Plans (44) MILBRANDT ARCHITECTS Bulletin
25 Central Way, Suite 210 • Kirkland, WA 98033
Tel: (425) 454-7130 • Fax: (425) 646-0945
Bulletin#: MA-12 Date: 8-17-2016 ATTACHMENTS: MA-12
Job Name: RIVER TERRACE Job No: 15-03
This bulletin is in response to a request from the City of Tigard regarding a%"P.T. plywood
spacer strip being installed behind the deck ledger as shown on the attached MA-12 detail.
The attached MA-12 detail is approved by Milbrandt Architects to be used for the deck ledger
installation on the River Terrace project.
CITY OF'TIGARD
REVIEWED FOR CODE COMPLIANCE
Approved: N/ J
OTC: [ J
Permit #: r1'js-)- J (, - 000 caLl-
Address: 15i-HO _� _S ►� c-k
Suite #:
By: - Date: 9 al- 14
OFA:CE COPY
•
Distribution: From: David Burnett
Polygon Northwest
Attn: Chris Walther
Phone: (360)695-7700
REVISION
,
BUILDING PAPER
PRE-FLASHING, EXTEND 6"
ABOVE LEDGER, MIN.
METAL Z-FLASHING TYPE B
ii' / r
SEE DETAIL 19/15
SPACED DECKING
���l ��P77"
T77a
2
P.T. 2x JOISTS
]- SEE STRUC. FORP' L-.'r li,„1.'-
CONNECTION DETAILSI----- :*.` 1P.T. 2x LEDGER
P.T. PLYWOOD FUR STRIPS
Y" x 1Y2'-2" AT EVERY LAG.
TYPE A FLASHING
I!� SEE DETAIL 19/15
I
\ PRE-FLASHING, EXTEND 2" BELOW LEDGER, MIN.
SIDING
BUILDING PAPER OR PRE-FLASHING;
EXTEND TO ABOVE DECK-TO-WALL FLASHING
DECK TO WALL FLASHING
CI SPACED DECKING
1-1/2" = 1'-o- SECTION
R317.1.1.1 Field treatment/ Field-cut ends, notches and
drilled holes of preservative-treated wood shall be treated in
the field in accordance with AWPA M4
PROJECT NAME: RIVER TERRACE ARCH. JOB NO.: 1503 BULLETIN
DATE: 08-16-16 SCALE: 1 1/2" = 1'-0" PAGE:
PREPARED BY: DAVID BURNETT REF. SHEETS: DETAILS MA-12
This bulletin is a stand-alone document. Referenced sheets posted at online plan center have NOT been updated typically.
CT ENGINEERING
INC 180 Nickerson St.
Suite 302
Seattle,WA 98109
(206)2854512(V)
(206)285-0618(F)
asolomon@ctengineering.com
BULLETIN
Date: August 17,2016 Number:CT-11 Project#: 15238
Project Name: River Terrace Attached: None
Subject: Deck Connection Detail(Spaced Decking)
Drawings Affected:
Description/Action:
This bulletin provides response to RFI, design clarifications and/or variation requests for the `River
Terrace' project located in Tigard, Oregon.
Based on our review of Bulletin MA-12 (Deck to Wall Flashing—Spaced Decking), this is an
acceptable deck connection detail provided the fasteners attaching the ledger to the structure have
the required penetration to the rim/blocking per the structural deck details.
.(c�G
C9 ' 60 Ni
,(�j,
cd11.4 kams
,REGrANikk
:4£S T GO'
08/17/2016
CALL WITH ANY QUESTIONS
Issued by: Arnold R. Solomon Date: Aug. 17.2016
Distribution:
Contact Information:
Chris Walther Polygon Northwest Company •
Angela Graiewski Polygon Northwest Company
David Burnett Milbrandt Architects
R:\15238 River Terrace\Bulletins\15238_2016.08.17_CT11_Deck Connection Detail(Spaced Decking).doc
Structural Engineers