Loading...
Permit (12) CITY OF TIGARD BUILDING PERMIT 114 ■ COMMUNITY DEVELOPMENT Permit#: BUP2016-00241 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 10/03/2016 ;k R D9 Parcel: 1S136CD01400 Jurisdiction: Tigard Site address: 11650 SW PACIFIC HWY A Project: Habebi Hookah Bar Subdivision: None Lot: None Project Description: TI for change of use from office to eating&drinking establishment. Contractor: ENB INCORPORATED Owner: MASSIH,ABBAS PO BOX 66634 0836 SW CURRY ST, UNIT 400 PORTLAND, OR 97290 PORTLAND, OR 97239 PHONE: 503-997-4222 PHONE: FAX: Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: VB Permit Fee-Additions,Alterations, 10/03/2016 $453.95 Demolition Occupancy Grp: A-2 Occupancy Load: 90 12%State Surcharge-Building 10/03/2016 $54.47 Dwelling Units: 0 Plan Review 08/03/2016 $295.07 Stories: 0 Height: 0 ft DC Provision Review,COM TI-Ping 10/03/2016 $90.00 Bedrooms: 0 Bathrooms: 0 Plan Review-Fire Life Safety 10/03/2016 $181.58 Value: $25,000 Info Process/Archiving-Lg$2.00(over 10/03/2016 $6.00 11x17) Parks SDC Improvement 10/03/2016 $677.00 Floor Areas: Parks SDC Reimbursement 10/03/2016 $122.00 Total Area: 3400 Wash Co Trans Dev Tax 10/03/2016 $2,782.00 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $4,662.07 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: ( Permittee Signature: Ute_ !!! .639.4175 by 7:00 a.m. o xt available inspection date. This permit card shall be kept in a conspicuous place on the i ' until completion of the project. Approved plans are required on the job site at the time of each inspection. IIIR uilding Permit Application ti3 Commercial RECEIVED FOR 0141( I: CSF.011.1' City of Tigard AUG 2016 DDatte/By: ?//�� ,��j/�—permit Nq fg ; eiOo2G// II 13125 SW Hall Blvd.,Tigard,OR 97223 Plan Revi }�j 1 Iii . Phone: 503-718-2439 Fax: 503-598-1��OF TIGARD Date/By: {� 142 i''' Related PernV f/y/„:21)/6,'&70,2./ T I G A R D Inspection Line: 503-639-4175 BUILDING DIVISION Date Ready/By: GJure See Page 2 for Internet: www.tigard-or.gov Notified/Method:o . Supplemental Information TYPE OF WORK REQUIRED DATA:1-AND 2-FAMILY DWELLING 0 New construction ❑Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. Valuation: $ ❑ 1-and 2-family dwelling ommerctal/industrial ❑Accessory building ❑Multi-family Number of bedrooms: ❑Master builder ❑Other: Number of bathrooms: , JOB SITE INFORMATION AND LOCATION I ITotal number of floors: Job site address: t J J <7Eh-Z-'� C.- �t-..ly New dwelling area: square feet City/State/ZIP: ") _ l q-'�-"3 Garage/carport area: square feet Suite/bldg./apt.#: Project name: mn-->t Ket,-dtZ ACt-i Covered porch area: square feet Cross street/directions to job site: Deck area: square feet Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: Lot#: Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all Tax map/parcel#: equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. Valuation: $ V5. ,.K-, _ P `-t _,-�- Existing building area: square feet �c t'i tomNew building area: ;74 ..3 square feet 0 PROPERTY OWNER KTENANT Number of stories: 2 Name: .f -S) {'l e.,0l.0 0 Type of construction: iV/t- Address: 1 t Z.,') •'''. e.,3 ' i'_.,C,. 1-(...,.....3y/ Occupancy groups: ...., .-9J" City/State/ZIP: te_ati' y �? 11-Zz_3 Existing: �i A,--Z, Phone:( ) Fax:( ) New: tkZ APPLICANT 0 CONTACT PERSON BUILDING PERMIT FEES* (Please refer to fee schedule) Business name: 1 ,54. t-r--z- Structural plan review fee(or deposit): 95', Q 7 Contact name: -17)k c/;_ -'"'?t T-Z --�_ FLS plan review fee(if applicable): Address: Z.2)7---5 l -c- L .hl'1 i\- L City/State/ZIP: �p��t_,ttt-- _ "'��A Total fees due upon application: Phone:(-)c."0") 'jar) `fit.. Fax::( ) Amount received: C J 0 7 44 i'��G�1 f z PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* E-mail: l�.�tl�C.*,) -G � L-e.91 Commercial and residential prescriptive installation of CONTRACTOR roof-top mounted Photo Voltaic Solar Panel System. Business name: E i-t-.?„ 1 4.e..._, eA `- j S Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address: "`c .-(6'.yx (.l z-, j Solar Installation Specialty Code checklist. City/State/ZIP: --p.,___,--.:1---4_,a,_.41,6"). �Z cr-z: Permit fee(includes plan review $180.00 and administrative fees): Phone:(5 2 ) 91--q9.9-'y Fax:( ) State surcharge(12%of permit fee): $21.60 CCB Lie.: t C.53 (.1.4-.2._ --7/1 7 I/eg Total fee due upon application: $201.60 Authorized signature:` i -`w-A.--.1 ��J This permit application expires if a permit is not obtained ( ) , l __ within 180 days after it has been accepted as complete. Print name1.7 i^ C t Date: (6, * Fee methodology set by Tri-County Building Industry Service Board. 1:\Building\Pennits\BUP COM_PermitApp.doc Rev.04/21/2014 440-4613T(11/02/COM/WEB) City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT Accessibility: Barrier Removal Improvement Plan Commercial & Multi-Family - Additions or Alterations TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five percent(25%). VALUATION: Total of all renovation,alteration or modification being done, excluding painting and wallpapering: [1] $ 75 c c 0 MULTIPLIER(25%barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [21 $ ed?; Z5jo ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ (b) An accessible entrance: $ (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex restroom: $ .) (e) Accessible telephones: $ (f) Accessible drinking fountains: and, $ (g) When possible,additional accessible elements such as storage and alarms: $ TOTAL(shall equal line [2] of Valuation Computation): $ I:ABuilding\Permits\BUP_COM_PermitApp.doc Rev.12/18/2014 City of Tigard 114 N COMMUNITY DEVELOPMENT DEPARTMENT TIGARD Building Permit Review — Commercial - With Land Use Building Permit #: P * -OO ?I./7 Site Address: /I QpSQ SW P0 i Ci - ;-1►y4A" i Suite/Bldg#: Project Name: 1+6110-e&-i �° (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: '�/ ( T Go 144 b2 d-,' htvo cn h (6 C4" yr Verify site address/suite#exists and active in permit system. River Terrace Neighborhood: ❑ Yes 0 No Cp' Land Use Case#: M M 02,01 (e - 000/1 Plans Match Approved Land Use: /-Site Plan CILandscape Plan ❑ Other: ❑ Urban Forestry Plan ❑ Elevation Plan --ding Height: Maximum Height Actual Height -2-Conditions Met: ❑ Prior to Submittal ❑ Prior to Permit Issuance Business License: Exists: ❑ Yes ❑ No,applicant notified to obtain business license ilities Improvement(PFI) Permit: Required: ❑ Yes,applicant was notified /— No Applied For: ❑ Yes ❑ No,stop intake Notes: Approved by Planning: /1/7614- 2- Date: /3 Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: S / Site Plans: # Building Plans: Building Permit#: P-Enter building permit#above. ,� �� Workflow Routing: E Planning 0--"EngineeringL�1'ermit Coordinator wilding Workflow Sign-off: Sign-off for Planning(include notes from planning review) Route Application Documents: uilding: original permit application, site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: � _ _,_ . mad_,� / Date: /1A 1 I:\Building\Forms\B1dgPermitRvw_COM_WithLandUse_070915.docx Engineering Review Slope at building pad: PFI Permit#: Conditions "Met"prior to issuance of building permit Easements (encroachments)per engineering conditions of approval and plat(not typical on SDR/CUP) Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: ❑ Yes ❑ o Assess Water Quantity Fee in-lieu: ❑ Yes ❑ No LIDA Facility on lot: ❑ Yes No ❑ NOT Approved by Engineering: Date Notes: Approved by Engineering: / (IGP' Date: ..- Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: ❑ SDC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes ❑ N/A Tigard Trans SDC: ❑ Yes ❑ N/A Parks SDC: ❑ Yes ❑ N/A "a OK to Issue Permit Approved by Permit Coordinate a Date: f9//6 Hs5, at ti,,,,, t- a-k,_,- o_ I:\Building\Forms\BldgPermitRvw COM WithlandUse 070915.docx City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Tel: 503.718.2439 Location: Inspection Date: 11650 SW PACIFIC HWY A, TIGARD, OR, 97223 April 4, 2017 at 1 :06:41 PM Record Type: Record ID: Commercial - Building BUP2016-00241 Inspection Type: Inspector: 299 Final inspection Chip Barnett Result: PASS - CofO Comments: Violation Summary: Inspector Contractor