Resolution No. 16-22 CITY OF TIGARD, OREGON
TIGARD CITY COUNCIL
RESOLUTION NO. 16-ate
A RESOLUTION ADOPTING THE CITYWIDE MASTER FEES AND CHARGES SCHEDULE
WHICH REPLACES RESOLUTION NO 04-99 AND RESOLUTION NO 15-31 AND ALL
SUBSEQUENT AMENDMENTS TO DATE. w e,t�,. lod�,cs q b� r-eer e t fi G v.. e 4 u t- C-
WHEREAS,
deltd at :is e,a rren4 r-a /-e- .
WHEREAS, the City of Tigard has a Master Fees and Charges Schedule that was adopted during the last
budget hearings as Resolution 15-31;and
WHEREAS,Resolution 04-99 increased planning fees and that increase is incorporated in the planning fee;and
WHEREAS,city staff has reviewed fees and services provided;and
WHEREAS,city staff has proposed new fees and changes to certain fees to recover costs or due to previously
approved annual adjustment formulas;and
WHEREAS,the city's Master Fees and Charges Schedule includes fees set by other agencies;and
WHEREAS, Tigard Municipal Code (IMC) 3.32.050 requires that the City Council review fees and charges
annually.
NOW,THEREFORE,BE IT RESOLVED by the Tigard City Council that:
SECTION 1: The fees and charges for the City of Tigard are enumerated and set as shown in the attached
schedule(Exhibit A).
SECTION This resolution is effective July 1,2016.
PASSED: This 211- day of 2016.
Mayo/- ity of Tigard
ATTEST:
City kfcoorder-City of Tigard
RESOLUTION NO. 16-,Q,2
Page 1
Exhibit A
City of Tigard, Oregon
Master Fees & Charges Schedule
Fiscal Year 2016 - 2017
Adopted
June 14,2016
11
TIGARD
Page 1
MANAGEMENT
Claims Application Fee(TMC 1.21.050&1.22:Ord.08-0 $1,000.00 /deposit* TMC 1.21.050&1.22 6/24/201
* Claim fee shall be actual cost incurred by the city to process claim. Ord.08-09
Any funds remaining from the deposit after the claim has been processed will be
refunded to the claimant.Payment of any costs exceeding the amount of the deposit
is required prior to issuance of a final decision by the city on the claim.
INISTRATIVE SERVICES
Municipal Court Fees Judge Order
Civil Compromise $150.00 No.01-08 8/28/201
Traffic School and Compliance Program Fee
Criminal $150.00 Rule 16-adopted 08/28/08 8/28/201
Juvenile non-traffic $75.00 8/28/201
Traffic School Equal to the relevant fine provided for the 8/28/201
violation in the Violations Bureau Fine Schedule
Traffic School Setover 520.00 8/28/201
License Reinstatement S15.00 8/28/201
Payment Agreement Administrative Fee 515.00 8/28/201
Overdue Payment Letter $10.00 8/28/201
Show Cause Hearings-Court Costs 8/28/201
Non-compliance $25.00
Non-payment-fees paid prior
to hearing No Fee
Warrant Fee $50.00 8/28/201
MANAGEMENT
Public Assembly Ord.70-35 8/25/19'
Application Fee TMC 7.48.040
Persons Reasonably Anticipated
1,000 to 2,499 $100.00
2,500 to 4,999 5150.00
5,000 to 9,999 $500.00
10,000 to 49,999 $1,000.00
50,000 and over $1,500.00
INISTRATIVE SERVICES/RECORDS
Tigard Municipal Code(TMC)(Titles 1-17)or TMC/CDC(Titles 1-18)
Compact Disk(CD) $10.00 7/1/201
Page 2
WIDE
Attorney Time Current attorney billing rate Dept.Policy 1999
2GB Flash Drives $11.00 each 7/1/2011
Candidate Nomination Petition Fee $50.00
DVD CD $10.00 7/1/2015
Faxes for Public $2.00 /first page 7/1/2007
$1.00 /each additional page
Microfiche Sheet Copies $1.00 /sheet up to 50 sheets plus 7/1/2007
staff time
Microfilm/Microfiche&Photocopies
8-1/2 x 11 $0.25 /page 1999
8-1/2 x 14 $0.50 /page 1999
11 x 17 $1.00 /page 7/1/2005
17 x 24 $1.50 /page 7/1/2007
36 x 36 $2.50 /page 7/1/2007
Candidate Nomination Petition Fee $50.00 7/1/2008
Oversized Copies $2.50 /page 7/1/2011
Photographs actual Cost Dept.Policy 1999
Recording of Documents Actual Cost Dept.Policy 1999
Research Fee Staff hourly rate+Citywide Overhead 2/7/2002
Fee+Materials
Staff Hourly Rate for Miscellaneous Billing Staff hourly rate+benefits+paid time off+ 7/1/2015
and Reimbursement Agreements administrative time+department overhead+citywide overhead
as determined by most recent A-87 Indirect Cost Study
Based on the agreement,all,or part,of the components
of the A-87 Indirect Cost Study may be used.
Page 3
tent Revenue Source r Chw� Authority Effective Date
:IAL&INFORMATION SERVICES
Assessment Assumption $50.00 4/22/1985
Bu et Document
Compact Disk(CD) $10.00 7/1/2007
Paper $50.00
Business License Ord.88-13
Annual Fee*
0-2 employees 388 $89/per year 7/1/204516
3-5 employees 31-8 5119/per year 7/1/201-516
6-10 employees 941-5 5420/per year 7/1/a"16
11-20 employees 3680 5687/per year 7/l/204416
21-50 employees $740 $789/per year 7/l/204-3 16
51-75 employees 3850 $859/per year 7/1/20}516
greater than 75 employees 64,150 $1,163/per year 7/l/204-5 16
*
Adjusted annualll,in coons ion mitt the Portland Consumer Phir Index(CPI)
Pro-Rated Fee Schedule
Issued January 1-June 30 See Fee Schedule above
Issued July 1-December 31 1/2 the annual fee
Temporary License $25.00 1/1/2008
Duplicate License/Change of Ownership Fee
Change in ownership or name only $10.00 1/l/2008
Copy/replacement of license $10.00 1/1/2008
Delinquency Charge
Whenever the business license fee is not paid on or before the delinquent date,a delinquency charge equal to ten percent(1090)of the original business license fee due and payable shall be added for
each calendar month or fraction thereof that the fee remains unpaid. The total amount of the delinquency penalty for any business license year shall not exceed one hundred percent(1000,'0)of the
business license fee due and payable for such year.
Comprehensive Annual Financial Repo $0.00 Dept.Policy 2/7/2002
Franchise Fee/Right ofWIW Usage Fee(,See TMC 15.061
(Owns facility in ROW and provides service to customers Res.01-16 as updated by Ord.08-21A,Ord.12-04,Ord.14-06&
Electricity within Tigard) 5%of gross revenue or$4,000 whichever is greater Ord.14-14 1/9/2013
(Owns facility in ROW and provides no service to Res.01-16 as updated by Ord.08-21A,Ord.12-04,Ord.14-06&
Electricity customers within Tigard) $2.90/linear foot of installation in right-of-way Ord.14-14 1/9/2015
or$4,000,whichever is greater
(Using a nom-owned facility in ROW and provides service to
Electricity customers within Tigard) 5°'0 of gross revenue Ord.14-14 1/9/2015
(Owns facility in ROW and provides service to customers
Natural Gas within Tigard) 5°'0 of gross revenue or$4,000 whichever is greater Ord.0406,updated by Ord.08-21 A,Ord.14-06&Ord.14-14 1/9/2015
(Owns facility in ROW and provides no service to
Natural Gas customers within Tigard) $2.90/linear foot of installation in tight-of-way Ord.0406,updated by Ord.08-21 A,Ord.1406&Ord.1414 1/9/2015
or$4,000,whichever is greater
(Using a non-owned facility in ROW and provides service to
Natural Gas customers within Tigard) 5-6 of gross revenue Ord 1414 1/9/2015
Page 4
(Owns facility in ROW and provides service to customers
Telecom* within Tigard) Y o of gross revenue or$4,000 whichever is greater Ord.00-35,updated by Ord.08-21A,Ord.14-06&Ord.14-14 1/9/2019
Ord.00-35,updated by Ord.06-11,Ord.08-21 A,Ord.14-06&Ord.
Telecom* (Provides no service to customers within Tigard) $2.90/linear foot of installation in right-of-way 14-14 1/9/2019
or$4,000,whichever is greater
(Using a non-owned facility in ROW and provides service to
Telecom* customers within Tigard) 5°'0 of gross revenue Ord.14-14 1/9/2019
*(1nrGrder kkmnmuniration utilities,loqgdi Tann ponders,
prieate networks and eempewiee aarm pntiden)
Res.01-01 Updated to all utility franchise fee application by Ord.06-
Utility Franchise Application Fee $2,000.00 11 8/8/200(
Solid Waste Disposal(See TMC 11.04) 51 o of gross revenue Ord.78-64,as amended by Ord.02-05,Ord.03-08,&Res.13-18 7/l/2011
Cable TV(See TMC 5.12) 5"b of gross revenue Res.99-04 1/26/1 W
Application filed with MACC(email mar a@rnaemr erg)
Lien Search Fee $35.00 Res.01-31 2/1/2004
Overhead Fee
Added to charges for property damage/repair 101.of total charge
Passport Execution Fee $25.00 2/1/200(
Passport Photographs Fee $10.00 4/1/2001
Returned Check Fee $20.00 Res.01-55 10/9/2001
Sewer Reimbursement District Loans
Interest Rate Applicable Federal Rate(AFR),Table,Long-term,semiannual for the
month the loan is approved
System Development Charge Financing(other than Sewer Reimbursement District Loans)
Application Fee $25.00
Interest Rate Prime rate as published in the Wall Street Journal as of the date of the
application plus 4%
Page 5
LRY
Collection Agency Fee $10.00 7/1/2
Disk or CD(Blank) $1.00 2/7/2
Flash Drive $5.00 each 7/1/2
Library Card Fee(non-residents only], $110.00 per year 7/1/2
Lost Items Replacement cost+$5.00 processing fee 7/1/2
Overdue Cultural Passes $10.00 per day 7/1/2
Overdue Items
Daily Charge(All Items except DVDs&Blu-Rays) $0.15 /item 7/1/2
Daily Charge(DVDs&Blu-Rays) $1.00 /item 7/1/2
Maximum Charge $5.00 /item 7/1/2
E-Readers $1.00 per day up to a maximum of$5.00 7/1/2
Public Copier and Printer Charges
$0.10 /page for black&white 2
$0.50 /page for color 7/1/2
Replacement Library Card Fee $1.00 7/1/2
Page 6
rtment Revenue Source Fee or Charge Authority Effective Dai
CE
Alarm Permit Fee(Residential&Commerciall
(Government agencies,disabled residents or over the age o,f 60 are e:'•empt) $25.00 Ord.82-32 7/1/20(
Late payment of fees/fines(after 60 days) $100.00 Ord.82-32 7/1/201
Failure to Obtain Permit within 60 Days of Alarm Installation S100.00 7/1/201
Reinstatement Fee,Once Revoked(After 90 days past due) $100.00 7/1/201
Non-permitted or Revoked Alarm Permit $500.00 7/1/201
Distracted Driving Diversion Program $25.00 7/1/201
False Alarm Fines
1 st false alarm No Charge No Charge Ord.87-73 7/l/201
2nd false alarm No Charge No Charge 7/1/201
3rd false alarm $100.00 7/1/201
4th false alarm 5150.00 7/1/201
5th false alarm $200.00 7/1/201
6 or more false alarms $250.00 7/1/201
Fing-etprint Card $15.00 per card 7/1/201
Good Conduct Background/Letter $10.00 7/1/201
Law Enforcement Officers Safety Act Qualification Fee $25.00 7/1/200
Liquor License $25.00 Res.01-45 7/10/200
Police Services Fees Res.84-17A
DVD/Audio/VMS Evidence Copies $20.00 7/1/201
Police Documents/Reports $10.00 /for the first 15 pages and 7/1/200
$0.30 /page thereafter
Police Digital Photo CD Copies $10.00 /CD 7/1/200
Police Photograph Copies $10.00 /fou 7/l/200
Property Forfeiture for Criminal Activity Varies Ord.99-14 5/25/199'
Second Hand Dealers and Transient Merchant License
Occasional $40.00 7/1/2011
Full-Time $100.00 7/1/2011
Reporting Forms $0.80 each 7/1/2011
Page 7
Special Event Permit Application Fee
For-Profit Fee(Resident) $150.00 7/1/201
For-Profit Fee(Non-Resident) $200.00 7/1/201
Non-Profit Fee(Resident) $75.00 7/1/201
Non-Profit Fee(Non-Resident) $125.00 7/l/201
Social Gaming License
Annual fee due January 1st $100.00 TMC 5.22.060 1/1/201
If a business applies on or after July 1st $50.00 7/1/201
Vehicle Release Fee $125.00 ORS 709.720 7/1/201
Page 8
rtment Revenue Source Fee or Charge , Authority Effective D�
MUNITY DEVELOPMENT-BUILDING
Building Permit Fees
(New Commercial) 10/1/20
Total Valuation:
$0.00 to$500.00 $51.09 /minimum
$500.01 to$2,000.00 $51.09 /for the first$500 and
$2.69 /for each additional$100 or fraction thereof.
$2,000.01 to$25,000.00 $91.44 /for the fust$2,000 and
$10.76 /for each additional$1,000 or fraction thereof
$25,000.01 to$50,000.00 $338.92 /for the fust$25,000 and
$8.06 /for each additional$1,000 or fraction thereof
$50,000.01 to$100,000.00 $540.42 /for the fust$50,000 and
$5.38 /for each additional$1,000 or fraction thereof
$100,000.01 and over $809.42 /for the fust$100,000 and
$4.49 /for each additional$1,000 or fraction thereof
(New Single Family&Multi-Family) 10/1/20
Total Valuation:
$0.00 to$2,000.00 $66.25 /minimum
$2,000.01 to$25,000.00 $66.25 /for the fust$2,000 and
$11.48 /for each additional$1,000 or fraction thereof
$25,000.01 to$50,000.00 $330.29 /for the first$25,000 and
$8.75 /for each additional$1,000 or fraction thereof
$50,000.01 to$100,000.00 $549.04 /for the fust$50,000 and
$6.25 /for each additional$1,000 or fraction thereof
$100,000.01 to$250,000.00 $861.54 /for the fust$100,000 and
$4.46 /for each additional$1,000 or fraction thereof
$250,000.01 to$500,000.00 $1,530.54 /for the fust$250,000 and
$4.42 /for each additional$1,000 or fraction thereof
$500,000.01 to$1,000,000.00 $2,635.54 /for the fust$500,000 and
$4.10 /for each additional$1,000 or fraction thereof
Page 9
IK'Authofity Effective Dal
S1,000,000.01 to$2,000,000.00 $4,685.54 /for the first$1,000,000 and
$3.33 /for each additional$1,000 or fraction thereof
$2,000,000.01 and over $8,015.54 /for the first$2,000,000 and
$3.18 /for each additional$1,000 or fraction thereof
(Additions,Alterations,and Demolitions for
Single Family,Multi-Family,Commercial,&Industrial) 10/1/20C
Total Valuation:
50.00 to$500.00 $53.27 /minimum
S500.01 to$2,000.00 $53.27 /for the first$500 and
$3.39 /for each additional$100 or fraction thereof
$2,000.01 to$25,000.00 $104.12 /for the first$2,000 and
$15.21 /for each additional$1,000 or fraction thereof
$25,000.01 to$50,000.00 $453.95 /for the first$25,000 and
$11.02 /for each additional$1,000 or fraction thereof
$50,000.01 to$100,000.00 $729.45 /for the first$50,000 and
$7.53 /for each additional$1,000 or fraction thereof
S100,000.01 to$500,000.00 $1,105.95 /for the first$100,000 and
$6.04 /for each additional$1,000 or fraction thereof
$500,000.01 to$1,000,000.00 $3,521.95 /for the first$500,000 and
$5.09 /for each additional$1,000 or fraction thereof
$1,000,000.01 and over $6,066.95 /for the first$1,000,000 and
$3.39 /for each additional$1,000 or fraction thereof
Building Plan Review Fee 65%of base building permit fee 9/26/20(
Deferred Submittals $200.00 minimum fee 9/24/20(
Plan Review plus 65%of building permit fee based on valuation
of the particular portion or portions of the project.
Phased Permitting $200.00 9/24/20(
Plan Review plus 10%of building permit fee based on total project valuation
not to exceed$1,500 for each phase
Page 10
ntent Revenue Source Fee or Charge ��luthority Effective Dai
Photovoltaic Solar Panel System $180.00 (includes plan review and administrative fees) i 121 I
plus 12%state surcharge of permit fee
Electrical Fees u
New residential,single or multi-family per dwelling unit;service included:
1000 square feet or less $168.54
Each additional 500 square
feet or portion thereof $33.92
Limited energy,residential or multi-family $75.00
(with above sq ft)
Each manufactured home or
modular dwelling service or feeder $67.84
Services or feeders;installation,alterations or relocation:
200 amps or less $100.70
201 amps to 400 amps $133.56
401 amps to 600 amps $200.34
601 amps to 1000 amps $301.04
Over 1000 amps or volts $552.26
Reconnect only $67.84
Temporary services or feeders;installation,alteration or relocation:
200 amps or less $59.36
201 amps to 400 amps $125.08
401 amps to 600 amps $168.54
Branch circuits;new,alteration or extension per panel:
With purchase of service or
feeder-each branch circuit $7.42
Without purchase of service or feeder
First Branch Circuit $56.18
Each addit.Branch circuit $7.42
Miscellaneous(service or feeder not included):
Each pump or irrigation circuit $67.84
Each sign or outline lighting $67.84
Signal circuit(s)or a limited
energy panel,alteration or extension $75.00
Each additional inspection over
the allowable in any of the above
Per Inspection $66.25 /hour(min 1 hour)
Per Hour $66.25 /hour(min 1 hour)
Industrial Plant Inspection $78.18 /hour(min 1 hour)
Page 11
Authority Effective Dal
Renewable Energy Electrical Fees:
5 kva or less $100.70 7/1/201
5.01 to 15 kva $133.56 7/1/201
15.01 to 25 kva $200.34 7/1/201
Wind generation systems in excess of 25 kva:
25.01 to 50 kva $301.04 7/1/201
50.01 to 100 kva $552.26 7/1/201
>100 kva the permit fee shall be calculated
in accordance with OAR 918-309-0040.
Solar generation systems in excess of 25 kva:
Each additional kva over 25 $7.42 7/1/201
>100 kva no additional charge
Each additional inspection over allowable in any of the above:
Each additional inspection will be charged $66.25/hr 7/1/201
at an hourly rate(1 hr minimum)
N isc.fees at an hourly rate(1 hr minimum) $90.00/hr 7/1/201
Electrical permit plan review fee 25%of the electrical permit fee
Fire Protection Systems 10/1/20C
(Commercial Fire Suppression-Sprinkler,Alarm and Type I-Hood systems based on project valuation)
Total Valuation:
50.00 to$500.00 $51.09 /minimum
S500.01 to$2,000.00 $51.09 /for the first$500 and
$2.69 /for each additional$100 or fraction thereof
$2,000.01 to$25,000.00 $91.44 /for the first$2,000 and
$10.76 /for each additional$1,000 or fraction thereof
$25,000.01 to$50,000.00 $338.92 /for the first$25,000 and
$8.06 /for each additional$1,000 or fraction thereof
$50,000.01 to$100,000.00 $509.42 /for the first$50,000 and
$5.38 /for each additional$1,000 or fraction thereof
$100,000.01 and over $809.42 /for the first$100,000 and
$4.49 /for each additional$1,000 or fraction thereof
Page 12
Authority Effective Da
Fire Life Safety Plan Review 40%of base building permit fee 9/26/20
(Commercial Only)
Fire Protection Systems 10/1/20
(Residential Fire Suppression)
Stand Alone System
Square Footage:
1 to 2,000 $198.75
2,001 to 3,600 $246.45
3601 to 7,200 $310.05
7,201 and over $404.39
Multipurpose or Continuous Loop System
Square Footage:
0 to 2,000 $121.90
2,001 to 3,600 $169.60
3,601 to 7,200 $233.20
7,201 and over $327.54
Manufactured Dwelling Installation $305.50 9/24/20
(Fee includes placement permit$275.50 and state administration fee$30.00)
Manufactured Dwelling;and Mobile Home Per OAR 9/24/20
Parks,Recreation Camps,and Organizational Camps
Mechanical Fees 10/1/20
(1&2 Family Dwellings for New,Additions,or Alterations)
Heating/Cooling.
Air conditioning $46.75
Furnace 100,000 BTU(ducts/vents) $46.75
Furnace 100,000+BTU(ducts/vents) 554.91
I seat pump 561.06
Duct work $23.32
Hydronic hot water system $23.32
Residential boiler(radiator or hydronic) $23.32
Unit heaters(fuel-type,not electric),
in-wall,in duct,suspended,etc. 546.75
Flue/vent for any of above 523.32
Other 523.32
Page 13
tment Revenue Source . Fee or Chargeft Authority Effective Da
Other fuel appliances:
Water heater $23.32
Gas fireplace $33.39
Flue/vent for water heater or gas fireplace $23.32
Log lighter(gas) $23.32
Wood/pellet stove $33.39
Wood fireplace/insert $23.32
Chimney/liner/flue/vent $23.32
Other $23.32
Environmental exhaust and ventilation:
Range hood/other kitchen equipment $33.39
Clothes dryer exhaust $33.39
Single-duct exhaust(bathrooms,
toilet compartments,utility rooms) $23.32
Attic/crawlspace fans $23.32
Other $23.32
Fuel piping.
First four $14.15
Each additional $4.03
Minimum permit fee $90.00
Mechanical plan review fee 25%of Permit Fee
Mechanical Permit Fees
(Commercial and Multi-family)
Total Valuation:
$0.00 to$500.00 $69.06 /minimum
$500.01 to$5,000.00 $69.06 /for the first$500 and
$3.07 /for each additional$100 or fraction thereof
$5,000.01 to$10,000.00 $207.21 /for the first$5,000 and
$2.81 /for each additional$100 or fraction thereof
$10,000.01 to$50,000.00 $347.71 /for the first$10,000 and
$2.54 /for each additional$100 or fraction thereof
$50,000.01 to$100,000.00 $1,363.71 /for the first$50,000 and
$2.49 /for each additional$100 or fraction thereof
$100,000.01 and over $2,608.71 /for the first$100,000 and
$2.92 /for each additional$100 or fraction thereof
Plan Review 25%of permit fee 9/24/201
Page 14
:ment Revenue Source Fee or CharLye Authority Effective Dal
Plumbing Fees 10/1/204
(Commercial,Industrial,Residential,&Multi-Family)
New One&Two Family Dwellings
1 bath $312.70
2 bath $437.78
3 bath $500.32
Each additional bath/kitchen fixture $25.02
Site Utilities
Catch basin or area drain $18.76
Drywell,leach line,or trench drain $18.76
Footing drain,first 100' $50.03
Each additional 100'or part thereof
(footing drain) $37.52
Manufactured home utilities $50.03
Manholes $18.76
Rain drain connector $18.76
Sanitary sewer,first 100' S62.54
Storm sewer,first 100' S62.54
Water service,first 100' S62.54
Each additional 100'or pan thereof
(sanitary,storm,water service) $37.52
Fixture or Item
Backflow preventer $31.27
Backwater valve $12.51
Clothes washer $25.02
Dishwasher $25.02
Drinking fountain $25.02
Ejectors/sump $25.02
Expansion tank $12.51
Fixture/sewer cap $25.02
Moor drain/floor sink/hub $25.02
Garbage disposal $25.02
Hose bib $25.02
Ice maker $12.51
Interceptor/grease trap $25.02
Medical gas(value:$ } see table
Primer $12.51
Roof drain(commercial) $12.51
Sink/basin/lavatory $25.02
Solar units(potable water) $62.54
Tub/shower/shower pan $12.51
Page 15
tment Revenue Source AL_ Fee or Charkm Authority Effective Da
Urinal $25.02
Water closet $25.02
Water heater $37.52
Water Piping/DWV $56.29
Other: $25.02
Minimum permit fee $72.50
Plumbing plan review 25%of permit fee
Medical Gas Systems 9/24/201
Total Valuation:
$1.00 to$5,000.00 $72.50 /minimum
$5,000.01 to$10,000.00 $72.50 /for the first$5,000 and
$1.52 /for each additional$100 or fraction
thereof,to and including$10,000.
$10,000.01 to$25,000.00 $148.50 /for the first$10,000 and
$1.54 /for each additional$100 or fraction
thereof,to and including$25,000.
$25,000.01 to$50,000.00 $379.50 /for the first$25,000 and
$1.45 /for each additional$100 or fraction
thereof,to and including$50,000.
$50,000.01 and over $742.00 /for the first$50,000 and
$1.20 /for each additional$100 or fraction thereof.
Restricted Energy 6/27/201
Residential Energy Use,for all systems combined $75.00
Commercial Energy Use,for each system $75.00
Sanitary Sewer Inspection Fee 6/6/201
Residential $35.00
Commercial $45.00
Industrial $75.00
Site Work/Grading Permit Fees 10/1/201
Bared on project whiatiorr-See Building Permit Feer(New Commercial.
Page 16
Authod= Effective Dye
Miscellaneous Fees
Administrative fee to change issued permits,including but not limited to:
Address change(minimum charge-one-half hour) $90.00 per hour Dept.Policy 7/1/201
Contractor change(minimum charge-one-half hour) $90.00 per hour Dept.Policy 7/1/201
Process and handling fee to mail permits with plans $5.00 Dept.Policy 7/1/201
Fee paid inspections for residential structures pursuant to Title 14,Chapter 16 6/27/206
Single&Two Family Dwellings $100.00
Apartment Houses&Social
Care Facilities $160.00 /plus$7 for each dwelling unit in excess of 3
Hotels $160.00 /plus$5 for each dwelling unit in excess of 5
Information Processing&Archiving(IPA)Fee $2.00 /sheet larger than 11"X 17" 7/1/201
$0.50 /sheet 11"X 17"and smaller
Investigation Fee $90.00 per hour(average cost) 1/1/201
(minimum charge: one-half hour)
Phased Occupancy $200.00 6/27/206
Permit or Plan Review Extension $90.00
Temporgy Occupancy $90.00
Other Inspections&Fees:
1. Inspections outside of normal business hours 10/1/206
(minimum charge-2 hours) $90.00 per hour
2 Reinspection fees $90.00 per hour 10/1/20(
3. Inspections for which no fee is specifically 10/1/20(
indicated(minimum charge:one-half hour) $90.00 per hour
4. Additional plan review required by changes, 10/l/20(
additions or revisions to plans(minimum
charge:one-half hour) $90.00 per hour
Note.A 12%immba7 fee as mandated by the State Building Coder Division is applied to al/permit fees,investigation fees and inspection jeer listed above.
Page 17
Bent Revenue Source C 11iffthority Fe DA
UNITY DEVELOPMENT-DEVELOPMENT SERVICES PLANNING
Accessory Residential Units $44 $250 Council policy decision 2016 7/1/201(
Annexation $3;244 $3,353 7/l/201(
Appeal
Directors Decision(Type II)to Hearings Officer $250 Set by Oregon Law[ORS 227.175(10)(b)] 7/1/2011
Expedited Review(Deposit) 9-4w $300.00 Set by Oregon Law[ORS 197.375(1)(a)] 7/l/201(
Hearings Referee $544 $610 7/1/201(
Planning Commission/Hearing's Officer to
City Council s3342 $3,372 7/l/201(
Approval Extension $351• $357 7/1/201(
Colocation(of Wireless Communication Facilities) TMC 18.798 7/1/201:
Conditional Use
Initial $6,558 $6,676 7/l/201(
Major Modification 86,559 $6,676 7/1/201(
Minor Modification $748 5731 7/1/201(
Design Evaluation Team(DET)
Recommendation(deposit) s1;831 $1,864 7/1/2011
Development Code Provision Review
Single-Family Building Plan s88 $90 7/1/2011
New/Additions/Accessory(including,but not
limited to,garages,carports,porches,patios,decks,
storage sheds,awnings,steps and ramps)
Commercial/Industrial/Institution-New 9351• $357 7/1/2011
Commercial/Indus trial/Instimtion—
Tenant Improvements in Existing Development
Project Valuation up to$4,999
Project Valuation$5,000-$74,999 988 590 7/1/201(
Project Valuation$75,000-$149,999 $244 $224 7/1/201(
Project Valuation$150,000 and more sm+ $357 7/1/201(
Page 18
Downtown Review
Downtown Review Compliance Letter $a 18 $123 7/l/201
Downtown Design Administrative Review
Under$1,000,000.00 $1;678 $1,708+0.004 x project valuation 7/1/201
$1,000,000.00 and over(max fee$25,000.00) 56,,470 $6,586+0.002 x project valuation 7/1/201
Downtown Design Review-Design Review Board S;,4(45 $3,466+applicable Type II fee 7/1/201
Hearing Postponement $399 $406 7/1/201
Historic Overlay/Review District
Historic Overlay Designation $5,45.7 $5,219 7/l/201
Removal Historic Overlay Designation S5+2; $5,219 7/l/201
Exterior Alteration in Historic Overlay District 36769 $783 7/l/201
New Construction in Historic Overlay District $7769 $783 7/l/201
Demolition in Historic Overlay District 9769 $783 7/1/201
Home Occupation Permit
Types 44-4 $123 7/1/201
Type I1 $745 $300 Council policy decision 2016 7/1/2101
Interpretation of the Community_Development Code
Directors Interpretation 36795 $731 7/1/201
Appeal to City Council $3,345 $3,372 7/1/201
Land Partition
Residential and Non-Residential(3 Lots) $4,745 $4,830 7/1/201
Residential and Non-Residential(2 Lots) $63;946 $4,017 7/1/201
Expedited $5,537 $5,637 7/1/201
Final Plat $4,402 $1,122 7/1/201
Lot Line Adjustment $745 $731 7/1/201
Marijuana Facility Permit $7B4 $714 7/1/201
Minor Modification to an Approved Plan $795 $731 7/1/201
Non-Conforming Use Confirmation $795 $731 7/1/201
Planned Development
Conceptual Plan Review $9,286.00 Council policy decision 2016 7/1/201
Detailed Plan Review(Concurrent Hearing) Applicable SDR Fee or Subdivision Fee $150 plus$93.00 per lot Council policy decision 2016 7/1/201
Detailed Plan Review(Separate Hearing) Applicable SDR Fees Subd vi4an Fee $2,771 plus$93.00 per lot Council policy decision 2016 7/1/201
Page 19
Pre-Application Conference 9748 7/l/201
Type III or IV $718 Council policy decision 2016 7/l/201
Type I or Type II $300 Council policy decision 2016 7/1/201
Sensitive Lands Review
With Excessive Slopes/Within Drainage Ways/ 97-" $731 7/1/201
Within 100-Year Floodplain(Type I)
With Excessive Slopes/Within Drainage Ways/ $3,456 $3,207 7/1/201
Within Wetlands(Type II)
With Excessive Slopes/Within Drainage Ways/ $3 463 $3,464 7/1/2101
Within Wetlands/Within the 100-Year
Floodplain(Type III)
Sign Permit
Existing and Modification to an Existing Sign
(No Size Differential) 49:; $201 7/1/201
Temporary Sign(Per Sign) 863 $63 7/1/201
Site Development Review&Major Modification
Under$1,000.000.00 853/x1 $5,664 7/l/201
51,000,000.00/Over 87;,228 $7,358 7/l/201
(+$6.00/per each$10,000.00 over$1,000,000.00)
Minor Modification $748 $300 Council policy decision 2016 7/l/201
Subdivision
Preliminary Plat 86,124 $8,890 Council policy decision 2016 7/1/201
3ltF896 Council policy decision 2016 7/1/201
Expedited Preliminary Plat ane
57,;64 $7,497 7/1/201
ftf $7,365 Council policy decision 2016 7/1/201
Final Plat $2;224 $2261 7/1/201
Plat Name Change 8464 $408 7/1/201
Temporary Usc
Director's Decision 835} $357 7/1/201
Special Exemption/Non-Profit
Special Mixed Use-Central Business District Zone Rate
1st Temporary Use in a Calendar Year 8354 $357 7/1/201
2nd Through 5th Temporary Use With Substantially the
Same Site Plan Within A Calendar Year 862 $63 7/1/201
Page 20
Urban Forestry
Type I Modification to the Urban Forestry Plan
Component of an Approved Land Use Permit $694- $703 7/1/201(
Type III Discretionary Urban Forestry Plan Review
Permit with concurrent Type III review $434 $440 7/1/201(
Type III Discretionary Urban Forestry Plan Review
Permit without concurrent Type III review $2,664 $2,712 7/1/201(
Variance/Adjustment
Administrative Variance $769 $783 7/1/201(
Development Adjustment 5-4-94 $357 7/1/201(
Special Adjustments
Adjustment to a Subdivision $6351 $357 7/1/201(
Reduction of Minimum
Residential Density $4b $357 7/l/201(
Access/Egress Standards
Adjustment $769 $783 7/1/201(
Parking Adjustments
Reduction in Minimum or Increase
In Maximum Parking Ratio $769 $783 7/1/201(
Reduction in New or Existing
Development/Transit Imprvmnt $7-69 $783 7/1/201(
Reduction in Bicycle Parking 4764 $783 7/1/201(
Alternative Parking Garage
Layout $769 $783 7/1/201(
Reduction in Stacking Lane
Length $354 $357 7/1/201(
Sign Code Adjustment $769 $783 7/1/201(
Street Improvement Adjustment $769 $783 7/l/201(
Wireless Communication Facility Adjustments
Setback from Nearby Residence s4A $783 7/1/201(
Distance from Another Tower *4&+ $357 7/l/201(
Zoning Map/Text Amendment
Legislative-Comprehensive Plan $11,043 $11,211 7/1/201(
Legislative-Community Development Code $4,496 $4,577 7/1/201(
Quasi-judicial $4,443 $4,218 7/1/201(
Zoning Analysis(Detailed 5744 $731 7/1/201(
Zoning Inquity Letter(Simple l 44* $107 7/1/201(
Page 21
:UNITY DEVELOPMENT- MISCELLANEOUS FEES&CHARGES
Plan Copies 52.50 7/1/200'
Community•Development Code
CD Rom 510.(]0
Tigard Comprehensive Plan
$75.00 7/1/201
GIS Maps*
8-1/2".x 11"
Non Aerial $2.50 7/1/201
Aerial $4.00 7/1/201
11"x 17"
Non Aerial $5.00 7/1/201
Aerial $7.00 7/1/201
17"x 22"
Non Aerial $11.00 7/1/201
Aerial $15.00 7/1/201
34"x 44"
Non Aerial $25.00 7/1/201
Aerial $.30.00 7/1/201
Custom Maps Staff Hourly Rate
Information Processing&Archiving_ (IPA)Fee
Temporary Sign $5.00 7/1/201
Type I Review $18.00 7/1/201
Type iI Review $175.00 7/1/2011
Type III Review $200.00 7/1/201
Type IV Review $200.00 7/1/201
Neighborhood Meeting;Signs(Land Use 1 $2.00 199
Oversize Load Permit $200.00 7/1/200
Planimetric Maps
Blucline print-quarter section $5.00
Mylar-quarter section $150.00 /+reproduction cost
Retrieval of Materials Confiscated in ROW
Lawn and A-board signs $40.00 /sign 7/1/201
Other signs and materials(based on size and value) City Manager's Discretion 7/1/201
(per TMC 7.61.035 Ord 10-06)
Tigard Transportation System Plan $75.00 7/1/201
Washington Square Regional Center 199
Task Force Recommendations $10.00
Master Plan Map(Zoning/Pian) $2.50
N Ord O3S9.jee it a4x*r ,yem#band ort the Gonthrnrim Cext Inde jm the City ojSwttle o jnb6.rhed in!be Afnil hrnr of Enginee ing Near Rerord.
Page 22
neat Revenue Source Fee AM Authority Effective RSI
UNITY DEVELOPMENT-MISCELLANEOUS DEVELOPMENT
Blasting Permit* *_W4 $380 7/1/204520'
Fee in Lieu of Sewer Based on actual cost of sewer connection, 19,.
if sewer was available
(MU-CBD zone only) the current Washington County Assessor-determined
real market value of the land(not improvements)by
10%.
Sanitary Sewer Connection Fee $5;199 $5,300/dwelling unit 7/l/241420
(This fee is determined by Clean Water Services.
The City of Tigard receives 3.99%of fees collected.)
Water Quality Facility Fee(Fee set by Clean Water Services6/6/201
(City receives 100°o of fees collected)
Residential Single Family $225 /unit
Commercial&Multi-family S225 /2,640 sq.ft of additional
impervious surface
Water Quantity Facility Fee ee set by Clean Water Services) 6/6/201
(City receives 100%of fees collected)
Residential Single Family $275 /unit
Commercial&Multi-family $275 /2,640 sq.ft of additional
impervious surface
Metro Construction Excise Tax 12%of building permits for projects 7/l/201
(City will retain 5%for administrative expenses) with a total valuation of$100,001 or more;
(Tax set by Metro,but collected by cities) not to exceed$12,000.
School District Construction Excise Tax
(City will retain 446 for administrative expenses)
(Tax set by school districts based on ORS 320.170-189 and collected by cities)
Beaverton School District 84.47 $1.23 /sq.ft.residential construction ORS 320.170-189 7/1/291-5 20'
$95g $0.61 /sq.ft.non-residential construction ORS 320.170-189 7/1/291-520
Non-residential maximum per building
$30,700.00 permit or per structure,whichever is less ORS 320.170-189 7/l/20
Tigard-Tualatin School District $1-14 $1.20 /sq.ft.residential construction ORS 320.170-189 7,11 2014 9/l/20
$4S7 $0.60 /sq.ft.non-residential construction ORS 320.170-189 7f 1y 2914 9/l/20
Non-residential maximum per building
$29,900.00 permit or per structure,whichever is less ORS 320.170-189 9/l/20
Page 23
F L. _Im, ._ ' -- ority Effective Dai
UNITY DEVELOPMENT-MISCELLANEOUS DEVELOPMENT
Urban Forestry*
Ilazard Tree Dispute Resolution Fee $449 $172 +$55.00 each additional tree 7/1/201
In Lieu of Planting Fees(Planting&3 Year Maintenance)
Street Tree $550 $560 per 1.5"caliper tree 7/1/201
Open Grown Tree 3550 $560 per 1.5"caliper tree 7/1/201
Stand Grown Tree 3392 $399 per tree 2'in height or 1 gallon container 7/1/201
Tree Permit Fees(Complex)
City Board or Committee
City Manager 3/1/201
Tree Canopy Fee per square foot of tree canopy 3/1/201
Urban Forest Inventory Fees
Open Grown Tree 31-31 $154 +$28.00 each additional tree 7/1/201
Stand of Trees 32110 S204 +$44.00 each additional stand 7/l/201
Tree Establishment Bond(Planting&Early Establishment)
1.5"Caliper Minimum Street or Open
Grown Tree in Subdivisions or Minor
Land Partitions 350I 5510 per tree 7/1/201
1.5"Caliper Minimum Street or Open
Grown Tree in Land Use Review Types
other than Subdivisions or Minor Land
Partitions 5452 5460 per tree 7/1/201
Tin Height or 1 Gallon Container
Minimum Stand Grown Tree in
Subdivisions or Minor Land Partitions 3374+ S3R3 per tree 7/1/201
2'in Height or 1 Gallon Container
Minimum Stand Grown Tree in Land Use
Review Types other than Subdivisions or
Minor Land Partitions $359 $365 per tree 7/1/201
Vacation(Streets and Public Access)* 32,637 $2,705/deposit+actual costs 7/1/2W
*Per Ord 05-59,fee a a*iwedjearh based on the Cawe maion Cort Index for tie City of Seattle aspubbihed in the Apel u'rue o(Eogineering Neux Record.
**1307,00 per tin Imp to end imindbtg 10 tines./,f arr 10 tms,the appliainl mbnrits a deposit of$.107,00 fm-each tree over 10 trees mp In a menrmnm of$5000.00.The eppawni is rkaged uferl sk!#'
time topmersr the pe mit and will he vrfnnded the balanrr of the deposit ifany remains aor 1b reelew is tv"kie
Page 24
Ment Revenue Source �K Fee or Charge , Authority Effective Dat
C WORKS-DEVELOPMENT ENGINEERING
Addressing Assignment Fee Res.99-08 10/29/2003
Erosion Control Inspection Fee
With Development
Construction Cost Estimate$0425,000 $80.70 IGA w/Clean Water Service 7/1/2014
Construction Cost Estimate$25,001-$50,000 $107.60 7/1/2014
Construction Cost Estimate$50,001-$100,000 $161.40 7/1/2014
Construction Cost Estimate over$100,000 $161.40 plus$75 per$100,000 or fraction thereof 7/1/2014
exceeding the first$100,000
Without Development
0-0.99acres $322.80 7/1/2014
lacre of greater $322.80 plus$150 per acre or fraction thereof 7/1/2014
Reinspection Fee $96.84 per hour with a minimum of 1 hour 7/1/2014
Plan Check included in inspection fee 7/1/2014
Plan Resubmittal Review $96.84 per hour with a minimum of 1/2 hour 7/1/2014
Fee In Lieu Of Bicycle Striping
8-inch white stripe $2.69 /linear foot of frontage 7/1/2014
Bike lane legends $188.30/each 7/1/2014
Directional mini-arrows $107.60/each 7/1/2014
Mono-directional reflective markers $4.30/each 7/1/2014
Fee In Lieu Of Undergrounding $35.00 /lineal feet of frontage CDC 18.180.120 10/29/2003
Public Facility Improvement Permit 2%plan review plus 7/1/2009
5%of estimated cost of public improvement with a 7/1/2005
$300 minimum
Reimbursement District Application Fee $300.00 1/27/1998
Reimbursement District Fee Not to Exceed$6,000.00 unless reimbursement fee exceeds$15,000.00. Res.98-03 7/1/2001
Any amount over$15,000.00 shall be reimbursed by the owner;$6,000.00 limit
valid for only 3 years from Council approval of district cost.
Streetlight Energy&Maintenance Fee Based upon PGE Schedule#95 Option"A"for the first two years costs PGE 2000
Traffic/Pedestrian Signs Cost of materials and labor Dept.Policy 2/7/2002
with Council Direction
Page 25
meat Revenue Source Authority _ e Datt'
C WORKS-UTILITIES
Booster Pump Charge
Meter Size(diameter inches)
5/8 x 3/4 $4.86/monthly 1/1/2014
$5.15/monthly 1/1/2015
3/4 x 3/4 $7.00/monthly 1/1/2014
$7.42/monthly 1/1/2015
1 $12.95/monthly 1/1/2014
$13.72/monthly 1/1/2015
1.5 $38.83/monthly 1/1/2014
$41.16/monthly 1/1/2015
2 $63.04/monthly 1/1/2014
$66.82/monthly 1/1/2015
3 $111.16/monthly 1/1/2014
$117.83/monthly 1/1/2015
4 $227.97/monthly 1/1/2014
$241.65/monthly 1/1/2015
6 $242.67/monthly 1/1/2014
$257.23/monthly 1/1/2015
8 $388.27/monthly 1/1/2014
$411.57/monthly 1/1/2015
10 $758.59/monthly 1/1/2014
$804.11 /monthly 1/1/2015
12 $1,092.36/monthly 1/1/2014
$1,157.91 /monthly 1/1/2015
Page 26
Customer Char¢e
(Banc fee charged to cmrtemerr to hate the
City deUtvr water.)
Meter Size(diameter inches)
5/8 x 3/4 3/rnenfhly 4,/1"2045
$26.67/monthly 1/1/2016
$27.54/monthly 1/1/2017
$28.44/monthly 1/1/2018
$29.36/monthly 1/1/2019
3/4 x 3/4 837.2-1 'Im"nehiy 4 4r 2015
$38.42/monthly 1/1/2016
$39.67/monthly 1/1/2017
$40.96/monthly 1/1/2018
$42.29/monthly 1/1/2019
1 $5796 4rnonEhlg 4 4
$59.84/monthly 1/1/2016
$61.78/monthly 1/1/2017
$63.79/monthly 1/1/2018
$65.86/monthly 1/1/2019
1.5 9153.45�,r+fmhiy 4 !n 20 i si`
$158.02/monthly 1/1/2016
$163.16/monthly 1/1/2017
$168.46/monthly 1/1/2018
$173.93/monthly 1/1/2019
2 £248.4 ,4pcir+thl3 '11,120;b
$256.39/monthly 1/1/2016
$264.72/monthly 1/1/2017
$273.32/monthly 1/l/2018
$282.20/monthly 1/1/2019
Page 27
3 6488-77'11"fiwhly X2915
$504.66/monthly 1/1/2016
$521.06/monthly 1/1/2017
$537.99/monthly 1/1/2018
$555.47/monthly 1/1/2019
4 5928-43"menthly 3i3
$958.60/monthly 1/1/2016
$989.75/monthly 1/1/2017
$1,021.92/monthly 1/1/2018
$1,055.13/monthly 1/1/2019
6 S1,041.0 nn,"mo 1,ly 4,11,12015
$1,074.83/monthly 1/1/2016
$1,109.76/monthly 1/1/2017
$1,145.83/monthly 1/1/2018
$1,183.07/monthly1/1/2019
8 " Imfnthlly 1,4,12w5
$1,678.68/monthly 1/1/2016
$1,733.24/monthly 1/1/2017
$1,789.57/monthly 1/1/2018
$1,847.73/monthly 1/1/2019
10 SA,,OW.08 thly 4�4,12046
$3,097.58/monthly 1/1/2016
$3,198.25/monthly 1/1/2017
$3,302.19/monthly 1/1/2018
$3,409.51 /monthly 1/l/2019
12 S4,244.91 r 4f4f2045
$4,382.87/monthly 1/1/2016
$4,525.31 /monthly 1/1/2017
$4,672.38/monthly 1/1/2018
$4,824.23/monthly 1/1/2019
Final Notification Process Fee $30.00/per instance 7/1/2009
Page 28
Effective Date
Fire Hydrant Flow Test 5325(I(1 $375.00 /test 12'91209 7/1/2011
Fire Hydrant Us&"-Temporary
3"hydrant meter deposit* $650.00 9/l/2002
*Deposit is refundable if returned in good condition
Hook-up service $50.00 2/27/2001
Continued use $50.00/month 2/27/2001
Consumption Current irrigation water usage rate 9/1/2002
per 100 cubic feet of water used
Fire Rates(Sprinklers)
6"or smaller $49.16 $18.49 /month 7/l/0-04-5 2016
8"or larger 624.0-4 $24.46 /month 7/1/294.5 2016
Fire Service Connection $1,495.29 /+12'o fee based 7/1/2015
on construction costs.
Meter Disconnection Actual labor and material costs+10'. 9/1/2002
Meter Installation Fees
5/8"x 3/4"Meter 8350{19 $356.00 914,12014 7/1/201i
3/4"x 3/4"Meter $49y(]0 $407.00 ,^ 7/1/201i
1"Meter S550.00 $560.00 n 14,2011 7/1/2011
1 1/2"Meter $ll5fhE)8 $865.00 9"x;,44 7/l/201i
2"Meter $44F141.W $1,120.00 n"� 7/l/201i
3"or more Meter Actual labor&materials+10% 9/1/2011
Meter Out-of-Order Test Meter calibration cost+actual labor 9/1/2002
and material costs+10%
Sanitary Sewer Service(Fee set by Clean Water Services)
(City receives 20%of fees collected)
Base Charge 826.63 $27.45/dwelling unit/month 7/1/2445 2016
Use ChargeQom, $1.82/100 cubic feet/month for 7/1/244§2016
individual customer winter average
Tigard Sewer Surcharge $2.07/dwelling unit/month 10/1/2016
Service Installation Fees
Single Trench-Single Residential Service $3;630-0(1 $3,695.00 includes labor&materials 40. 1,12014 7/1/201,
1 1/2"Meter and greater Actual labor and material costs+10% 10/l/2011
Storm and Surface Water(Fee set by Clean Water Services)
(City retains 75%of Service Charge fees collected)
(City retains 1000,o of its Surcharge fees collected)
Service Charge S7 25 $7.75/ESU/month 7/1/2045 2016
Tigard Stormwater Surcharge $2.00/ESU/month 7/1/2009
Water Bacteriological Quality Testing
Cost per test 36l}(N1 $65.00 71i2009 7/1/201
Page 29
Effective Date
Water Disconnection Charge for Non-payment
During business hours $50.00 2/27/2001
Water Line Construction-New Development 129 0 of Actual Cost 2/27/2001
Water Main Extension
Designed and installed by others 129 o of Actual Cost 9/l/2002
Water Usage Charges
Residential
Tier 2
Tier 3 '�@C COTS 100_..L:_f__.of /1 i 20is
Tier 1 $3.45/100 cubic feet of water TIT/T17/20166
Tier $5.04/100 cubic feet ofwater 1/1/2016
Tier 3 $5.76/100 cubic feet of water I/l/2016
Tier 1 $3.56/100 cubic feet of water 1/1/2017
Tier 2 $5.20/100 cubic feet of water 1/1/2017
Tier 3 $5.95/100 cubic feet of water 1/1/2017
Tier $3.68/100 cubic feetofwater 1/1/2018
Tier $5.37/100 cubic feetofwater 1/1/2018
Tier 3 $6.14/100 cubic feet of water 1/1/2018
Tier 1 $3.80/100 cubic feet of water 1/1/2019
Tier 2 $5.54/100 cubic feet of water 1/l/2019
Tier 3 $6.34/100 cubic feet of water I/1/2019
Multi-Family
T _1 82.99 'WO_..L:_feet of4,14,42045
4.06 /11111....t_..f__.of 1/1T 2 5
Tier 11 $4.65 /100_..L._a_ (if 1,14,12046
Tier 1 $2.87/100 cubic feet of water 1/1/2016
Tier $4.19/100 cubic feet ofwater 1/1/2016
Tier 3 $4.80/100 cubic feet of water 1/1/2016
Tier 1 $2.96/100 cubic feet of water 1/1/2017
Tier 2 $4.33/100 cubic feet ofwater 1/1/2017
Tier 3 $4.96/100 cubic feet of water 1/1/2017
Tier $3.06/100 cubic feet ofwater 1/1/2018
Tier 2 $4.47/100 cubic feet of water 1/1/2018
Tier 3 $5.12/100 cubic feet of water 1/1/2018
Tier 1 $3.16/100 cubic feet of water I/1/2019
Tier 2 $4.62/100 cubic feet of water 1/1/2019
Tier 3 $5.29/100 cubic feet of water 1/l/2019
Page 30
AuthorityEffective Date
Commercial
Tier 1 $4.441,14,12041
Tier 2 $&.44 14 00 etthie feet of 4,11,12044
Tier 4 $;-W 1400 etibie feet of
TierSSS-54 /Inn_..L:_i_...aC...,..,._ 4,/4,/2()45/' n
/' '§
T1400 ettbie feet of 4,14,12046
�T
ier 3 96.44
Tier 1 $3.92/100 cubic feet of water 1/1/20116
Tier 2 $5.72/100 cubic feet of water 1/l/2016
Tier 3 $6.54/100 cubic feet ofwater 1/l/2016
Tier 1 $4.05/100 cubic feet ofwater 1/1/2017
Tier $5.91 /100 cubic feet ofwater 1/1/2017
Tier 3 $6.75/100 cubic feet of water 1/1/2017
Tier 1 $4.18/100 cubic feet of water 1/1/2018
Tier 2 $6.10/100 cubic feet ofwater 1/1/2018
Tier 3 $6.97/100 cubic feet ofwater 1/1/2018
Tier 1 $4.32/100 cubic feet ofwater 1/1/2019
Tier 2 $6.30/100 cubic feet of water 1/1/2019
Tier 3 $7.20/100 cubic feet of water 1/l/2019
Industrial Uniform Rate $5.2 "Fnenthly 4 14
$5.46/monthly 1/1/2016
$5.64/monthly 1/1/2017
$5.82/monthly 1/1/2018
$6.01 /monthly 1/l/2019
Irrigation Uniform Rate $7-4 mthly 1,/4,12045
$7.75/monthly 1/1/2016
$8.00/monthly 1/1/2017
$8.26/monthly 1/1/2018
$8.53/monthly 1/1/2019
Page 31
Effective Date
Tiered Rate Structure Thresholds(100 cubic feet of water)
Meter Size
5/8 x 3/4 Tier 1 6 ccf
Tier 2 15 ccf
Tier 3 over 15 ccf
3/4 x 3/4 Tier 1 9 ccf
Tier 2 22 ccf
Tier 3 over 22 ccf
1 Tier 1 16 ccf
Tier 2 40 ccf
Tier 3 over 40 ccf
1.5 Tier 1 48 ccf
Tier 2 120 ccf
Tier 3 over 120 ccf
2 Tier 1 78 ccf
Tier 2 195 ccf
Tier 3 over 195 ccf
3 Tier 1 137 ccf
Tier 2 344 ccf
Tier 3 over 344 ccf
4 Tier 1 282 ccf
Tier 2 705 ccf
Tier 3 over 705 ccf
6 Tier 1 300 ccf
Tier 2 750 ccf
Tier 3 over 750 ccf
8 Tier 1 480 ccf
Tier 2 1,200 ccf
Tier 3 over 1,200 ccf
10 Tier 1 938 ccf
Tier 2 2,345 ccf
Tier 3 over 2,345 ccf
12 Tier 1 1,350 ccf
Tier 2 3,376 ccf
Tier 3 over 3,376 ccf
Street Maintenance Fee aMC 15.20)
Monthly Residential Rate-Single and Multi-Family $5.30 /unit Ord.16-07 7/1/2016
Monthly Non-Residential Rate $1.86 /per min required parking space 7/1/2016
Monthly Residential Rate-Single and Multi-Family $6.56 /unit 1/1/2017
Monthly Non-Residential Rate $2.15 /per min required parking space 1/1/2017
Staff Review No Charge
City Council Written Appeal Piling Fee $300.00
Tigard Transportation Utility Fee(River Terrace) $5.00 /month Res.14-66 10/1/2016
Page 32
ent Revenue Source Fee or Charge Revi�'' Authority Effective Date
WORKS-PARKS&RECREATION
Community Garden Plot Rental
Large $40.00 /year 7/1/2010
Small $20.00 /year 7/1/2010
Park Reservation Fees
APPI"Am n Pec
Resident $25.00 /per event 7/1/2010
Non-Resident $50.00 /per event 7/1/2010
Rental Change Fee $15.00 /per event 7/1/2011
Organized Group Event Processing Fee $50.00 /per event 7/1/2012
Event Monitor $15.00 /hour 7/1/2012
Special Use/Alcohol Permit Fee $25.00 /per event 7/l/2010
(T,'ee assessed at time of reservation)
Special Event Pemrit Fee(First 3 hours) $75.00 0 to 100 people 7/1/2013
$175.W 101 to 200 people 7/1/2013
$275.00 201 to 500 people 7/1/2013
$475.00 501 to 2000 people 7/1/2013
$1,000.00 2001 and more 7/l/2013
(Each Additional Hour) $25.00 0 to 100 people 7/1/2013
$55.00 101 to 200 people 7/1/2013
$90.00 201 to 500 people 7/1/2013
$155.00 501 to 2000 people 7/1/2013
$330.00 2001 and more 7/1/2013
Shelter Rental Fees(2 hour minimum)
Shelter#2
Resident $35.00 /hour 7/1/2012
Non-Resident $70.00 /hour 7/1/2012
Shelter#1,#3,#4,Bishop/Scheckla Pavilion,&Summedake
Resident $25.00 /hour 7/l/2012
Non-Resident $50.00 /hour 7/1/2012
Soccer/Ball Field Rental Fee(2 hour minimum)
Resident $10.00 /hour 7/1/2010
Non-Resident $20.00 /hour 7/1/2010
Refundable Security/Cleaning Deposit May be required for some events to mitigate Not to exceed$400 7/1/2010
possible cleanup and/or damages.
Page 33
Fee or Charge Authority Effective Date
.IC WORKS-PARKS
Parks&Recreation Fee(TMC 3.70)
Monthly Residential Rate-Single and Multi-Family $3.75 /equivalent dwelling unit 4/1/2016
Monthly Non-Residential Rate $3.75 /equivalent dwelling unit 1&2 4/1/2016
Reduction for Qualified Low Income Single Family 50% 4/1/2016
Notes:
1 Commercial EDU Calculation(rounded to nearest whole EDU):
(Billed Parking Stalls from Street Maintenance Fee*0.76 Jobs Per Stall)/15 EDU Factor =EDUs
2 Industrial EDU Calculation(rounded to nearest whole EDU):
(Billed Parking Stalls from Street Maintenance Fee* 1.19 Jobs Per Stall)/15 EDU Factor =EDUs
Calculation of the annual Park Maintenance Fee Index(from FCS Group report"Tigard Parks Maintenance Fee:
Report to Council for January 12,2016 Public Hearing"
Cost Center Annual Rate Weight
Personnel 4.80% 0.60
Services/Utilities 3.00% 0.25
Materials/Internal Services 4.20% 0.15
Annual Index(Weighted Average) 4.26%
TMC 3.75.050.D authorizes the establishment of a program to reduce the Park Maintenance Fee for low income individuals
responsible for paying the utility bill.
The reduction will last for 12 billing cycles after which the fee reduction will end or the responsible party can reapply
To Qualify for the reduction,the responsible party:
1 Must be the individual(s)on the utility bill
2 Provide documented proof of income such as most recent tax statement or W-2.
3 Have an income at,or below,50%of the Median Income for Oregon as set by the US Department of Housing
and Urban Development(HUD).
Page 34
sue Source Fee or Charge JL AuthlEffective Date
Waste Collection Rates
Residential Cart Collections
Recycling only(carts&yard debris cart) $13.38 7/1/2015
(recycling cart only) $7.17 7/1/2015
(yard debris only) $6.21 7/1/2015
Mini cart(20 gal)with yard debris $21.51 7/1/2015
without yard debris $19.10 7/1/2015
Cart(32 gal)with yard debris $24.50 7/1/2015
without yard debris $21.99 7/1/2015
Cart(60 gal)with yard debris $36.43 7/1/2015
Cart(90 gal)with yard debris $43.50 7/1/2015
On-call service (mixed waste,recycling cart and yard debris $12.25 7/1/2015
Commercial Cart Collections
20 gallon $21.51 7/1/2015
32 gallon $24.50 7/1/2015
60 gallon $36.43 7/1/2015
90 gallon $43.50 7/1/2015
Commercial Container Collections
Weekly Collection Frequency
Every other Week One Two Three Four Five
One yard $65.46 S106.94 $199.95 $289.35 S378.76 S468.39 7/1/2015
Each additional $70.14 $135.29 $200.30 $265.32 $330.48 7/1/2015
One and 1/2 yards $77.02 $137.33 $253.46 $369.49 S485.53 $601.67 7/1/2015
Each additional $97.13 $188.80 $280.45 S372.08 $463.76 7/1/2015
Two yards $90.29 $164.37 $307.03 $449.68 $592.32 $734.96 7/1/2015
Each additional $124.19 $242.38 $360.63 $478.88 $597.05 7/1/2015
Three yards $116.90 $218.29 $414.16 $609.93 $805.73 $1,001.62 7/1/2015
Each additional $178.09 5349.50 $520.89 $692.29 $863.70 7/1/2015
Four yards $143.53 $272.22 S521.35 $770.25 $1,019.15 $1,271.73 7/1/2015
Each additional $232.61 5456.69 $681.19 $905.72 $1,130.37 7/1/2015
Five yards $170.02 $326.20 5628.34 $930.49 $1,232.64 $1,534.80 7/1/2015
Each additional $286.01 $563.71 $841.44 $1,119.19 $1,396.89 7/1/2015
Six yards $196.66 $379.85 $735.25 $1,090.52 $1,445.79 $1,801.17 7/1/2015
Each additional $339.67 $670.59 $1,001.45 $1,332.34 $1,663.28 7/1/2015
Page 35
dee or Charge Auth(Effective Date
Eight yards $249.78 $488.69 $950.33 $1,411.99 $1,873.62 $2,335.28 7/1/2015
Each additional $448.51 $885.68 $1,322.94 $1,760.18 $2,197.36 7/1/2015
1 yard compacted $240.61 $449.90 $651.05 $851.15 $1,053.91 7/1/2015
2 yard compacted $369.85 $690.81 $1,011.79 $1,332.74 $1,653.69 7/1/2015
3 yard compacted $491.14 $931.84 $1,372.31 $1,812.85 $2,253.58 7/1/2015
4 yard compacted $612.49 $1,173.03 $1,733.06 $2,293.08 $2,861.37 7/1/2015
Drop Box Collections 7/1/2015
10 Cubic Yard Container $143.38 7/1/2015
20 Cubic Yard Container $143.38 7/1/2015
30 Cubic Yard Container $143.38 7/1/2015
40 Cubic Yard Container $143.38 7/1/2015
All Compactors $149.80 7/1/2015
Delivery $72.76
Demurrage
20 Cubic Yard Container $5.35 10/20 Yard Box after 48 hours 7/1/2015
30 Cubic Yard Container $7.06 30 Yard Box after 48 hours 7/1/2015
40 Cubic Yard Container $7.06 40 Yard Box after 48 hours 7/1/2015
All Compactors $8.56 Drop Box with Lid 7/1/2015
Delivery
Service Fee plus actual disposal tort and franchise fee
Medical Waste Collections 7/1/2015
On-Site Pick-up Charge $30.50 Rate is the on-site collection 7/1/2015
Disposal Cost per 17 to 31 gallon unit $21.74 charge plus the disposal cost per 7/1/2015
Disposal Cost per 43 gallon unit $26.34 medical container unit
Miscellaneous Service Rates 7/1/2015
Extra mixed waste per cart-overload fee(based on 32 gallon capacity) $4.28 /occurrence 7/1/2015
Extra yard debris(manual up to 32 gallon) $3.21 /occurrence 7/1/2015
Additional yard debris service(second 60 gallon cart) $3.75 /occurrence 7/1/2015
Call back/return for pick up of inaccessible cart per service call $12.84 /occurrence 7/1/2015
Yard service rate-extra distance away from curb after first 5 feet $4.28 /occurrence 7/1/2015
Special service fees $77.04 /occurrence 7/1/2014
Account reinstatement fee $30.00 /occurrence 7/1/2014
NSF check fee $35.00 /occurrence
Tire disposal Hourly Rate+disposal fee
Page 36
m' Auth(Effective Date
Solid Waste Compactor Permit 5100.00 Res.91-76
Solid Waste Collection Rates 1.5%increase
Residential Cart Collections
Recycling only(carts&yard debris cart) $13.58 1/1/2017
(recycling cart only) $7.28 1/1/2017
(yard debris only) $6.30 1/1/2017
Mini cart(20 gal)with yard debris $21.83 1/1/2017
without yard debris $19.39 1/1/2017
Cart(32 gal)with yard debris $24.87 1/1/2017
without yard debris $22.32 1/1/2017
Cart(60 gal)with yard debris $36.98 1/1/2017
Cart(90 gal)with yard debris $44.15 1/1/2017
On-call service (mixed waste,recycling cart and yard debris $12.43 1/1/2017
Commercial Cart Collections
20 gallon $21.83 1/1/2017
32 gallon $24.87 1/1/2017
60 gallon $36.98 1/1/2017
90 gallon $44.15 1/1/2017
Weekly Collection Frequency
Every other Week One Two Three Four Five
One yard $66.44 $108.54 $202.95 $293.69 $384.44 $475.42 1/1/2017
Each additional $71.19 $137.32 $203.30 $269.30 $335.44 1/1/2017
One and 1/2 yards $78.18 $139.39 $257.26 $375.03 $492.81 $610.70 1/1/2017
Each additional $98.59 $191.63 $284.66 $377.66 $470.72 1/1/2017
Two yards $91.64 $166.84 $311.64 $456.43 $601.20 $745.98 1/1/2017
Each additional $126.05 $246.02 $366.04 $486.06 $606.01 1/1/2017
Three yards $118.65 $221.56 $420.37 $619.08 $817.82 $1,016.64 1/1/2017
Each additional $180.76 $354.74 $528.70 $702.67 $876.66 1/1/2017
Four yards $145.68 $276.30 $529.17 $781.80 $1,034.44 $1,290.81 1/1/2017
Each additional $236.10 $463.54 $691.41 $919.31 $1,147.33 1/1/2017
Five yards $172.57 $331.09 $637.77 $944.45 $1,251.13 $1,557.82 1/1/2017
Each additional $290.30 $572.17 $854.06 $1,135.98 $1,417.84 1/1/2017
Six yards $199.61 Pa e3T5.55 $746.28 $1,106.88 $1,467.48 $1,828.19 1/1/2017
g
Fee or Charge Auth(Effective Date]
Each additional $344.77 $680.65 $1,016.47 $1,352.33 $1,688.23 1/1/2017
Eight yards $253.53 $496.02 $964.58 $1,433.17 $1,901.72 $2,370.31 1/1/2017
Each additional $455.24 $898.97 $1,342.78 $1,786.58 $2,230.32 1/1/2017
1 yard compacted $244.22 $456.65 $660.82 $863.92 $1,069.72 1/1/2017
2 yard compacted $375.40 $701.17 $1,026.97 $1,352.73 $1,678.50 1/1/2017
3 yard compacted $498.51 $945.82 $1,392.89 $1,840.04 $2,287.38 1/1/2017
4 yard compacted $621.68 $1,190.63 $1,759.06 $2,327.48 $2,904.29 1/1/2017
Drop Box Collections
10 Cubic Yard Container $145.53 1/1/2017
20 Cubic Yard Container $145.53 1/1/2017
30 Cubic Yard Container $145.53 1/1/2017
40 Cubic Yard Container $145.53 1/1/2017
All Compactor; $152.05 1/1/2017
Delivery $73.85 1/1/2017
Demurtagc
20 Cubic Yard Container $5.43 10/20 Yard Box after 48 hours 1/1/2017
30 Cubic Yard Container $7.17 30 Yard Box after 48 hours 1/1/2017
40 Cubic Yard Container $7.17 40 Yard Box after 48 hours 1/1/2017
All Compactors $8.69 Drop Box with Lid 1/1/2017
Delivery
Service Fee plus actual disposal cost and franchise fee
Medical Waste Collections
On-Site Pick-up Charge $30.96 Rate is the on-site collection 1/1/2017
Disposal Cost per 17 to 31 gallon unit $22.07 charge plus the disposal cost per 1/1/2017
Disposal Cost per 43 gallon unit $26.74 medical container unit 1/1/2017
Miscellaneous Service Rates
Extra mixed waste per cart-overload fee(based on 32 gallon capacity) $4.34 /occurrence 1/1/2017
Extra yard debris(manual up to 32 gallon) $3.26 /occurrence 1/1/2017
.Additional yard debris service(second 60 gallon cart) $3.81 /occurrence 1/1/2017
Call back/return for pick up of inaccessible cart per service call $13.03 /occurrence 1/1/2017
Yard service rate-extra distance away from curb after first 5 feet $4.34 /occurrence 1/1/2017
Special service fees $78.20 /occurrence 1/1/2017
Account reinstatement fee $30.00 /occurrence 7/1/2014
NSF check fee $35.00 /occurrence 7/1/2014
Tire disposal Hourly Rate+disposal fee
Solid Waste Compactor Permit $100.00 Res.91-76
Page 38
irtment Revenue Source Fee or Charge Authority Effective Date
[MUNITY DEVELOPMENT-DEVELOPMENT SERVICES PLANNING
Park System Development Charge(SDC)* Ord. 15-09
Single Family Detached Dwelling-Reimbursement $4:004:09 $1,207.00 7/1/2913 2016
Single Family Detached Dwelling-Improvement $4,248.09 $4,356.00 7/1/2913 2016
Single Family Detached Dwelling-Improvement for Neighborhood Parks
Outside River Terrace $4,57S.90 $1,615.00 7/1/2943 2016
Inside River Terrace $i n� $2,003.00 7/1/2913 2016
Multi-Family Detached Dwelling-Reimbursement $753-09 $772.00 7/1/2045 2016
Multi-Family Detached Dwelling-Improvement $34-98-09 $3,280.00 7/1/2914 2016
Multi-Family Detached Dwelling-Improvement for Neighborhood Parks
Outside River Terrace $4;1.86.09 $1,216.00 7/1/2045 2016
Inside River Terrace $10.00 $1,507.00 7/l/241-5 2016
Non-Residential(Per Employee)-Reimbursement $66.00 $68.00 7/1/2045 2016
Non-Residential(Per Employee)-Improvement $367.00 $376.00 7/1/2045 2016
*See methodology report used to calculate the charges.
The Park System Development Charge(Park SDC)is a City of Tigard charge that is assessed on new development to
support the acquisition and development of parks,greenways,and paved trails,all of which are used by residents of
Tigard and by those who work here. The Park SDC is a one-time fee charged to new development to help pay a portion
of the costs associated with building additional parks and trails to meet the needs created by both residential and
commercial/industrial growth. The SDC revenues can only be used on capacity-increasing capital improvements and
cannot be used to repair existing park facilities.
Park SDCs are assessed on new residential development on a per-unit basis and against commercial and industrial
development on a per-employee basis.
The amount of the charge for each land use category is adjusted each year,effective July 1st,in
relation to two indices,one reflecting changes in development/construction costs and one
reflecting changes in land acquisition costs.
For more detailed and updated information on calculating Park SDC's see"Parks&Recreation System
Development Charge Methodology Report,"by FCS Group,May 19,2015. Adopted by Ord. 15-09.
Page 39
ee or Charge Revised Fe Effective Dan
LIC WORKS-WATER
Water System Development Charge(SDC)*
5/8"x3/4"Meter $7;;;; $7,917 7/1/291-52016
3/4"x3/4"Meter 844,200 $11,402 7/1/291-52016
1"Meter 629; 46 $21,119 7/1/281-52016
11/2"Meter °',� $63,321 7/1/281-52016
2"Meter 8184,003 $102,821 7/1/281-52016
3"Meter 64;8,413 $181,319 7/1/294-52016
4"Meter $365,289 $371,864 7/1/241§2016
6"Meter 8388,848 $395,847 7/1/291-5 2016
8"Meter °='�3 $633,354 7/1/241-52016
Water system connections greater than 8 inch diameter,City will foreca t tbe demands on an average-day,peak-day,and peak-boar basis to determine SDC fees.
*Asper ORS 223.30.1(8)Res. 10-76,the City will use ENR Seattle CCIfor the month of April prior to the budgetyear imposed.
The ENR Seattle CCIforApri12016 is 1.8%bated on a 12-month average. The multipher 1.018 is usedfor all lVater SDCs jectice 71112016.
Page 40
(UNITY DEVELOPMENT-DEVELOPMENT SERVICES PLANNING Ord.15-08
Residential Transportation System Development Charge(SDC)* Res.15-15
Single Family Detached Dwelling-Reimbursement $M4 $ 317 Amende.'d• 'ice} 7/1
Single Family Detached Dwelling-Improvement $65;4442 $ 5,488 Amended. "'�} 7/1
Single Family Detached Dwelling-River Terrace Overlay" 92,642 S 2,684 5 7/1
Multi-Family Dwelling-Reimbursement 54�92 S 185 Amended. _ /1 0019 7/1
Multi-Family Dwelling-Improvement 6;0SF S 3,201 Amended.Pep 6,41,1AI;b*oeo;ie&"�fg!;4b"d ftiA4 PA& 14 1204_;} 7/1
Multi-Family Dwelling-River Terrace Overlay $1,541 S 1,566 'n 7/1
*See Adopted Methodology Report used to calculate the charges.
**Based on 501/6 Credit Policy for the"local"elements of River Terrace Blvd.
For more detailed and updated information on calculating Transportation SDC's see"Transportation System
Development Charge Methodology Report,"by FCS Group,April 28,2015.
} .
Transportation SDC Annual Adjustment Ord.15-09 7/1/2015
Transportation SDC fees shall be adjusted annually on July 1 st of each year beginning in 2016. The index to be used for adjusting transportation SDCs will based on the weighted average
of the year over year escalation for two measurements:90 percent multiplied by the Engineering News Record Construction Cost Index for the Seattle Area percent change plus 10 percent
multiplied by the Oregon Department of Transportation monthly asphalt price(annualized)percent change.
Page 41
�.1 Revenue Source Fee or Charge „ Aft Authority Effective Dat
1UNITY DEVELOPMENT-DEVELOPMENT SERVICES ENGINEERING
Countywide Transportation Development Tax(TDT)-(Example Land Uses and Charges*)
Single Family Detached $8,443 $8,278/per unit WaCo Board of Commissioners 7/1/22944S,2011
Fees were increased by 2.03%
Apartment $5,308 $5,415 /per unit 7/1/2-94-5 2011
Residential Condominium/Townhouse $4,853 $4,951 /per unit 7/l/2204-5 2011
General Office Building $8,545 $8,687 (per TSFGFA**) 7/1/2-94.5 2011
Shopping Center $44,440 $11,366 (per TSFGLA**) 7/1/029445 2011
The Countywide Transportation Development Tax(TDT)is a Washington County Tax approved by the voters in November,2008,that is administered and
collected by the City of Tigard. It went into effect on July 1,2009,replacing the Traffic Impact Fee(TIF)program.
Like TIF,TDT is assessed on new development to help provide funds for the increased capacity transportation improvements needed to accommodate the
additional vehicle traffic and demand for transit facilities generated by that development. It provides funds for these capacity improvements to county and city
arterials,certain collectors,and certain state and transit facilities as listed in the County's Capital Improvements Project List. The TDT is categorized as an
Improvement Fee:revenue must be dedicated to capital improvements that expand capacity and may not be used for maintenance,repair,or other non-capital
improvements.
TDTs are assessed on new development on a per-unit basis. For residential uses the units are dwelling units,bedrooms,etc. For commercial and industrial uses
the units are the square footage of the use or units unique to the use such as lanes,fueling positions,etc.
For information about the TDT regarding a specific project contact the City's Permits/Projects Coordinator at(503)718-2426.
* For more detailed information on calculating TDT charges and a detailed list of Land Uses and TDT charges through 6/30/2013 see Appendix B to
Washington County Engrossed Ordinance 691,August 29,2008 and the Washington County Countywide Transportation Development Tax Manual.
** TSFGFA=thousand square feet gross floor area;TSFGLA=thousand square feet gross leasable area.
Page 42