Loading...
Plans up?Fj',.x,,,iNGt VAULTED TED RECE1 I/cr.% - v,/,..-.u :-,Z...1 4,-,•.,....,-1 . AUG 1 7 2016 Cay, r, uF 77 01-IILDING GARD DioN 7 Nu V LANDING N 7 y V N X 7 V N N V 0 N<" MASTER SUITE V N 7 y V X N N V I N V N /n z ti I„H I I I I \ A:_n_41 DA__N at "([ n II w = Fr 1.11 Z II luar,ap_FA w > (r) Lf) =L ,= , a) o--) BEDROOM 2 ERDROCNI 3 REVISIONS: LEGEND INDICATES NEVI STUD WALL E=7 INDICATES EXISTING STUD WALL TO BE REMOVED INDICATES EXISTS G STUD WALL' N NDICATES EXISTING POST TO BE REMOVED EXIST. / 1. NI:AGATES EXISTING post OFFICE COPY DEMOLITION SECOND LEVEL FLOOR PLAN . Crry op TiGARD REVIEUrnk:40R CODE COMPLIANCE ' I EXIST. / DEMOLITION SECOND LEVEL FLOOR PLAN SCALE 1/4..1'.0. N.., DI.1 Approved: I DATE: 621.1i OTC: [ I SCALE: 1/4" . r-C DRAUN: ML Permit#: JOS NO: MN-16-0 Address: cis-G...6 . - °° .3.--1 0 Suite it: " `(-------'-L-...r'` C"-1-. is • .............}...._...........,. ...................- „ pat '1 AZZIGala......ih 0 ORIGINAL SWEET SIZE:72x34 / LANDING MASTER 91117E / T✓ 0.4 / \ / \ / \ \ UPPER VAULTED LIVING ROOM _ o BArHI r CLQ 0 ( .SITTING AREA F.DROOM Z BEDROOM 3 REVISIONS: NELU SECOND FLOOR PLAN I NEUJ SECOND FLOOR PLAN ALI SCALE:V4,1'-O' DATE: 621.1I SCALE: 14" = I'-C DRAWN: MT, JOB NO: I6-0 5 ORIGINAL SHEET SIZE:2234 y 1 4cU HHOA-e, �GINEF,'o / 51 9PE 1 v OR ON • -414D 1J'NSP ' Expires:6-30-17 H - STRUCTURAL NOTES i§.1gENI tiliEggi Lt-c, UQQE 2014 OSSC.AM 2014 ORSC. C Pas T L a 0ESIGN LOADS: pp�p� �yl^py yyy wm N°ate' LIELOAD -4AS0 P5F RED ® 9 kz m�'�a DEADEE LOAD -AS REF '� 333 -g^m SNOW LOAD -25 PSF `��' SEISMIC •DI SEISMIC DESIGN CATEGORY PER ORSC. m WIND: -ASCE 1 20Iph 3-SEC GUST EXP.B yq i p3¢iik 6 z a '6 SOIL BEARING •BOO PSF ASSUMED 3�O' $i a 8 ET-2,3_d= EARTHWORK: (E)HDR (El HDR (E)HDR !E)HDR y2y! l gy a` E I EXCAVATE TO LEES I LEVELS 5+40118 ON DRAWINGS.ALL FOOTINGS TO BEAR . x5 '�Yn-" o 04 FIRM UNDISTWFS3ED NATIVE SANDS /� 'gg = a CONCRETE: \ \ 1 \ g � BB USW L REFERENCE SPECIFICATION-ACI 301 PLANT MIX PER ASTM 094. / / 4 H� 2.STRENGTH: \ \ 3 E AGROUND BOOR SLAB-3p00 PSI AT 1B DAYS yL B FOOTINGS,WALLS 2500 PS 428 DAYS ® \ / \ ® \ / G g*F.1409 °;..I.:44 3.REAFORCMG-ASTM A645,GRADE 60.LAP BARS AS 5HO)N ON PLAN WITH y t in MN LAP OF 44 BAR DIAMETERS.PROVIDE 24'400(5 AT CORNERS. I 2 4.BOLTS t� fE/2x8's \ / \ / \ / % ;11111;o A ANCHOR BOLTS-A5TM A301 •YG'OG OPEN / B.EXPANSION BOLTS-HILT!KWIK-BOLT-TZ SPECIAL INSPECTION REQUIRED. \ / x (El 2x6'•/(N NO'- 3 E / (E)2xB's/(N)240's 'O (E)2xe's D C.ADHESIVE ANCHORS-14101-RE 500-SD OR SIMPSON SET•XP. \ / / •16'OL. \ / •W'O.C. •16'OC SPECIAL INSPECTION REQUIRED. \ x 5.COVER-AS FOLLOWS UNLESS NOIR OTHERWISE ON PLANS. AN A CONCRETE PLACED AGAINST EARTH•3' / \ El POST \ / / \ _ B 7' FORMED CONCRETE AGARBT EARTH-M. �" C.SECOND FLOOR SLAB•A / \ X \ / / \ I 6.FINISH•PER ARCHITECT 1.SUBMITTALS:(4 COPIES) - / \ \ / / A MIX DESIGNS PER BC BON B.REIIFORLMG SHOP DRAILINGS / / 2-2x4 CARPENTRY: \\ „ \ OPEN / \\� I- L REFERENCE SPECIFICATION-IBL CHAPTER 23. 1, 2.LIMBER-DOUGLAS FIR WITH MOISTURE CONTENT PER SPECIFICATION.ALL \ / M CONTACT WITH CONCRETE TO BE PRESSURE PRESERVATIVE TREATED. ® / GRADE AS FOLLOWS. A POSTS AND BEAMS 63 AND GREATER-DF.NO L !E)2x8 CLG JSTS O 3 / \ 0 B.POSTS AND BEAMS 4X SMALLER-DF.NO 2 OR BETTER J4 •We 00. C.STUDS-DF.STUD GRADE OR BETTER moi/ \ pi D.PLATES 1 SILLS•Of N0.2 P.T.AT CONCRETE SLAB. 2-2x4I I $ lO'll�� •KILN DRIED DF.STANDARD TYPICAL / // \ LL 3.SHEATHING•PLYWOOD,ORIENTED STRANDBOARD OR APPROVED EQUAL. / 3 A ROOF 1 WALL SHEATHING-APA 24/0.THICKNESS 1 NAILING PER PLAN. LIillE. LI B.FLOOR SHEATHING-APA-48/24.THICKNESS AND NAILING PER PLAN / \ (EN 246's (E)2xB's Z 3 C4.PLTLLOOD LLEB JOISTS-TRB JOIST TJI SERIES OR APPROVED EQUAL / \ •W'O.C. •W'OC al BRIDGING BLOCKING 1 ERECTION BRACING PER MANFACTURER'S } RECOMMENDATIONIL \ 5.GLUE LAMINATED BEAMS•DOIQLAS FIR COMBINATION 24F-V4,FABRICATED WITH WATER PROOF GLUE.FINISH PER PROJECT SPECIFICATIONS. \ (f)S.P.T.GLUE LAMINATED BEAMS-EWE 24F-V5111/SP,FABRICATED WITH L / mm L WATER PROOF GLUE FINISH PER PROJECT SPECIFC.4TIONS. Ln 1.GLUE LAMINATED COLUMNS-DOUGLAS FIR COMBINATION 24F-VB,FABRCATED \ N.. ON PROOF GLUE.FINISH PER PROJECT SPECIFICATIONS. O (E2 POS / \ 0 El POST ln 8.PARALLATI BEAMS-20 E BY TRJS JOIST. S.TMBERSTRAND BEAMS-3-1/2',ISE BY IRS JOIST 0 TMBER57RAVD BLOCKING-LSL 1.3/4'BY 7R5 JOIST. 1_7 I // \ 1 ONN IL CONNECTIONS-SIMPSON STRONG-TIE OR ISP,GALVANIZED. R.FRAING-PER INDUSTRY 1 CODE STANDARDS FOR ALL DETAILS NOT 51401N.51401N. \ REFER TO IBC SECTIONS 2324,2325 AND 2326. 13.NAILING•USE COMMON TYPE NAILS.MINMIFI NAILING PER IBL TABLE NO.23-1-(2 UNLESS NOTED OTHERWISE ON PLANS. LCMION WIRE PNEUMATIC HMRAH NAIL NAIL g NAIL NAIL DIAMETER LENGTH APPLICATION A , 300 CO11ICN 02014 P-NAIL 4-IR' 3X DECKING 400 COMMON 02254 P-NAIL 5' 4X DECKING 20D COMM 0.824 P-NAIL 4' FRAMING REVISIONS: SD COMMON 01624 P-NAIL 3-10' FRAMING (00 COMMON 0.1484 P-NAIL 3' FRAMING WA 0.1484 P-NAIL 2.3/8' FLR SHEATHING 80 COTCN 0.814 P-NAIL 2-10' ROOF SHEATHING N/A 0.62'•P-NAIL 3-U2' STRAPS W.DRYING-PRIOR TO INSTALLATION OF GYPSUM WALL BOARD,DRY COMPLETED TOA M4XIMU1 MOISTURE CONTENT OF B%. B.SUBMITTALS-SHOP DRAWINGS,4 COPIES. N.16.UNLESS NOTED OTHERWISE,ALL BEAMS I GIRDER TRUSSES TO BE STRUCTURAL SUPPORTED AT ENDS BY: A MULTIPLE STUDS EQUAL TO BEAM WIDTH(TRIPLE STUD MM)WHEN NOTES / CEILING LOCATED M WALL CONTINUE ON ALL FLOORS DOWN TO FOUNDATION WITH SOLD BLOCKING AT FLOORS.CONN STUDS TOGETHER WITH IBD•TM OC FRAMING / B SOLID POST EQUAL TO BEAM WIDTH LLNEN FREE STANDING EXTEND CONTINIIQUS FOR RILL HEIGHT DOWN TO SOLID BEARING. ROOF FRAMING LEGEND PLAN I CEILING FRAMING PLAN 2 ROOF FRAMING PLAN C--7 INDICATES WALL ABOVE FRAMING LEVEL S 1.1 SCALE:114".1'-0' S1.1 SCALE:V4'.1'-0' I I INDICATES WALL BELOW FRAMING LEVEL INDICATES INTERIOR BEARING WALL ® BELOW FRAMING LEVEL D 6 21.I( ® INDICATES COLU'N ABOVE SCALE: Ti" c I'-C • INDICATES COLUMN BELOW FRAIMG LEVEL DRAIN: MT/ JOB NO: MZI-I-I6-O O INDICATES DETAIL REFERENCE APPLIES TO ALL SIMILAR LOCATIONS ><: INDICATES VAULTED AREA i i so ORIGINAL SHEET SIZE:22434 r '\`''C,I N EFs,'o M)2x10 RIDGE BD (N)2xIO'e/EXIST.2xe'e tif: 51 SPE I 1,:. (1.1)2.2x6 TIEb P kj-ON •32.OL(EVERT OTHER RAFTER PAIR) '411'. '\yA°j w/3-SDS�x3'SC(ELLS12 A (E)2x6'e/(N)2x10's •EA END(EA 1x6 q�lD J., He •W'OL m1144111411k6 2-I6d Expires:6-30-17 FROM BO/•O.OLRAFTER6 a 2.16c1Q • •OL 'W `f X W B FROM(AU/(E/RAFTERS = .`v 4$§o94111 ,N ( M)NON-STRIC7URAL ritli Z'3 2x4 PONT WALL $y / _'� %c / (E/24 LLD JSTS- g3 t148 = NOTCH(N)2x10b yg aJ E$ & p. w TC •(E)DBL TOP `Sea W4 B13 NOH M/2x10'e •(E)DBL TOP R U k1 \ (E)2(4 STUD WALL ( M)2x4 STUD WALL (E)2x4 STUD WALL !131 9ed 0::1::44 •14'OL S4 3 § 11111;1. x 1 ck M)/(E)1x8 ELKS g = •32"OL. .11 2.16c1•121 oL. tim m FRAMING SECTION �► ► 1'� I SCALE U1'•I'-O' Ctf- y►� RIPPED 2x NAILR W (E)2x4 DEL TOP R 11 k, (E/2x4 PONT WALL Lh (E)24 LLD JSTS III 16d•1210C,FROM TO BE REMOVED (N)/(E)STUDS et 1111 �111 (E)EXT.SHT'D 'p' ire �� Iv ,:,,,,000- NOTCH EXIST. �` REVISIONS: DBL TOP R AS REDD �•"'+.. •(N)FULL HT.2x6 STUDS 'la- (N)2x6 FULL AT.STUD -..YS?'e •EA EXIST.2x4 SW i- (E)zxf STUD WALL :4-,,,,, -4001:: FRAMING SECTION (N)7x CONT.NAILR IIII / DETAILS (E)PERP.FLR JETS ILII (E)2x4 STUD SILL . NEW 4x6&1 I'I,, N2SA CLIP•EA SIDE '1 IP Of BM•EA SES(EXIST III CLG./ST IP _A_ QQ" l&-51: ,I DATE: 6 .I 4.71 Ii10,004), SCALE: vARIE rE)2x4 STUD WALL `. DRAWN: ME • JOB NO: MZH-I6-0 1�1 EXIST.zx c I li( EXIST.IUALL TO BE 1 REMOVED,AFTER RJSTAL 1� OF BM IS COMPLETE 2 . 0 (N)2x6 FULL RT. 2x6 STUDS fl VAULTED END WALL NEW BM / EXIST. /NEW CLG JSTS ® SCALE:I'.I'•O' O 5 ____ O ORIGINAL SHEET SIZE.22(34