Loading...
Correspondence (3) CANTERBURY CREST BUILDING PERMIT NUMBER ADDRESS 1 BUP2005-00277 10871 SW CANTERBURY LN 2 BUP2005-00279 10857 SW CANTERBURY LN 3 BUP2005-00280 10845 SW CANTERBURY LN 4 BUP2005-00282 10839 SW CANTERBURY LN 5 BUP2005-00285 10831 SW CANTERBURY LN 6 BUP2005-00288 10819 SW CANTERBURY LN 7 BUP2005-00290 10807 SW CANTERBURY LN 8 BUP2005-00300 10801 SW CANTERBURY LN 9 BUP2005-00298 10813 SW CANTERBURY LN 10 BUP2005-00289 10775 SW CANTERBURY LN 11 BUP2005-00291 10769 SW CANTERBURY LN 12 BUP2005-00292 10765 SW CANTERBURY LN 13 BUP2005-00303 10771 SW CANTERBURY LN 14 BUP2005-00302 10779 SW CANTERBURY LN 15 BUP2005-00301 10783 SW CANTERBURY LN 16 BUP2005-00293 10739 SW CANTERBURY LN 17 BUP2005-00295 10731 SW CANTERBURY LN 18 BUP2005-00296 10723 SW CANTERBURY LN 19 BUP2005-00299 10715 SW CANTERBURY LN 20 BUP2005-00309 10711 SW CANTERBURY LN 21 BUP2005-00308 10719 SW CANTERBURY LN 22 BUP2005-00307 10727 SW CANTERBURY LN 23 BUP2005-00306 10735 SW CANTERBURY LN 24 BUP2005-00305 10743 SW CANTERBURY LN 25 BUP2005-00304 10749 SW CANTERBURY LN 26 BUP2005-00284 10797 SW CANTERBURY LN 27 BUP2005-00286 10793 SW CANTERBURY LN 28 BUP2005-00287 10789 SW CANTERBURY LN 29 BUP2005-00297 10825 SW CANTERBURY LN 30 BUP2005-00309 10711 SW CANTERBURY LN 31 BUP2005-00281 10863 SW CANTERBURY LN 32 BUP2005-00283 10877 SW CANTERBURY LN LZOlg D ). nilLDR HithT ARCH TILT 11715 SE 5T11 STREET. 541TE 100 DELLEVVE, WA 96005 Ph 1425) 454-7130 PAX 1425) 646-0945 July 13, 2005 RECENED Val Henzel, Plans Examiner ltj 13125 SW Hall Boulevard Tigard, Oregon 97223 {� � tLDIR RE: Canterbury project for Polygon Northwest Company Dear Val, As requested by your e-mail sent to Kathleen of Polygon and follow up conversation we have made the requested revisions. The attached drawings reflect these changes. The carriage style building has been mirrored over to match the site plan. This includes all plans and the elevations. The detail bugs 5/D3 and 1/F3 have been changed on the plan sheets. We have added an additional detail, 3/D2, to replace the mislabeled call-out 5/D3. The mislabeled detail call-out 4/D5 has been revised. The sheet reference has been revised; a number of corrections were made. We have added sheet R10 which was missing from the set. I checked the square footages and they are correct as shown on the cover sheet. As we discussed, we calculate the square footages to the inside face of the walls. All items associated with the permits, if needed, will be handled by Polygon. If you have any additional follow up questions please call. Sincerely, Bob Weible I Irl 0INI4IKI> i. r II il,0 hKdIN 6T K ki IH! [i ll Ir'K,ir 11715 5r 5111 3 r"U r.. r•. :Mir l 0 0 D r;L r.r,V(r r. W a 96005 Yl9 (425) 454•7l30 nut 14; 5B 416-0915 August 31, 2005 City of Tigard Van Henzel, Plans Examiner 13125 SW Hall Blvd. Tigard, OR 97223 RE: Canterbury Project for Polygon Northwest Company Dear Van, Attached are the revised plans and associated data, revised in response to your plan review letter dated July 20, 2005. The revisions are as follows; 1. Additional unit plan sheets (U sheet numbers denoted by suffix a)have been generated and included for units E, F, G& H to illustrate the mirrored unit plan layouts. 2. Shear wall and Framing design diagrams by the structural engineer have been coordinated with/revised as necessary with the architectural U and F-series sheets. 3. Two sets of the revised structural calculations are enclosed. 4. Polygon Northwest to submit completed TVF&R Building Survey Reports. 5. By others, to be submitted by Polygon Northwest. If you have any additional follow up questions please call. Sincerely, David Squi es L o INI M J. 111111,1 1° dfl wir a (1I 11715 sr 5TH srKr:rr. surrr. 100 dr1.r.cvc! . Wa 98005 P11 14251 454-7130 rax (425) 646-0945 August 31, 2005 City of Tigard Van Henzel, Plans Examiner 13125 SW Hall Blvd. Tigard, OR 97223 RE: Canterbury Project for Polygon Northwest Company Dear Van, Attached are the revised plans and associated data, revised in response to your plan review letter dated July 20, 2005. The revisions are as follows; 1. Additional unit plan sheets (U sheet numbers denoted by suffix a)have been generated and included for units E, F, G&H to illustrate the mirrored unit plan layouts. 2. Shear wall and Framing design diagrams by the structural engineer have been coordinated with/revised as necessary with the architectural U and F-series sheets. 3. Two sets of the revised structural calculations are enclosed. 4. Polygon Northwest to submit completed TVF&R Building Survey Reports. 5. By others, to be submitted by Polygon Northwest. If you have any additional follow up questions please call. Sincerely, David Squi es 7,------A ' 1I, July 20, 2005 .s� z CITY OF TIGARD Canterbury Place, LLC OREGON Duane Wilson 109E 13th St. \ .. Vancouver,WA 98660 RE:NEW TWO AND THREE STORY MULTYFAMILY BUILDINGS Tenant Name: Canterbury CrestOccupancy Type: Rl Construction Type: V Ihr&V-N, Sprinklered Stories: 2& 3 The plan review was performed under the State of Oregon Structural Specialty Code(OSSC) 1998 edition; and the Tualatin Valley Fire&Rescue Ordinance 99-01 (TVFR99-01) 1999 edition.The following information is required in order to complete the review. 1. Provide actual building layout to match foundation plan for all buildings where units are reversed on the foundation plan. Example like units EI,Fl, Gl, and H where they are flipped to be placed in the lay out of the building. 2. Provide information showing shear wall and framing design diagrams match both submitted engineers calculations and diagrams in submitted plans.Example Unit E middle level framing plan in the structural calc shows'HD8A crossed out and PHD8 put in its place also other areas with hand written items on these drawings, as submitted in this office and received on Dec. 29, 2005. (The structural calc. diagrams don't match the submitted plan in all areas. 3. Provide 2 complete sets of structural calc when above completed. 4. Provide copy of TVF&R Building Survey Report. Attached 5. Provide exterior elevations and erosion control plan with details. When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard,Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. Respectfully, ....,,,,, al Henzel, Senior Plans Examiner 13125 SW Hall Blvd., Tigard, OR 97223 (503)639-4171 TDD(503) 684-2772 CT ENGINEERING P L L C 180 Nickerson St. Suite 302 Seattle,WA 98109 (206)285-4512(V) (206)285-0618(F) teaton@ctengineering.com 29 August 2005 Val Henze!—Senior Plans Examiner City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 do: Bob Weible Milbrandt Architects 11715 SE 5th Street, Suite 100 Bellevue, WA 98005 Re: Canterbury Crest(a.k.a. Canterbury Woods) Response to review comments dated 20 July 2005 Dear Val, We have reviewed the comments contained in the review letter dated 20 July 2005 pertaining to the Canterbury project that is planned for construction in Tigard, OR. We have prepared the following itemized response to those comments that pertain to the structural issues. Responses to the non-structural items are by the architect. Please refer to the original comments as we have provided only our responses. 2 A review has been completed of the framing drawings and back-checked with the structural calculations. Note that some of the items originally specified are no longer produced and as such the drawings have been revised. On such item is the PHD8 which is no longer made. All PHD8 references on the plans have been revised to HDQ8 holdowns. Note also that the HDQ8 has a higher load capacity and was able to replace HD8A and many HD10A holdowns on the plans. PHD2 holdowns have replaced HD2A holdowns as we believe that they are more easily installed correctly. The manufactured joist(the TJI/Pro series is no longer produced)callouts also have been revised to reflect items that are currently available. 3. Two sets of calculations are included for your use. See also response item 2 We trust that this letter along with the revised plans address your comments. Please phone if you have any questions or further comments pertaining to this letter, the structural calculations, or the plans. Sincerely, ,or ') Todd R. Eaton PE CT Engineering q4196 Structural Engineers Pri:nte ;, z., CT ENGINEERING P L L C 180 Nickerson St. Suite 302 Seattle,WA 98109 (206)285-4512(V) (206)285-0618(F) teaton@ctengineering.com 29 August 2005 Val Henzel—Senior Plans Examiner City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 do: Bob Weible Milbrandt Architects 11715 SE 5th Street, Suite 100 Bellevue, WA 98005 Re: Canterbury Crest(a.k.a. Canterbury Woods) Response to review comments dated 20 July 2005 Dear Val, We have reviewed the comments contained in the review letter dated 20 July 2005 pertaining to the Canterbury project that is planned for construction in Tigard, OR. We have prepared the following itemized response to those comments that pertain to the structural issues. Responses to the non-structural items are by the architect. Please refer to the original comments as we have provided only our responses. 2 A review has been completed of the framing drawings and back-checked with the structural calculations. Note that some of the items originally specified are no longer produced and as such the drawings have been revised. On such item is the PHD8 which is no longer made. All PHD8 references on the plans have been revised to HDQ8 holdowns. Note also that the HDQ8 has a higher load capacity and was able to replace HD8A and many HD10A holdowns on the plans. PHD2 holdowns have replaced HD2A holdowns as we believe that they are more easily installed correctly. The manufactured joist(the TJI/Pro series is no longer produced)callouts also have been revised to reflect items that are currently available. 3. Two sets of calculations are included for your use. See also response item 2 We trust that this letter along with the revised plans address your comments. Please phone if you have any questions or further comments pertaining to this letter,the structural calculations, or the plans. Sincerely, )' ,/ . Todd R. Eaton PE CT Engineering :\04t96ldocurnetts•04190 rsp01_050B29.4oc Structural Engineers Printed:August 29,2CC5