2.83 COP 9.23 EER Requirements Specific To: HVAC System 2 : 1. Equipment meets minimum efficiency: Heat Pump: 2.89 COP 9.74 EER Generic Requirements: Must be met by all systems to which the requirement is applicable: v/ 1. Calculation of heating and cooling loads.Design loads are determined in accordance with the procedures described in the ASHRAE/ACCA Standard 183.Alternatively,design loads have been determined by an approved equivalent computation procedure. • 2. Equipment and system sizing.Heating and cooling equipment and systems capacity do not exceed the loads calculated in accordance with Section 503.2.1. Plans reference page/section: • 3. HVAC Equipment Performance Requirements.Reported efficiencies have been tested and rated in accordance with the applicable test procedure.The efficiency has been verified through certification under an approved certification program or,if no certification program exists,the equipment efficiency ratings are supported by data furnished by the manufacturer. • 4. Thermostatic Controls,The supply of heating and cooling energy to each zone is controlled by individual thermostatic controls that respond to temperature within the zone. Project Title:Tigard APTS Report date: 09/08/16 Data filename:\\Projects.jetheating.IocallProjects\2016\16-0219-TIGARD APTS\1 ENGR111 SPPT\1 HVAC\Comcheck-Bldg A3.cck Page 1 of 3 20.AII air-conditioning equipment and air-handling units with direct expansion cooling and a cooling capacity at ARI conditions greater than • or equal to 110.000 Btuth that serve single zones have their supply fan operation controlled according to code specific requirements. Plans reference pagetsection: NA Section 5: Compliance Statement Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans,specifications and other calculations submitted with this permit application.The proposed mechanical systems have been deigned to meet the 2014 Oregon Energy Efficiency Specialty Code requirements in COMcheck Version 4.0.4.1 and to c• a.y wit• tj: andatory requirements in the Requirements Checklist. j Jeff Stauffer PE ��►' �, '' j� � 8 Sept 2016 Name-Title Signa ure Date Section 6: Post Construction Complianc= Statement J HVAC record drawings of the actual installation,system capacities,calibration information,and performance data for each equipment provided to the owner. HVAC O&M documents for all mechanical equipment and system provided to the owner by the mechanical contractor. Written HVAC balancing and operations report provided to the owner. The above post construction requirements have been completed. Principal Mechanical Designer-Name Signature Date Project Notes: Building A3 Project Title: Tigard APTS Report date:09/08/16 Data filename:\\Projects.jetheating.local\Projects12016\16.0219-TIGARD APTS\1 ENGR\11 SPPT\1 HVACIComcheck-Bldg A3.cck Page 3 of 3