CCDA Packet - 10/04/2016 Na u
CCDA
CITY OF TIGARD
CITY CENTER DEVELOPMENT AGENCY
MEETING
13125 SW Hall Blvd., Tigard, OR 97223
in Town Hall
NOTICE OF CITY CENTER DEVELOPMENT AGENCY (CCDA)
MEETING ON October 4, 2016
6:30 p.m.
Public Welcome
Forwarded to:
❑Allen Brettman,The Oregonian (abrettman@oregonian.com)
❑Editor,The Regal Courier(Editor(&theregalcourier.com)
❑Mark Miller,Tigard Times (mmiller@commnewspapers.com)
The CCDA was reactivated by Resolution 05-32 on May 10,2005,and will meet occasionally to address issues related to urban
renewal.The CCDA,functioning as the city's urban renewal agency,will work on an urban renewal plan designed to facilitate the
development and redevelopment of downtown Tigard and possibly other areas within the city.For further information,please
contact Deputy City Recorder Kelly Burgoyne by calling(503) 718-2410 or by email at kellyb@tigard-or.gov
Kelly Burgoyne
Deputy City Recorder
September 27, 2016
Post: Tigard City Hall
Tigard Permit Center
Tigard Public Library
_ City of Tigard
CCDA City Center Development Agency Board - Agenda
TIGARD CITY CENTER DEVELOPMENT AGENCY BOARD
MEETING DATE AND TIME: October 4,2016 - 6:30 p.m.
MEETING LOCATION: City of Tigard-Town Hall- 13125 SW Hall Blvd.,Tigard,OR 97223
PUBLIC NOTICE:
Times noted are estimated.
Assistive Listening Devices are available for persons with impaired hearing and should be scheduled for City
Center Development Agency Board meetings by noon on the Monday prior to the City Center Development
Agency Board meeting. Please call 503-718-2419 (voice) or 503-684-2772 (TDD -Telecommunications
Devices for the Deaf).
Upon request,the City will also endeavor to arrange for the following services:
• Qualified sign language interpreters for persons with speech or hearing impairments; and
• Qualified bilingual interpreters.
Since these services must be scheduled with outside service providers,it is important to allow as much lead
time as possible. Please notify the City of your need by 5:00 p.m. on the Thursday preceding the meeting by
calling: 503-639-4171,ext. 2410 (voice) or 503-684-2772 (TDD -Telecommunications Devices for the Deaf).
SEE ATTACHED AGENDA
_ City of Tigard
City Center Development Agency Board - Agenda
CCDA
TIGARD CITY CENTER DEVELOPMENT AGENCY BOARD
MEETING DATE AND TIME: October 4,2016 - 6:30 p.m.
MEETING LOCATION: City of Tigard-Town Hall- 13125 SW Hall Blvd.,Tigard,OR 97223
6:30 PM
1. CITY CENTER DEVELOPMENT AGENCY BOARD MEETING
A. Call to Order-City Center Development Agency
B. Roll Call
C. Call to Board and Staff for Non-Agenda Items
2. DOWNTOWN BUSINESS SPOTLIGHT:THE BALLROOM DANCE COMPANY 6:30 p.m.
estimated time
3. INITIATE PUBLIC REVIEW OF TIGARD TRIANGLE URBAN RENEWAL PLAN 6:50
p.m. estimated time
4. PUBLIC REVIEW OF CITY CENTER URBAN RENEWAL PLAN SUBSTANTIAL
AMENDMENT 7:30 p.m. estimated time
5. NON AGENDA ITEMS
•EXECUTIVE SESSION:The Tigard City Center Development Agency Board may go into Executive
Session. If an Executive Session is called to order,the appropriate ORS citation will be announced
identifying the applicable statute.All discussions are confidential and those present may disclose nothing
from the Session. Representatives of the news media are allowed to attend Executive Sessions,as
provided by ORS 192.660(4),but must not disclose any information discussed. No Executive Session
may be held for the purpose of taking any final action or making any final decision. Executive Sessions
are closed to the public.
6. ADJOURNMENT 7:45 p.m. estimated time
AIS-2767 2.
CCDA Agenda
Meeting Date: 10/04/2016
Length (in minutes): 20 Minutes
Agenda Title: Downtown Business Spotlight: the Ballroom Dance Company
Submitted By: Sean Farrelly, Community
Development
Item Type: Update, Discussion, Direct Staff Meeting Type: City Center
Development
Agency
Public Hearing: No Publication Date:
Information
ISSUE
As part of an occasional series, a downtown business owner will be invited to talk about their
business. The second Downtown Business Spotlight will be on Sunnie Page, owner of the
Ballroom Dance Company.
STAFF RECOMMENDATION / ACTION REQUEST
The Board of the CCDA is requested to participate in the discussion.
KEY FACTS AND INFORMATION SUMMARY
The Ballroom Dance Company opened at 8900 Southwest Commercial Street in 2007. The
17,400-square-foot facility is the largest ballroom dance studio in the country. They offer
private lessons and group classes for all levels of dancers in a variety of dance styles seven
days a week. The Ballroom also offers weekly public ballroom dances. In addition, they
frequently host private event rentals.
The studio's owner and director, Sunnie Page is a retired championship level ballroom dancer.
She trained extensively in New York and England and was ranked second in the nation at the
amateur championship level before going pro in 2005. She will talk about her business and
future plans.
OTHER ALTERNATIVES
No alternatives for consideration at this time.
COUNCIL GOALS, POLICIES, APPROVED MASTER PLANS
Tigard City Council 2015-17 Goals and Milestones
Goal #2. Make Downtown Tigard a Place Where People Want to Be
Tigard Strategic Plan
Goal 3: Engage the community through dynamic communication
DATES OF PREVIOUS COUNCIL CONSIDERATION
N/A
Attachments
No files) attached.
8900 CYA9 emmerczajcYf SUPPLEMENTAL PACKET
ar� np FOR 14m /01,YIJ6
� (DATE OF MEETING)
403)63-9-3861
www.flfaJTraama1a'ncecam16any.cam
y /
S
>r.
�y
ma
Bonbons
At
lw
Jf v q
r- �.,
•�T t I �r
14
• We are the largest ballroom dance studio in the United
States at over 17,000 square feet.
• We have 3 full size ballrooms, simultaneously booked with
group classes and private lessons most nights and weekends.
• We offer 50 hours of group classes to choose from every
week, and teach hundreds of private lessons. We also host
multiple weekly public ballroom dances, and rent out our
conference rooms and ballrooms for special events like
fundraisers.
• In addition to our resident coaches, we fly in guest coaches
& performers like Victor Fung & Anastasia Muravyeva from
"Dancing with the Stars," and Ryan & Ashleigh Delello from
"So You Think You Can Dance." FOX TV hosted a nationally
televised premier party for "So You Think You Can Dance"
from our ballroom...live from Tigard, Oregon!
We are open 12 hours a day, 7 days a week.
•
• Our busiest times are nights and weekends.
On average 3,000 students visit our ballroom each month.
• We have hundreds and sometimes thousands more come
monthly for special events like weddings and fundraisers.
ra* ye //
• We employ 30 staff including instructors, administrative
and managers, as well as part-time custodial and CPA.
• Unlike most studios, all our instructors are certified and/or
highly accomplished in their respective fields. We never
hire poverty wage teachers and `train them as they go' week
-to-week, keeping them 1 step ahead of students. Since
moving to our Tigard location we've employed instructors
with 10 national titles from 5 countries.
• While ballet, square dance, entry level ballroom dance
teachers & other dance professionals typically earn low
wages (eg: $10/hour) experienced professional ballroom
dancers have a significantly higher industry standard wage.
Professional ballroom dance prevailing wage is $98,000.
We only hire experienced professionals.
• We have part-time receptionist staff at minimum wage.
The remainder and majority of our staff earn exponentially
more. Our lowest paid fitness instructors earn $20 per
hour. Our lowest paid ballroom instructors earn $35 per
hour. Our championship level (highest paid) pros are all
paid $100 per hour, and can earn thousands per hour
competing and performing.
l 1
_ � 74w1w
INN #fi r v
�1 1
i
.a
00 a . �=��
t
ra* Y&a"
• We created Oregon's 1 st Children's ballroom dance
program. We provide social, performance & competition
group & private lessons for youth 3- 19 years old. We now
run one of the country's largest kids ballroom dance
programs. Our program has been featured on the cover of
"American Dancer" magazine.
We offer group classes & private lessons tailored for seniors
& retirees.
We offer daily fitness classes for students of all abilities.
We provide elite level coaching for competitors & people
who wish to become professional dancers. We employ
multiple championship level coaches, who attract students
from across the region, country, and world. Students have
flown in from as far as Russia and China to take coaching
with our internationally renowned staff.
0 We host bi-annual fully costumed professional showcases,
open to the public. This gives students the opportunity to
perform. And gives the public an opportunity to enjoy
championship level ballroom dancing like they see on
TV...right here in Tigard!
Most studios in the country provide social dance instruction.
We are one of the few studios that not only provide social
instruction, but championship level instruction. Many of
our students have won national titles, and become
professional dancers themselves.
J 1
ww
AN.
Apo
r
o r
'4
-n -
a
y? llie
r -
s� t_• .-�
1 �'r
: `
4LC4F1FVeI"&
• Over 20% of our revenue comes from facility rentals. We
rely on this income to make ends-meet, as businesses based
solely in performing arts can be unsound.
• We rent out to non-profits, private weddings, public and
private schools, community groups, theater groups, business
meetings, cultural groups, fundraiser galas and more.
We are one of the few facilities in the area with the legal
capacity to host over 1,000 guests.
We are one of the few facilities in the area that do not
require renters to use a specific caterer. We also allow
self-catering.
Despite consistent demand we do not rent to rock
concerts, raves, or any event which puts our elegant
facilities at risk for damage. We also require events which
serve alcohol to use OLCC licensed bartenders. This
maintains the peaceful ambience of our neighborhood.
We regularly host upscale traditional live big-band dances
Our large events are consistently hosted on nights and
weekends (hours when our neighborhood is otherwise
empty).
C.... I�'O�'aso
• We are one of the only ballroom dance studios in the United
States with a competition regulation size floor with no
supporting poles or beams necessary for training
championship level competitors.
• Our floors are sprung. This means thousands of neoprene
pads support our oak floor boards. Such floors are
considered the best available for dance and indoor sports.
They enhance performance and greatly reduce injury.
• Sound-proof padding & upholstery covered vaulted ceilings
in every ballroom.
• Granite countertops & marble floors.
• Chandeliers, 4 foot tall disco balls, and custom
computerized LED and special effects lighting in every
ballroom.
• Computerized DJ stations in every ballroom, with music
wired into offices and our kitchen.
Custom hard-wired phone system and video system links
• our ballrooms and offices.
Staff break room complete with full shower, washer and
• dryer.
• Full Kitchen.
• Parking lots on either side of our building, plus ample street
narking_ a11nw fc)r high canacity events.
Ir
or
kn
Mol
F
f .
" .y4r,;�.; ICS:... ,. � . • � q• N. � .
Ak
x
J
y 0
7- - ; gl
a a ra
° i
*4*44
R
a
I
r
f �
}
1
Jjf
fi Z
t
AIS-2788 3.
CCDA Agenda
Meeting Date: 10/04/2016
Length (in minutes): 40 Minutes
Agenda Title: Initiate Public Review of Tigard Triangle Urban Renewal
Plan
Prepared For: Susan Shanks Submitted By: Susan
Shanks,
Community
Development
Item Type: Update, Discussion, Meeting Type: City Center
Direct Staff Development
Agency
Public Hearing No
Newspaper Legal Ad Required?:
Public Hearing Publication
Date in Newspaper:
Information
ISSUE
Should the City Center Development Agency (CCDA) send the draft Tigard Triangle Urban
Renewal Plan and Report through the public review process as prescribed by ORS 457?
STAFF RECOMMENDATION / ACTION REQUEST
Staff recommends that the CCDA initiate the public review process for the draft Tigard
Triangle Urban Renewal Plan and Report (attached).
KEY FACTS AND INFORMATION SUMMARY
The long range land use and development vision for the Tigard Triangle is outlined in the
Tigard Comprehensive Plan and further defined in the recently completed Tigard Triangle
Strategic Plan. Both documents envision the Triangle as a mixed-use area with diverse
employment and housing opportunities, many pedestrian amenities, and a multimodal
transportation network. The Tigard Triangle Strategic Plan also identifies barriers to
development and redevelopment and how they might be overcome through specific
regulatory actions, investment strategies, and partnerships. Urban renewal is identified as one
such strategy since, as a source of funding, it has the ability to remove barriers to development
and build projects that implement the vision.
In general, the purpose of urban renewal is to improve specific areas of the city that are
t>oorly develotied or underdeveloped and meet the ORS 457 definition for blight. Blighted
areas generally have old or deteriorated buildings, failing or inadequate utilities, incomplete
streets, or other obstacles to development. The Tigard Triangle meets the definition for blight
due to its many infrastructure deficiencies and number of vacant and underdeveloped lots.
At the direction of Council, staff worked with a team of urban renewal consultants to prepare
an Urban Renewal Plan for this area. The attached draft plan and report were developed with
substantial input from an ad hoc Citizen Advisory Council and Technical Advisory
Committee. The CCDA is the city's Urban Renewal Agency. Pursuant to ORS 457, the city's
Urban Renewal Agency is required to initiate the public review process for all proposed urban
renewal plans. Initiation of the public review process for the attached draft plan and report
will result in the following:
•Staff will forward a copy of the draft plan and report to all overlapping taxing districts
and formally solicit their comments on October 5.
•Staff will brief the Washington County Board of Commissioners on the draft plan and
report on October 18.
•Planning Commission will hold a hearing on November 14 for the purpose of making a
recommendation on the draft plan and report to City Council.
•City Council will hold a hearing on December 13 for the purpose of considering
adoption of the draft plan and report. Staff will send out a notice advertising this hearing
to all Tigard registered voters pursuant to ORS 457.
•City Council will forward the adopted plan and report to the voters for their
consideration at the May 2017 election.
The draft report is expected to change between now and the City Council hearing in
December in order to reflect the most updated assessed values. The County Assessor releases
updated assessed value figures in October of each year. Changes will be limited to the
financial analysis and are expected to be very minor in nature.
OTHER ALTERNATIVES
Council may suggest revisions to the plan or could chose not to initiate the public review
process. The latter may prevent a public vote on the plan in May 2017.
COUNCIL OR CCDA GOALS, POLICIES, MASTER PLANS
City Strategic Plan Goal 1: Facilitate walking connections to develop an identity.
City Strategic Plan Goal 2: Ensure development advances the vision.
Council Goal 3: Adopt and begin Implementation of Tigard Triangle Strategic Plan (TTSP).
TTSP completed March 2015.
DATES OF PREVIOUS CONSIDERATION
March 2015: Staff completed the Tigard Triangle Strategic Plan (Tl Sl')
June 2015: Council directed staff to submit a CPDG application to Metro for funds to
implement the TTSP
February 2016: Council directed staff to enter into an IGA with Metro for CPDG funds
March 2016: Council awarded a contract to MIG Inc. to implement the TTSP
April 2016: Council approved the formation/membership of a Citizen Advisory Council
(CAC) for the Tigard Triangle Urban Renewal Plan
August 2016: Council appointed an additional Urban Renewal CAC member
September 2016: Staff jointly briefed Council and Planning Commission on the Tigard
Triangle Urban Renewal Plan
Attachments
Urban Renewal Plan
Tigard Triangle Urban Renewal Report
Tigard Triangle Urban
Renewal Plan
Adopted by the City of Tigard
Date
Ordinance No.
If Amendments are made to the Plan,the Resolution or Ordinance Number and date will be
listed here. The amendment will be incorporated into the Plan and noted through a footnote.
LIST OF PARTICIPANTS
Mayor John L. Cook
City Council Jason Snider, Council President
John Goodhouse
Marland Henderson
Marc Woodward
Planning Commission: Calista Fitzgerald, President
Brian Feeney, Vice President
Michael Enloe, Alternate
Y-Kang Hu
Gary Jelinek
Bret Lieuallen
Brian McDowell
Chris Middaugh
Matthew Muldoon
Tom Mooney, Alternate
Don Schmidt
City Manager Marty Wine
City Attorney(Jordan Ramis PC) Dan Olsen and Shelby Rihala
Community Development Director Kenny Asher
Finance Director Toby LaFrance
Senior Planner Susan P Shanks
Associate Planner Cheryl Caines
Project Planning Assistant Hannah Holloway
Citizen Advisory Council John Boren
Calista Fitzgerald
John Goodhouse
Scott Hancock
Gary Jelinek
Jim Long
Cathy Olson
Katen Patel
Elise Shearer
Veronica Smith
David Walsh
Dustin White
Technical Advisory Committee Celina Baguiao,PCC
Kelly Betteridge, TriMet
Joshua Brooking, ODOT
Buff Brown, City of Tigard Planning
Cheryl Caines, City of Tigard Planning
Rachael Duke, CPAH
Lori Faha, City of Tigard Engineering
Sean Farrelly, City of Tigard Community Development
Cara Fitzpatrick, City of Tigard Finance
Chris Ford, Metro
Steve Kelley, Washington County
Allen Kennedy, TVFR
Kate Lyman, TriMet Alternate
Mike McCarthy, City of Tigard Engineering
Debi Mollahan, Tigard Chamber of Commerce
David Moore, TTSD
Carrie Pak, TVWD
Jeffrey Raker, Metro Alternate
Damon Reische, C W S
Ryan Smith, TVWD Alternate
Cassandra Ulven, TVFR Alternate
Phil Wentz, TTSD Alternate
Shannon Wilson, CPAH Alternate
Jessica Woodruff, REACH
Consultant Team Elaine Howard and Scott Vanden Bos of Elaine Howard
Consulting, LLC
Nick Popenuk of Tiberius Solutions,LLC
Ali Danko and Rob Wyman of ECONorthwest
Alex Dupey and Jon Pheanis of MIG, Inc.
TABLE OF CONTENTS
I. DEFINITIONS 1
fl. INTRODUCTION 3
I11. GOALS AND OBJECTIVES 5
IV. URBAN RENEWAL PROJECT CATEGORI 9
f _
V. URBAN RENEWAL PROJECTS 9
VI. PROPERTY ACQUISITION AND DIS ION . 13
VII. RELOCATION METHODS 14
VIII. TAX INCREMENT FINANCING OF PLAN 14
IX. AMENDMENTS TO PLAN 16
X. RELATIONSHIP TO LOCAL OBJECTIVES 18
X1. APPENDIX A: LEGAL DESCRIPTION 27
I. DEFINITIONS
"Agency"means the Tigard Urban Renewal Agency. This Agency is responsible for
administration of the urban renewal plan. In Tigard, the Agency is the City Center
Development Agency(CCDA).
"Area"means the properties and rights-of-way located with the Tigard Triangle urban
renewal boundary.
"Blight" is defined in ORS 457.010(I)(A-E)and identified in the ordinance adopting the
urban renewal plan.
"Board of Commissioners"means the Washington Cougo Board of Commissioners.
"City"means the City of Tigard, Oregon.
"City Council"or"Council"means the Tigard City Council.
"Comprehensive Plan"means the City of Tigard comprehensive la a plan and its
implementing ordinances,policies, and standards.
"County"means Washington County, Oregon.
"Fiscal year"means the year commencing on July 1 and closing on June 30.
"Frozen base"means the total assessed value including all real, personal, manufactured, and
utility values within an urban renewal area at the time of adoption. The county assessor
certifies the assessed value after the adoption of an urban renewal plan.
"Increment"means that part of the assessed value of a taxing district attributable to any
increase in the assessed value of the property located in an urban renewal area, or portion
thereof,over the assessed value specified in the certified statement.
"Maximum indebtedness"means the amount of the principal of indebtedness included in a
plan pursuant to ORS 457.190 and does not include indebtedness incurred to refund or
refinance existing indebtedness.
"ORS" means the Oregon revised statutes and specifically Chapter 457, which relates to
urban renewal.
"Planning Commission" means the Tigard Planning Commission.
"Revenue sharing"means sharing tax increment proceeds as defined in ORS 457.470.
"Tax increment financing(TIF)"means the funds that are associated with the division of
taxes accomplished through the adoption of an urban renewal plan.
"Tax increment revenues"means the funds allocated by the assessor to an urban renewal area
due to increases in assessed value over the frozen base within the area.
"Urban renewal area"means a blighted area included in an urban renewal plan or an area
included in an urban renewal plan under ORS 457.160.
"Urban renewal plan"or"Plan"means a plan, as it exists or is changed or modified from
time to time, for one or more urban renewal areas, as provided in ORS 457.085, 457.095,
457.105,457.115, 457.120, 457.125,457.135 and 457.220.
Tigard Triangle Urban Renewal Plan 1
"Urban renewal project" or"Project"means any work or undertaking carried out under ORS
457.170 in an urban renewal area.
"Urban renewal report" or"Report"means the official report that accompanies the urban
renewal plan pursuant to ORS 457.085(3).
"Tigard Park System Master Plan"means the Park System Master Plan adopted by the
Tigard City Council.
"Tigard Transportation System Plan(TSP)"means the Transportation System Plan adopted
by the Tigard City Council.
Tigard Triangle Urban Renewal Plan 2
II. INTRODUCTION
The Tigard Triangle Urban Renewal Plan (Plan)was developed for the Tigard City Council
(City Council)with cooperative input from a Citizen Advisory Council (CAC) and Technical
Advisory Committee (TAC)that were formed for this purpose. The Plan also includes input
from the community received at a public open house and several public meetings and
hearings before the Planning Commission, City Council, and Washington County Board of
Commissioners. Pursuant to the Tigard City Charter,this Plan will go into effect when it has
been adopted by City Council and approved by Tigard voters at a public election.
A. Plan Overview
The Tigard Triangle is located in the northeast corner of the city. Its triangular shape is the
result of the three state highways that surround it, namely OR 99W, OR 217, and Interstate 5.
The long range land use and development vision for the Tigard Triangle is outlined in the
Tigard Comprehensive Plan and further defined in the recently completed Tigard Triangle
Strategic Plan (TT Strategic Plan). The latter was developed with extensive public
engagement and technical analysis in 2015.
The TT Strategic Plan generally describes the desired scale and design of development for
the Area. It also specifically identifies the need for pedestrian amenities,multimodal
transportation improvements,public spaces, and certain kinds of uses, such as housing and
neighborhood-scale goods and services. Additionally, the TT Strategic Plan identifies
barriers to development and how they might be overcome through specific regulatory
actions,public-private partnerships, and investment strategies. Urban renewal is listed as one
such strategy because it has the ability to remove barriers to development and build projects
that implement the vision by utilizing tax increment financing(TIF)as a source of funding.
The purpose of this Plan, therefore, is to implement the land use and development vision for
the Area and support its transformation into an active, urban, multimodal,and mixed-use
district that is:
• Attractive to new residents and businesses,
• Connected to the city and the region, and
• Built around its distinguishing natural features.
The Plan Area, shown in Figure 1, consists of approximately 547.9 total acres: 383.04 acres
of land in tax lots and 164.86 acres of public rights-of-way. It is anticipated that the Plan will
take 35 years of tax increment collections to implement. The maximum amount of
indebtedness (amount of TIF for projects and programs)that may be issued for the Plan is
$188,000,000 (one hundred eighty-eight million dollars.)
Detailed goals and objectives developed by the community for this Plan are intended to guide
TIF investment in the Area over the life of the Plan. The project category descriptions and
list of projects are similarly intended to aid future decision makers when considering how
best to expend funds generated by TIF. The Plan is to be administered by the city's Urban
Renewal Agency,which is currently the Tigard City Center Development Agency.
Substantial amendments to the Plan must be approved by City Council as outlined in
Tigard Triangle Urban Renewal Plan 3
Section IX. All amendments to the Plan are to be listed numerically in this section of the Plan
and then incorporated into the Plan document and noted by footnote with an amendment
number and adoption date.
In summary,the Plan is designed to implement the goals and policies of the Tigard
Comprehensive Plan and the vision of the TT Strategic Plan; advance the city's mission to
become the most walkable city in the Pacific Northwest; and, support the area's designation
as a regional Town Center.
B. Urban Renewal Overview
Urban renewal allows for the use of TIF, a financing source that is unique to urban renewal,
to fund its projects. Tax increment revenues—the amount of property taxes generated by the
increase in total assessed values in the urban renewal area from the time the urban renewal
area is first established—are used to repay borrowed funds. The borrowed funds are used to
pay for urban renewal projects and cannot exceed the maximum indebtedness amount set by
the urban renewal plan. In general, urban renewal projects can include construction or
improvement of streets, utilities, and other public facilities;assistance for rehabilitation or
redevelopment of property; acquisition and re-sale of property(site assembly) from willing
sellers; and improvements to public spaces.
The purpose of urban renewal is to improve specific areas of a city that are poorly developed
or underdeveloped, called blighted areas in ORS 457. These areas can have old or
deteriorated buildings, public spaces that need improvements, streets and utilities in poor
condition, a complete lack of streets and utilities altogether, or other obstacles to
development. The Tigard Triangle meets the definition of blight due to its infrastructure
deficiencies and number of vacant and underdeveloped lots. These blighted conditions are
specifically cited in the ordinance adopting the Plan and described in detail in the
accompanying Urban Renewal Report (Report).
The Report accompanying the Plan contains the information required by ORS 457.085,
including:
• A description of the physical, social, and economic conditions in the area;
• Expected impact of the Plan, including fiscal impact in light of increased services;
• Reasons for selection of the Plan Area;
• The relationship between each project to be undertaken and the existing conditions;
• The estimated total cost of each project and the source of funds to pay such costs;
• The estimated completion date of each project;
• The estimated amount of funds required in the Area and the anticipated year in which
the debt will be retired;
• A financial analysis of the Plan;
• A fiscal impact statement that estimates the impact of tax increment financing upon
all entities levying taxes upon property in the urban renewal area; and
• A relocation report.
Tigard Triangle Urban Renewal Plan 4
III. GOALS AND OBJECTIVES
The goals of the Plan represent its basic intents and purposes.Accompanying each goal are
objectives,which generally describe how the Agency intends to achieve each goal. The urban
renewal projects identified in Sections IV and V of the Plan are the specific means of
meeting the objectives. The goals relate to adopted plans,as detailed in Section X, and were
developed with input from the CAC and TAC. The goals and objectives will be pursued as
economically as is feasible and at the discretion of the Agency. The goals and objectives are
not listed in any order of importance or priority.
Goal 1 –Encourage meaningful involvement by citizens, interested parties,and affected
agencies throughout the life of the urban renewal district to ensure that it reflects the
community's values and priorities.
Objectives: „
r
1. Invite citizens both within and outside of the boundaries of the Area, interested
parties, and affected agencies to participate on urban renewal advisory committees
and task forces.
2. Invite public comment at all Agency meetings.
3. Hold a public vote as required by the City Charter to use tax increment financing as a
method of funding projects in the Area.
Goal 2–Provide a safe and effective multimodal transportation network that provides
access to, from,and within the Area and supports mixed-use and pedestrian-oriented
development.
Objectives:
1. Develop comfortable, interesting, and attractive streetscapes—especially along
designated pedestrian streets—that build upon the Area's existing assets, improve the
pedestrian experience, and support a variety of commercial and social activities,e.g.
cafe seating, outdoor displays, etc.
2. Create more connections within the Area by building new streets and trails so that
people of all ages and abilities can enjoy healthy and interconnected lives.
3. Create more access points into and out of the Area by building new overpasses and/or
undercrossings and modifying existing intersections and/or interchanges so that the
Area is more connected to downtown Tigard, Portland Community College, and other
neighboring areas and businesses.
4. Provide transportation choices for all modes of travel,as appropriate, and on-street
parking and vegetative stormwater facilities, where feasible, when building new
streets and extending and/or modifying existing streets, including but not limited to
the following:
a. Shared bicycle and vehicle travel lanes along low volume streets.
b. Separate bicycle and vehicle travel lanes along high volume streets.
c. Sidewalks and pedestrian crossings that connect to transit(e.g. bus) stops.
Tigard Triangle Urban Renewal Plan 5
5. Allow transitional street improvements (i.e.temporary or partial improvements)that
further the Area's transportation goals and objectives and support small, incremental
development when construction of all permanent street elements is not practicable at
the time of development.
6. Provide a reliable transportation system that effectively manages vehicle congestion
and safely moves people, goods, and services to, from,and through the Area,with
special consideration for the following:
a. Pedestrian crossings of high volume streets.
b. Freight trucks to, from,and through the Area.
c. Transit service(e.g. buses)to, from, and through the Area.
7. Build a multi-use trail for pedestrians and bicyclists along Red Rock Creek that
provides an off-street east-west connection parallel to Highway 99W and facilitates
the transformation of this natural corridor into a greenway. Identify and build other
off-street multi-use trails and connections as opportunities arise.
8. Develop and implement a parking management plan for the Area that supports
economic development efforts,the desired land use pattern, and a balanced
transportation system, including but not limited to public-private partnerships, public
parking facilities, and parking enforcement.
9. Periodically evaluate the functioning of the transportation system to refine project
scope and inform project prioritization.
Goal 3–Provide public utility improvements to support desired development.
Objectives:
1. Develop a stormwater master plan for the Triangle and a greenway plan for Red Rock
Creek. Build regional stormwater facilities where practicable.
2. Extend the public sewer system to areas served by private septic systems.
3. Permanently fix compromised sewer lines in Red Rock Creek.
4. Ensure new water mains are constructed as needed and coordinate replacement of
existing water mains.
5. Encourage sustainable utility and energy usage practices.
Goal 4–Create a clear identity for the Area as a fun and diverse place to live,work,
shop,eat,and play by building upon existing unique and desirable features.
Objectives:
1. Build public facilities that support the Area's identity as a mixed-use, multimodal,
and pedestrian-oriented district, including but not limited to parks,plazas,public
restrooms, recreational facilities, and non-vehicular infrastructure, e.g. bike racks,
bike lockers,pedestrian shelters, and wayfinding signage.
2. Use parks,trails, stormwater facilities, and existing natural features—such as
wetlands,creeks,trees/tree groves, and view corridors—to create focal points that
reinforce the Area's identity as a unique and special place.
Tigard Triangle Urban Renewal Plan 6
3. Apply distinctive and consistent sign, art, gateway,and streetscape treatments to
visually distinguish the Area from surrounding areas.
4. Relocate or underground existing utilities as practicable to provide a more
aesthetically pleasing pedestrian environment.
Goal 5—Provide financial and technical assistance to new and existing businesses and
housing developments that contribute to the Area's diversity and vitality and help it
transform into a mixed-use and pedestrian-oriented district.
Objectives:
1. Support new and existing businesses by providing a variety of financial and technical
assistance programs that increase the diversity of goods and services available in the
Area and/or contribute to the Area's liveliness and upkeep, including but not limited
to fagade improvement grants, streetscape improvements, site preparation, permit fee
assistance,private utility extensions/upgrades, and business development incentives.
2. Form public-private partnerships and use public investment in infrastructure and
public spaces/facilities to spur private development.
3. Support the development of mixed-use buildings that provide a variety of housing
types and storefront spaces for a range of community and commercial needs.
4. Assist in the development of affordable and workforce housing.
5. Assemble parcels to enhance development opportunities.
6. Encourage low impact and environmentally sustainable building practices wherever
practicable.
Tigard Triangle Urban Renewal Plan 7
Figure 1 —Tigard Triangle Urban Renewal Plan Area Boundary
Tigard Triangle Urban Renewal Area
•f r ■
f�cNWy ■
■■■■■rrr■■■■r•�Q2f� ;
a `� r
■ � r I •
Rin
SW Dartmouth St
LF-
L
.
• _ -� + ■
r
4v
"Y""zi ♦,♦ — 1- r — ■
■
■
■
•
�...♦ �♦ h, QST
■ Tigard Triangle URA wy ■
■■■r■■�
0 500 1,000 feet a
Ile
Source:ECONorthwest
Tigard Triangle Urban Renewal Plan K
IV. URBAN RENEWAL PROJECT CATEGORIES
As an outcome of the goals described in the previous section,the projects within the Area fall
into the following categories:
• Transportation (Goal 2)
• Public Utilities(Goal 3)
• Public Spaces, Facilities, and Installations (Goal 4)
• Re/Development Assistance and Partnerships (Goal 5)
• Finance Fees and Plan Administration
V. URBAN RENEWAL PROJECTS
Urban renewal projects authorized by the Plan are described below.
A. Transportation
The following transportation projects are intended to provide a safe and effective multimodal
transportation network in the Area that supports mixed-use and pedestrian-oriented development
through improved internal connectivity, external access, and mobility; a variety of travel options;
comfortable, interesting, and attractive streetscapes; and, well-managed parking options.
Table 1 —Transportation Projects
Project Project Type Project Description
Number
1 New Hwy 217 Overpass Extend Beveland Rd south over Hwy 217 to Hunziker
(Beveland) Rd/Wall St area with car,ped,and bike facilities.
New Street Extend 74th Ave south from 99W to Hermoso Way or
2 << (74th Ave) Beveland Rd.
3 New Street Extend Atlanta St west from 69th Ave to Dartmouth St or
(Atlanta) future 74th Ave.
4 New Hwy I-5 Overpass Provide ped/bike bridge across Hwy I-5 from Beveland Rd
(Beveland) to Southwood Dr.
New Hwy I-5 Overpass Provide ped/bike bridge across Hwy I-5 between the
5 (Red Rock Creek) Triangle and PCC Sylvania around location of Red Rock
Creek.
6 Modified Intersection Install traffic signal and turn lanes where needed at Atlanta
(Atlanta/68th) St/68th Ave intersection.
Tigard Triangle Urban Renewal Plan 9
Project
Project Description
Number
7 Modified Intersection Add protected left turn and transit improvements on 68th
(99W/68th) Pkwy at 99W.
Develop comfortable,interesting,and attractive streetscapes
8 Modified Streets throughout the Area,especially along designated pedestrian
streets.
9 New Trail Build a new trail along Red Rock Creek parallel to and
(Red Rock Creek) south of 99W.
10 New Streets Improve connectivity, circulation,and access throughout the
Area with new or extended local streets.
Modified Street TBD. Improve 72nd Ave corridor,including
I I (72nd Ave) intersections/interchanges. Dependent on 72nd Ave Corridor
Study recommendations.
Modified Street Implement access management strategies and median
12 (99W) projects in Hwy 99W Plan,including additional pedestrian
crossing locations.
13 Modified Interchange Add second left turn lane on Hwy 217 northbound ramp to
(99W/Hwy 217) 99W.
14 Modified Signals Upgrade signals throughout the Area with adaptive signal
coordination technology.
15 Parking Management Plan Develop a plan and implement strategies for managing
parking.
Periodically evaluate the functioning of the transportation
16 Transportation Study system to refine project scope and inform project
prioritization.
B. Public Utilities
The following public utility projects are intended to address infrastructure deficiencies in the
Area. This list includes the development of a stormwater master plan for the Area and a
greenway plan for Red Rock Creek that addresses stormwater, sewer, and recreational needs. It
also includes construction of new stormwater facilities, repair of existing sewer lines, and
extension or enlargement of existing water and sewer lines as needed to support desired
development.
Tigard Triangle Urban Renewal Plan 10
Table 2—Public Utility Projects
Project Project Type Project I)escription
Number
Develop a stormwater master plan for the Triangle and a
1 Stormwater/Sewer greenway plan for Red Rock Creek that addresses
stormwater, sewer,and recreational needs.
Construct approximately three regional stormwater facilities
2 Stormwater to meet new DEQ regulations for water quantity
management.
3 Sewer Extend public sewer system to areas served by private septic
systems.
4 Stormwater/Sewer Permanently fix compromised sewer lines in Red Rock
Creek and restore creek channel and riparian buffer.
5 Water Install new water mains as needed.
C. Public Spaces, Facilities, and Installations
Projects within this category are intended to support the Area's new identity as a fun and diverse
place to live and visit by building upon existing unique and desirable features. When considering
whether to fund a specific project within this category,the Agency shall evaluate how it meets
the goals and objectives of this Plan and whether it will encourage private investment in the Area
and increase assessed value over time. The Agency shall also take the city's level of service
standards for parks into consideration where applicable. Level of service standards are contained
in the Tigard Park System Master Plan.
Projects may include,but are not limited to, the following:
• Parks, such as splash pads, nature play areas, skate parks,pocket parks, linear parks, and
neighborhood parks
• Greenways, such as along Red Rock Creek
• Recreational facilities, such as those that serve the immediate needs of Area residents
• Plazas
• Public restrooms
• Public art
• Wayfinding
• Gateway installations
• District signage
Tigard Triangle Urban Renewal Plan 11
As part of its evaluation,the Agency should consider consulting with the private development
community to identify the kinds of amenities that would catalyze private sector development,
particularly housing and mixed-use development.
D. Re/Development Assistance and Partnerships
Projects within this category are intended to contribute to the Area's diversity and vitality by
providing assistance to new and existing businesses and housing developments. Projects include,
but are not limited to,the following:
• FaVade improvement grants/loans
• Streetscape improvements
• Technical, code,and/or fee assistance
• Site assembly
• Site clean-up/preparation
• Site acquisition
• Partnerships that facilitate housing and mixed use developmen
E. Finance Fees and Plan Administration A �
This category allows for repayment of costs associated with implementation of the Plan,
including but not limited to ongoing administration and financing costs associated with issuing
long-and short-term debt, relocation costs, and other administrative costs.
x
Tigard Triangle Urban Renewal Plan 12
VI. PROPERTY ACQUISITION AND DISPOSITION
The Plan authorizes the acquisition and disposition of property as described in this section.
Property includes any and all interests in property, including fee simple ownership, lease,
easements, licenses,or other rights to use. If property is acquired it will be identified in the Plan
through a Minor Amendment, as described in Section IX. Identification of property to be
acquired and its anticipated disposition is required by ORS 457.085(g).
A. Property acquisition for public improvements
The Agency may acquire any property within the Area for the public improvement projects
undertaken pursuant to the Plan by all legal means, including use of eminent domain. Good faith
negotiations for such acquisitions must occur prior to institution of eminent domain procedures.
B. Property acquisition from willing sellers
The Plan authorizes Agency acquisition of any interest in property within the Area that the
Agency finds is necessary for private redevelopment, but only in those cases where the property
owner wishes to convey such interest to the Agency. The Plan does not authorize the Agency to
use the power of eminent domain to acquire property from a private party to transfer property to
another private party for private redevelopment. Property acquisition from willing sellers may be
required to support development of projects within the Area.
C. Land disposition
The Agency will dispose of property acquired for a public improvement project by conveyance
to the appropriate public agency responsible for the construction and/or maintenance of the
public improvement. The Agency may retain such property during the construction of the public
improvement.
The Agency may dispose of property acquired under Subsection B of this Section VI by
conveying any interest in property acquired. Property shall be conveyed at its fair reuse value.
Fair reuse value is the value, whether expressed in terms of rental or capital price, at which the
urban renewal agency, in its discretion, determines such land should be made available in order
that it may be developed, redeveloped, cleared, conserved,or rehabilitated for the purposes
specified in the Plan. Because fair reuse value reflects limitations on the use of the property to
those purposes specified in the Plan, the value may be lower than the property's fair market
value.
Where land is sold or leaser a purchaser or lessee must agree to use the land for the purposes
designated in the Plan and to begin and complete the building of its improvements within a
period of time that the Agency determines is reasonable.
Tigard Triangle Urban Renewal Plan 13
VII. RELOCATION METHODS
When the Agency acquires occupied property under the Plan,residential or commercial
occupants of such property shall be offered relocation assistance,as required under applicable
state law. Prior to such acquisition,the Agency shall adopt rules and regulations, as necessary,
for the administration of relocation assistance.No specific acquisitions that would result in
relocation benefits have been identified; however,there are plans to acquire land for
infrastructure which may trigger relocation benefits in the future in the Area.
VIII. TAX INCREMENT FINANCING OF PLAN
Tax increment financing consists of using annual tax increment revenues to make payments on
debt, usually in the form of bank loans or revenue bonds. The proceeds of the bonds are used to
finance the urban renewal projects authorized in the Plan. Bonds may be either long-term or
short-term.
Tax increment revenues equal most of the annual property taxes imposed on the cumulative
increase in assessed value within an urban renewal area over the total assessed value at the time
an urban renewal plan is adopted. (Under current law,the property taxes for general obligation
(GO)bonds and local option levies approved after October 6, 2001 are not part of the tax
increment revenues.)
A. General description of the proposed financing methods
The Plan will be financed using a combination of revenue sources. These include:
• Tax increment revenues;
• Advances, loans, grants, and any other form of financial assistance from federal, state, or
local governments, or other public bodies;
• Loans, grants, dedications, or other contributions from private developers and property
owners, including, but not limited to, assessment districts; and
• Any other public or private source.
Revenues obtained by the Agency will be used to pay or repay the costs, expenses,
advancements, and indebtedness incurred in(1)planning or undertaking project activities, or(2)
otherwise exercising any of the powers granted by ORS Chapter 457 in connection with the
implementation of this Plan.
B. Tax increment financing and maximum indebtedness
The Plan may be financed, in whole or in part, by tax increment revenues allocated to the
Agency, as provided in ORS Chapter 457. The ad valorem taxes, if any, levied by a taxing
district in which all or a portion of the Area is located, shall be divided as provided in Section Ic,
Article IX of the Oregon Constitution, and ORS 457.440.Amounts collected pursuant to ORS
457.440 shall be deposited into the unsegregated tax collections account and distributed to the
Agency based upon the distribution schedule established under ORS 311.390.
Tigard Triangle Urban Renewal Plan 14
The maximum amount of indebtedness that may be issued or incurred under the Plan, based upon
good faith estimates of the scope and costs of projects in the Plan and the schedule for their
completion is $188,000,000 (one hundred and eighty-eight million dollars). This amount is the
principal of such indebtedness and does not include interest or indebtedness incurred to refund or
refinance existing indebtedness or interest earned on bond proceeds. It does include initial bond
financing fees and interest earned on tax increment proceeds, separate from interest on bond
proceeds.
C. Plan Evaluation
During the fifteenth (15th)year of the Plan,the Agency shall undertake a financial analysis of
the Plan, including updated projections for tax increment finance revenues, and evaluate the
ability of the Plan to achieve its maximum indebtedness by the anticipated expiration date in
fiscal year 2052-53. The Agency shall consult and confer with affected taxing districts regarding
the results of this financial update and will consider revenue sharing or shortening the time frame
of the Plan if revenues are exceeding projections.
Tigard Triangle Urban Renewal Plan 15
IX. AMENDMENTS TO PLAN
The Plan may be amended as described in this section.
A. Substantial Amendments
Substantial Amendments, in accordance with ORS 457.085(2)(i), shall require the same notice,
hearing, and approval procedure required of the original Plan,under ORS 457.095, including
public involvement,consultation with taxing districts,presentation to the Agency,the Planning
Commission, and adoption by the City Council by non-emergency ordinance after a hearing.
Notice of such hearing shall be provided to individuals or households within the City of Tigard,
as required by ORS 457.120.Notice of adoption of a Substantial Amendment shall be provided
in accordance with ORS 457.095 and 457.115.
Substantial Amendments are amendments that:
1. Add land to the urban renewal area, except for an addition of land that totals not more
than 1%of the existing area of the urban renewal area; or
2. Increase the maximum amount of indebtedness that can be issued or incurred under the
Plan.
B. Minor Amendments
Minor Amendments are amendments that are not Substantial Amendments as defined in this Plan
and in ORS 457. Minor Amendments require approval by the Agency by resolution.
C. Amendments to the Tigard Comprehensive Plan and/or Tigard Community Development
Code.
Amendments to the Tigard Comprehensive Plan and/or Tigard Community Development Code
that affect the Plan and/or the Area shall be incorporated automatically within the Plan without
any separate action required by the Agency or City Council.
Unless otherwise permitted by state law,no land equal to more than 20 percent of the total land area of the original Plan shall be
added to the urban renewal area by amendments,and the aggregate amount of all amendments increasing the maximum
indebtedness may not exceed 20 percent of the Plan's initial maximum indebtedness,as adjusted,as provided by law.
Tigard Triangle Urban Renewal Plan 16
Figure 2—Comprehensive Plan Designations
Tigard Triangle Urban Renewal Area
Comprehensive Plan Designations
�5 F�
15
.r •
■seam/•■ass.
■
r hS'
■
0■■■■A■/■■■MAP •
t•a 5�
•
m ■
c
■
SAY �
y4��ke` Rd
Comprehensive Plan
General Commercial
,'' ■
Professional Commercial •• �
Medium Density Residential i
Mixed Use Employment
- Light Industrial r'
•memo y
■ ■ Tigard Triangle URA _W
*most
Source:ECONorthwest
Tigard Triangle Urban Renewal Plan 17
X. RELATIONSHIP TO LOCAL OBJECTIVES
ORS 457.085 requires that the Plan conform to local objectives. This section provides that
analysis. Relevant local planning and development objectives are contained within the Tigard
Comprehensive Plan, Tigard Community Development Code Chapter 18.500 Zoning Districts,
Tigard Transportation System Plan, and Tigard Park System Master Plan. The following section
describes the purpose and intent of these plans,the main applicable goals and policies within
each plan, and an explanation of how the Plan relates to the applicable goals and policies.
The numbering of the goals and policies within this section reflects the numbering that
occurs in the original document.Italicized text is text that has been taken directly from an
original document.
Comprehensive Plan designations for all land in the Area are shown in Figure 2.All proposed
land uses conform to Figure 2. Maximum densities and building requirements for all land in the
Area are contained in the Tigard Community Development Code.
A. Tigard Comprehensive Plan
Citizen Involvement
Goal 1.1: Provide citizens, affected agencies, and other jurisdictions the opportunity to
participate in all phases of the planning process.
Policies:
3. The City shall establish special citizen advisory boards and committees to provide input
to the City Council, Planning Commission, and City staff.
4. The City shall provide staff and financial support to the Committee for Citizen
Involvement and any other appointed board or committee.
5. The opportunities for citizen involvement provided by the City shall be appropriate to the
scale of the planning effortand shall involve a broad cross-section of the community.
Goal 1.2 Ensure all citizens have access to:
A) opportunities to communicate directly to the City; and
B) information on issues in an understandable form.
Policies:
1. The City shall ensure pertinent information is readily accessible to the community and
presented in such a manner that even technical information is easy to understand.
2. The City shall utilize such communication methods as mailings,posters, newsletters, the
internet, and any other available media to promote citizen involvement and continue to
evaluate the effectiveness of methods used.
3. The City shall work to maximize citizen involvement through education and accessibility.
4. The City shall ensure citizens receive a timely response from policy-makers regarding
recommendations made through the citizen involvement program.
Tigard Triangle Urban Renewal Plan 18
S. The City shall seek citizen participation and input through collaboration with community
organizations, interest groups, and individuals in addition to City sponsored boards and
committees.
6. The City shall provide opportunities for citizens to communicate to Council, boards and
commissions, and staff regarding issues that concern them.
The Plan conforms to Citizen Involvement Goals 1.1 and 1.2, as a Citizen Advisory Council
(CAC)was formed to help develop the Plan. The CAC included representatives from
neighborhood organizations, the business and development community, and standing city
advisory committees on land use,transportation,etc. They met four times to review the
boundary, goals and objectives, finances, and draft Plan and Report. There was also an open
house where citizens were given information on the proposed Plan and public meetings and
hearings before the Planning Commission and City Council where citizens had the opportunity to
comment on the proposed Plan. The Plan was voted on by the citizens of Tigard in May of 2017.
Parks,Recreation, Trails, and Open Space
Goal 8.1: Provide a wide variety of high quality park and open spaces for all residents,
including both:
A) developed areas with facilities.for active recreation; and
B) undeveloped areas for nature-oriented recreation and the protection and enhancement of
valuable natural resources within the parks and open space system.
Policies: .
1. Tigard shall acquire, develop, and maintain a diverse system of parks, trails, open space,
and recreational facilities that are safe,functional, and accessible to all of its population.
2. The City shall preserve, and where appropriate, acquire and improve natural areas
located within a half mile of every Tigard resident to provide passive recreational
opportunities.
3. The City shall seek to achieve or exceed the ideal park service level standard of 11.0
acres of parkland per thousand population.
4. The City shall endeavor to develop neighborhood parks[or neighborhood park facilities
within other parks, such as a linear park]located within a half mile of every resident to
provide access to active and passive recreation opportunities for residents of all ages.
S. The City shall develop other parks, including linear parks, special use facilities, urban
plazas, skate parks, and pet arenas, consistent with the descriptions and standards
contained in the park system master plan.
9. The City shall integrate green concepts into park and open space design, maintenance,
and operations.
20. The City shall continue to improve access to neighborhood parks and other facilities in
order to serve all citizens, regardless of ability.
Tigard Triangle Urban Renewal Plan 19
Goal 8.2: Create a Citywide network of interconnected on-and off-road pedestrian and bike
trails.
Policies:
1. The City shall create an interconnected regional and local system of on-and off-road
trails and paths that link together neighborhoods,parks, open spaces, major urban
activity centers, and regional recreational opportunities utilizing both public property
and easements on private property.
The Plan conforms to Parks,Recreation, Trails, and Open Space Goals 8.1 and 8.2, as there are
projects in the Plan to develop plazas, parks, greenways,and public restrooms in the Area. There
are also plans for the development of a trail system along Red Rock Creek parallel to and south
of 99W.
Economy
Goal 9.1: Develop and maintain a strong, diversified, and sustainab ertl economy.
Policies:
S. The City shall promote well-designed and efficient development and redevelopment of
vacant and underutilized industrial and commercial lands.
Goal 9.2:Make Tigard a center and incubator,for innovative businesses, including those that
focus on environmental sustainability.
1. The City shall institute appropriate land use regulations to accommodate a contemporary
mix of economic activities.
Goal 9.3: Make Tigard a prosperous and desirable place to live and do business.
Policies:
1. The City shall focus a significant portion offuture employment growth and high-density
housing development in its Metro-designated Town Center(Downtown); Regional Center
(Washington Square); High Capacity Transit Corridor(Hwy 99W); and the Tigard
Triangle.
3. The City shall commit to improving and maintaining the quality of community life (public
safety, education, transportation, community design, housing,parks and recreation, etc.)
to promote a vibrant and sustainable economy.
The Plan conforms to Economy Goals 9.1, 9.2 and 9.3, as there are projects in the Plan to
provide financial and technical assistance to new and existing businesses and housing
developments to help with the development of vacant and underutilized lands in the Area.
Development assistance will include, but is not limited to, fagade improvement grants/loans,
streetscape improvements,technical assistance, site assembly, site clean-up/preparation, site
acquisition, and/or partnerships that facilitate housing and mixed-use developments. The Plan
was developed with the guidance of a Technical Advisory Committee,comprised of partners
from various organizations including the Tigard Chamber of Commerce.
Tigard Triangle Urban Renewal Plan 20
Housing
Goal 10.1: Provide opportunities for a variety of housing types to meet the diverse housing needs
of current and future City residents.
Policies:
1. The City shall adopt and maintain land use policies, codes, and standards that provide
opportunities to develop a variety of housing types that meet the needs,preferences, and
financial capabilities of Tigard's present and future residents.
3. The City shall support housing affordability, special-needs housing, ownership
opportunities, and housing rehabilitation through programs administered by the state,
Washington County, nonprofit agencies, and Metro.
S. The City shall provide for high and medium density housing in the areas such as town
centers (Downtown), regional centers (Washington Square), and along transit corridors
where employment opportunities, commercial services, transit, and other public services
necessary to support higher population densities are either present or planned for in the
future.
Goal 10.2: Maintain a high level of residential livability.
1. The City shall adopt measures to protect and enhance the quality and integrity of its
residential neighborhoods.
2. The City shall provide multi-modal transportation access from residential neighborhoods
transit stops, commercial services, employment, and other activity centers.
S. The City shall encourage housing that supports sustainable development patterns by
promoting the efficient use of land, conservation of natural resources, easy access to
public transit and other efficient modes of transportation, easy access to services and
parks, resource e f tient design and construction, and the use of renewable energy
resources.
The Plan conforms to Housing Goals 10.1 and 10.2, as there are projects in the Plan to facilitate
workforce and affordable housing and transit-oriented and mixed-use development. The Plan
was developed with the guidance of a Technical Advisory Committee,comprised of partners
from various organizations including Community Partners for Affordable Housing and REACH
Community Development.
Transportation
Goal 12.1: Develop mutually supportive land use and transportation plans to enhance the
livability of the community.
1. The City shall plan for a transportation system that meets current community needs and
anticipated growth and development.
2. The City shall prioritize transportation projects according to community benefit, such as
safety,performance, and accessibility, as well as the associated costs and impacts.
3. The City shall maintain and enhance transportation functionality by emphasizing multi-
modal travel options for all types of land uses.
Tigard Triangle Urban Renewal Plan 21
4. The City shall promote land uses in transportation investments that promote balanced
transportation options.
S. The City shall develop plans for major transportation corridors and provide appropriate
land uses in and adjacent to those corridors.
6. The City shall support land use patterns that reduce greenhouse gas emissions and
preserve the function of the transportation system.
9. The City shall coordinate with private and public developers to provide access via a safe,
efficient, and balanced transportation system.
10. The City shall require all development to meet the ado transportation standards or
provide appropriate mitigations.
Goal 12.2: Develop and maintain a transportation system for the efficient movement of goods.
2. The City shall manage the transportation system to support desired economic
development activities.
3. The City shall design streets to encourage a reduction in trip length by improving
arterial, collector, and local street connections.
4. The City shall design arterial routes, highway access, and adjacent land uses in ways
that facilitate the efficient movement of people, goods and services.
6. The City shall develop and maintain an efficient arterial grid system that provides access
within the City, and searched through traffic in the City.
9. The City shall require the provision of appropriate parking in balance with other
transportation modes.
11. The City shall design the transportation system to provide connectivity between Metro
designated centers, corridors, employment and industrial areas.
Goal 12.3: Provide an accessible, multi-modal transportation system that meets the mobility
needs ofthe community.
3. The City shall design and construct transportation facilities to meet the requirements of
the Americans with Disabilities Act.
4. The City shall support and prioritize bicycle,pedestrian, and transit improvements for
transportation disadvantaged populations who may be dependent on travel modes other
than private automobile.
S. The City shall develop and maintain neighborhood and local connections to provide
efficient circulation in and out of the neighborhoods.
6. The City shall require development adjacent to transit routes to provide direct pedestrian
accessibility.
7. The City shall develop and implement public street standards that recognize the multi-
purpose nature of the street right-of-way.
8. The City shall design all projects on Tigard city streets to encourage pedestrian and
bicycle travel.
Tigard Triangle Urban Renewal Plan 22
9. The City shall require sidewalks to be constructed in conjunction with private
development and consistent with adopted plans.
10. The City shall require and/or facilitate the construction of off-street trails to develop
pedestrian and bicycle connections that cannot be provided by a street.
11. The City shall require appropriate access to bicycle and pedestrian facilities for all
schools,parks,public facilities, and commercial areas.
Goal 12.4:Maintain and improve transportation system safety.
1. The City shall consider the intended uses of street during the design to promote safety,
efficiency, and multi-modal needs.
2. The City shall ordinate with appropriate agencies to provide safe, secure, connected, and
desirable pedestrian, bicycle, and public transit facilities.
3. The City shall require new development to provide safe access for all modes to and from
a publicly dedicated street.
S. The City shall prioritize intersection imiirovements to address safety deficiencies.
9. The City shall require new transportation facilities to meet adopted lighting standards.
Goal 12.6: Fund an equitable, balanced, and sustainable transportation system that promotes
the well-being of the community.
2. The City shall seek to invest in capital projects that leverage other infrastructure
investments.
3. The City shall seek opportunities for transportation investments that support
transportation goals of efficiency, multi-modal access, and safety.
The Plan conforms to Transportation Goals 12.1, 12.2, 12.3, and 12.4, as there are projects in the
Plan to improve the transportation system for all modes of travel and to create better access to,
from, and within the Area. The specific projects include modifying existing streets, constructing
new streets, providing better pedestrian and bicycle access, intersection improvements, overpass
connections, parking solutions for vehicles and bicycles, and trail development along Red Rock
Creek. The Plan was developed with the guidance of a Technical Advisory Committee,
comprised of partners from various agencies including Metro,TriMet, Washington County, and
the Oregon Department of Transportation.
B. Tigard Community Development Code
The land uses in the Area will conform to the zoning designations in the community
development code, including maximum densities and building requirements, and are
incorporated by reference herein. The following zoning districts are present in the Area.
C-G: General commercial district. The C-G zoning district applies to roughly half of the land in
the Area. This zoning district is designed to accommodate a full range of retail, office and civic
uses with a citywide and regional trade area. Except where nonconforming, residential uses are
limited to single-family residences that are located on the same site as a permitted use. A wide
range of uses, including but not limited to adult entertainment, automotive equipment repair and
Tigard Triangle Urban Renewal Plan 23
storage,mini-warehouses, utilities,heliports,medical centers,major event entertainment, and
gasoline stations, are permitted conditionally.
MUE: Mixed-use employment. The MUE zoning district applies to roughly half of the land in
the Area and is the city's only regional mixed-use employment district. This zoning district
permits a wide range of uses including major retail goods and services,business/professional
offices, civic uses and housing;the latter includes multi-family housing at a maximum density of
25 units/acre, equivalent to the R-25 zoning district. A wide range of uses, including but not
limited to community recreation facilities, medical centers, schools, utilities and transit-related
park-and-ride lots, are permitted conditionally. Although it is recognized that the automobile will
accommodate the vast majority of trips to and within the Triangle, it is still important to: (1)
support alternative modes of transportation to the greatest extent possible, and (2)encourage a
mix of uses to facilitate intra-district pedestrian and transit trips even for those who drive.
R-12: Medium-density residential district. The R-12 zoning district is designed to accommodate
a full range of housing types at a minimum lot size of 3,050 square feet.A wide range of civic
and institutional uses are also permitted conditionally.
C-P: Professional/administrative commercial district. The C-P zoning district is designed to
accommodate civic and business/professional services and compatible support services, e.g.,
convenience retail,personal services, and restaurants in close proximity to residential areas and
major transportation facilities. Residential uses at a minimum density of 32 units/net acre, i.e.,
equivalent to the R-40 zoning district,are permitted in conjunction with a commercial
development. Heliports, medical centers, religious institutions and utilities are permitted
conditionally. Development in the C-P zoning district is intended to serve as a buffer between
residential areas and more-intensive commercial and industrial areas.
C. Tigard Transportation System Plan
Goal 1: Land use and transportation coordination—develop mutually supportive land use and
transportation plans to enhance the livability of the community. The city shall plan for a
transportation system that meets current community needs and anticipated growth and
development.
Goal 2: Transportation efficiency—develop and maintain a transportation system for the
efficient movement of people and goods.
Goal 3:Multi-modal tran., ation system—provide an accessible, multi-modal transportation
system that meets the mobility needs of the community.
Goal 4: Safe transportation system—maintain and improve transportation system safety.
Goal S:Inter-agency coordination—coordinate planning, development, operation and
maintenance of the transportation system with appropriate agencies.
Goal 6: Transportation funding—fund and equitable, balanced and sustainable transportation
system that promotes the well-being of the community.
Tigard Triangle Urban Renewal Plan 24
In addition to the above applicable goals,the Tigard Triangle is identified as one of three special
areas within the city with significant growth opportunities and transportation challenges.
The Tigard Triangle is a priority opportunityfor community development and economic activity.
The triangle has long been a retail and commercial hub within the city. Today, the triangle is
zoned for commercial and mixed-use development and is identified as an area of significant
future growth in housing and jobs.
Although the area is bordered by three major regional roadways, in many ways those roadways
function as barriers to access the triangle. Travel to and from the Tigard Triangle is funneled
from Pacific Highway via 72nd Avenue, Dartmouth Street and 68th Parkway; the Highway
217172nd Avenue interchange; the northbound 1-5 interchange with Haines Street; and the
southbound 1-5 interchange with Dartmouth Street.
Access to and from the Tigard Triangle area is, and will remain, a critical issue to the success of
the Tigard Triangle area. The majority of employees and customers traveling to the area on city
streets access the Tigard Triangle area off of Pacific Highway. There is considerable congestion
on Pacific Highway in the vicinity of the Tigard Triangle and this congestion is forecast to
worsen with future development and regional growth.
A second issue with the Tigard Triangle relates to non-auto mobility/circulation to/from and
within the area. The triangle area as a whole is generally sloping downward from Pacific
Highway and 1-5 to Highway 217. The topography makes pedestrian and bicycle transportation
more difficult. These conditions are worsened by incomplete bicycle and pedestrian systems
within the Triangle.At the broadest level, options for improving access to the Tigard Triangle
area fall into the following categories:
• Provide additional intersection and roadway capacity improvements to improve traffic
operations at the boundary streets.
• Minimize additional roadway capacity infrastructure investment and focus on travel
demand management('IDM)programs.
• Provide better facilities for alternative modes (transit, bicycles,pedestrians, etc.).
• Create a mix of critical additional capacity and implementing TDMprograms.
The Plan conforms to the Transportation System Plan goals and recommendations, as there are
projects in the Plan to improve the transportation system for all modes of travel and to create
better access to, from, and within the Area. The specific projects include modifying existing
streets, constructing new streets,providing better pedestrian and bicycle access, intersection
improvements,overpass connections,parking solutions for vehicles and bicycles, and trail
development along Red Rock Creek. The Plan was developed with the guidance of a Technical
Advisory Committee, comprised of partners from various agencies including Metro, TriMet,
Washington County,and the Oregon Department of Transportation.
Tigard Triangle Urban Renewal Plan 25
D. Tigard Park System Master Plan
Goal 1: Provide a wide variety of high quality park and open spaces for all residents, including
both: 1)Developed areas with facilities for active recreation; and 2) Undeveloped areas for
nature-oriented recreation and the protection and enhancement of valuable natural resources
within the parks and open space system.
Goal 2: Create a citywide network of interconnected on-and off-road pedestrian and bicycle
trails.
Goal 3:Provide Tigard residents with a broad range of recreational, cultural and educational
activities.
The Plan conforms to the Park System Master Plan,as there are projects in the Plan to develop
plazas,parks, greenways, and public restrooms in the Area.There are also plans for the
development of a trail system along Red Rock Creek parallel to and south of 99W.
Im
Tigard Triangle Urban Renewal Plan 26
XI. APPENDIX A: LEGAL DESCRIPTION
INSERT TEXT LEGAL DESCRIPTION OF URBAN RENEWAL DISTRICT BOUNDARY
THAT IS CONSISTENT WITH THE ENCLOSED MAP
Tigard Triangle Urban Renewal Plan 27
Report Accompanying the Urban
Renewal Plan
Adopted by the City of Tigard
DATE
Ordinance No.
Tigard Triangle Urban Renewal Area
Consultant Team
Elaine Howard Consulting, LLC
Elaine Howard
Scott Vanden Bos
Tiberius Solutions LLC
Nick Popenuk
Rob Wyman
ECONorthwest
Kate Macfarlane
TABLE OF CONTENTS
I. INTRODUCTION ...............................................................................................................1
II. EXISTING PHYSICAL, SOCIAL,AND ECONOMIC CONDITIONS AND
IMPACTS ON MUNICIPAL SERVICES ..........................................................................3
III. REASONS FOR SELECTION OF EACH URBAN RENEWAL AREA IN THE
PLAN.................................................................................................................................20
IV. THE RELATIONSHIP BETWEEN URBAN RENEWAL PROJECTS AND THE
EXISTING CONDITIONS IN THE URBAN RENEWAL AREA..................................20
V. THE ESTIMATED TOTAL COST OF EACH PROJECT AND THE SOURCES OF
MONEYS TO PAY SUCH COSTS..................................................................................24
VI. THE ANTICIPATED COMPLETION DATE FOR EACH PROJECT...........................27
VII. THE ESTIMATED AMOUNT OF TAX INCREMENT REVENUES REQUIRED
AND THE ANTICIPATED YEAR IN WHICH INDEBTEDNESS WILL BE
RETIRED...........................................................................................................................32
VIII. FINANCIAL ANALYSIS OF THE PLAN.......................................................................37
IX. IMPACT OF THE TAX INCREMENT FINANCING.....................................................39
X. COMPLIANCE WITH STATUTORY LIMITS ON ASSESSED VALUE AND SIZE
OF URBAN RENEWAL AREA.......................................................................................43
XI. RELOCATION REPORT..................................................................................................43
Report on Tigard Triangle Urban Renewal Area
I. INTRODUCTION
The Report on the Tigard Triangle Urban Renewal Plan(Report)contains background
information and project details that pertain to the Tigard Triangle Urban Renewal Plan (Plan).
The Report is not a legal part of the Plan, but is intended to provide public information and
support the findings made by the City Council as part of the approval of the Plan.
The Report provides the analysis required to meet the standards of ORS 457.085(3), including
financial feasibility. The format of the Report is based on this statute. The Report documents the
existing conditions in the Tigard Triangle Urban Renewal Area(Area) as they relate to the
proposed projects in the Plan.
The Report provides guidance on how the urban renewal plan might be implemented. As the
Tigard City Center Development Agency(Agency) reviews revenues and potential projects each
year, it has the authority to make adjustments to the implementation assumptions in this Report.
The Agency may allocate budgets differently, adjust the timing of the projects, decide to incur
debt at different timeframes than projected in this Report, and make other changes as allowed in
the amendments section of the Plan.
Report on Tigard Triangle Urban Renewal Area 1
Figure I —Tigard Triangle Urban Renewal Plan Area Boundary
Tigard Triangle Urban Renewal Area
r .
l ■
.■■■■■■.■•■r•••nQa�`n�Nwy i
r , •
■
•
9 TIT ■
♦♦ l � SW Dartmouth St '� ■
j j ■
L �_. �c �j
■
■
• •
■
v
�yunziker Rd�♦ ���
%y •
d �
•r■rr •• ' �`sc�
�■ ■� Tigard Triangle URA •0 ky2
•
0 500 1,000 feet
ye
Source:ECONorthwest
Report on Tigard Triangle Urban Renewal Area 2
II. EXISTING PHYSICAL, SOCIAL, AND ECONOMIC
CONDITIONS AND IMPACTS ON MUNICIPAL SERVICES
This section of the Report describes existing conditions within the Tigard Triangle Urban
Renewal Area and documents the occurrence of"blighted areas,"as defined by ORS
457.010(1).
A. Physical Conditions
1. Land Use
The Area measures 547.9 total acres in size,encompassing 383.04 acres included in 327
individual parcels, and an additional 164.86 acres in public rights-of-way. An analysis of
FYE 2016 property classification data from the Washington County Department of
Assessment and Taxation database was used to determine the land use designation of parcels
in the Area. By acreage, commercial accounts for the largest land use within the area(83%).
This is followed by vacant(9%), and exempt(6%). The total land uses in the Area,by
acreage and number of parcels, are shown in Table 1.
Table I —Existing Land Use in Area
Land Use Parcels Acres %Total
Acres
Commercial 263 321.15 83.84%
Vacant 41 35.08 9.16%
Exempt 18 2. 1.82 5.70%
Multi-Family Residential 5 4.99 1.30%
Total 327 383.04 100%
Source:Compiled by Tiberius Solutions LLC with data from the Washington County Department of Assessment and Taxation(FYE 2016)
Report on Tigard Triangle Urban Renewal Area 3
2. Zoning and Comprehensive Plan Designations
The zoning and comprehensive plan designations in the Area are the same. As illustrated in
Table 2 and Figure 2,the majority(52%)of the Area by acreage is zoned and designated in
the comprehensive plan as General Commercial. The second most prevalent zoning and
comprehensive plan designation is Mixed-Use Employment,representing 45%of the Area.
There are two lots that are split zoned/designated. The data uses the most prevalent category.
Table 2—Existing Zoning/Comprehensive Plan Designations of Area
DesignationZoning/Comprehensive Plaii Pa reels Acres % Total
General Commercial 113 200.98 52.47%
Mixed Use Employment 204 173.54 45.31%
Medium Density Residential 1 77 1.51%
Professional Commercial 9 1 �"2.75 0.72%
Total 327 383.04 100.00%
Source:Compiled by Tiberius Solutions LLC with data from the Washington County Department of Assessment and Taxation(FYE 2016)
NQL
Report on Tigard Triangle Urban Renewal Area 4
Figure 2 —Area Zoning and Comprehensive Plan Designations
Tigard Triangle Urban Renewal Area
Zoning and Comprehensive Plan
Designations ASF
.r J�
f•r1 ■ ■ `�
M ■
■
r •
•
SV/Dartmouth St
•
♦
>
m
syy �`` ■
NVhZ*91'Rd t
Zoning ♦�
General Commercial ♦♦ r
i
jProfessional Commercial �♦ •
Mixed Use Employment •:a
Medium Density Residential (R-12)
.v IF
- Light Industrial
■ ■ Tigard Triangle URA a
�■■■r
0 500 1,000 1,500 feet
I I I I
Source:ECONorthwest with data from the City of Tigard and Metro RLIS 2016 Q1
Report on Tigard Triangle Urban Renewal Area 5
B. Infrastructure
This section identifies the existing conditions in the Area to assist in establishing blight.
There are projects listed in several City of Tigard infrastructure master plans and the Tigard
Triangle Strategic Plan that relate to these existing conditions. This does not mean that all
of these projects are included in the Plan. The specific projects that are included in the
Plan are listed in Sections IV and V of this Report.
1. Transportation
The Tigard Transportation System Plan (TSP)details the transportation needs within the
Area.
Streets and Intersections
There are significant transportation needs within the Area:
"The Tigard Triangle is a priority opportunity for community development and economic
activity. The triangle has long been a retail and commercial hub within the city. Today,the
triangle is zoned for commercial and mixed-use development and is identified as an area of
significant future growth in housing and jobs.
Although the area is bordered by three major regional roadways, in many ways those
roadways function as barriers to access the triangle. Travel to and from the Tigard Triangle is
funneled from Pacific Highway via 72nd Avenue, Dartmouth Street and 68th Parkway;the
Highway 217/72nd Avenue interchange;the northbound 1-5 interchange with Haines Street;
and the southbound I-5 interchange with Dartmouth Street.
Access to and from the Tigard Triangle area is, and will remain,a critical issue to the success
of the Tigard Triangle area. The majority of employees and customers traveling to the area
on city streets access the Tigard Triangle area off of Pacific Highway. There is considerable
congestion on Pacific Highway in the vicinity of the Tigard Triangle and this congestion is
forecast to worsen with future development and regional growth.
A second issue with the Tigard Triangle relates to non-auto mobility/circulation to/from and
within the area. The triangle area as a whole is generally sloping downward from Pacific
Highway and 1-5 to Highway 217. The topography makes pedestrian and bicycle
transportation more difficult. These conditions are worsened by incomplete bicycle and
pedestrian systems within the Triangle. At the broadest level, options for improving access to
the Tigard Triangle area fall into the following categories:
• Provide additional intersection and roadway capacity improvements to improve
traffic operations at the boundary streets.
• Minimize additional roadway capacity infrastructure investment and focus on travel
demand management(TDM)programs.
• Provide better facilities for alternative modes(transit, bicycles,pedestrians, etc.).
• Create a mix of critical additional capacity and implementing TDM programs."I
' Tigard 2035 Transportation System Plan,November 23, 1010,p.5.73
Report on Tigard Triangle Urban Renewal Area 6
Infrastructure Investments
As identified in the Tigard TSP: "Within the Triangle,the improvement projects include
several capacity enhancements to existing roadways, extension of Atlanta Street to connect
68th Avenue and Dartmouth, and a new Highway 217 overcrossing connecting Hunziker
Street to Hampton Street. The Atlanta Street extension and Hunziker Street overcrossing
would provide needed additional circulation options for auto and non-auto modes of
transportation within the Tigard Triangle. In addition,the Hunziker Street overcrossing
would provide an additional access to the Tigard Triangle area from the south and west.
The plan also includes widening 72nd Avenue (arterial)and Dartmouth Street(collector)to
five lanes. Without careful design of both facilities,these could end up functioning as a
surrogate for 1-5 travel and could become significant pedestrian and bicycle barriers within
the Tigard Triangle. An initial step toward realizing these projects is a corridor study to
review street cross sections and potential parallel routes."2
Specific project considerations from the TSP for the Area are listed in Table 3 on the
following page.
a '..
2 Tigard 2035 Transportation System Plan,November 23, 1010,p.5.74
Report on Tigard Triangle Urban Renewal Area 7
Table 3—Transportation Project Needs as Identified in the Tigard TSP
Name I)escription Time Cost
Frame ['stimate
OR 217/72nd Avenue Complete interchange reconstruction with Near-term $19,500,000
Interchange improvements additional ramps and overcrossings
Atlanta Street extension Extend Atlanta Street west to Dartmouth Street Mid-term $3,300,000
68th Avenue Widen to 2/3 lanes between Dartmouth Mid-term $10,000,000
Street/I-5 Ramps and south end
72nd Avenue widening: Widen to 4/5 lanes Mid-term $8,000,000
ORE 99W to Dartmouth
�w max:
72nd Avenue widening: Widen to 4/5 lanes,including bridge 'd-term $7,000,000
Dartmouth to Hunziker
Complete 4/5-lane section from Costco to
Dartmouth Street widening 72nd Avenue(small section missing in Near-te $320,000
eastbound direction only)
Dartmouth Street widening Widen to 4 lanes plus turn lanes and sidewalks Near-term $3,000,000
between 72nd Avenue and 1-5 (68th Avenue)
68th/Atlanta/Haines Traffic signal and turn lanes where necessary Near-term $500,000
68th Ave/Dartmouth Street Install traffic signal and turn lanes where Near-term $500,000
necessary
72nd Ave/Dartmouth Street Traffic signal and intersection widening Near-term $1,100,000
Intersection improvements such as dual
Pacific Hwy/1-5 SB northbound through lanes on pacific highway Near-term $5,000,000
and dual lanes for I-5 ramps to reduce
4 confusion,congestion and related accidents
Pacific Hwy/68th Ave Intersection improvements such as added turn Near-term $1,000,000
lanes,protected left-turns at 68th
Pacific Hwy/72nd Ave Intersection improvements such as added turn Near-term $2,000,000
lanes,a southbound right turn pocket
Pacific Hwy/Dartmouth St Intersection improvements such as turn lanes Near-term $6,000,000
and auxiliary lanes
Source:City of Tigard Transportation System Plan
Report on Tigard Triangle Urban Renewal Area 8
Z Water
Water is provided by the Tualatin Valley Water District(TVWD). The TVWD Capital
Improvement Plan for the adopted 2015-17 budget lists no specific projects in the Tigard
Triangle Area,3 though general improvements such as replacement of aging infrastructure
upgrades and renewal are anticipated through the entire TVWD service area.
3. Stormwater
The city maintains the stormwater system in the Area.There are two concentrations of
stormwater mains with the Area, including one in the vicinity of SW Dartmouth Street/SW
Clinton Street/SW 68th Avenue/SW 69`"Avenue and another at the southern corner of the
Area. Although there are no identified improvement projects for the Area in capital
improvement plans, future development will need to consider stormwater improvements. The
majority of stormwater runoff from the Area drains into Red Rock Creek. This runoff scours
the creek bed and undermines the sanitary sewer line located in the stream corridor. More
information concerning the blighting conditions concerning stormwater are detailed in a
memo from the City Engineer as follows:
"The city does not currently have a Stormwater Master Plan but is in the process of
developing one, scheduled for completion summer of 2017. Initial work on the plan has
included an identification of known issues, which are shown on the attached maps, Exhibits
B and C respectively. [See Figures 3 and 4.1 Issues are grouped into one of four categories,
namely water quality, flooding, erosion, and maintainability. As the two maps show, issues in
the Tigard Triangle are centered around Red Rock Creek, which serves as the main
stormwater conveyance corridor for the area.
In addition to the known issues discussed above,the Department of Environmental Quality
(DEQ)recently issued a new National Pollution Discharge Elimination System (NPDES)
permit to Clean Water Services for storm water and sanitary sewer/treatment systems. The
City of Tigard is a co-implementer of these permit requirements within city limits. As a result
of the new permit, the city expects that the Stormwater Master Plan will need to include
identification of capital projects and design standards that provide additional water quantity
management throughout areas of the city, including the Triangle. The city currently plans to
consider a regional approach to stormwater management in this area, similar to the approach
used in River Terrace, which will require the acquisition of land or easements and
construction of detention ponds and conveyance infrastructure. For the purposes of this
memo,the city will assume that at least three regional detention ponds will be needed in the
Triangle area."4
s Tualatin Water District CIP Overview 2015-17 Budget,Section 17
4 Memo Re:Existing Conditions in Tigard Triangle:Sewer and Stormwater,August 8,2016
Report on Tigard Triangle Urban Renewal Area 9
Figure 3—Stormwater Issues
Stormwttftt DRAFT Exhibit B
•� a • , = :■/�M� L• •q ■ ■r■u■r■eall! - LooalorMap
. • ' i ■ . e •8 • t
all
' d ■ • tt
i ■�. ... ° tr"• .ell • ♦�• 1 ■i■• i 2 3
l�lq■• ,�PSs`r:, lasia, aaff
• �■+ate■11 .�y � ;
00—" alp ft 1 ♦� �a� l � r'. 8 7
�- a '• 4 is
wed t# �.. a
�,. •a" G "■"�
. ra■�+. let r`■� ■•s■+� I. for/aril. ..' -7I VA
walk ■� 12
_ �1 -J �
s. .ar7r■■rar i. s■fd i 1t••y • • *• •a. r �' ;1 �lmimil ofm ■ asmoi.`•••i
• M pen ras7 Yres•tillyr+lLa P _ r
..■a■. ., ,.! ■ s .Rae . are r..�1r• ■ • .• ' .•• -
_..Dun■r uo■u r■w.•.rr■u■u•uir
STORMWQTER
` 7
' Asn •�•.•• j ssos
:.........••.• r-: Rad Rad` a • r........
••■•.• •� sae .•
all
ry „"X10, ` �. • i
Legend
yuu■rV
Tigard City Boundary Slormwator Outfall Stonnwabr Swalo O Water Quality issue Point • Flooding Issue Point • Erosion Issue Point O Maintarnebility,lawn Point
saaaas
�.•••+SludyArea S Slormweter Vault Starmweler DeMnaon Pipe Water Quality Issue Area - Flooding Issue Lme Erosion Issue Line Maintamebeay Issue Line
Trails Stormwater Culvert Stormwatar Water Quality Pipe Flooding Issue Area Eroslon Issue Area Mamtainabillty Uwe Area
Sheama Stormwater Mein Stormwater Water Quality Pond
Datc-C+C0�535190 pm
Source:City of Tigard memo on conditions 8/20/,Exhibit B
Report on Tigard Triangle Urban Renewal Area 10
Figure 4—Stormwater Issues
Stormwater Known Issues DRAFT Exhibit C
$100 - 6 7
0+05 5101
r� 5007 H.i .
a � 11 12
+ s,os
•
• s7ii+ �� t 16 17
i
•
-- -
STORMWOER
INAAS"It PLAN
Red ROCk ....:. N
■■u
e a- •
Ligand
ur•r■+u
�u■r•P Tigard City Boundary Stormwater Outfall -- Stormwater Swale O Water Quality Issue Point • Flooding Issue Point • Erosion Issue Point O Maintainability Issue Point
•Study Area M Stormwater Vault W111111 Stormwater Detention Pipe Water Quality Issue Area Flooding Issue Line Erosion Issue Line Maintainability Issue Line
Trails Stormwater CUWeA Stormwater Water Quality Pipe Flooding Issue Area Erosion Issue Area Maintainability Issue Area
✓�.^- Streams Stormwater Main -.�{:.'�Stormwator Water Quality Pond
Date.7212016 3 T 43 Psi
Source:City of Tigard memo on conditions 8/20/.Exhibit C
Report on Tigard Triangle Urban Renewal Area 1 I
4. Sanitary Sewer
The city maintains the sanitary sewer system in the Area.Although there are no projects
listed in the Five Year Capital Improvement Plan,there is acknowledgement that there are
sanitary sewer needs in the Area. These needs have been documented in a memo from the
City Engineer as follows:
"There are two areas in the Tigard Triangle that are not currently served by the public sewer
system. These areas contain single-family residential uses on private septic systems that pre-
date the area's current zoning. Redevelopment of these areas would likely trigger the
requirement to extend the nearby sewer mains and connect to the public sewer system. The
city's Sanitary Sewer Master Plan does not identify these as capital sewer projects because
they are generally considered the responsibility of the property owner(s). One of the
unsewered areas is around 691h Avenue north of Dartmouth, and the other area is around
Elmhurst Street east of 72nd Avenue.
In addition to these unsewered areas,there is an existing sewer main that runs the length of
Red Rock Creek corridor in the Tigard Triangle. This main has had two breaks in the recent
past that have been caused by erosive storm water flows that have undercut the ground
around the main. The city has completed emergency repairs but a permanent fix remains
unfunded."5
Figures 3 and 4 on the previous pages show where the sewer line in Red Rock Creek has
been compromised. Line 5201 identifies the general area of erosion, and Points 5106 and
5107 identify the location of the two breaks and subsequent repairs.
Figure 5 on the following page shows the areas that are currently not served by the public
sewer system.
5 Memo Re:Existing Conditions in Tigard Triangle:Sewer and Stormwater,August 8,2016
Report on Tigard Triangle Urban Renewal Area 12
Figure 5 —Sanitary Sewer Deficiencies
/ EXHIBIT A:Tigard
a wi ATLANTA ST Triangle Sewer
> y� Infrastructure
Yri irV� �+9 � ■ 1 � <
fBAYL-ORIS T
Lu ujO
t � � \S _-;
TON S,T CLINT
f _ �
w
ILUnsewered Areas l
DARTMOU�TH-S7
� a
_ W
,.. ip
IW < w
> r �>
111111 EL�MHURST ST ELMHURST Silk=—♦ — -- = Q
u J=
=H�MOS0,w
FRANKLIN'S17 Or L
r 1 `
Source:City of Tigard memo on conditions 820 16
S. Parks and Open Space
The Tigard Park System Mater Plan provides the following information:
The level of service standard for community and neighborhood parks is 3 acres and 1.5 acres
per 1000 persons respectively in Tigard. The existing level of service in Tigard for
community and neighborhood parks is 2.24 acres and .77 acres per 1000 persons
respectively.
Recommendations for park facilities in the Area are as follows:
• Address park and recreation needs for this area in the final Tigard Triangle Strategic
Plan;
• Develop an on and off-street trail loop in the area with benches and other trail
amenities; and
• Explore the potential for a small plaza with seating for employee breaks.b
6 Tigard Park System Master Plan,p.59
Report on Tigard Triangle Urban Renewal Area 13
The Tigard Triangle Strategic Plan augments the recommendations of the city's Park System
Master Plan as follows:
• Develop two neighborhood parks in the Area. Consider opportunities for
incorporating regional stormwater facilities within park locations
• Improve Red Rock Creek as both a natural and recreational amenity to make it a
defining feature for the Triangle.A paved multi-use trail could connect this feature to
the larger bicycle network.
• Locate parks and plazas in the central and southern parts of the Triangle to take
advantage of existing trees and vegetation.7
6. Other Utilities
There is no fiber optic infrastructure in the Area.
Tigard Triangle Strategic Plan,p.33-34
Report on Tigard Triangle Urban Renewal Area 14
C. Social Conditions
Data from the US Census Bureau is used to identify social conditions in the Area. The
geographies used by the Census Bureau to summarize data do not strictly conform to the Plan
Area. As such,the Census Bureau geographies that most closely align to the Plan Area are
used, which, in this case, is Block Group 1 of Census Tract 307. Within the Area,there are
14 tax lots shown as multifamily residential use. According to the US Census Bureau,
American Community Survey(ACS)2010-14, the block group has 579 residents, 91%of
whom are white.
Table 4—Race in the Area
White Alone 529 91%
Black or African American Alone 0 0%
American Indian and Alaska Native Alone 0 0%
Asian Alone 33 6%
Native Hawaiian and Other Pacific Islander Alone 6 1%
Some Other Race Alone 6 1%
Two or More races 5 1%
Folal ' 11' .
Source:US Census Bureau,Soci Explorer,American Community Survey 2010-2014.5-Year Estimates
a
Report on Tigard Triangle Urban Renewal Area 15
The largest percentage of residents in the block group is between 25-34 years of age(20%).
Table 5 —Age in the Area
Number
Under 5 Years 24 4%
5 to 9 Years 37 6%
10 to 14 Years 40 7%
15 to 17 Years 19 3%
18 to 24 Years 51 9%
25 to 34 Years 114 20%
35 to 44 Years 87 15%
45 to 54 Years 85 15%
55 to 64 Years 55 9%
65 to 74 Years 55 9%
75 to 84 Years - 0%
85 Years and over 12 2%
11'.
Source:US Census Bureau,Social Explorer,American Community Survey 2010-2014.5-Year Estimates
In the block group, 33%of adult residents have earned a bachelor's degree or higher.
Another 27%have some college education without a degree, and another 29%have
graduated from high school with no college experience.
Table 6—Educational Attainment in the Area
Educational Attainment Number Percent
Less Than High School 45 11%
High School Graduate(includes equivalency) 117 29%
Some college 112 27%
Bachelor's degree 119 29%
Master's degree 0 0%
Professional school degree 0 0%
Doctorate degree 15 4%
11'
Source:US Census Bureau,Social Explorer,American Community Survey 2010-2014,5-Year Estimates
Report on Tigard Triangle Urban Renewal Area 16
In the block group, 33%of commuters drove less than 10 minutes to work, and another 24%
of commuters drove 10 to 19 minutes to work.
Table 7—Travel Time to Work in the Area
Less than 10 minutes 111 36%
10 to 19 minutes 72 24%
20 to 29 minutes 55 18%
30 to 39 minutes 20 7%
40 to 59 minutes 15 5%
60 to 89 minutes 12 4%
90 or More minutes 5 2%
Worked at home 15 5%
Total1
Source:US Census Bureau,Social Explorer,American Community Survey 2010-2014,5-Year Estimates
Of the means of transportation used to travel to work, the majority, 64%, drove alone with
another 21%carpooling.
Table 8—Means of Transportation to Work in the Area
-
Means of
rtation to Work Number Percent
Drove Alone 194 64%
Carpooled 65 21%
Public transportation(Includes Taxicab) 11 4%
Motorcycle 0 0%
Bicycle 0 0%
Walked 20 7%
Other means 0 0%
Worked at home 15 5%
Source:US Census Bureau,Social Explorer,American Community Survey 2010-2014,5-Year Estimates
Report on Tigard Triangle Urban Renewal Area 17
D. Economic Conditions
1. Taxable Value of Property within the Area
The estimated total assessed value of the Area calculated with data from the Washington
County Department of Assessment and Taxation for FYE 2016, including all real,personal,
manufactured, and utility properties, is estimated to be$413,798,185.
2. Building to Land Value Ratio
An analysis of property values can be used to evaluate the economic condition of real estate
investments in a given area. The relationship of a property's improvement value(the value of
buildings and other improvements to the property)to its land value is generally an accurate
indicator of the condition of real estate investments. This relationship is referred to as the
"Improvement to Land Value Ratio," or"I:L." The values used are real market values. In
urban renewal areas,the I:L is often used to measure the intensity of development or the
extent to which an area has achieved its short- and long-term development objectives.
Table 9 below shows the improvement to land ratios for properties within the Tigard Triangle
Area. The majority of parcels in the area (53%of the acreage)have I:L ratios of less than 1.0.
In other words,the improvements on these properties are worth less than the land they sit on.
A reasonable I:L ratio for properties in the Area is 2.0. Only 41 parcels in the Area,totaling
16.68%of the acreage have I:L ratios of 2.0 or more in FYE 2016. In summary, the Area is
underdeveloped and not contributing significantly to the tax base in Tigard.
Table 9-I:L Ratio of Parcels in the Area
Im provement/Land Percent of
Ratio Parcels Acres Acres
Exempt 18 21.82 5.70%
Condos 14 2.94 0.77%
No Improvement Value 47 41.09 10.73%
0.01-0.50 113 107.60 28.09%
0.51-1.00 43 55.51 14.49%
1.01-1.50 32 56.88 14.85%
1.51-2.00 19 33.28 8.69%
2.01-2.50 ""',;:x 12 16.40 4.28%
2.51-3.00 13 30.41 7.94%
3.01-4.00 10 8.31 2.17%
>4.00 6 8.79 2.29%
Total 327 383.04 100.00%
Source:Calculated by Tiberius Solutions LLC with data from Washington County Department of Assessment and Taxation(FYE 2016)
Report on Tigard Triangle Urban Renewal Area 18
E. Impact on Municipal Services
The fiscal impact of tax increment financing on taxing districts that levy taxes within the
Area(affected taxing districts) is described in Section IX of this Report. This subsection
discusses the fiscal impacts resulting from potential increases in demand for municipal
services.
The projects being considered for future use of urban renewal funding are transportation;
public utilities; public spaces, facilities and installations; and re/development assistance and
partnership projects. The use of urban renewal funding for these projects allows the city to
match other funding sources to construct the improvements. It also allows the city to tap into
different funding source besides the City of Tigard general fund or system development
charges (SDC) funds.
It is anticipated that these improvements will catalyze development on the undeveloped and
underdeveloped parcels in the Area. This development would not occur were the
infrastructure not upgraded. This development will require city services. However, since the
property is within the city limits,the city has anticipated the need to provide services to the
Area. As the development will be new construction or redevelopment, it will be up to current
building code and will aid in any fire protection needs. An upgraded transportation system
will also assist in fire prevention to the Area.
The financial impacts from tax increment collections will be countered by providing future
jobs in the Tigard Triangle Area and, in the future,placing property back on the property tax
rolls with future increased tax bases for all taxing jurisdictions, including the city.
w
Report on Tigard Triangle Urban Renewal Area 19
III. REASONS FOR SELECTION OF EACH URBAN RENEWAL
AREA IN THE PLAN
The reason for selecting the Area is to provide the ability to fund improvements necessary to
cure blight within the Area.
IV. THE RELATIONSHIP BETWEEN URBAN RENEWAL
PROJECTS AND THE EXISTING CONDITIONS IN THE URBAN
RENEWAL AREA
The projects identified for the Area are described below, including how they relate to the
existing conditions in the Area.
A. Infrastructure Improvements
I. New Hwy 217 Overpass—Extend Beveland Rd south over Hwy 217 to
Hunziker/Wall with car, ped, and bike facilities.
Existing conditions: Currently Beveland Rd ends on the west side of 217 near Lowe's
Home Improvement, and there is no overpass or ped/bike facilities.
2. New Street(74th Ave)—Extend 74th Ave south from 99W to Hermoso or Beveland.
Existing conditions: Currently 74th Ave only exists between SW Spruce and SW
Torchwood Streets, north of 99W; 74th Ave south of 99W does not exist.
3. New Street (Atlanta St)—Extend Atlanta St west from 69th Ave to Dartmouth or
future 74th Ave.
Existing conditions: Currently Atlanta St has a westward boundary of SW 69th Ave.
4. New Hwy I-5 Overpass (Beveland)—Provide ped/bike bridge across Hwy I-5 from
Beveland Rd to Southwood Dr.
Existing conditions: Currently Beveland has an eastward boundary of 68th Pkwy.
5. New Hwy I-5 Overpass(Red Rock Creek)—Provide pedestrianibike bridge across
Hwy I-5 between the Triangle and PCC Sylvania around location of Red Rock Creek.
Existing conditions: Currently there is no bike/pedestrian overpass in this location.
6. Modified Intersection (Atlanta/68th)—Install traffic signal and turn lanes where
needed.
Existing conditions: Currently the Atlanta/68th intersection is a four way stop.
Report on Tigard Triangle Urban Renewal Area 20
7. Modified Intersection (99W/68th)—Add protected left turn and transit
improvements on 68th Pkwy at 99W.
Existing conditions: Currently the left turn on 68th Pkwy yields to oncoming traffic.
8. Modified Streets (Various)—Develop comfortable, interesting, and attractive
streetscapes, especially along designated pedestrian streets.
Existing conditions: For the most part,the streets in the Area have limited or no
pedestrian amenities and bike facilities.
9. New Trail(Red Rock Creek)— Build a trail alon Red Rock Creek parallel to and
south of 99W.
Existing conditions:No trail currently exists.
10. New Streets (Various)—Improve connectivity,circulation,and access with new or
extended local streets.
� s
Existing conditions: There is a lack of connectivity in the Area, with many parcels
lacking internal local streets. Internally,the street network in the Triangle is
somewhat of a grid, although some larger developments limit extending the street
grid without impacts to either buildings or parking areas. The Triangle is also
surrounded by highways, with primary access from OR 99W on the north side of the
Triangle. The primary arterial through the Triangle is SW 72nd Avenue, linking OR
99W and OR 217. There is no direct access between downtown Tigard and the
Triangle.$
11. Modified Street (72nd Ave)— Improve 72"d Ave corridor, including
intersections/interchanges. Design dependent upon 72nd Ave Corridor Study
recommendations.
Existing conditions: 72"d Ave is the primary arterial through the Area, linking OR
99W and OR 217. 72nd Ave does not have bicycle lanes or sidewalks on the full
length of the street. The street is congested And is not comfortable, interesting, or
attractive to pedestrians.
12. Modified Street(99W)—Implement access management strategies and median
projects in Hwy 99W Plan, including additional pedestrian crossing locations.
Existing conditions: Highway 99W is an arterial on the northern edge of the Area. It
is currently without bike lanes. The number of trips and speed of vehicles makes it
difficult to develop a pedestrian oriented environment.
8 Tigard Triangle Strategic Plan,p.6
Report on Tigard Triangle Urban Renewal Area 21
13. Modified Interchange(99W/Hwy 217)—Add second left turn lane on Hwy 217
northbound ramp to 99W.
Existing conditions: Currently there is one left turn lane at this location. An additional
turn lane would alleviate congestion at this interchange.
14. Modified Signals (Various)—Upgrade signals with adaptive signal coordination
technology.
Existing conditions: Currently the signals in the A;&e not been upgraded with
adaptive signal technology.
15. Parking Management Plan —Develop a plan and implement strategies for managing
parking.
Existing conditions: Currently there is no plan in place to manage or develop
appropriate parking options to help facilitate the Area's transitions into a dense,
pedestrian-oriented, and mixed-use district.
16. Transportation Study (Various)—Periodically evaluate the functioning of the
transportation system to refine project scope and inform project prioritization.
Existing conditions: Currently there is no study that provides this information.
17. Stormwater/Sewer— Develop a stormwater master plan for the Triangle and a
greenway plan for Red Rock Creek that includes stormwater, sewer, and recreational
needs.
Existing conditions: The city does not currently have a Stormwater Master Plan but
is in the process of developing one. Initial work on the plan has included an
identification of known issues, which are shown on Figures 4 and 5. Issues are
grouped into one of four categories, namely water quality, flooding,erosion,and
maintainability. As the two maps show, issues in the Tigard Triangle are centered
around Red Rock Creek, which serves as the main stormwater conveyance corridor
for the area.
18. Stormwater—Construct approximately three regional stormwater facilities to meet
new DEQ regulations for water quantity management.
Existing conditions: The stormwater facilities in the Area are described in the
physical conditions section of this Report and shown in Figures 4 and 5. They are
presently deficient.
19. Sewer—Extend public sewer system to areas served by private septic systems.
Report on Tigard Triangle Urban Renewal Area 22
Existing conditions: There are two areas in the Tigard Triangle that are not currently
served by the public sewer system. These areas contain single-family residential uses
on private septic systems that pre-date the area's current zoning. Redevelopment of
these areas would likely trigger the requirement to extend the nearby sewer mains and
connect to the public sewer system. The city's Sanitary Sewer Master Plan does not
identify these as capital sewer projects because they are generally considered the
responsibility of the property owner(s). See Figure 5 for a map showing the
unsewered areas. One area is around 69th Ave north of Dartmouth, and the other area
is around Elmhurst St. east of 72nd Ave. These are shown on Figure 6 of this Report.
20. Stormwater/Sewer—Permanently fix compromised sewer lines in Red Rock Creek
and restore creek channel and riparian buffer. .4
Existing conditions: There is an existing sewer main that runs the length of the Red
Rock Creek corridor in the Tigard Triangle. This main has had two breaks in the
recent past that have been caused by erosive stormwater flows that have undercut the
ground around the main. The city has completed emergency repairs but a permanent
fix remains unfunded. See Figures 3 and 4 for two maps showing the areas of
concern. Line 5201 identifies the general area of erosion, and Points 5106 and 5107
identify the location of the two breaks and subsequent repairs.
21. Water—Install new water mains as needed.
Existing conditions: The TVWD Capital Improvement Plan for the adopted 2015-17
budget lists no specific projects in the Tigard Triangle Area9,though general
improvements such as replacement of aging infrastructure upgrades and renewal are
anticipated through the entire TVWD service area.
22. Public Spaces,Facilities,and Installations—Create a clear identity for the Triangle
as a fun and diverse place to live and visit through the development of parks, plazas,
greenways,public restrooms,recreational facilities,public art,wayfinding, gateway
installations, and/or district signage.
Existing conditions: There is currently no funding to do these improvements.
23. Re/Development Assistance and Partnerships—Provides assistance to new and
existing businesses and housing developments through fagade improvement
grants/loans, streetscape improvements,technical/code/fee assistance, site assembly,
site cleanup/preparation, site acquisition, and/or partnerships that facilitate housing
and mixed-use developments.
Existing conditions: There is currently no funding to do these activities.
9 Tualatin Water District CIP Overview 2015-17 Budget,Section 17
Report on Tigard Triangle Urban Renewal Area 23
24. Finance Fees and Administration -This project will allow for the repayment of
costs associated with the implementation of the Tigard Triangle Urban Renewal Plan.
It also includes ongoing administration and any financing costs associated with
issuing long-and short-term debt, relocation costs and other administrative costs.
Existing Conditions: As there is currently no urban renewal program in this Area,
these activities do not exist.
V. THE ESTIMATED TOTAL COST OF EACH PROJECT AND THE
SOURCES OF MONEYS TO PAY SUCH COSTS
The total urban renewal fund expenditures for all proposed projects by category are shown in
Table 10a. Individual projects and cost estimates are shown in Table 10b. All cost estimates
shown are the most current figures available at the time of the preparation of the Plan.
The Plan assumes that the city will seek out other funding sources to pay for many of the
urban renewal projects listed and use urban renewal funds as leverage. These sources include
City of Tigard general funds and system development charges. The city may also pursue
regional, County, State, and federal funding and private developer contributions.
The Agency will be able to review and update fund expenditures and allocations on an
annual basis when the annual budget is prepared.
Table I Oa—Projects to be Completed Using Urban Renewal Funds by Category
(nominalProject Funding Categories Expenditures Percent
Transportation ($87,803,000) ($40,000,000) 42%
Public Utilities ($21,410,600) ($13,000,000) 14.25%
Public Spaces,Facilities,and Installations ($30,369,400) ($15,000,000) 16%
Re/Development Assistance and Partnerships ($39,211,300) ($22,000,000) 23%
Project Administration ($6,607,100) ($3,500,000) 3.7%
Finance Fees ($1,648,100) ($1,000,000) 1.05%
Total Expenditures 7 5 94 S 100%
Source:City of Tigard,Tiberius Solutions LLC forecasts
"'WW
Report on Tigard Triangle Urban Renewal Area 24
Table l Ob—Projects to be Completed Using Urban Renewal Funds
FundingTotal Proposed
Project I'miect IN pe Project Description Cost URA
in SM
I New Hwy 217 Overpass Extend Beveland Rd south over Hwy 217 to Hunker Rd/Wall St area 50 5
(Beveland) with car,ped,and bike facilities.
2 New Street(74th Ave) Extend 74th Ave south from 99W to Hermoso Way or Beveiand Rd. 5 5
3 New Street(Atlanta) E-de d Atlanta St west from 69th Ave to Dartmouth St or future 74th 4 3
Ave.
4 New Hwy I-5 Overpass(Beveland) Provide ped/b&e bridge across Hwy I-5 from Beveland Rd to 6 1
Southwood Dr.
5 New Hwy I-5 Overpass(Red Rock Creek) Provide ped/b&e bridge across Hwy 1-5 between the Triangle and 6 1
PCC Sylvania around location of Red Rock Creek.
6 Modified Intersection(Atlarta/68th) Install traffic signal and tum lanes where needed at Atlanta St/68th Ave 0.5 0.5
intersection
7 Modified Intersection(99W/68th) Add protected left turn and transit miprovements on 68th Pkwy at 4 1
99W.
8 Modified Streets Develop comfortable,interesting,and attractive streetscapes TBD 3.5
throughout the Area,especially along designated pedestrian streets.
9 New Trail(Red Rock Creek) Bmkl a new trail along Red Rock Creek parallel to and south of99W. 3 3
10 New Streets Improve connectivity,circulation,and access throughout the Area with 5 4
new or extended local streets.
TBD.Improve 72nd Ave corridor,including intersections/interchanges.
11 Modred Street(72nd Ave) Dependent on 72nd Ave Corridor Study recommendations. TBD 8
Implement access management strategies and median projects in Hwy
12 Modified Street(99W) TBD 0.6
99WPlan,includngadditionalpedestriancrossinglocations.
13 Modified Interchange(99 W/fiwy 217) Add second left turn lane on Hwy 217 northbound ramp to 99W. 3 0.6
14 Modified Signals Upgrade signals throughout the Area with adaptive signal coordination 1.2 0.3
technology.
15,mv Parking Management Plan Develop a plan and mgnlement strategies for managing parking. TBD 3
Periodically evaluate the finetionmg ofthe transportation system to
16 Transportation Study 0.5 0.5
refine project scope and inform project prioritization
Source:City of Tigard,Tiberius Solutions LLC forecasts
Report on Tigard Triangle Urban Renewal Area 25
Table l Ob—Projects to be Completed Using Urban Renewal Funds,page 2
Project Total Proposed
Number Pruiect Type Project Description Cost URA
Estimate Funding
Develop a stormwater master plan for the Triangle and a greenway
17 Storrmvater/Sewer plan for Red Rock Creek that addresses stormwater,sewer,and 0.3 0.3
recreational needs.
18 Stonrrnater Construct approximately three regional stormwater facilities to meet TBD 6
new DEQ regulations for water quantity management.
19 Sewer Extend public sewers stem to areas served by private septic sterns. 5 3
20 Stomtwater/Sewer Permanently fix compromised sewer lanes in Red Rock Creek and 3 3
restore creek channel and riparian buffer.
21 Water Install new water mains as needed. 4 0.7
Creates a clear identity for the Triangle as a fun and diverse place to
22 Public Spaces,Facilities,and Installations live and visit through the development of parks.plazas.greenways, TBD 15
public restroors,recreational facilities,public art,wayfunding,gateway
installatio and/or district signage.
Provides assistance to new and existing businesses and housing
developments through fagade improvement grants/bans,streetscape
23 Re/Development Assistance and Partnerships innprovemerts,technical/code/fee assistance,site assembly,site clean- TBD 22
up/preparation,site acquistion,and/or partnerships that facilitate
housing and mixed-use developments
Allows for repayment ofcosts associated with implementation ofthe
24 Finance Fees and Plan Administration Tigard Triangle Urban Renewal Plan.Includes ongoing administration 4.5 4.5
and any financing costs associated with issuing long-and short-term
debt,relocation costs,and other administrative costs.
Total TBD i E94.50
Source:City of Tigard,Tiberius Solutions LLC forecasts
Report on Tigard Triangle Urban Renewal Area 26
VI. THE ANTICIPATED COMPLETION DATE FOR EACH
PROJECT
The schedule for construction of projects will be based on the availability of funding. The
projects will be ongoing and will be completed as directed by the Agency. Rather than
identify the specific timing and dollar amount of individual projects,the forecast for the
allocation of funding over time is shown for four broad categories of projects: transportation;
public utilities;public spaces, facilities, and installations; and re/development assistance and
partnerships. Annual expenditures for project administration and finance fees are also shown.
The Area is anticipated to complete all projects and have sufficient tax increment finance
revenue to terminate the district in FYE 2053. The projections in the financial model assume
4.5%annual growth in the assessed value of real property in the urban renewal area, and no
change in the value of personal, utility, or manufactured property value.
Estimated annual expenditures by project category are shown in Table 11. All costs shown in
Table 11 are in year-of-expenditure dollars, which are adjusted by 3%annually to account
for inflation. The Agency may change the completion dates in their annual budgeting process
or as project decisions are made in administering the Plan. The first year of tax increment
collections is anticipated to be FYE 2019.
Report on Tigard Triangle Urban Renewal Area 27
Table 11 -Projects and Costs in Year of Expenditure Dollars
2018-19 2019-20 2020-21 2021-22 2022-23 2023-24 21)2 4-214; 2025-26
PRO.ILCI FI ND
Resources
Beginning Fund Balance $0 $189 $9.051 $12.808 $18,545 $22,168 $21,306 $26,804
Pay-as-you-go(Transfer from TEF Fund) $167,538,676 $382,689 $195,861 $409,412 $632.573 $420,430 $664,127 $918,791 $671,361
Bond/Loan Proceeds $73,525,000 $0 $4,875.000 $0 $0 $5,550,000 $0 $0 $6,400,000
Interest Earnings $264,968 $0 $1 $45 $64 $93 $111 $107 $134
Total Resources $241,328,644 $382,689 $5,071,051 $418,508 $645,445 $5,989,068 $686,4061 $940,204 $7,098,299
Expenditures(nominal$)
Project Administration -$6,607,100 -$109.300 -$112,600 -$1151900 -$119.400 -$123,000 -$126,700 -$130,500 -$134,400
Transportation -$87,803,000 -$2,251,000 -$1,229,900 -$652,400 -$3,359,800
Utilities -$21,410,600 -$337,700 -$3,689,700 -$1,343,900
Public Spaces,Facilities,and Installations -$30,369,400 -$1.125.500 -$1,343,900
Re/Development Assistance and Partnerships -$39,211,300 -$273,200 -$1.125.500 -$289.800 4507,500 -$799,400 -$538,400 4130,500 -$739,100
Finance Fees -$1.648,100 -$109,700 -$124,900 -$144,000
Total Expenditures -$187,049„500 -$382„500 -$5,062,000 -$405,700 -$626,900 -$5,966,900 -$665,100 -$913,400 -$7,065,100
Ending Fund Balance 1 $1891 S9,0511 $12,8081 $18,545 $22,1681 $21,3061 $26,804 $33,199
Source:Tiberius Solutions LLC
Report on Tigard Triangle Urban Renewal Area 28
Table 11 -Projects and Costs in Year of Expenditure Dollars, page 2
2026-27 2027-28 2028-29 2029-30 2030-31 203 1-32 2032-33 2033-34 2034-35
PROJECTt
Resources
Beginning Fund Balance $33,199 $13,925 $6,569 $7.219 $4,829 $22,866 $34,766 $6,583 $8,013
Pay-as-you-go(Transfer ftom TV Fund) $949,460 $1,240,074 $966,017 $1.283,374 $1.615.013 $1,303,586 $1,665,743 $2,044,197 $1,678,428
Bond/Loan Proceeds $0 $0 $7,200,000 $0 $0 $8,200,000 $0 $0 $9,200,000
Interest Earnings $166 $70 $33 $36 $24 $114 $174 $33 $40
Total Resources $982,825 $1,254,069 $8,172,619 51,290,629 $1,619,866 S9,526,566 $1,700,683 $2,050,813 $10,886,481
Expenditures(nominal$)
Project Administration -$138,400 -$142,600 -$146,900 -$151,300 -$155,800 -$160.5(x) -$165,300 -$170.200 4175,400
Transportation -$779,000 -$8,023,500
Utilities -$2,937,000 -$5,260,500
Public Spaces,Facilities,and Installations -$2.716,700 -$3,507,000
Re/Development Assistance and Partnerships -$830,500 -$1,104,900 41202,800 -$1,134.500 4662,200 -$1,123,300 -$1,528,800 -$1,872,600 -$1.709,700
Finance Fees -$162.000 -$184,500 -$207,000
Total Fx nditures -$968,900 41,247„500 48,165,400 -51,28.5,800 -51597,000 -$9,491,800 -$1,694,100 -$2,042,800 -$10,859,600
Ending Fund Balance 513,925 $6,5691 57,219 $4,829 $22,866 $34,7661 $6583 $8,0131 $26,881
Source:Tiberius Solutions LLC
Report on Tigard Triangle Urban Renewal Area 29
Table 11 —Projects and Costs in Year of Expenditure Dollars,page 3
2035-30 2036-37 I204243 2043-44
PROJECTFUND
Resources
Beginning Fund Balance $26,881 $41.724 $7,622 $5,952 $28,697 $41,240 $14,770 $5,568 $43,085
Pay-as-you-go Transfer from TIF Fund $2,091,709 $2,523,589 $2,116,792 $2,588.415 $2,442,000 $2,957,024 $3,495,224 $2.986,089 $3,573,817
Bond/Loan Proceeds $0 $0 $9,300.000 $0 $10,200.000 $0 $0 $12,600,000 $0
Interest Earnings $134 $209 $38 $30 $143 $206 $74 $28 $215
Total Resources $2,118,724 $2,565,522 $11,424,452 $2,594,397 $12,670,840 $2,998,470 $3,510,068 $15,591,685 $3,617,117
Expenditures(nominal$)
Project Administration -$180,600 4186,000 -$191,600 -$197.400 -$203,300 -$209,400 -$215,700 -$222,100 4228,800
Transportation 49,580,500 -$680,500 41,132,200 49,051,800 -$2,802,700
Utilities -$4,065,600 43,776,200
Public Spaces,Facilities,and Installations -$6,098,400
Re/Develo trent Assistance and Partnerships -$1,896,400 -$2,371,900 -$1.437.100 -$2.368.300 -$2,032,800 -$2,093,800 -$2,156,600 P -$2,221,300 4571000
Finance Fees 4209.300 -$229,500 4277,200
Total Fx nditures -$2,077,000 -$2,557,900 -$11,418,.500 -$2,565,700 -$12,629,600 -$2,983,700 -$3,504,500 -$15,548,600 -$3,603,500
Ending Fund Balance $41,7241 $7,622 S5,9521 S28,6971 $41,2401 $14,770 $5,5681 $43,0851 $13,617
Source:Tiberius Solutions LLC
Report on Tigard Triangle Urban Renewal Area 30
Table 11 — Projects and Costs in Year of Expenditure Dollars, page 4
204445 204546 2046-47
PROJECTFUND —LL
Resources
Beginning Fund Balance $13,617 $18,878 $22,531 $36.699 $56,713 $58,891 $39,254 $62,436 $60,831
Pay-as-you-go(Transfer fromTlF Fund) $4,187,993 $5,343,359 $6,014,055 $6,714,931 $8,025,094 $8,790,469 $9,590,286 $11,084,083 $11,957,502
Bond/Loan Proceeds $0 $0 $0 $0 $0 $0 $0 $0 $0
Interest Earnings $68 $94 $113 $183 $284 $294 $196 $312 $304
Total Resources $4,201,678 $5,362331 $6,036,699 $6,751,813 $8,082,091 $8,849,654 $9,629,736 $11,146,831 $12,018,637
Expenditures(nominal$)
Project Administration 4235,700 4242,700 -$250,000 -$257,500 -$265,200 -$273,200 -$281,400 -$289,800 4298,500
Transportation 44,490,300 -$5,793,800 -$7,990,800 -$8,723,100 -$10,216,500 -$11,045,200
Utilities
Public Spaces,Facilities,and Installations -$3,358,000 -$5,125,000 -$7,094,900
Re/Development Assistance and Partnerships 4589,100 -$606,800 -$625,000 -$643,800 -$663,100 4546,400 -$562,800 -$579,700 -$671,700
Finance Fees
Total Expenditures -$4,182,800 -$5,339,800 -$6,000,000 -$6,695,100 -$8,023,200 -$8,810,400 -$9,567,300 -$11,086,000 -$12,015,400
Endng Fund Balance 1 $18,8781 $22,5311 $36,6991 $56,713 $58,8911 $39,254 $62,436 $60,8311 $3,237
Source:Tiberius Solutions LLC
Report on Tigard Triangle Urban Renewal Area 31
VII. THE ESTIMATED AMOUNT OF TAX INCREMENT REVENUES
REQUIRED AND THE ANTICIPATED YEAR IN WHICH
INDEBTEDNESS WILL BE RETIRED
Table 12 shows the allocation of tax increment revenues to debt service and transfers to the
project fund.
It is anticipated that all debt will be retired by FYE 2053 (any outstanding bonds will be
defeased). The maximum indebtedness is $188,000,000(one hundred and eighty-eight
million dollars). Akk
The estimated total amount of tax increment revenues required to service the maximum
indebtedness of$188 million is $278,560,738 and is made up of tax increment revenues from
permanent rate levies.
The interest rate for the loans and bonds are estimated at 5%with varying terms. The
assumed financing plan maintains a debt service coverage ratio of at least 1.5 x total annual
debt service payments.
The time frame of urban renewal is not absolute; it may vary depending on the actual ability
to meet the maximum indebtedness. If the economy is slower, it may take longer; if the
economy is more robust than the projections, it may take a shorter time period. The Agency
may decide to issue bonds or take on loans on a different schedule, and that will alter the
financing assumptions. These assumptions show one scenario for financing and that this
scenario is financially�feasible.
bh gd
dg's
Report on Tigard Triangle Urban Renewal Area 32
Table 12—Tax Increment Revenues and Allocations to Debt Service
1(11:11 21118-19 2019-20 2020-21 2021-22 2022-23 2023-24 I2025-26
DEB TSER IICE FUND
Resources
Beginning Fund Balance $0 $0 $0 $0 $0 $0 $0 $0
TIF for LIRA $278,560,738 $382,689 $587,044 $800,595 $1,023,756 $1,256,959 $1,500,656 $1,755,320 $2,021,443
Total Resources $278,560,738 $382,689 $587,044 5800,595 $1,023,756 $1,256,9591 $1,500,656 $1,755,320 $2,021,443
Fxpenditures
Debt Service
New Loan 2020 -$7.823,660 -$391,183 -$391.183 -$391,183 4391.183 4391,183 4391,183 -$391,183
New Loan 2023 48,906,920 4445,346 4445,346 -$445,346 -$445,346
New Loan 2026 410,271,060 4513.553
New Loan 2029 -$11,554,940
New Loan 2032 -$13,159,780
New Loan 2035 -$14,463,826
New Loan 2038 413,729,760
New Loan 2040 -$14,426,216
New Loan 2043 -$16,685,900
Total Debt Service -$111,022,062 $0 -5391,183 -5391,183 -5391,183 -$836,529 -$836529 -$836„529 -$1,350,082
Coverage Ratio $0 $2 $2 $3 $2 $2 $2 $1
Transfer to Project Fund -$167,538.676 -$382,689 4195,861 4409,412 -$632,573 -$420,430 4664,127 4918,791 -$671,361
Total Expenditures -$278,560,738 -$382,689 -$587,044 -$800,595 -$1,023,756 -$1,256,959 -$1,500,656 -$1,755,320 -$2,0219443
Ending Fund Balance $0 SO $0 $01 $0 $0 $0 $0
Cumulative D/S Remaining -$111,022,062 -$110,630,879 -$110,239,696 -$109,848.5131 4109,011,984 $108,175,45514107,338.9261 -$105,988,844
TIF Sufficient to Pay Off D/S NO NO NO NO NO NO NO NO
Source:Tiberius Solutions LLC
Report on Tigard Triangle Urban Renewal Area 33
Table 12-Tax Increment Revenues and Allocations to Debt Service, page 2
2026-27 2027-2N 2028-29 2029-30 2030-31
DEB TSER VICE FUND
Resources
Beginning Fund Balance $0 $0 $0 $0 $0 $0 $0 $0 $0
TIF for URA $2,299,542 $2,590,156 $2,893,846 $3.211,203 $3,542.842 $3,889,404 $4,251,561 $4,630,015 $5,025,500
Total Resources $2,299,542 $2,590,156 $2,893,846 $3,211,2031 $3,542,842 $3,889,404 $4,251,561 $4,630,015 $5,025,500
Fxpenditures
Debt Service
New Loan 2020 -$391,183 4391,183 -$391,183 -$391,183 -$391,183 -$391,183 -$391,183 -$391,183 -$391,183
New Loan 2023 -$445,346 -$445,346 -$445,346 -$445.346 -$445,346 4445,346 -$445,346 -$445,346 -$445,346
New Loan 2026 4513,553 -$513,553 4513,553 -$513,553 -$513,553 -$513,553 -$513,553 -$513,553 -$513,553
New Loan 2029 -$577.747 -$577,747 -$577,747 -$577,747 -$577,747 -$577,747 -$577,747
New Loan 2032 -$657,989 4657,989 -$657,989 -$657,989
New Loan 2035 -$761,254
New Loan 2038
New Loan 2040
New Loan 2043
Total Debt Service -51,350,082 -51,350,082 -$1,927,829 -$1,927,829 -$1,927,829 -$2,585,818 -$2,585,818 -$2,585,818 -$3,347,072
Coverage Ratio $2 $2 S2 $2 $2 $2 $2 $2 $2
Transfer to Project Fund 4949.460 -$1,240.074 -5966,017 -$1,283,374 -$1,615,013 -$1,303,586 -$1,665,743 -$2,044,197 -$19678,428
Total Fac nditures -52,299,542 -$2,590,156 -52,893,846 -S3,211,203 -$3,542,842 -$3,889,404 -$4,251,561 -$4,630,015 -$5,025,500
Fnding Fund Balance SO $0 Sol $0 $0 $0 $0 $0 $0
Cumulative D/S Remaining -5104.638.762 -$103.288,680 -$101,360,851 -$99,433,022 -$97,505,1931 494,919,375 -$92,333,557 -$89,747,739 -$86,400,667
TIF Sufficient to Pay Off D/S NO NO NO NO NO NO NO NO NO
Source:Tiberius Solutions LLC
Report on Tigard Triangle Urban Renewal Area 34
Table 12-Tax Increment Revenues and Allocations to Debt Service,page 3
2035-36 2036-37 2037-38 2038-39 2039-40 2040-41 2041-42 204243 2043-44
DEBT SERVICE FUND
Resources
Beginning Fund Balance $0 $0 $0 $0 $0 $0 $0 $0 $0
TIF for URA $5,438,781 $5,870,661 $6,321,974 $6,793,597 $7.286,443 $7,801,467 $8,339,667 $8,902,086 $9,489,814
Total Resources $5,438,781 $5,870,661 $6,321,974 $6,793,597 $7,286,443 $7,801,467 $8,339,667 $8,902,086 $9,489,814
Expendtures
Debt Service
New Loan 2020 -$391,183 -$391,183 -$391,183 4391,183
New Loan 2023 -$445,346 -$445,346 -$445.346 -$445,346 4445,346 -$445,346 -$445,346
New Loan 2026 -$513,553 -$513,553 -$513,553 -$513,553 4513,553 -$513,553 -$513,553 -$513,553 -$513,553
New Loan 2029 -$577,747 -$577,747 -$577.747 -$577.747 -$577,747 -$577,747 4577,747 -$577,747 4577,747
New Loan 2032 -$657,989 4657,989 -$657,989 -$657.989 -$657,989 4657,989 4657,989 -$657,989 -$657,989
New Loan 2035 -$761,254 -$761,254 -$761,254 -$761,254 -$761,254 4761,254 -$761,254 -$761,254 -$761,254
New Loan 2038 -$858,110 4858.110 -$858.110 4858,110 -$858,110 4858,110 -$858,110
New Loan 2040 -$1,030,444 -$1,030,441 41,030,444 -$1,030,444 -$1,030,444
New Loan 2043 -$1,516,900 -$1,516,900
Total Debt Service -$3,347,072 -53,3.17,072 -$4,205,182 -$4,205,182 -$4,844,443 -$4,844,443 -$4,844,443 -$5,915,997 -$5,915,997
Coverage Ratio $2 $2 $2 $2 $2 $2 $2 $2 $2
Transfer to Project Fund -$2,091.709 -$2.523,589 -$2,116,792 -$2,588,415 -$2,442,000 -$2,957,024 -$3,495,224 -$2,986,089 -$3,573,817
Total Fx nditures -$5,438,781 -$5,870,661 46,321,974 -$6,793,597 -$7,286,443 -$7,801,467 -$8,339,667 -$8,902,086 -$9,489,814
Ending Fund Balance $0 $0 $0 $0 $0 $0 $0 $01 0
Cumulative D/S Remaining -$83.053,595 -$79,706,523 -$75,501,341 -$71,296,159 -$66,451,716 461,607,273 -$56,762,830 -$50,846,833 -$44,930,836
TIF Sufficient to Pay Off D/S NO NO NO NO NO NO NO NO NO
Source:Tiberius Solutions LLC
Report on Tigard Triangle Urban Renewal Area 35
Table 12—Tax Increment Revenues and Allocations to Debt Service, page 4
2044 4; 21)4;-4(, 2046-4- 2114-48 204849 2049-50 2050-51 2051-52 2052-53
DEB TVR VICE FUND
Resources
Beginning Fund Balance $0 $0 $0 $0 $0 $0 $0 $0 $0
TIF for URA $10,103,990 $10,745,803 $11,416,499 $12.117,375 $12,849,791 $13,615,166 $14,414,983 $15,250,791 $16,124,210
Total Resources $10,103,990 $10,745,803 $11,416,499 $12,117375 512,849,791 513,615,166 $14,414,983 $15,250,791 $16,124,210
Fxpendtures
Debt Service
New Loan 2020
New Loan 2023
New Loan 2026 -$513,553
New Loan 2029 -$577.747 -$577,7471 4577,747 -$577,747
New Loan 2032 -$657,989 -$657,989 -$657,989 -$657,989 -$657,989 -$657,989 4657,989
New Loan 2035 -$761,254 4761,254 4761,254 -$761,254 -$761,254 -$761,254 4761,254 4761,254 -$761,254
New Loan 2038 -$858,110 -$858,1101 4858,110 -$858,110 -$858,110 -$858,110 4858,110 4858,110 4858,110
New Loan 2040 -$1,030,444 41,030,444 -$1,030,444 -$1,030,444 -$1,030,444 -$1,030,444 -$1,030,444 -$1,030,444 -$1,030,444
New Loan 2043 -$1,516,900 -$1,516,900 -$1,516,900 -$1,516,900 -$1,516,900 41,516,900 -$1,516,900 -$1,516,900 -$1,516,900
Total Debt Service -$5,915997 -$5,402,444 -$5,402,444 -$5,402,444 -$4,824,697 44,824,697 -$4,824,697 -$4,166,708 -$4,166,708
Coverage Ratio $2 $2 $2 $2 $3 $3 $3 $4 $4
Transfer to Project Fund -$4,187,993 45.343.359 46,01055 -$6,714,931 -$8,025,094 -$8,790,469 -$9,590,286 -$11,084,083 -$11,957,502
Total Fac nditures -$10,103,990 -$10,745,803 -Sl 1,416,499 -$12,117,375 -$12,849,791 -$13,615,166 -$14,414,983 -$15,250,791 -$16,124,210
Ending Fund Balance SO 50 50 $0 $0 $0 $0 $0 $0
Cumulative D/S Remaining539,014,839 -$33,612,395 $28,209.951 -$22.807,507 -$17,982,810 -$13,158,1131 48,333,416 44,166,708 $0
TIF Sufficient to Pay OffD/S ANO NO NO NO NO NO NO NO YES
Source:Tiberius Solutions LLC
Report on Tigard Triangle Urban Renewal Area 36
VIII. FINANCIAL ANALYSIS OF THE PLAN
The estimated tax increment revenues through FYE 2053,as shown above, are based on
projections of the assessed value of development within the Area and the consolidated tax
rate that will apply in the Area. The assumptions include assumed growth in assessed value
of 4.5%for real property, derived from a combination of appreciation of existing property
values and new construction.No change in value for personal,utility, and manufactured
property is assumed.
Table 13 shows the projected incremental assessed value,tax rates and tax increment
revenues each year, adjusted for discounts, delinquencies, and compression losses. These
projections of increment are the basis for the projections in Tables 11 and 12. The first year
of tax increment collections is FYE 2019. Gross TIF is calculated by multiplying the tax rate
times the excess value. The tax rate is per thousand dollars of value, so the calculation is "tax
rate times excess value divided by one thousand." The consolidated tax rate includes
permanent tax rates only, and excludes general obligation bonds and local option levies
which would not be impacted by this Plan.
Report on Tigard Triangle Urban Renewal Area 37
Table 13 -Projected Incremental Assessed Value, Tax Rates, and Tax Increment Revenues
Tax Increment Finance Revenue
l-')I Assessed Value Fro7en Base Fxcess Value Tax Rate Gross TIF Adjustments Net TIF TIF
2019 $463,541,305 $429,654,966 $33,886,339 11.8877 402,831 20142 382,689 382,689
2020 $481,636,527 $429,654,966 $51,981,561 11.8877 617,941 30,89 587,044 969,733
2021 $500,546,034 $429,654,966 $70,891,068 11.8877 842,732 42,13 800,595 1,770,328
2022 $520,306,469 $429,654,966 $90,651,503 11.8877 1,077,638 53,882 1,023,756 2,794,084
2023 $540,956,123 $429,654,966 $111,301,157 11.8877 1,323,115 66,156 1,256,959 4,051,043
2024 $562,535,012 $429,654,966 $132,880,046 11.8877 1,579,638 78,982 1,500,656 5,551,699
2025 $585,084,951 $429,654,966 $155,429,985 11.8877 1,847,705 92,385 1,755,320 7,307,019
2026 $608,649,637 $429,654,966 $178,994,671 11.8877 2,127,835 Q06392 2,021,443 9,328,462
2027 $633,274,734 $429,654,966 $203,619,768 11.8877 2,420,571 121,029 2,299,542 11,628,004
2028 $659,007,960 $429,654,966 $229,352,994 11.8877 2,726,480 136,324 2,590,156 14,218,160
2029 $685,899,181 $429,654,966 $256,244,215 11.8877 3,046,154 (152,308 21893846 17,112,006
2030 $714,000,507 $429,654,966 $284,345,541 11.8877 3.380,214 (169,011) 3,211,203 20,323,209
2031 $743,366,393 $429,654,966 $313,711,427 11.8877 3,729.307 186,465 3,542,842 23,866,051
2032 $774,053,744 $429,654,966 $344,398,778 11.8877 4,094,109 204,705 3,889,404 27,755,455
2033 $806,122,026 $429,654,966 $376,467,060 11.8877 4,475,327 (223,766) 4,251,561 32,007,016
2034 $839,633,380 $429,654,966 $409,978,414 11.8877 4,873,700 (243,685) 4,630,015 36,637,031
2035 $874,652,745 $429,654,966 $444,997,779 11.8877 5,290,000 264,500 5,025,500 41,662,531
2036 $911,247,982 $429,654,966 $481,593,016 11.8877 5,725,033 286,252) 5,438,781 47,101,312
2037 $949,490,004 $429,654,966 $519,835,038 11.8877 6,179,643 308,982 5870,661 52,971,973
2038 $989,452,917 $429,654,966 $559,797,951 11.8877 6,654,710 (332,736)1 6,321,974 59,293,947
2039 $1,031,214,161 $429,654,966 $601,559.195 11.8877 7,151,155 357,558 6,793,597 66,087,544
2040 $1,074,854,661 $429,654,966 $645,199,695 11.8877 7,669,940 383,49 7,286,443 73,373,987
2041 $1,120,458,984 $429,654,966 $690,804.018 11.8877 8.212,071 410604 7,801,467 81,175,454
2042 $1,168,115,501 $429,654,966 $738,460,535 11.88771 8.778,597 438,930 8,339,667 89,515,121
2043 $1,217,916,562 $429,654,966 $788,261,596 11.8877 9.370,617 (468,531) ,902,086 98,417,207
2044 $1,269,958,670 $429,654,966 $840,303,704 11.8877 9,989,278 (499,464) 9,489,814 107,907,021
2045 $1,324,342,673 $429,654,966 $894,687,707 11.8877 10,635,779 531,789 10,103,990 118,011,011
2046 $1,381,173,956 $429.654,966 $951,518,990 11.8877 11,311,372 565,569 10,745,803 128,756,814
2047 $1,440,562,647 $429.654.966 $1,010,907,681 11.8877 12,017,367 600,868 11,416,499 140,173,313
2048 $1,502,623,829 $429.654966 $1,072,968,863 11.8877 12 755,132 (637,75 12,117,375 152,290,688
2049 $1,567,477,764 $429,654,966 $1,137,822,798 11.8877 13,526,096 676,305 12,849,791 165,140,479
2050 $1,635,250,126 $429,654,966 $1,205,595,160 11.8877 14,331,754 716,588 13,615,166 178,755,645
2051 $1,706,072,245 $429,654,966 $1,276.417.279 11.8877 15,173,666 758683 14,414,983 193,170,628
2052 $1,780,081,359 $429,654,966 $1,350,426,393 11.8877 16,053,464 802,673 15,250,791 208,421,419
2053 $1,857,420,883 $429,654.966 $1'427,765,917 11.8877 16,972,853 848643 16,124,210 224,545629
Source:Tiberius Solutions LLC
Notes:TIF is tax increment revenues.Tax rates are expressed in terms of dollars per$1,000 of assessed value.
Revenue sharing is part of the 2009 legislative changes to urban renewal and means that, at
thresholds defined in ORS 457.470,the impacted taxing jurisdictions will receive a share of
the incremental growth in the area. The share is a percentage basis dependent upon the tax
rates of the taxing jurisdictions. The first threshold is 10%of the original maximum
indebtedness. At the 10%threshold,the Agency will receive the full 10%of the initial
maximum indebtedness plus 25%of the increment above the 10%threshold and the taxing
jurisdictions will receive 75%of the increment above the 10%threshold. The second
threshold is set at 12.5%of the maximum indebtedness. If this threshold is met, revenue for
the district would be capped at 12.5%of the maximum indebtedness,with all additional tax
revenue being shared with affected taxing districts.
Report on Tigard Triangle Urban Renewal Area 38
This 12.5%threshold is not anticipated to be reached prior to the termination of this district.
Revenue sharing targets are not projected to be reached during the life of the Area. If
assessed value in the Area grows more quickly than projected,the revenue sharing triggers
could be reached.
IX. IMPACT OF THE TAX INCREMENT FINANCING
This section describes the impact of tax increment financing of the maximum indebtedness,
both until and after the indebtedness is repaid, upon all entities levying taxes upon property
in the Area.
The impact of tax increment financing on overlapping taxing districts consists primarily of
the property tax revenues foregone on permanent rate levies as applied to the growth in
assessed value in the Area. These projections are for impacts estimated through FYE 2053,
and are shown in Tables 14a and 14b.
The Tigard-Tualatin School District and the Northwest Regional Education Service District
are not directly affected by the tax increment financing, but the amounts of their taxes
divided for the urban renewal plan are shown in the following tables. Under current school
funding law, property tax revenues are combined with State School Fund revenues to achieve
per-student funding targets. Under this system, property taxes foregone,due to the use of tax
increment financing, are substantially replaced with State School Fund revenues, as
determined by a funding formula at the State level.
Tables 14a and 14b show the projected impacts to permanent rate levies of taxing districts as
a result of this Plan. Table 14a shows the general government levies, and Table 14b shows
the education levies.
General obligation bonds and local option levies are impacted by urban renewal only if they
were originally approved by voters in an election prior to October 6, 2001. There are no local
option levies or general obligation bonds approved prior to October 6, 2001 that will still be
in effect in the Area at the time that tax increment revenues begin to be collected.
Report on Tigard Triangle Urban Renewal Area 39
Table 14a-Projected Impact on Taxing District Permanent Rate Levies- General
Government
General GoNernineni
WashingtonCounty CityofTigard TN'FR Port of Portland Metro Aquatic District
Fly, Perm Perm Perm Perm Perm Perm Subtotal
2019 $72,381 $80,902 $49,099 $2,25 $486 $2,89 $208,022
2020 $111,032 ($124,103) ($75,318 $3462 $7 $4,444 $319,105
2021 $151,422 $169,248 $102,71 $4,721 $1,01 $6,061 $435,186
2022 $193,630 $216425 $131,349 $6,03 $1,300 $7751 156,492
2023 ($237,737) ($265,725) ($161,269) $7,412) $1,59 ($9,516)1 $683,256
2024 ($283,829) $317,244 $192,535 ($8.849) ($1,906 $11361 $815,724
2025 $331,995 $371081 $225,209 ($10,351) ($2,230 $13289 $954,155
2026 $382,329 $427,340 $259,353 ($11,920) ($2,568 $15,304 ($1,098,814
2027 $434,928 $486,131 ($295,033) ($13.560) ($2,921 $17,409 $1,249,982
2028 $489,893 $547,568 $332,319) ($15,274) ($3,290) $19,610 $1,407,954
2029 $547,332 $611,769 $371,282 ($17,065) ($3,676) ($21,909 $1,573,033
2030 $607,356 $678,859 $412,000 $18,936 $4,079) $24,312 $1,745,542
2031 ($670,081) ($748,969) $454,549 $20,892 ($4,500) ($26,822) ($1,925,813)
2032 $735,629 $822,233 $499,013) ($22,935) ($4,940 ($29,446) ($2,114,196
2033 $804,126 $898,794 ($545,478) ($25.071) $5400 $32,188 $2,311,05
2034 $875,706 $978,801 ($594,034) ($27,303) $5,881 $35,053 $2,516,778
2035 $950,506 $1,062,408 ($644,775) ($29,635) $6,383 $38,04 $2,731,754
2036 $1,028,673 $1,149,77 ($697,799) ($31072). $6,908 $41,176 $2,956,405
2037 $1,110,35 $1,241,078 $753.210 ($34.618) ($7.45 $44446 $3,191,166
2038 $1,195,717) $1.336,487 $811.114) $37.280) $8.030 $47,863 ($3,436,491)
2039 ($1,284,918) $1,436,189 $871,623) ($40,061) ($8,629) $51,433) ($3,692,853
2040 $1378,134 $1,540379 $934,856) $42,96 $ 255 $55165 $3960756
2041 $1,475,543) $1,649,257 ($1,000,934) ($46,004) $9910 $59064 $4,240,712
2042 $1,577,337) $1,763,034) $1,069,985) ($49,178 $10,593 $63,138 $4,533,265
2043 ($1,683,711) ($1,881.931 ($1,142.144) ($52,494) ($11308 $67,396 $4,838,984
2044 ($1,794,872) ($2,006,179) ($1,217-550) $55,960 $12,054 $71,846 $5,158,461
2045 ($1,911,035) ($2,136,018) ($1,296,349) ($59,582) ($12834 $76,496 $5,492,314
2046 $2,032,425) ($2.271,699) ($1,378,694) $63,366 $13,650 $81,355 $5,841,189
2047 ($2,159,279) $2.413.487 ($1,464,745) ($67,321) ($14,501) ($86,433) $6205766
2048 $2,291840 $2,561.654) ($1,554667) ($71,454 $15392 $91739 $6,586,746
2049 ($2,430,36 $2,716.489 ($1,648,63 $75,773 $16,322 $97,284 $6,984,872
2050 ($2,575,12 ($2,878,292) ($1,746,835) ($80,28 $17,294 $103,078 $7,400,913
2051 ($2,726,402) ($3,047,376) ($1,849,452 $85,003 $18,310 $109,134 ($7,835,677)
2052 $2,884,484) ($3,221069 $1,956,68 $89.932 $19,372 $115,461 $8,290,005
2053 $3,049,679 ($1408,713) ($2,068,74 $95,082 $20,481 $122,074 $8,764,776
Total ($42,469,812)1($4 7,469,708 $28,809,360 $1,324,114 $285,220 $1,700,000 $122,058,214
Source:Tiberius Solutions LLC
Report on Tigard Triangle Urban Renewal Area 40
Table 14b-Projected Impact on Taxing District Permanent Rate Levies -Education
Education
NW Regional TigardESD Tualatin SD
1") Perm Perm Perm Subtotal Total
2019 $9,104 ($4,951) ($160,612) ($174,667) ($382,689
2020 $13,965 $7,595 $246,379 $267,939 ($587,044
2021 $19,046 $10,358 ($336,005 $365,409 $800,595
2022 $24,354 ($13,245) ($429,665) ($467,264) ($1,023,756)
2023 ($29,902) ($16,262) ($527,539) ($573,703) ($1,256,959
2024 $35,700 ($19,415)_ ($629,817) ($684,932) ($1,500,656
2025 $41,758 ($22,710) ($736,698) ($801,166) ($1,755,321
2026 $48,089 $26,153 ($848,388) ($922,630) ($2,021,444
2027 $54,704 ($29,751)_ ($965,105) ($1,049,560) ($2,299,542
2028 $61,618 ($33,511) ($1,087,074 $1,182,203 ($2,590,157
2029 ($68,843) ($37,440) ($1,214,531) ($1,320,814) ''; ($2,893,847
2030 $76,392 $41,546 $1,347,724) ($1,465,662) ($3,211,204
2031 $84,282 ($45,836)_ ($1,486,911) ($1,617,029) ($3,542,842
2032 ($92,526) $50,320) ($1,632,361) ($1,775,207) ($3,889,403)
2033 $101,142 $55,006) $1,784,356 ($1,940,504 ($4,251,561
2034 ($110,145) ($59,902) ($1,943,191) ($2,113,238) ($4,630,016
2035 ($119,553) ($65,019)_ ($2,109,174) ($2,293,746) ($5,025,500
2036 ($129,385) ($70,366) ($2'282'625) ($2,482,376) ($5,438,781
2037 ($139,659) ($75,953) ($2,463,883) ($2,679,495) ($5,870,661
2038 ($150,395) ($81,792) ($2,653,296) ($2,885,483) ($6,321,974
2039 ($161,615) ($87,894) ($2,851,234) ($3,100,743) ($6,793,596
2040 ($173,339) ($94,270) ($3,058,079) ($3,325,688)_ ($7,286,444
2041 ($185,591) $100,933 $3,274,231 $3,560,755 $7,801,467
2042 ($198,395) ($107,896) ($3,500,111) ($3,806,402 ($8,339,667
2043 ($211,774) ($115,173) ($3,736,155) ($4,063,102) ($8,902,086
2044 ($225,756) ($122,777 ($3,982,821) ($4,331,354 $9,489,815
2045 ($240,367) ($130,723) ($4,240,587) ($4,611,677) ($10,103,991
2046 ($255,635) ($139,026) ($4,509,952) ($4,904,613 $10,745,802
2047 ($271,590) ($147,704)_ ($4,791,440) ($5,210,734 $11,416,500
2048 $288,264 ($156,771)_ ($5,085,593) ($5,530,628) ($12,117,374
2049 ($305,687) ($166,247) ($5,392,984) ($5,864,918) ($12,849,790
2050 $323,895 $176,150 $5,714,208 ($6,214,253) ($13,615,166
2051 ($342,922) ($186,497) ($6,049,886) ($6,579,305) ($14,414,982
2052 $362,806 ($197,311 $6,400,670 ($6,960,787) ($15,250,792
2053 $383,584 $208,611 $6,767,239 $7,359,434 $16,124,210
Total $5,341,782 $2,905,114 $94,240,524 $102,487,420 $224,545,634
Source:Tiberius Solutions LLC
Please refer to the explanation of the schools funding in the preceding section
Report on Tigard Triangle Urban Renewal Area 41
Table 15 shows the projected increased revenue to the taxing jurisdictions after tax increment
proceeds are projected to be terminated. These projections are for FYE 2054.
Table 15 —Additional Revenues Obtained after Termination of Tax Increment Financing
Tax Revenue in FYL2054(year after exoration)
From Frozen
Taxing District
General Government
Washington County 2.2484 $ 966,036.00 $ 3,391,904.00 $ 4,357,940.00
City of Tigard 2.5131 $ 1,079,766.00 $ 3,791,227.00 $ 4,870,993.00
TVFR 1.5252 $ 655,310.00 $ 2,300,895.00 $ 2,956,205.00
Port of Portland 0.0701 $ 30,119.00 $ 105,752.00 $ 135,871.00
Metro 0.0151 $ 6,488.00 $ 22,780.00 $ 29,268.00
Tigard/Tualatin Aquatic District 0.0900 $ 38.669.00 $ 135,773.00 $ 174,442.00
Subtotal 6.4619 $ 2.776.387.00 $ 9.748.330.00 $ 12,524,719.00
Education
PCC 0.2828 $ 121.506.00 $ 426,628.00 $ 548,134.00
NW Regional ESD 0.1538 $ 66.081.00 $ 232,020.00 $ 298,101.00
Tigard-Tualatin SD 4.9892 $ 2.143.635.00 $ 7,526,636.00 $ 9,670,271.00
Tigard-Tualatin SD 00 Bond 0.0000 $ - $ - $ -
Subtotal 5.4258 $ 2,331,222.00 $ 8,185,284.00 $ 10,516,506.00
Total 1 11.88771 $ 5,107,610.00 $ 17,933,615.00 $ 23,041,225.00
Source:Tiberius Solutions LLC
Report on Tigard Triangle Urban Renewal Area 42
X. COMPLIANCE WITH STATUTORY LIMITS ON ASSESSED
VALUE AND SIZE OF URBAN RENEWAL AREA
State law limits the percentage of both a municipality's total assessed value and the total land
area that can be contained in an urban renewal area at the time of its establishment to 15%for
municipalities over 50,000 in population. As noted below,the frozen base(assumed to be
FYE 2017 values), including all real,personal,personal,manufactured, and utility properties
in the Area, is projected to be$429,654,966. The total assessed value of the City of Tigard,
minus excess value of the city's existing urban renewal area is $5,875,954,608. Excess value
is the assessed value created above the frozen base in an urban renewal area. The total urban
renewal assessed value of the two urban renewal areas is 8.49%of the total assessed value of
the city, minus excess value,which is below the 15% statutory limitation.
The Area contains 547.9 acres, including public rights-of-way, and the City of Tigard
contains 8,129 acres.After accounting for the acreage in the city's other urban renewal area,
9.12 %of the city's acreage is in an urban renewal area,which is below the 15%statutory
limitation.
Table 16—Urban Renewal Area Conformance with Assessed Value and Acreage Limits
Assessed Value UR Excess Acreai,-e
City of Tigard $5,907,591,736 8,129
City of Tigard minus Urban
Renewal (UR)excess $5,875,954.608 _
Existing Tigard City Center
UR Area $69.207,378 $31,637,128 193.71
Proposed Tigard Triangle
UR Area _ $429.654,966 547.90
City Center and Tigard
Triangle UR Areas $498,862,344 741.61
Percentage in UR Areas 8.49% 9.12%
Source:Compiled by Elaine Howard Consulting,LLC with data from City of Tigard and Washington County Department of Assessment
and Taxation(FYE 2016)
XI. RELOCATION REPORT
There is no relocation report required for the Plan. No specific acquisitions that would result
in relocation benefits have been identified, however,there are plans to acquire land for
infrastructure which may trigger relocation benefits in the future in the Area.
Report on Tigard Triangle Urban Renewal Area 43
AIS-2840 4.
CCDA Agenda
Meeting Date: 10/04/2016
Length (in minutes): 15 Minutes
Agenda Title: Public Review of City Center Urban Rcncwal Plan Substantial
Amendment
Submitted By: Sean Farrelly, Community
Development
Item Type: Update, Discussion, Direct Staff Meeting Type: City Center
Development
Agency
Public Hearing: No Publication Date:
Information
ISSUE
Should CCDA forward the draft substantial amendment of the City Center Urban Rcncwal
Plan and accompanying report for public review?
STAFF RECOMMENDATION / ACTION REQUEST
Staff recommends that the CCDA initiate the public review process for the draft Substantial
Amendment of the City Center Urban Renewal Plan and accompanying report.
KEY FACTS AND INFORMATION SUMMARY
The City Center Urban Renewal district does not have the financial capacity originally
estimated when approved by voters in 2006. The urban renewal financial analysis, done prior
to the Great Recession of 2008, projected that $22 million in tax increment would be
generated by 2026. The recession greatly reduced growth in property values and development.
Current estimates are that the current district will generate about$6 million less tax increment
than originally projected. Without new resources, there will be insufficient funds for several
City Center Urban Renewal Plan projects
At the direction of the City Center Development Agency Board, staff worked with
consultants to prepare a draft Substantial Amendment to the City Center Urban Renewal
Plan. The proposed expanded district would allow for the collection of tax increment revenue
closer to the amount envisioned for the urban renewal area time period. State law ORS
457.220(3) limits increases to the size of an urban renewal district to 20% of a district's
original size. The City Center Urban Renewal District is 191.22 acres. It can be increased
38.24 acres in size. The City Center Advisory Commission has been briefed on the substantial
amendment.
I tie purpose of urban renewal is to improve specific areas or the city that are poorly
developed or underdeveloped and meet the ORS 457 definition for blight. Downtown Tigard
meets the definition due to its many underdeveloped lots and lack of a mix of high quality
commercial, office, residential and public uses in the area.
Pursuant to ORS 457, the city's Urban Renewal Agency (the CCDA) shall initiate the public
review process for all proposed urban renewal plans and substantial plan amendments.
Initiation of the public review processes for the attached draft plan amendment and
accompanying report require the following actions to be taken:
•Staff will forward a copy of the draft plan amendment and report to all overlapping
taxing districts and formally solicit their comments on October 5.
•Staff will brief the Washington County Board of Commissioners on the draft plan
amendment and report on October 18.
•Planning Commission will hold a hearing on November 14 for their review of the draft
plan amendment's conformance to the Tigard Comprehensive Plan.
•City Council will hold a hearing on December 13 for the purpose of considering
adoption of the draft plan and report. Staff will send out a notice advertising this hearing
to all Tigard registered voters pursuant to ORS 457.
•City Council will forward the adopted plan and report to the voters for their
consideration at the May 2017 election.
The draft report may change between now and the City Council hearing in December.
Changes will be minor and limited to the financial analysis.
OTHER ALTERNATIVES
Council may suggest revisions to the plan amendment or could chose not to initiate the
public review process. The latter may prevent a public vote on the plan in May 2017.
COUNCIL GOALS, POLICIES, APPROVED MASTER PLANS
Tigard City Council 2015-17 Goals and Milestones
Goal #2. Make Downtown Tigard a Place Where People Want to Be
City Center Urban Renewal Plan
Tigard Comprehensive Plan
Special Planning Areas- Downtown
Goal 15.2 Facilitate the development of an urban village.
City Strateg!c Plan Goal 1: Facilitate walking connections to develop an identity.
City Strategic Plan Goal 2: Ensure development advances the vision.
DATES OF PREVIOUS COUNCIL CONSIDERATION
beptemoer zu, Zuio: Liscuss Aaopuon rrocess for oubstannai hmenament to Lowntown
City Center Urban Renewal Plan
May 3, 2016 : Discuss Potential Substantial Amendment to City Center Urban Renewal Plan.
Attachments
City Center Urban Renewal Plan Amended Language
Report Accompanying the Tigard City Center Urban Renewal Plan Substantial Amendment
Proposed new text is shown in double-underline.
Deleted text is shown in laugh.
CITY CENTER URBAN RENEWAL PLAN
I. Introduction
The Plan has a duration of 20 years(see Chapter XI),meaning that no new debt will be
incurred after Fiscal Year 2025/2026.The maximum amount of indebtedness(amount of tax
increment financing for projects and programs)that may be issued for the Plan is Twenty-
Two Million Dollars and No Cents($22,000,000).
The first substantial amendment was developed in 2016 and went to voters in the May 2017
election. It amended the boundary and updated the plan as needed.
II. Goals and Objectives
No changes to this section
III. Outline of projects
No changes to this section
IV. Map and Legal Description of Urban Renewal Area
Map and Legal Description are replaced in their entirety.
V. Urban Renewal Projects
No changes to this section
VI. Relationship to Local Objectives
B. Tigard Comprehensive Plan Goals and Policies
(Comprehensive Plan has been updated since original City Center Urban Renewal Plan
adoption)
Pelie),3.4.-2
The City Shall-
a.
D ♦ t fish and wildlife habitat along steam., nide«..by Hianaging the
h biter and .,4811ing er-esion, and byr-equir-ing th.,t aFeas of stands ,,.
tfees ,7 et, a4 et; el,. e „ e .7« and .,te be
vast �a� tl o _
peliey 3.6.4
The Cit., shell eneeur-agepr-ivere sate and ..te e.,tel agr-eeme..t..
40"W01;NVill PFOVide for-open > lands, e
and pr-esef-,,e
t 1' seenie d h' e
t intent with the availability of
r,esetiFees.
'-v=icT
nerve., G
�4
The-City has designated the 100 Yea Fleedplain of Fanne G ek is 4r-ibwar-icr,
and the Tuala4in River-as e
whieh will be the h--Rekbene efthe open
to the 100 Ve Fleedplain,the CitT��shall theeensiader-atien of dediemieff
of su f:eient open 1^..a area for-g adjoining,,.,ayOishin the fleedplain.
Del;e., 2 G A
�
J�T
TheCity shell p ,;ae ., „t„r,.,..,.,e,.te a „eaest.-;.,. 1 l.'I, „tl, tl,.•,,.,,,l,eat t4,
CitYi
peliey 3.7.4
The City shall idenfif�, and promote the pr-esei-�,a4ien and PFOteetien of hister-ieauy
a a'.,t,.:ets within T a
� lt>:►rall�Sigi3i�Eaiit Str�tEttii'e, Site-al3jeets uixcraiocxxcco e�ianxrrr�urtx.
NATURAL RESOURCES AND HISTORIC AREAS.
Goal 5.1:Protect natural resources and the environmental and eeolagieal fin tions th v
provide. and to the extent feasible,restore natural resources to create naturally fan tioning
,U&ms and high levels ofbiodiversity,
Policy 7: The City shall protect and restore rivarian and upland habitats to the maximum
extent feasible on Public and private lands
Goal 5.2: Promote the preservation and prate tion of histori cull,and cultura&signif ant
resources.
The Plan identifies Parks,Public Spaces and Bicycle/Pedestrian Facilities projects,including
but not limited to the Fanno Park Improvements,Urban Creek/Green Corridor and Urban
Green Spaces projects,which will further the Comprehensive Plan's Natural Areas policy
objectives. In addition to preserving and upgrading existing parks and natural areas such as
Fanno Creek Park,the Plan will facilitate the creation of"green"amenities and
pedestrian/bicycle facilities that will provide new active and passive recreational
opportunities for residents,downtown workers and visitors and improve connectivity between
downtown and adjacent neighborhoods.
peliey 5.1
The Git.,shall promote vetiyities aimed et the diye%ifit' f th
appeAunities available to Tigan-d residents with paoieaulaf emphasis pl..eea on the
grwmh of the le el eh.,, ..Let
peliey 5.3
The City shallimpr-eveand e„hanee the pei4iens efthe,ee.#-M bussi,ess dist t as
the feeel peipA f e ..1 high den-i#"« side«t' 1 business,eivie an
a
ECONOMIC DEVELOPMENT
Goal 91•Develop and maintain a strong dirersilied and sustainable local ec•onomv.
Policy 1: The City shall establish strategies to retain and encourage the growth of existing
businesses.
Policy 5 The City shall promote well-designed and efficient development and redevelovnwut
of vacant and underutilized industrial and commercial lands.
One of the Plan's stated goals is to"Promote high quality development of retail,office
and residential uses that support and are supported by public streetscape,transportation,
recreation and open space investments."The Plan identifies intersection improvements,
such as the Hall Blvd/99 W Intersection Improvements project,road widening and
realignment projects and other street projects that will improve circulation and access in
and around downtown. In addition,the Plan authorizes streetscape projects and
pedestrian/bicycle improvements that will make downtown safer and more accessible to
pedestrians and bicyclists by filling in gaps in the existing sidewalk system,providing
new or upgraded bike lanes,and establishing new multiuse trails and pedestrian
crossings. Finally,the Plan includes parks, public spaces and public facilities projects
that will make downtown a more appealing place to do business and facilitate the
transition of existing industrial and auto-oriented uses to locations outside of the Central
Business District.
Pelir.),6.1.4
r-esidepAiai types atyar-i us pr-iraes and Font levels.
HOUSING
Goal 10.1:Provide opportunities for a variety of/rousing"es to meet the diverse housing
needs of current and future City residents.
Policy 1• The City shall adopt and maintain land use policies, coda and standards that
provide opportunities to develop a variety ofhousing types that meet the needs, preferences.
and financial capabilities_ofTigard's present and future residents.
Policy 5• The City shall provide for high and medium density housing in areas such as town
centers Downtown) gional centers (Washington Sauare), and along transit corridors
ere employment opportunities commercial services transit and other public services
necessary to support higher population densities are either present or vlanned for in the
In addition to financing the programs described in Section IV,the Plan includes public
improvements projects that will make the Area a more attractive and viable location for
new,high quality medium-and high-density residential development in downtown
Tigard.
Peliey 8.1.4
thea IA,-Abilify ef:Figar-d b5-
pedestrian r-eates.
Poliesy 8.14
fnedes)b5-
a. The development of and implementation efpublie stfeet stEffidafds th
- . the multi purpose nature of the stfeet right ofway feF utifi4y-,
;
b. CoEwdination with T-A met,andiEW an), other-tfansit pfe-videfs sefwing ,
e. !`enst......tion efbieyele A- -Al e.we.•-RIS .,...i 0-ARAIe..t.,r- ...:tl.:.f T-igaFd
eensisteetwith the -Plaefl.All >pafks,
,
e. Development of bieyele and pedestr-im plans whie-A link to r-ee-weatiefial ;
r.onneetionsi
and
L. Design SeC e..,7 seew-we pedest.•:.,n and bikeways betwee., p.fks e d ethe..
peliey 8.24
The Goy shell «le« for-e of and eff:e a«t street and.eed«,e.,system thet fneets
Pokey 8.3.4-
The Cit., ..1,.,11 ,. e..d:«ete
with T.: met to p ,:de f«e publ:e t..e«e:t system
a. Meets the needs of-beth the e e«t e«d « °rated f_the_T-igafd_eemffi..«:t..•
� e
h Add.• the dtransit d .le«t« .leti
. e e te e eneeds of a e « «;
d. Reduees energy reens
I:eliray 8.3.2
The!`:t., shell a theexpansien «d use of pubiie transit h.
e. C e..t:« effefts by T« et and ethe gr-oupsto pFev:de f..the needs of the
tr-anspeftmiea disadvantaged.
Pokey 8.5.4
Th Git.. hell 1 to Ne.,eWpede t.•:e« ide.•s i x,l iE?h pr-e.��:dee�=
7-t•1�i-C'1TTe.7i'[i[n�vcsee�7vTe7v7'(.'7Ge7a�ammrGvr7�"�ICTvrS'in-'a x i�ieixi�c i'v i� �e��-Px y r ra
7
f
by developing the pa4hweey system shewn en the adepted
Pedes4r4afVBikeway Plan,
TRANSPORTATION
Goal 12.3: Provide an accessible,multi-modal transportation stem that meets the
mobift needs ofthe community.
Policy 4: The City shall support and prioritize bicycle. pedestrian. and transit improvements
for transportation disadvantaged populations who may be dependent on travel modes other
than private automobile.
Policy 6: The City shall require development adiacent to transit routes to provide direct
pedestrian accessibility.
Policy 8: The City shall design all Moiects on Tigard city streets to encourage pedestrian and
bicycle travel.
Goal 12.4:Maintain and improve transportation sv.
Policy 2: The City shall coordinate with appropriate agencies to provide safe, secure.
connected and desirable pedestrian. bicycle and public transit facilities.
In conjunction with proposed street improvements,the Plan provides for new bike lanes
and sidewalks as well as upgrades to inadequate bicycle and pedestrian facilities. These
projects will increase multimodal access and circulation throughout the Area. Further,to
improve neighborhood livability and create a visually appealing streetscape environment
that draws residents and visitors to downtown and promotes more active commercial,
recreation and entertainment uses, landscape improvements, street trees,street furniture
and other streetscape improvements are identified as key components of the Plan.
Pelie), 11.44
The«e.deyelopmew e f downt,,wn T:...,«.d ..1...11 be a plishe,d ina«,de«to m1aake :t
of the shopping publie should be pr-ifnai-y eensider-ati
Pelie., 11.64
Require that all development peFmioed in Aefien AFeas be designed to f6eilit
pedestrian m nt, ,:thin the a „te«aR d to t«e„s:t
SPECIAL PLANNING AREAS-DOWNTOWN
Goal 15.1: The City will promote the creation of a vibrant and active urban villas at tIz
heart ofthe community that is pedestrian oriented,accessible by many mod c of
resources as an asset, and features a combination of
uses that enable people to live, work,ttlay,and shay in an environment that is ttniat� ly
Goal 15.2:Facilitate the development ofan urban village.
PoliCy 5:Downtown design development and provision shall emphasize public safety
ility, and attractiveness as primary obiective
Goal 15.4:Develop comprehensive slaet and circulation improv m nts for ped striunc.
automobiles, bicycles, and transit.
Policy 1: The downtown shall be served by a complete array ofmulti-modal transportation
services including auto, transit, bike, and pedestrian facilities.
Policy 5:Streetscape and public area design shall focus on creating a pede trian friendly
environment without the visual dominance by automobile-oriented u e
Proposed pedestrian and bicycle improvements, such as the Commuter Rail Access and
Tigard Street/Grant Pedestrian/Bicycle Crossing projects,will provide safe and convenient
pedestrian access to local shops and transit. In addition, streetscape improvements along
Main Street,Burnham Street,Commercial Street and other Area roadways will make
downtown a more accommodating,pedestrian-oriented commercial district than it is today.
Lastly,public facilities projects such as the Performing Arts Center and Public Market will
generate support for new and existing businesses that provide entertainment and recreational
options for downtown visitors.
Goal 1! Livability
Plan d a t« t tFan Ftat:en f •I•t > I
� »....��xa oeixsa uec nmxsPvrccscrorr-racnTrxc�-nrcrrrrarirrcai-rrcrr
enhanoes the livability of T-igefd.
Peliey-2 €aRearage-pedestrian aeeessibility by pr-evidifig safe,seetife
and desirable pedestrian Feates.
i-_eal 7. nalaneea Trannnertat:en System
8tbef FAedes)
pedestrian,the multi pur-pose natur-e ofthe street Fight ef way fer-utility,
bie„elef♦Fans:♦1 l.tF„eand a,.te.
1�eliE)3 Ric,,yele lanes must be eenstnieted en all aiEerials and rollevirno
within T.bar-d ......ntentwith the-nicreTeMmst crDI / ith art ravt
vn
e
PeNey 4 Sidewalks must be ”t 4vteaoi-all streetsr4hirrTr'gcxa(with
publie
e peAs,
f:,eil:t' a retail aFeaS Shall L. .l' t t a sidewalk.
lene+4, by n ,iding„ eet:.,:t„ and limiting out of .l' t'efi t 1
Peliesy 8 Tigar-d will suppef4 the development of a eommuter-Fail system
as art of ther-egiefial transit netwer-L
Geal 3- Safety
standards,aeeess management e.en n .7
nspeed an ret«el h
en
ran+ ehe ia of a fig, ea, t' ,l f t
Pelie.y 3 Safe and seeur-e pedestf:iaR and bikeways shall be designed
between narLs and other aet:..:t., e ntefs :n T-iga F,l
!_e a� eeessibilit J
Develop t«ansneFtat:en F e:l:t:es whieh a oeeessibi t ll members f
t., a t fa t t l
r..?sr-r,,�,,, 'ixic7-uixv-iniimiriz'.c�crex-cTxrcvcxvn-cmrcr.
Polie), 1 Design and-eel3stfuet Ifanspef4atiea faeili'cies to meet the
Ms of the AfneF:eans with Disabilities A t
.vow.. v.aw va ....v,>.,aava,v •
adequate eir-esulation in and out of the neighber-heeds,
Goal 6- Goods MevomeW
DFeyide C F efferent movement of goods and
Pelioy 1 Design aiteCial rAHics,highway areess aneent jand uws
C. Transportation System Plan Goals and Policies
TRANSPORTATION SYSTEM PLAN
Goal 2• Trancnortation Fffci nCv—Develan and maintain a transportation cr.ctem for the
efficient movement of people and goods.
Policy 4 The city shall design arterial routes, highway access and ad
iacent land uses in
ways that facilitate the efficient movement of people. goods. and services.
Goal 3:Multi-modal Transportation System—Provide an accessible, multi-_modal
at meets the mobility needs ofthe contnu!nity.
Policy S• The city shall require development adjacent to transit routes to provide direct
pedestrian accessibility.
Policy 7• The city shall design all proiects on Tigard city streets to encourage pedestrian and
bicycle travel.
Goal 4. Safe Transportation Srctem—Maintain and improre transportation system safety.
Policy 2• The city shall coordinate with appropriate agencies to provide safe. secure.
connected and desirable pedestrian, bicycle. and public transit facilities.
The Plan includes streetscape improvements and bicycle/pedestrian system improvements
designed to encourage alternative modes of transportation to the automobile. By filling gaps
in the existing sidewalk system, installing new bike lanes and upgrading existing bikeways to
standard,the Plan will help create a complete system of bicycle and pedestrian facilities that
enables pedestrians and bicyclists to commute safely and efficiently to and within downtown.
The Plan includes street improvements that will address motor vehicle needs in and around
downtown Tigard. Projects such as the Scoffins Street/Hall Boulevard/Hunziker Realignment
and Highway 99W intersection improvements will reduce congestion and improve circulation
while creating a safer environment for drivers,pedestrians and bicyclists.
"TL.,..,ugh building a eetions,the City of Tigard will p .:.de a par-Ii system..the
i
-B lanees the: ..et.. a fgFewth afid g de.,sity with......L.. .."d
C'eenspaees;
e at
eni4y destinations, ad n neighbor-hoods with trails a«.1 e esu..
gr-eenwaysT.
Fosters stewardship of natural Feseur-ees sueh as fleedplains and e
the City;
. D«eyi des safe and well maintained paFks and r if.-._:.lifies ,td
e eaten �. a
- Provides f-.q-r-effreetive Rand eeenemiealb,sound management 4 publies Feseur-Ges.
inefease
,
renters,
eemmer-eial areas."
D. City of Tigard Park System Master Plan
PARKS,RECREATION TRAILS AND OPEN SPACE
Goal 8.2: Create a Citywide network of interconnected on-and off-road pedestrian and
cycle trails.
Policy 1: The City shall create and interconnected regional and local system ofon-and off-
road trails and baths that link together neighborhoods.Parks, open spaces, maior urban
activity centers and regional recreational opportunities utilizing both public property and
easements on private property.
The Plan includes multiple projects that support the City's park system vision and
recommendations. In particular,the Fanno Creek Park Improvements and Enhanced
Pedestrian Bridge,Urban Creek/Green Corridor and Urban Green Spaces projects will
upgrade and increase multimodal access to existing parks and open space areas and create
new green space and recreational areas that will draw residents,shoppers and visitors to
downtown Tigard.
VII. Proposed Land Uses
No changes to this section
VIII. Property Acquisition and Disposition
No changes to this section
IX. Relocation Methods
No changes to this section
X. Tax Increment Financing of Plan
No changes to this section
XI. Duration of Plan
No changes to this section
XII. Future Amendments to Plan
Report Accompanying the Tigard
City Center Urban Renewal Plan
Substantial Amendment
Adopted by the City of Tigard
DATE
Ordinance No.
Approved by Voters
DATE
Consultant Team
Elaine Howard Consulting,LLC
Elaine Howard
Scott Vanden Bos
Tiberius Solutions LLC
Nick Popenuk
Rob Wyman
ECONorthwest
Ali Danko
Kate Macfarlane
Faik'`"rh.`c`Lk
Jr$:•:i�:y:.:
v'l 4:Y
{:
4:•:
dr f
rr .:4Y:Yn
r{! • {FFA
$.
%AW
wom,.
TABLE OF CONTENTS
I. INTRODUCTION.............................................................................................................. 1
11. EXISTING PHYSICAL, SOCIAL,AND ECONOMIC CONDITIONS AND IMPACTS
ON MUNICIPAL SERVICES..................................................................................................4
III. REASONS FOR SELECTION OF EACH URBAN RENEWAL AREA IN THE PLAN
15
IV. THE RELATIONSHIP BETWEEN URBAN L PROJECTS AND THE
EXISTING CONDITIONS IN THE URBAN RENT ....................................... 15
V. THE ESTIMATED TOTAL COST OF EACI-�OROJECT JHESOURCESOF
MONEYS TO PAY SUCH COSTS............. ............................... ............................ 16
VI. THE ANTICIPATED COMPLETION DATE,FOR EACH PROJE .................... 17
VII. THE ESTIMATED AMO TAX IN< IVI£NT REVENUES UIRED
AND THE ANTICIPATED YEAIC. H INDEBTEDNESS WILL BE RETIRED..20
VIII. FINANCIAL ANALYSIS OF PL ...........................................................25
IX. IMPACT OF RE FINtT1` 2
X. COMPLIANC H ST TORY LIMITS ON ASSESSED VALUE AND SIZE
OF URBAN RENEW ,. .............................................................29
.:>. ;::.: %N�.- :REPORT—
X1. . . ............................................................. 29
' ••mak
Report on Tigard City Center Urban Renewal Area Amendment
I. INTRODUCTION
The Report on the Tigard City Center Urban Renewal Plan Amendment(Report)contains
background information and project details that pertain to the Tigard City Center Urban
Renewal Plan (Plan)Amendment(Amendment). The Report is not a legal part of the Plan,
but is intended to provide public information and support the findings made by the City
Council as part of the approval of the Plan.
The Report provides the analysis required to meet the standards of ORS 457.085(3),
including financial feasibility. The format of the Report is based.on this statute. The Report
documents not only the proposed projects in the Plan, but also documents the existing
conditions in the Tigard City Center Urban Renewal Area (Area).
The Report provides only guidance on how the Plan inight be i:<.: lemented.As the Tigard
City Center Development Agency (Agency) co # its annual .�.- et process each year, it
has the authority to make adjustments to the, tptions in this R particularly in
c.O.' :.}.
regards to forecast revenues and planned exitures. The Agency a allocate budgets
differently,adjust the timing of the projects,d ':. to incur bt at different timeframes than
projected in this Report, and make other changes; to the amendments section of
the Plan.
�
Com'
Y:t}:
Report on Tigard City Center Urban Renewal Area Amendment 1
Figure 1 —Tigard City Center Urban Renewal Plan Area with Amendment Properties
Tigard City Center Urban Renewal Area
Boundary of Amendment Area
Slr✓C'�e
am NOR av*
e�
• W j•• a
s• •••• •• P9a��� a •' a
i •• • `' i
••IO ••♦ ••• so Rose
•• S� ■i
■
•i ■
%*o#'
l:•�. A/I'2:�Q
• s • �R
..in
-1 ■
i.•• �drn St+
� r
■
�. a
■
■
Its
■■■ ■
Boundary of Amendment Area
■ ■ Existing Tigard City Center URA
•■■■*
0 500 1,000 1,500 feet
I I I I
Source:ECONorthwest
Report on Tigard City Center Urban Renewal Area Amendment 2
Figure 2—Tigard City Center Urban Renewal Plan Area After Amendment
Tigard City Center Urban Renewal Area
Boundary as Amended
e�
N
• N/C ♦ S�
• � tJ
■ m �
♦♦• ♦• �I1 P a ♦♦♦ 3
♦ -o
♦•♦: •■arm
•••■■••■■■■•■�i
:♦♦ •� N♦
♦ ♦ S
t �'yo
• ■ 'Qd
■
w♦♦ dam St+♦
i
■
.1 ■
♦■ 1•■■■
■
M
■ ■ Tigard City Center URA
0 500 1,000 1,500 feet
I I I I
Source:ECONorthwest
Report on Tigard City Center Urban Renewal Area Amendment 3
II. EXISTING PHYSICAL, SOCIAL,AND ECONOMIC
CONDITIONS AND IMPACTS ON MUNICIPAL SERVICES
This section of the Report describes existing conditions within the Tigard City Center Urban
Renewal Area and the Amendment Area and documents the occurrence of"blighted areas,"
as defined by ORS 457.010(1).
A. Physical Conditions
1. Land Use
The existing Tigard City Center Area is 191.22 acres in size`containing 191 tax lots
consisting of 147.91 acres. The Amendment area is 37.74 acres in size, containing 7 tax lots
consisting of 37.69 acres.After the Amendment thei total Area `' kbe 228.96 acres, including
198 tax lots consisting of 185.60 acres and 43.36 acres of right o for a total of 228.96
acres. "
}y
An analysis of property classification data for FYE 2016 fro M.- the Was ,11 County
Department of Assessment and Taxation was used to deterrmiKe the land us gnation of
tax lots in the Area as amended. l3 ` creage, commercial use accounts for the `gest land use
within the area(51.51%). This is followed by exempt(28.11%), and multifamily residential
(11.73%). The total land uses of the Area. by acreage and parcel, are shown in Table 1.
Table 1 —Existing Lan „se:of Area
I", �
..
Land t se Existing Exisitng Amendment Amendment Total Total Percent of
Taxiots Acres Taxiots Acres Taxiots Acres Acres
Commercial s 4 :3.16 Ss :: 22.45 125 95.61 51.51%
Exempt 0.00 30 52.18 28.11%
Industria0 .:. 0.00 1 6.41 3.45%
Multi- ;residential""`< 10 `: 6.68 "% :;. "' 15.10 11 21.78 11.73%
Sin Residential 5 0.00 18 5.45 2.94%
Vacant ML 1 0.15 13 4.17 2.25%
Total 19 147. 7 37.70 198 185.60 100.00%
2Source:Compiled rius Solutions LL data fro the Washington County Department of Assessment and Taxation(FYE 2016)
az;?
Report on Tigard City Center Urban Renewal Area Amendment 4
2 Zoning and Comprehensive Plan Designations
As illustrated in Table 2 and Figure 2,the majority (67.56%)of the Area by acreage is zoned
as Mixed Use Central Business District.
Table 2—Existing Zoning Designations of Area
Zoning Existing Existing Amendment Amendment Total Yotal Perce fit of
Tailots Acres Taxlots Acres Taxiots Acres Acres
IMixed Use Central Business District 1 187 125.40 0
187 125.40 1 67.56%
'M/U CBD-Planned Development Overlay 0 0.00 1 1 15.1 8.14%
General Commercial 0 0.00 5 5 21.61 11.64%
Parks and Recreation 4 22.50 0 .00 4 2150 12.12%
1 0.99 0.53%
Industrial Park 0 0.00 1
Total 191 147790 , 198 185.60 100.00%
Source:Compiled by Tiberius Solutions LLC with data from the Wash"" -Aksessment and Taxation(FYE 2016)
bounty
Departure`'
and Metro RLIS 2016 Ql.
As illustrated in Table 3, 67.47%of the acrQ4s designated as Mixe' a Central Business
District in the City of Tigard Comprehensive
Table 3 —Existing Comprehensivq-.�:.P.Jan Designat%4M�`-'---'-"'.-.
Comprehensive Plan Designation Existing Existing Amendment Amendment Total Total Pe rce nt of
Tax"ts Acres Taxiots Acres Taxiots Acres Acres
Mixed Use Central Business District 179 i� .1 0 1 180 1 125.22 67.47%
General Commerical 0 5 21.61 11.64%
Open Space
12
0.�M 12 37.78 20.36/6
. .............
Light Industrial ...... 0.99 1 0.99 0.53%
1rotal1 147.00: ?•v ;�'i=<7o 198 185.60 100.00%
Source:Compiled by Tiberi"" ions LLC wN.W"ta from the bri County Depa ent of Assessment and Taxation(FYE 2016)
and Metro RLIS 2016 Q1.
:X.
X:
X.
Report on Tigard City Center Urban Renewal Area Amendment 5
Figure 3 —Area Zoning Designations
Tigard City Center Urban Renewal Area
Zoning Designations
ti
♦
7
V ,^ L
v
Zonin • •
- Mixed Use CBD- .
Planned Development ••M,�,
- Mixed Use CBD
- General Commercial
Industrial Park
Parks and Recreation
■ City Center URA r F
0 500 1,000 1,500 feetki
Source:ECONorthwest with data from the City of Tigard and Metro RLIS 2016 Q1.
Report on Tigard City Center Urban Renewal Area Amendment 6
Figure 4—Area Comprehensive Plan Designations
Tigard City Center Urban Renewal Area
Comprehensive Plan Designations
r
40
•
yjT ••
r �
y
�: \ \,Y�
■
r �
■ r
Comprehensive Plan ■•M:
r
- Mixed Use CBD
General Commercial 14`� ,
f 1_. zz I
- Light Industrial
r a
Open Space f t i )moi
■■■ City Center URA
•■■.• ,:�-fit
0 50G 1,000 1,500 feet I i
Source: ECONorthwest with data from the City of Tigard and Metro RLIS 2016 Q 1.
Report on Tigard City Center Urban Renewal Area Amendment 7
B. Infrastructure
This section identifies the existing conditions in the Area to assist in establishing blight.
There are projects listed in City of Tigard master plans and Tigard Transportation Systems
Plan that identify these existing conditions. This does not mean all of these projects are
included in the urban renewal plan. The specific projects to be included in the urban
renewal plan are not changed by this Amendment. They are listed in Table 11.
1. Transportation
.tA
The Tigard Transportation Systems Plan details the transp r needs within the Area.
Streets and Intersections
There are significant transportation needs within th `:
Table 4—Transportation Needs in the Area :..
Cost
Name Description Time Frame Estimate
Ash Ave railroad Extend Ash Avenue across ilroa
crossing( >: .• �Burnham tracks from am to Com <>::�.ear-term ,000,000
to Commercial Street _ > :.
Hall Boulevard
widening,Pacific Widen to up to an riding o
Highway to Fanno corridor plan ar-term $2,500,000
Creek
,.:. to is signal at Main
'$treet/Ti Street. Project need
Main Street/Tigard uld be ' 'aluated after Pacific Near-term $350,000
Street „ayI ea-burg Road/Hall
Bo evard improvements and Main
treet improvements are completed
Source''?of Tigard Transports te-, 'inn
tv.
i'• :v
4 ..{i
Report on Tigard City Center Urban Renewal Area Amendment 8
Table 4 Continued—Transportation Needs in the Area
Cost
Name Description Time Frame Estimate
Provide 2 travel lanes,turn lanes where
Main Street Green necessary,on-street parking,good
Street(Phase II) sidewalks,and lots of pedestrian-friendly Near-term $2,000,000
amenities on Main Street from the
railroad tracks south to Pacific Highway
Tigard Transit Provide bicycle hub at Tigard Transit riWar-term $50,000
Center bicycle hub Center
Convert a segment of inactive railroad t"':,.:;:::..
right-of-way adjacent to Tigard Street
Tigard Street Trail Near-term $1,250,000
from Tiedeman Avenue to Main Street to
a multiuse path
Commercial Street Install sidewalks on bothr of the Near-term $400,000
street from Main Street to L Street
Source:City of Tigard Transportation Systems Pla
2. Water
There are no water needs in the Area..:.,
3. Storm Water ?� :r�`M .
There are two storm 1Nater projects in the Area: <'z
a. 94028—Main Street Storm Rehabilitation (Fanno Creek)
Project Need: Upgrade mitltiple`stdrmwater outfalls in a way that promotes visual appeal
in the downtown area.
Project Description: The projeet'w ill upgrade functional stormwater outfalls and abandon
inactive stormwater outfalts along;Fanno Creek in the vicinity of Main Street. The goal of
the projo dAimill be to develm" a plan-for outfall design that improves the aesthetics of
downtownird and takdvantages of this well-used location to provide public
education ab a creek Fe plan will develop a vision to be used to attract grant
N.
funding.
k.l.'•4.
Total Project Cost: h .k 00 (conceptual planning and grant application only)
b. 95042—Commercial Street Sidewalk and Storm Detention Facility(Main to Lincoln)
Project Need: Commercial Street currently lacks sidewalks west of Main Street. This
project would connect a large residential neighborhood to downtown Tigard and the
Tigard Transit Center. Rather high pedestrian volumes are observed despite the lack of
adequate pedestrian facilities. Commercial Street is particularly narrow under this reach
of the Pacific Highway overcrossing. There is also a lack of sidewalk along Pacific
Highway between Naeve Street and Beef Bend Road.
Report on Tigard City Center Urban Renewal Area Amendment 9
Project Description: This project will construct a sidewalk along one side of Commercial
Street from Main Street under the Pacific Highway overcrossing to Lincoln Avenue. The
railroad and ODOT may dictate the location of the sidewalk which could result in the
roadway being shifted to the southwest so that the sidewalk can be added on the northeast
side of the roadway. While the street is under construction,a stormwater facility will be
added to treat the stormwater runoff from 47 acres that discharges into Fanno Creek. This
project meets outfall retrofitting goals identified in the regional Healthy Streams Plan. A
pedestrian path connecting Commercial Street to Center Street and sidewalk along east
side of Pacific Highway from Naeve Street to Beef Bend Road will be constructed. This
is part of a larger TriMet-managed project to improve a to transit along the Pacific
wa
Hig hcorridor. Y
Y
Total Project Cost: $1,975,000
4. Sewer f .,� ... ''.:`..
:i
There is one sanitary sewer project in the A
93056—Commercial Street Sanitary Sewer L _
Project Need: The sanitary sewer lige was const r` .j"` .i 50s and after " s of
monthly and quarterly cleaning,t*::' walls have` thin. There is al 1 long sag
within the line that requires frequeri ' :`"' This line entified in the master plan to be
upsized to 12". `.>
i X
Project Description: Approximately 35 ' earfe���t w 12"Will be constructed.
Total Project Cost: $135.000. . .w
v.,
n
S. Parks and Open Space }„
Fanno Cre C j the center o Tigard s downtown redevelopment and revitalization.
The park is `' ss of being expanded in multiple directions,toward downtown with
the up)atid park and rojecls and south at the creek past the library. The upland park
and pY-za area will fea veloped athermg and play areas to be implemented along with
major redevelopment proj The dCplain area is a grassy,wooded wetland that provides
habitat for a variety of wildli The Fa` o Creek Park Extension will be developed as a
"natural environment”park w 'open spaces,wetlands, flora and fauna, and limited bridges,
boardwalks and soils. Tlw library is located here,as well as a large, meadow field
where public gathers h .; nynts can take place. Recommendations for this park include:
;.... :
• Upland Park and a—Continue to follow the recommended"catalyst project" in
the Downtown Improvement Plan to recognize and improve a central open space
resource and gathering place adjacent to Fanno Creek, supporting a range of passive
and active open space and public uses, including a farmers market. The projects and
phasing of implementation are described in the Fanno Creek Park& Plaza Master
Plan;
• Lower Park—In addition to the trail and restoration improvements in the site master
plan,the City should consider adding additional local park amenities (play area,
picnic site)to serve the area south east of Highway 99 and north of McDonald.
Report on Tigard City Center Urban Renewal Area Amendment 10
Consider a nature themed play area in this area. Potential locations include in the
entrances to the park and Ash street or adjacent to the Senior center;
• Park Gateway—The master plan also calls for an improved park gateway with a
cantilevered deck and a pathway into the park; and
C. Social Conditions
Data from the US Census Bureau is used to identify social conditions. The geographies used
by the Census Bureau to summarize data do not strictly confgn-n to the boundary of the
Tigard City Center Urban Renewal Area. As such,the Census abreau geographies that most
closely align with the Urban Renewal Area boundary ar....used. The Area is situated at the
intersection of seven different Census block groups,tach ole w h.ich extend a great distance
beyond the boundary of the Area, including significant residential populations that live
adjacent to, but outside of the Area.
Within the Tigard City Center Urban Renewal Area, there are 18 to shown as single-
family residential use, and another 11 tax lots_:witli multifamilv reside ri e. Only three of
the seven overlapping Census block groups include a.significant amount o ": 'dential land
uses within the Area. Thus,we lir fur demographic`analysis to those three' k groups:
block groups 1 and 2 in Census T"`': -%and block groin 4 in Census Tract 308.01. These
�
block groups have a total residential ":. i of 3,006`as;., picted in Tables 5 and 6.
Again,the majority of this population' gs i radjacer ' ut outside of the Area.
z
s qkiiY�tf:.
:i i' ii:{,{;i...... tai .•.�.
�v
41111
t
•i'
Report on Tigard City Center Urban Renewal Area Amendment 11
The majority of the Area, 78%, is White Alone, followed by Some Other Race Alone, 1 I%.
Table 5 —Race in the Area
Race Nuniber Percent 1
White Alone 2,348 78%
Black or African American Alone 59 2%
American Indian and Alaska Native Alone 82 3%
Asian Alone 67 2%
Native Hawaiian and Other Pacific Islander Alone 32 1%
Some Other Race Alone 336 11%
Two or More races 82 3%
Total 3.00611'
Source:US Census Bureau,Social Explorer,American Community S '10-2014,5-Year s
The largest age group in the area is 25 to 3 , 25%, followed b3,;to 24 years and 35 to
44 years, each at 13%.
Table 6—Age in the Area
Under 5 Years 240 8% h
5 to 9 Years 150 5% : :.:. %>.,.
4 {�
10 to 14 Years 103 3% V
xyvvn�•.
*,. w:< ,
15 to 17 Years 64 2%
18 to 24 Years 396 13% J
25 to 34 Years 737 25%
35 to 44 Years 389 13%,
45 to 54 Years 366 12%
55 to 64 Years 243 8%
65 to 74 Years 160 5%
75 to 84 Years 108 4%
85 Years and over 50 2%
Total 11
Source:US Census Bureau,Social American Community Survey 2010-2014,5-Year Estimates
Report on Tigard City Center Urban Renewal Area Amendment 12
A relatively large portion of the adult population in the Area has not achieved a high school
diploma, 20%. However, 30%of adult residents in the area have earned a bachelor's degree
or higher, another 28%have some college experience without a degree,and an additional
21%have graduated from high school with no college experience.
Table 7—Educational Attainment in the Area
Educational Attainment Number
Less Than High School 420 20%
High School Graduate (includes equivalency) 429 21%
Some college 584 28%
Bachelor's degree 415 20%
Master's degree 114 6%
Professional school degree 51 2%
Doctorate degree 40 2%
Total 2,0 5 3 100%
Source:US Census Bureau,Social Explorer,American Community Su :.... 10-2014, r Estimates `
The majority of residents, 64%,tr ...fess than 30 r work, includin'` � se who
worked at home.
Table 8—Travel Time to Work in th'' ea
Travel Time to Work NLIn-lber Percent
Less than 10 minutes 281 17%
10 to 19 minutes 525 31%
20 to 29 minutes 274 16%
30 to 39 minutes 230 14%
40 to 59 minutes 103 6%
60 to 89 minutes 142 8%
90 or More minutes 56 3%
Worked at home 61 4%
Votal 1.672 100%
Source:US Census Bureau, N` Explorer: rican Community Survey 2010-2014,5-Year Estimates
Report on Tigard City Center Urban Renewal Area Amendment 13
The majority of residents, 58%, drove alone to work.
Table 9—Means of Transportation to Work in the Area
Means ofl-ransI)ortation to Work NLImber Percent
Drove Alone 971 58%
Carpooled 285 17%
Public transportation (Includes 206 12%
Taxicab)
Motorcycle 0 0%
Bicycle 66 4%
Walked 83 5%
Other means 0 0%
Worked at home 61 4%
Source:US Census Bureau,Social Explorer,American Communi 2010-2014,5-Year Estimates
D. Economic Conditions;;;:..
1. Taxable Value of Property within the Area
The estimated total a....- W ue of the Existing Area calCUlated with data from the
Washington Cou art "f Assess ment and Taxation for FYE 2016, including all
real, personal, man ured, an hility properties, is estimated to be $100,844,506. The
N'
estimated total assess lue 0 Amendm�'ent Area is estimated to be $46,413,073.
2. Building to La ue
0
An analysis of prr%r%,- 1es C 0
Bused o 0
evaluate the economic condition of real estate
investments in a given are e r _.hip of a property's improvement value (the value of
buildings and other improve is to t roperty)to its land value is generally an accurate
indicator of the condition of MM%estate investments. This relationship is referred to as the
"Improvement to Land Value,-.".".io," or"LL."The values used are real market values. In
urban renewal areasj.,, I:L::::::- en used to measure the intensity of development or the
extent to which an are e its short-and long-term development objectives.
Table 10 below shows the improvement to land ratios for properties within the Area. The
majority of tax lots in the area that are not exempt(41.66%of the total acreage)have LL
ratios of less than 1.0. In other words,the improvements on these properties are worth less
than the land they sit on. We identify a target LL ratio of 2.0 for properties in this Area. Only
31 tax lots in the area, including 16.61%of the acreage have LL ratios of 2.0 or more in FYE
2016. The Area as a whole, is underdeveloped and not contributing its full potential to the tax
base in Tigard.
Report on Tigard City Center Urban Renewal Area Amendment 14
Table 10-I:L Ratio of Parcels in the Area
Aniend
Taxitits Acres ment Acres Taxiots Acres Acres
Exempt 30 52.18 0 0.00 30 52.18 28.11%
No Improvement Value 13 7.96 1 0.15 14 8.11 4.37%
0.01-0.50 41 25.49 2 5.98 43 31.47 16.96%
0.51-1.00 29 22.25 2 15.48 31 37.73 20.33%
1.01-1.50 25 17.77 0 0.00 25 17.77 9.57%
1.51-2.00 22 7.51 0 0.00 #%& 22 7.51 4.05%
2.01-2.50 2 1.04 1 0.MWf 3 2.03 1.09%
2.51-3.00 9 4.32 09 4.32 2.33%
3.01-4.00 13 8.26 0 :: '€ >. 13 8.26 4.45%
>4.00 7 1.12 1 5.10 8 16.22 8.74%
Total 191 147.9 7. ' 37.7 185.6 100.00%
Calculated by Tiberius Solutions LLC with source data from Wa "''County Office of Assessm' Taxation(FYE 2016).
E. Impact on Municipal Services:
The fiscal impact of tax increment financing on taxin icts that levy taxes within the
Area(affected taxing districts) is described in Section pct of Tax Increment Financing
of this Report. This subsection discusses the fiscal impacts resulting from potential increases
in demand for munici . ces. Since the properties bein(, added in the Amendment are all
in the city limits ane .:..,, wing ni I ttoicipal'servio.q, there will be no negative impact
on municipal sery `;; s a res bringing the properties1into the urban renewal area.
III. REASON OR SELECTION OF EACH URBAN RENEWAL
AREA IN THE PLAN ;t w
The i *: _ for selecting the Area is to provide additional revenue to enhance the ability to
fund imoftments necessary-to cure blight within the Area.
'ti :r
IV. THE RELATIONSHIP BETWEEN URBAN RENEWAL
PROJECTS AND THE EXISTING CONDITIONS IN THE
URBAN RENEWAL AREA
This section does not change as there are no new projects.
Report on Tigard City Center Urban Renewal Area Amendment 15
V. THE ESTIMATED TOTAL COST OF EACH PROJECT AND
THE SOURCES OF MONEYS TO PAY SUCH COSTS
The estimated allocation of funds to specific projects shown in this Report are the best
estimates of future expenditures at the time of preparation of the Amendment. The Agency
will be able to review and update the allocations on an annual basis when they prepare the
annual budget.Nominal dollars are year of expenditure doll a nclusive of inflation, which
is assumed to be 3.0%per year.
Table 11 —Projects to be Completed Using Urban Renewal Area Funds
Projects (nominal S) (constant l6 Si
Potential Saxony Purchase $515 . :' $5
Saxon demo/clean/prep $ ': 0 $525,
Other budgeted projects $2 ' 0 $223,000
Ti and Street Trail Match $154, :`> :150,000
Street Improvements $1,800,000 . ,.'1,380,000
Streetsca a Improvements $600,000 $533,000
Bike/Ped Facilities $400;000 355,000
Parks ':;'$400,000 000
Public Spaces h - 100,000 ` :::.:._$1,8 00
;;..
Public Facilities ` $3;090.000:` 68,000
Planning and Devel -. t Assist `': $2265.0,000 $2,278,000
PropertyAc uisition `* $4,500;flQEQ. $3,998,000
�.;:>.>«..
Financ . Win: ;�:� 62,ft : $221,000
ToW Ex eftks ;. $1 +` .,'> .0" $14,767,000
Source:Com *led by Tiberius Solutions LLC withNtfrCityof Tigard.
Report on Tigard City Center Urban Renewal Area Amendment 16
VI. THE ANTICIPATED COMPLETION DATE FOR EACH
PROJECT
The projects will be ongoing and will be completed as directed by the Agency.
The Area is anticipated to complete all projects on or before FYE 2026 and have sufficient
tax increment finance revenue to terminate the district in FYE 2034. Changes in market
conditions could affect the assumed development schedule.
Anticipated project completion dates are shown in Table 12. The" Agency may change the
completion dates in their annual budgeting process or as project decisions are made in
administering the urban renewal plan. The first year.of tax increment collections for the
property being added in the Amendment is FYE 201
�:•:•::vi v•�n t iv,
kk
•••�^: ..'.$•iii„ 4i::'•i :
ii�ii:•.
xi`z,•.'z•:•.>::. :mss:
Report on Tigard City Center Urban Renewal Area Amendment 17
Table 12—Projects and Costs in Year of Expenditure Dollars
2016-17 2017-18 2018-19 2019-20 2020-2 1
PROJECTFUND
Resources .......... c�
Beginning Fund Balance 140,333 299,306 244,584 44,395
Pay-as-you-go(Transfer from TIF Fund) $2,732,884 590,119 06 M98,781 53,588 144,836
Bond/Loan Proceeds $13,100,000 0 0 0 0 8,300,000
Rental Income $741,314 78,1571--V.--,. 78,157 NO 95,000 95,000
Proceeds from Property Sales $0 0 0 0
Intergovernmental Revenues $500,000 500,000
Interest Eamings $5,569 702 1,497 1,223 222
Total Resources Resources $17,079,767 1 -1-
*94,395 8,584,453
594,584
Expenditures(nominal$) —V
Potential Saxony Purchase ($515,000) -ft...00
I
Saxony demo/clean/prep (Wimew. -5OW . .....;..09
Other budgeted projects "Aw"'M Nk -223,6w
Tigard Street Trail Match : 54,500) < .IV
f:'>>'`154,500`''
Street Improvements ( ocicl)
Streetscape Improvements -600,000
Bike/Ped Facilities $400 -400,000
Parks •M 0,00 ..'. -400,000
Public Spaces ..F... -2,100,000
'.00)
Public Facilities ($3,096w)
Planning and Development Assistance'`:"•.::::: -350,000 -350,000 -350,000
Property Acquisition ($4,500,00 -4,500,000
Finance Fees ($262,000) -166,000
Total Expendftures 20,100. -1,243,000 -175,100 -350,000 -350,000 -8,516,000
iource:Tiberius Solutions LLC with input from City offigard.
[deport on Tigard City Center Urban Renewal Area Amendment 18
Table 12—Projects and Costs in Year of Expenditure Dollars,page 2
2021-22 2022-23 2023-24 2024-25 2025-26
Resources
Beginning Fund Balance 68,453 35,958
915 86,882
Pay-as-you-go(Transfer fromTIFFund) 217,163 292,293 2 72 98,684
Bond/Loan Proceeds 0 00
4,800,000
Rental Income 100,000 100,000 100.000 0
Proceeds from Property Sales 0 0 0 0 0
Intergovemmental Revenues
. ......
, "."ft
Interest Eamings 342
80 �495. V 434
Total Resources 385,958 498,9 536,882 4,986,000
Expenditures(nominal$)
Potential Saxony Purchase
Saxony demo/clean/prep
Other budgeted projects
Tigard Street Trail Match
Street Improvements -1,800.000
Streetscape hMrovements
Bike/Ped Facilities
Parks
Public Spaces
44=
Public Facilities -3,090,000
Planning and Development Assistance -350,006 IM -400.00,0 -400,(X)0 -450.000
Property Acq ishion s.
Finance Fees -96000
Total Expenditures -3r'O'OOO 400,0001 450,0001 4,98�6�, 00
Source:Tiberius Solutions LLC with input from City of Tigard.
Report on Tigard City Center Urban Renewal Area Amendment 19
VII. THE ESTIMATED AMOUNT OF TAX INCREMENT
REVENUES REQUIRED AND THE ANTICIPATED YEAR IN
WHICH INDEBTEDNESS WILL BE RETIRED
Table 13 shows the allocation of tax increment revenues to debt service and the debt service
reserve fund. Table 13 shows no new debt being incurred after FYE 2026, as required by the
Plan. It is anticipated that the Agency will have sufficient res ces to retire all debt by FYE
2034,which would then allow the Agency to cease collec r x increment revenues and
close down the Area. .� '
The time frame for retiring all debt for the Area is net sol may vary depending on the
actual terms of the indebtedness incurred, and the fuel tax in nt revenues received. If
the economy is slower, it may take longer to I1 debt; if the my is more robust
than the projections, it may take a shorter ti rind. The Agency ecide to issue
bonds or take on loans on a different schedul `; that will Iter the fi g assumptions,
however the existing Plan prohibits any new de r F1 26.
The maximum indebtedness of the Plan is $22,000, my-two million do ars), and is
not being increased by this Amendment. The City of Ti` estimates that$3,244,382 of
indebtedness has been incurred by the Agency for the Are `date,through the end of FYE
2016, resulting in $18.755.618 in remaining capacity for additional indebtedness for the
Area.
Information on scheduled debt service payments for all ext debt was provided by the
City of Tigard Finance Department. Additionally. we assume the Agency will undertake two
additional loans in future years to finance the costs of projects identified in the Plan. For
speculative future borro"ings,the amounts, timing. and terms of the debt are unknown. The
assumptions used in this Report are for planning purposes only, and subject to change based
on "t conditions. These assumptions were developed by Tiberius Solutions LLC and
inform '+> conversations with staff from the City of Tigard Finance Department. Specific
key assu`n '' s for the financial analysis include:
• DebtIce Coveraoe Ratio: Payments for future indebtedness are structured so that
annual ta >increment revenues are projected to equal or exceed 1.25 x total annual
debt service payments``in all years,with one exception. In FYE 2026, final year
allowed by the Plan to incur new debt,the projected debt service coverage ratio is
reduced to 1.10 to maximize the borrowing potential of the Area.
• New Loan FYE 2021: Assumes principal amount of$8,300,000 with 3.0% interest
rate, 20-year amortization period, level annual debt service payments,and no
prepayment penalties.
• New Loan FYE 2026: Assumes principal amount of$4,800,000 with 5.0%interest
rate, 20-year amortization period, level annual debt service payments, and no
prepayment penalties.
Report on Tigard City Center Urban Renewal Area Amendment 20
Without the Amendment,the Area is forecast to be able to incur$16,300,000 in indebtedness
through FYE 2026,which would be $5,700,000 less than the total maximum indebtedness of
the Area.
With the Amendment,the Area is forecast to be able to incur$19,100,000 in indebtedness
through FYE 2026,which would be $2,900,000 less than the total maximum indebtedness of
the Area. Thus,the increased tax increment revenue that will be generated due to the
amendment is projected to increase the borrowing capacity of the Area by $2,800,000
through FYE 2026, helping the Agency fund more of the projects identified in the Plan.
The assumptions used in this analysis present just one poten ' cenario for the long-term
cash flow of the Area. If actual results differ from the a `tions, it could affect the
ability of the Agency to achieve these projects at these, . amounts on this schedule.
Based on these assumptions,we find the Plan Amenf` cially feasible.
•.4 h•
4:y.
ti ii:f::i. ` •:r.
Qi• ii}
.... ••
:»
r.•
Report on Tigard City Center Urban Renewal Area Amendment 21
Table 13-Tax Increment Revenues and Allocations to Debt Service and Debt Service Reserve
Fund
I wal 2016-17 2017-18 2018-19 2019-20 2020-2 1
DER T SER VICE FUND
Resources
Beginning Fund Balance 359,791 0 0 212,169 0
TIF for URA $106,092,176.00 397,103 492,519 570,001 637,033 706,659
Total Resources $106,664,136.00 756,894 492,519 5709001 849,202 706,659
Expenditures
Debt Service
2014 US Bank Loan ($1,268,621.00) -162,842 -15 -155,118 -791,681
Loan#5 Sewer ($109,434.11) -512 ::<: -512 -512 -512
Loan#5 General Fund $42,904.56 -201 ?< l -201 -201 -201
Loan#6 General Fund $389,352.89 1,949 -1,949 -1,949 -1,949
Loan#7 General Fund $273,737.25 -1,27 %%:: >:%4 4,
-1,270 -1,270 -1,270
2021 New Loan $11,157,807.46 W -557,890
2026 New Loan ($3,466,479.77) {;"
$0.00
$0.00
Total Debt Service $16,708,337.04 ,775 -162,913 -159 795,614 561,823
Coverage Ratio 3.58 0.80 1.26
Transfer toDIS Reserve Fund ($89, -590,11 ,606 -198,781 ••=5'3,588 -144,836
Total&penditures $106,451, 4 >%x.;,..756,894 9 -357,832 -849,202 -706,659
Fndin Fund
Balance 'EE ; $0. 12,169.00 $0.00 $0.00
2016-17 2017-18 2018-19 2019-20 2020-21
DebtService Reserve Fund
MEW-
Resources @
.y.
Beginning Fund Balance .. $0 $0 $n $0 $0
Interest Earnings 53 1.00 $0 $0 $0 $0 $0
Transfer from D. - $ 9 $329,606 $198,781 $53,588 $144,836
Total Res o 8,4 i` .._ $596 $329,606 $198,781 $53,588 $144,836
Exp
en
Trans fet> ,• 'ect Fund For URAa (52, 00) -S3W,l19 -$329,606 -$198,781 -$53,588 -$144,836
Total Fac -$590,119 -$329,606 -$198,781 -$53,588 -$1449836
Fnding Fund Bal ?i:%?:, $0 $0 $0 $0 $0
Cumulative D/S Remainin -$16,541,565 -$16,378,652 -$16,219,601 -$15,423,987 -$14,862,164
TIF Sufficient to Pa OffD/S NO NO NO NO NO
Source:Tiberius Solutions LLMo
Report on Tigard City Center Urban Renewal Area Amendment 22
Table 13-Tax Increment Revenues and Allocations to Debt Service and Debt Service Reserve
Fund,page 2
2021-22 2022-23 2023-24 2024-25 2025-26 2026-27
DEBT SERVICE FUND
Resources
Beginning Fund Balance 0 0 0 0 0 0
TIF for URA 778,986 854,116 932,165 1,013,245 1,097,480 1,184,991
Total Resources 778,986 854,116 932,165 1,013,245 1,097 480 19184,991
Expenditures
Debt Service
2014 US Bank Loan
Loan#5 Sewer -512 -512 -10,533 -10,533 -10,533
Loan#5 General Fund -201 -201 ^ " -20 -4,130 -4130 4,130
Loan#6 General Fund -1,949 1,. -1,949 -1,949 -37181 -37,181
Loan#7 General Fund -1,270 -1:: ::. ?'' -1,270 70 -1,270 26,104
2021 New Loan -557,890 7$O -557,890 -557,890 -557,890
2026 New Loan <: °':;. -385,164 -385,164
Total Debt Service -56L823 561,823 'E •>..-5 575,773 ,169 -1,021,003
Coverage Ratio 152 � .66 1.76 1.10 1.16
Transfer to D/S Reserve Fund 217 -37 , 437,472 -101,311 163,988
Total Fx nditures :r `. -778,986 a '• -854,116 ':*":K:'•'$3.* 2,165 3,245 -1,097,480 -1,1849991
Fndin Fund Balance 50.00 ;,<: 0 $0.00 $0.00
'21-22 2022-23 2023-24 2024-25 2(12';-2(, 21126-2.
Debt Service Reserve Fund
Resources 4
Be innin . $tY <:< ::<;..
Interes "s - - $0 "n $0 $0 $0 $13
Trans " D/S Fund s> $217.163 $ $370,342 $437,472 $101,311 $163,988
Total R:.::"" 5217,163 $292,293 $370,342 $437,472 $101,311 $166,628
Expenditures sx:>:;;
Transfer to Pro 8%gjdForURA admin $217,163 `' -$292,293 -$370,342 -$437,472 -$98,684 $0
Total Expenditures '' `•: 217,163 4292,293 -$370,342 -$437,472 -$98,684 $0
Emlin F)und Balance A& $0 $0 $0 $0 $2,627 $166,628
Cumulative D/S Remaining -$14,300,341 -$13,738,518 -$13,176,695 -$12,60Q922 -$11,604,753 -$10,583,750
TIF Sufficient toPay Off D/S NO NO NO NO NO NO
Source:Tiberius Solutions LLC
Report on Tigard City Center Urban Renewal Area Amendment 23
Table 13-Tax Increment Revenues and Allocations to Debt Service and Debt Service Reserve
Fund, page 3
202 2028-29 2029-30 2030-31 2031-32 21,32-33 21,33-34
DFB TSER VICF MAD
Resources
Beginning Fund Balance 0 0 0 0 0 0 0
TIF for URA 1,386,954 1,485,861 1,588629 1,695,414 1,806,374 1,921,676 469,458
Total Resources 1,386 954 1,485,861 1,588,629 1 695 414 19906,374 1 921 676 469,458
Expenditures
Debt Service
2014 US Bank Loan
Loan#5 Sewer -10,533 -10,533 -10,533 lift -10,533 -10,533 -10,533
Loan#5 Gmera]Fund -4,130 4,130 4,130 4,130 4,130 4,130
Loan#6 General Fund -37,181 -37,181 -37,181 ;181 -37,181 .37,181 -37,181
Wan#7 General Fund -26,104 -26.104 -26,104,:<.'::i:<:':?':::::' ,104 -26,104 .26,104 -26,104
2021 New Loan -557,890 -557,890 -557, 557,890 557,890 557,890
2026 New Loan -385,164 -385,164 -385, -385,164 -385,164 -385,164
.ti
Total Debt Serece -1,021,003 1 021 003 003 -10219003 .1,003 1 021 003 -1,021,003
Coverage Ratio 1.36 1.46 1.56 1.66 1.88 0.46
Transfer to DIS Reserve Fund 365,951 464,858 i'7 626 ,l l 785,3 900,673 551,545
Total Et nditures 1 386 954 ,':` 485 61 -1 58816 51 S 414 -1,806,374 1 676 -469,458
Ending Fund Balance $0.00 $0.00 50.00 $0.00 $0.00 $0.00
2027-28 2028-29 2029-34) 20311-31 2031-32 2032-33 2033-34
DebtService Reserve Fund
Resources r;;•::;:c>::.
Beginning Fund Balance 516.6.6_8 $53 `:` $1 1,573, ,z>' $2,255,847 53,052,497 53,968,432
Interest Fermin s 5$3 $2; 868 $11,279 $15,262 519,842
Transfer from D S Fund 5+65 3::. $464,8 ;626 ",l l 5785,371 5900,673 4551,545
Total Resources $5334 ?i: $1.000.937 73 68 $2 2551147 S3,052,497 $3,968,432 $3,436,729
Expenditures
Transfer to Pro' URA admin ` ^: ;•:;:^. $0 60 $0 so s0 s0
Total Ik 'n 4}•z>::':. ,> Moon0 $0 $0 $0 $0
Ihdin " 'ance $53 $1,000,93t<iiiiii- #73,568 $2,255,847 $3,052,497 $3,968,432 $394369729
Cutinudive .:13fdA nin ,562,747 > :fS+$8,541,744 -67,520,741 -56,499,738 -$5,478,735 -$4,457,732 -$3,436,729
TIF Sufficient to D/S k• NO NO NO NO YES
Source:Tiberius S LLC > :
Report on Tigard City Center Urban Renewal Area Amendment 24
VIII. FINANCIAL ANALYSIS OF THE PLAN
The estimated tax increment revenues through FYE 2034 as shown above, are based on
projections of the assessed value of development within the Area and the consolidated tax
rate that will apply in the Area. The analysis assumes average annual growth in assessed
value of 4.0%for real property, 1.0%for personal and utility property, and 0.0%for
manufactured property. These growth rates assume both the appreciation of existing property
values and new construction activity in the Area.
Additionally, in FYE 2018,the forecast includes an incre 'assessed value of$4,877,582
for real property that would be the result of a new 165-unfixed-use development in the
Area that is currently under construction. This increase in vhiwould be on top of the
projected 4.0%background growth rate for assessed value of r:. ' roperty in the Area. This
increase is based on information provided to the City of Tigard bdeveloper regarding
the total anticipated construction cost of the;;project. These projectio ect the plans of the
developer to take advantage of the State of Oregon Vertical Housing 1" '' atement program,
which results in 60%of the value of the project being tax exempt for a per ,qf ten years.
Table 14 shows the projected incrinertlal assessed value, tax rates and tax inc' ent
revenues each year, adjusted for discounts, delinquencies, and compression losses. These
projections of increment are the basis for thefm,sections in Tables 12 and 13. The first year
the impact of the Amendment would be rellected in the calculation of tax increment revenues
is FYE 2019,with an increase in the frozen base value,'as well as a:;corresponding increase in
total assessed value ijf the Area. Gross TIF is calm lated by multiplying the tax rate times the
excess value. The tax rate is stated per thousand dollars of assessed value, so the calculation
is "tax rate times excess;value divided by one thousand". The consolidated tax rate includes
t::
only permanent rates an {� .eral obligation bonds rates approved by voters prior to October
6,2001. 1n FYE 2017.and 2018 the o is forecast to decrease,due to the expiration of
thosegeneral obligati' and
lvh.
Report on Tigard City Center Urban Renewal Area Amendment 25
Table 14-Pro'ected Incremental Assessed Value, Tax Rates, and Tax Increment Revenues
Tax Increment Fi nance Revenue
FN E' Assessed Value Frozen Base Excess Value Tax Rate Gross TIF Adjustments Net'IIF Cumulative'I'll'
2016 $100,844,506 $69207,378 $31,637,128 12.1668 384,923 (19,246) 365,677 365,677
2017 $104,326,036 $69,207,378 $35,118,658 11.9026 418,003 20,900 397,103 762,780
2018 $112,818,927 $69,207,378 $43,611,549 11.8877 518,441 25,922 492,519 1,255,299
2019 $167,485,234 $117,012,843 $50,472,391 11.8877 600,001 (30,000) 570,001 1,825,300
2020 $173,420,769 $117,012,843 $56,407,926 11.8877 670,561 (33,528) 637,033 2,462,333
2021 $179,586,127 $117,012,843 $62,573,284 11.8877 743,852 1 (37,193) 706,659 3,168,992
2022 $185,990,425 $117,012,843 $68,977,582 11.8877 819,985 40,999 778,986 3,947,978
2023 $192,643,144 $117,012,843 $75,630,301 11.8877 899,070 (44,954) 854,116 4,802,094
2024 $199,554,145 $117,012,843 $82,541,302 11.8877 981,22 . <>s (49,061) 932,165 5,734,259
2025 $206,733,679 $117,012,843 $89,720,836 11.8877 1,066 •:`:>:::> (53,329) 1,013,245 6,747,504
2026 $214,192,409 $117,012,843 $97,179,566 11.8877 1, (57,762) 1,097,480 7,844,984
2027 $221,941,422 $117,012,843 $104,928,579 11.8877 4 ;:; (62,368) 1,184,991 9,029,975
2028 $239,824,845 $117,012,843 $122,812,002 11.887. '` 952 ''-`' 2,998 1,386,954 10,416,929
2029 $248,582,783 $117,012,843 $131,569,940 11.,•,...•:":1,564,064 03) 1,485,861 11,902,790
2030 $257,682,729 $117,012,843 $140,669,886 (? 1 1,672,241 ( 1,588,629 13,491,419
2031 $267,138,280 $117,012,843 $150,125,437 :> $77 1,784,646 89, k695,414 15,186,833
2032 $276,963,577 $117,012,843 $159,950,734 `41&.77 1,901,446 (95,072374 16,993,207
2033 $287,173,323 $117,012,843 $170,160,480 11. _ ..2,022,8 101,141 6 18,914,883
2034 $297,782,813 $117,012,843 $t$Q769,970 11.88 4 (107,447) 2,04 20,956,375
Source:Tiberius Solutions LLC
Notes:
TIF is tax increment revenues
<X.WI3
Tax rates are expressed in terms of dollars per$1, f lue.
Changes in total tax rates are due to general obligannds le rates.TH ds are scheduled to be retired in FYE
2017,after which the total tax r or the area will s e as the f all pe :;dates for affected taxing districts.
C 4: •..r: :;.
�
IX. IMPA OFT : V TAX " . ,. .. ` ME1�T`FINANCING
This section describespa increltt�,...,, financin of the Amendment(properties
being add,e ' ' e Area), t rt Aebtedness is repaid,upon all entities
lev ijp �taxeS"upon roe urban Via. The impact of tax increment financing
Y .� property rtY .{, , P g
on napping taxing districts is prima f the property tax revenues foregone on
perma3 empte levies as applied to rowth in assessed value in the Area.
These projections are for impacts due le addition of properties in this Amendment, and
are shown in Tables 15a and 15b. This Amendment does not change the maximum
indebtedness of`tbe flan, nor does it change the allowed duration of the Plan to incur
indebtedness, and the"elate to pay off all indebtedness and cease collecting tax increment
revenues is anticipated 10 be the same with and without the Amendment. Therefore,the
impact of the Amendment,on overlapping taxing districts is measured by the increase in
annual tax increment revenues that would be foregone by those districts until all debt is
repaid.
The Tigard Tualatin School District and the Northwest Regional Education Service District
are not directly affected by the tax increment financing,but the amounts of their taxes
divided for the urban renewal plan are shown in the following tables. Under current school
funding law,property tax revenues are combined with State School Fund revenues to achieve
per-student funding targets. Under this system,property taxes foregone,due to the use of tax
Report on Tigard City Center Urban Renewal Area Amendment 26
increment financing, are substantially replaced with State School Fund revenues, as
determined by a funding formula at the State level.
Tables 15a and 15b show the projected impacts to permanent rate levies of taxing districts as
a result of this Amendment. Table 15a shows the general government levies and Table l 5b
shows the education levies.
General obligation bonds will not be impacted by this Amendment, because only bonds
approved by voters prior to October 6, 2001 are affected by this Plan,and those bonds will
have all expired by the time the Amendment is reflected in the calculation of tax increment
revenues by the Washington County Department of Assessme and Taxation, expected in
FYE 2019. ���211� �
Table 15a-Projected Impact on Taxing District Perm `, ate Levies- General
Government
General Covernment
Count% Tigard TNTR Portland Metro Aquatic Dis(rict
U YE' Pern) Perm Perm Pei-III Perin Perin Subtotal
2019 ($6,219) ($6,951) ($4,219) ($1 ($42
2020 ($10,135) ($11,329) ($ ($316) 9,130)
2021 ($14,204) ($15,877) ($443) ($569) ($40,825)
2022 ($18,432 $20,602) ($12, '• ;`' "z:$575) ($1 ($738) ($52,973)
2023 $22,825 ($25,512) ($15,48 ($153)> ($913) ($65,598)
2024 ($27,389) ($30613) ($18.579) `:z %: ($8 ,.. .• 184) ($1,096) ($78,715)
2025 ($32,131) :;:.$21.796) '{ :>:':$1,002) '$1,286) ($92,344)
2026 <:.._ k,•
($37,059) ,421) >;_:5,138) ,1 %_; ($2 ($1,484) ($106,507)
:..
2027 ($42,178) ":' 7,144) ( 12) ( < . ($283) "'>;< ($1,688) ($121,220)
2028 ($47,499) ;•,1) ($ 1) ($1; ;: ($319) ($1,901) ($136,512)
2029 ($53 028) ($5 , :.'
.:.. ($1,6 :_ ; ($356) ($2,122) ($152,402)
.::
2030 :>< ; $65,6 $$ )`: > €€€::: 1,83 < _:;($395) ($2,352) ($168,915)
2031 .': ' ,744}`' 366) '<> 919) ($435) ($2,592) ($186,075)
203 ($70,949) ) 8) ($f ($476) ($2,840) ($203,907)
2033 •:. ' 77,397) ($86, ($5 , ($2,413) ($520) ($3,098) ($222,439)
2034 SM,158 $94, 57,0 2,624 $566 $3,369 241,872
Total ($49 $557,528 8,364 ",.-'.`;'-$15,554) $3,349 ($19,965) ($1,433,564
Source:Tiberius Solut C <'
.:f.
Report on Tigard City Center Urban Renewal Area Amendment 27
Table 15b-Projected Impact on Taxing District Permanent Rate Levies-Education
Blucation
I'M NNN' Regional END SD
11YE Perm Perm Perm SuNotal Total
2019 ($782) ($426) ($13,799) ($15,007) ($32,881)
2020 ($1,275) J ($694) ($22,490) ($24,459) ($53,589)
2021 ($1,787) ($972) ($31,520) ($3U79) $75,104
2022 ($2,319) ($1,261) ($40,901) 1) ($97,454)
2023 ($2,871) ($1,561) ($50,648) 0) ($120,678)
2024 ($3,445) ($1,873) ($60,775) "w±' 093) ($144,808)
2025 ($4,041) ($2,198) ($71,298) 10- :' ^`W' ) ($169,881)
2026 ($4,661) ($2,535) ($82,233 ($89, ($195,936
2027 $5,305 ($2,885) ($93,5 ($101,78 $223,004)
2028 ($5,975) ($3,249) ($1 4. ($114,625) 1,137)
2029 ($6,670) ($3,628) ($11 ($127,967) ( 69)
2030 ($7,392) ($4,020) ($130,41 � ( ..•831 ($31
2031 ($8,144) ($4,429) ($143,668) . ,241) ($342,3kv
2032 ($8,923 ($4,853) <: $157,436) '' " ' l 71,212 ($375,119)
2033 ($9,735) ($5,294) <::; 744) y (86,773) ($409,212)
2034 $10,585 5,757 <:?z::.. 089 S44.961
Total $62,740 ($34,121) ( 06,8` $1,20 ' $2,637,273
Source:Tiberius Solutions LLC PleA c icJer to the explana . „k.-the sch ` ;,.; :; gin the' "'; ' g section
Table 16 shows the projected increased reue..y,.; . 'uric fictions after tax increment
.
proceeds are projected to be terminated. Thections ° ; 'or FYE 2035.
<., .
Table 16-Additional R'; nues Obtained afte ' .V.rmination of Tax Increment Financin
g
Tax Rewnue in F1 E2035(year after expiration)
From Frozen
Taxing District Tax Rate Base From Excess Value Total
Genera`' rnment z:
Washin f'`'' ` nt `` $155,606.00 $538,718.00 $694,324.00
City of Ti arm2.5 l $173,925.00 $602,140.00 $776,065.00
TVFR 1.5252 $105,555.00 $365,439.00 $470,994.00
Port of Portland 0.0701 $4,851.00 $16,796.00 $21,647.00
Metro 0.0151 $1,045.00 $3,618.00 $4,663.00
Ti and/Tualatin Aquatic `"#fit;•:::;;::;::':::>' 0.0900 $6,229.00 $21,564.00 $27,793.00
Subtotal ``"`'» '' 6.4619 $447,211.00 $1,548,275.00 $1.995.486.00
Education
PCC 0.2828 $19,572.00 $67,759.00 $87,331.00
NW Regional ESD 0.1538 $10,644.00 $36,851.00 $47,495.00
Tigard-Tualatin SD 4.9892 $345,289.00 $1,195,415.00 $1,540,704.00
Subtotal 5.4258 $375,505.00 $1,300,025.00 $1,675.530.00
Total 11.8877 $822,716.00 $2,848,300.00 $3,671,016.00
Source:Tiberius Solutions LLC
Report on Tigard City Center Urban Renewal Area Amendment 28
X. COMPLIANCE WITH STATUTORY LIMITS ON ASSESSED
VALUE AND SIZE OF URBAN RENEWAL AREA
State law limits the percentage of both a municipality's total assessed value and the total land
area that can be contained in an urban renewal area at the time of its establishment to 25%for
municipalities under 50,000 in population. As noted below,the frozen base, including all
real,personal,personal,manufactured,and utility properties in the Area after the
Amendment, is projected to be $117,012,843. The total assessed value of the City of Tigard,
minus excess value of the existing urban renewal areas is ,954,608. Excess value is
the assessed value created above the frozen base in the u• renewal area. The total urban
renewal assessed value is 9.30%of the total assessed . ; ?``; ..;the City,minus excess value,
below the 25%statutory limitation.
The Tigard City Center Urban Renewal Area c .:{ : s 228.96 ac ncluding right-of-way,
and the City of Tigard contains 8,129 acres. `''accounting for th eage in the potential
Tigard Triangle Urban Renewal Area, 9.56 the City's acreage w e in an urban
renewal area, below the 25% statutory limitati >.:.
Table 17—Urban Renewal AreaQft
rmance with Assessed Value and Acr � Limits
.:. .
Assessed Value UR Excess Acrea0e
Ci of Ti and $ '._'. :7,5 =~ '': :::. 8,129
City of Tigard minus ::
excess $5,8' 6
Tigard Ci Cent k : : $117 $ 1 `7,128 228.96
Proposed Tigard Trl <.:,`;k, $429,6L* 6 547.90
City Cen :: las_Tigar
>: >:::: < ..... $SAb,b67.80 ': 776.86
Trian <::;::.;:.:;.::.:.:...
Pe a in UR :'.<' — 9.30% 9.56%
.:
Source:C ' by Elaine Howard ting,L '''` data from City of Tigard and Washington County Department of Assessment
and Taxation' 016) =
XI. R :. ATION REPORT
There is no relocatio N'` ired for the Plan.No specific acquisitions that would result
in relocation benefits h:" 'n identified, however,there are plans to acquire land for
infrastructure which may trigger relocation benefits in the future in the Area.
Report on Tigard City Center Urban Renewal Area Amendment 29