Plans P
.041
STARK 4001 Main Street, Suite 305
FOUNDATIONS Vancouver WA, 98663
P: 360.566.7343
STRUCTURAL CALCULATIONS
PREPARED FOR
RAMJACK WEST -e.,_,A
FOR
FOUNDATION REPAIR t
12840 SW 107TH COURT
TIGARD,OR . .
SPECIAL INSPECTION REQUIRED .__.,•
;.
State of Oregon ruc ur'ai Specialty Code ;. PROJECT NUMBER: 16.083.RAM
DATE: SEPTEMBER 6, 2016
0 Concrete and Reinforcing incrg St l
PROJECT MANAGER: DANIEL STARK, P.E. ,.!
:.
Bolts Installed in Concrete ,„.
0 Special Moment-Resisting Concrete Frame
0 Reinforcing Steel&Prestressing Steel Tendons r ...\70 PRO/
0 Structural Welding �� $GINE4
`�'/l�
7 940PE
High-Strensght long •
c., 0 Structural Masonry
x'
- .....OREGON
Reinforced Gypsum Concrete %11°c ra.z°°'` s�Q
0 Insulating Concrete Fill `'wV/ELW�
� ' EXP.: 06/30/18
Spray Applied Fire-Resistive Material*
0 Piangs,Drilled Piero and Caissons
0 Shotcrete
1 0 Special Gr dng. Excavation and F „+29
j g--ry
k Ai
. Other h^sew i , > OFFICE COPY
e,,.. ._ .. CITY OP TIGARD`
REVIEWED FOR CODE COMPLIANCE
Approved: I/
OTC: ( j
Permit#: rn ta,D1 .g-- 0O3S J
Address: j a R 1-t-O ‘5,‘,4 10 7 ,___I--
suite#:
By: --id--- Date: ��
410.
STARK 4001 Main Street, Suite 305
FOUNDATIONS Vancouver WA, 98663
P: 360.566.7343
TABLE OF CONTENTS
Project Background 2
Geologic Setting &Soil Capacity 3
Floor Level Survey 4
Design Calculations 5
Foundation Plan & Detail 8
ICC ESR 1854 (applicable pages only) 11
STARK 4001 Main Street, Suite 305
FOUNDATIONS Vancouver WA, 98663
P: 360.566.7343
GEOLOGIC SETTING
The existing structure is located west of downtown Tigard and west of Highway 99. The geologic
structure in the area is comprised of silty loam. The site is relatively flat and there is no
noticeable slope instability at the site that would indicate that the site is sliding. No evidence of
large foundation cracks, cracks in the driveway or nearby roads, scarps, or arc-shaped cracks in
the ground was observed.
Based on observation, the settlement is likely a result of the improper drainage away from the
structure. As a result soil has softened and consolidated under the perimeter footings. Adequate
support should be able to be achieved with the installation of push piers to suitable bearing depth.
SUMMARY
Based on the geologic setting, adequate bearing for the push piers and helical anchor is
anticipated at depths of 15-25 feet. The design axial capacity(see attached calculations)for the
helical anchors is 12,000 lbs(24,000 lbs ultimate load). We recommend the helical anchor be
installed to a minimum depth of 10-ft and a minimum installation torque of 2,400 ft-lbs, or refusal,
and that the push piers be installed to a minimum depth of 10-ft and a minimum installation
pressure of 1,500 psi,or refusal, using a 16.27 square inch hydraulic ram.
Please give our office a call if you have any questions or need further assistance.
Regards,
.0)PRatt
71940:f Daniel Stark, P.E.
Stark Foundations, Inc. OREGON
'WEL*
DP.: 06/30/18
Page 3 of 14
1 5
JOB DESCRIPTION RAMJACK
In:it:411i 8 1,1.---m,lar:k Fs
Ram Jack West
Lii tc:..t a 'iui practicili PO BOX 11701 Eugene, OR 97440
1. (866) 472-6522 F: (541)688-4991
1ainJacl i s gaurefleeri for 14,4011e,11 s11,cture. CCB# 146906 WA#RAMJA01.941707
wafrin%
LEVEL SURVEY
Ratijrarr,k,F4,4
2
4 ,
>
4
oor
-A- Sq ft
-2 1,',4
4.. •
4'- •
<;.
6 41 -
--- -1!4
„
711 8 54'
284C) SW Ct Tigard
Lauracqinvecmlicat.ne:
Page 4 of 14
�F— Date: 02-Sep-16
.)ts•STARK W RamJack West- Foundation Underpinning Designed by: NDS
FOUNDATIONS C 12840 SW 107th Court
cg Tigard,OR
a
Job No.: 16.083.RAM
Design Criteria
Code(s):
International Building Code(IBC)2012
ASCE 7-10
Design Loads:
Dead: Soil:
Roof= 15 psf Allow Lateral Bearing Pressure= 150 psf/ft (IBC Table 1806.2)
Third Floor= 0 psf Active Pressure= 60 psf/ft
Second Floor= 12 psf
First Floor= 50 psf(slab)
Walls= 8 psf
8"Foundation Wall = 100 psf
Live:
Roof(snow) = 25 psf
Third Floor= 0 psf
Second Floor= 40 psf
First Floor= 40 psf
Wind: (not applicable)
Exposure= C Risk Category= II
Wind Speed,V= 120 mph Krt= 1,0
Gust Effect Factor,G= 0.85 Kd= Q.85
Internal Pressure Coefficient,GC„,= -0.18 KZ= 0.98
External Pressure Coefficient,C,= 0.8 Height,h2= 30 ft
Design Wind Pressure: Design Load Combo= D+0.6W
where: pw= q=(GCp-GC,) w= 0.6
qZ= 0.00256 KZ Kn Kd V2
Therefore:
q:= 30.7 psf
pw= 26,4 psf
Factored Wind Pressure,p'w= 15.8 psf(say 16 psf)
Page 5 of 14
•
Date: 02-Sep-16
401STARK t RamJack West- Foundation Underpinning Designed by: NDS
FOUNDATIONS C 12840 SW 107th Court
ig Tigard, OR
0.
Job No.: 16.083.RAM
Helical Pier Design\
Vertical Design Loads:
Tributary Widths:
Roof= 14 ft > 210 plf
Third Floor= 0 ft > 0 plf
Second Floor= 7 ft > 84 plf
First Floor= 2 ft > 100 plf
Walls= 16 ft > 128 plf
Foundation Wall(height) = 2 ft > 200 plf
EDL= 722 plf
Live:
Roof(snow) = 14 ft > 350 plf
Third Floor= 0 ft > 0 plf
Second Floor= 7 ft > 280 plf
First Floor= 2 ft > 80 plf
ELL= 710 plf
Max Pier Spacing = 8 ft
Pier Working Loads:
Pa= 5776 lbs
PLL= 5680 lbs
Pn= 11456 lbs
Pier Design:
Pier Types Helical Pier Shaft Diameter:
Bracket 4038.1
It Bracket Capacity= 19700 lbs Therefore ok Reference ICC ESR-1854, Table 1-Foundation
Mechanical Ratings of Brackets(Appendix A)
Shaft Diameter 2.375" I t
Installation Torque,T:
Qat= 2(PTL) Quit= Kt(1) where Kt=helix torque factor(ft-1) Shaft Dia Kt
22912 lbs according to the following table: 2.375 10
2.875 9
3.5 7
Therefore,T= Quit I Kt Allowable TsHAFr= 4000 ft-lbs Therefore ok 4.5 6
2291 ft-lbs
Page 6 of 14
Date: 02-Sep-16
F
STARK W RamJack West- Foundation Underpinning Designed by: NDS
FOUNDATIONS ^ 12840 SW 107th Court
cg Tigard,OR
a
Job No.: 16.083.RAM
Push Pier Desi,n Worst Case
Vertical Design Loads:
Tributary Widths:
Roof= 14 ft > 210 plf
Third Floor= 0 ft > 0 plf
Second Floor= 7 ft > 84 plf
First Floor= 2 ft > 100 plf
Walls= 16 ft > 128 plf
Foundation Wall(height) = 2 ft > 200 plf
EDL= 722 plf
Live:
Roof(snow) = 14 ft > 350 plf
Third Floor= 0 ft > 0 plf
Second Floor= 7 ft > 280 plf
First Floor= 2 ft > 80 plf
ELL= 710 plf
Max Pier Trib Width= 8 ft
Pier Working Loads:
Pa= 5776 lbs
PLL= 5 680 lbs
PTL= 11456 lbs
Pier Design:
Pier Type Push Pier It Shaft Diameter:
Bracket)4038.1 It Bracket Capacity= 19700 lbs Therefore ok Reference ICC ESR-1854, Table 1-Foundation
Mechanical Ratings of Brackets(Appendix A)
Shaft Diameter 2.875" I t
Installation Pressure,P:
Qua= 2(Pa.) Quit=Aco(P) where',icy'=working area of the dual bore
22912 lbs installation cylinder
Acyi= 16.27 in2
Therefore, P,j= Quit I Acyi
1408 psi Therefore install to a minimim pressure of 1500 psi(or refusal)
Page 7 of 14
STARK
FDUNDATIDNE
4001 MAIN STREET,SUITE 305
VANCOUVER WA 98863
P.360 5667343
S.starkd6 starkldn.corn
+/
n LINE
I
I le
12840 SW 107111 CT
1 GARD, OR
100' +/-
OITEPLAN
Page 8 of 14
STARK
FOUNDATIONS
4001 MAIN STREET,SUITE 305
VANCOUVER WA 95663
P:360 586 7343
E:starkd@starkfdn.cam
J-Ir O-o"
12K 12K
Th
\ �
NOTE: SEE FLOOR LEVEL
SURVEY FOR PLAN DIMENSIONS
LEGEND
\ i • INDICATES HELICAL PIER &
101( UNFACTORED DESIGN LOAD
(KPS).SEE DTL 1.
INDICATES PUSH PER&
10K UNFACTOIS DE9GN LOAD
(KIPS). SEE DTL 2.
\ ?■
CENTER HELICAL
■ —� •
121(
FOUNDATION REPAIR PLAN N
01)PROA?sn
7 94OPE
•
OREGON
‘vv&<Y 13..xell
DP.: 06/30/18
Page 9 of 14
410.
STARK
BACKFILL FOUNDATIONE
4001 MAIN STREET,SUITE 305
VANCOUVER WA 58663
(E)GRADE P:380.566.7343
E starkd(Vstarkfdn.com
Ln111111IIIII
11=IIII.
II=11=11
11=11=11. 4
11=II
11:=11171.7 II: :: •.4 f1 FOOTING BEYOND
(N)STANDARD BRACKET 'IICHIP OUT POCKET N (E)FOOTING
FLUSH NTH FDN WALL POCKET
(RAMJACK P/N 4038) WIDTH TO MATCH BRACKET 1ILDTI1
(N)2 7/8'0 a) X 18'GUIDE
SLEEVE(RAMJACK P/N 4100) ��
(N)2 3/8'0 CO X 5-0'
EXTENSIONS(RAMJACK PM N X315) NOTE: PILE EMBEDMENT SHALL BE
10'-0'MIN INSTALLED PER THE
(N) 2 3/8'0 OD X 5-0'LEAD W/ TORQUE CORRELATION METHOD TO
10'0 HELIX(RAMJACK P/N 4343) ACHIEVE 2X DESIGN LOAD NOTED ON
I' THE FOUNDATION PLAN.
OHELICAL PILE DETAIL
BACKFILL
(E)GRADE PRO/C45
cz 4.06114E4 *
I ;v 7 940PE
111111=11=11-1111-11-11:
11=11=11 / —1
o8Ec0N
'4
N;(14 Y 13,Zppk Q11 ii=l4 4MEtW `'
Il�I ll�l ll'.�: • ••.• `"
I1-II=1Ii. . I I FOOTING BEYOND DP.: 06/30/18
(N)STANDARD BRACKET '111 CHIP OUT POCKET N (E)FOOTING
FLUSH CH FDN WALL. POCKET
(RAMJACK P/N 4021) WD1H TO MATCH BRACKET WIDTH
(N) 3 W0 co X 48'GUIDE
SLEEVE(RAILJACK P/N 4021) I�
(N)2 7/8'0 OD X 5-0'
EXTENSIONS(RAMJACK P/N 4385) NO1E PUSH PIER EMBEDMENT SHALL
BE 10'-O'MIN INSTALLED 10
(N) 2 7/8'0 OD X 5-0'LEAD W/ ACHIEVE FOUNDATION 2X
TIDESIGN LOAD NOTED ON
10'0 HELIX(RAMJACK P/N 4373) THE
/) PUSH PIER DETAIL
Page 10 of 14
E� ICC EVALUATION
N..-.t SERVICE Most Widely Accepted and Trusted
ICC-ES Evaluation Report ESR-1854*
Reissued December 1, 2012
This report is subject to renewal February 1, 2015.
Ly - ,LI :t I (800)423-6587 I (562)699-0543 A Subsidiary of the International Code Council®
DMSION:31 00 00—EARTHWORK 27/8-or 31A-inch-outside-diameter(73 or 89 mm)steel pipe
Section:31 63 00—Bored Piles having a nominal shaft thickness of 0.217 or 0.254 inch,
respectively. Helical-shaped discs, welded to the pipe,
REPORT HOLDER: advance the helical piles into the soil when the pile is
rotated. The helical discs (plates) are 8, 10, 12 or
GREGORY ENTERPRISES,INC. 14 inches (203, 254, 305 or 356 mm) in diameter, and are
13655 COUNTY ROAD 1570 cut from 3/8-inch- or 1/2-inch-thick (9.5 or 12.7 mm) steel
ADA,OKLAHOMA 74820 plate. The helical plates are pressed, using a hydraulic
(580)332-9980 press and die, to achieve a 3-inch (76 mm)pitch, and are
_ ; ""'•- then shop-welded to the helical lead shaft. Figure 1
lows ___ illustrates a typical helical pile. The extensions have shafts
similar to the lead sections, except without the helical
ADDITIONAL LISTEE: plates. The helical pile lead sections and extensions are
connected together by using an internal threaded pin and
RAM JACK MANUFACTURING,LLC box system that consists of a box shop-welded into the
13655 COUNTY ROAD 1570 trailing end of the helical lead or extension sections. Each
ADA,OKLAHOMA 74820 extension consists of a threaded pin and box on opposing
ends. Figure 2 illustrates the helical pin and box
EVALUATION SUBJECT: connections. The lead shafts and extensions are coated
with a polyethylene copolymer coating complying with the
RAM JACK®HELICAL FOUNDATION&DRIVEN ICC-ES Acceptance Criteria for Corrosion Protection of
FOUNDATION SYSTEMS Steel Foundation Systems Using Polymer (EM) Coatings
'C 8 :id a 'n. a mi im m co=tin. • i., e-_
1.0 EVALUATION SCOPE 18 mi (..-. m ) .s . I e :p. ov:d )u ity
Compliance with the following codes: documentation.
2012,2009 and 2006 International Building Code(IBC) 3.2.2 Hydraulically Driven Pile System—Pilings,
Properties evaluated: Connectors, Starter, and Guide Sleeve: The pilings
consist of 218-inch-outside-diameter(73 mm)pipe having a
Structural and geotechnical o in. • :ft thi i 21 in , 'n :ith-r 3-, 5- or 7-
2.0 USES
Ram Jack® Foundation Systems include a helical pile used to conect the pilings together are 12-inch-long
system and a hydraulically driven steel piling system. The (305 mm),24/8-inch-outside-diameter(60.3 mm)pipe having
helical pile system is used to transfer compressive,tension, a nominal shaft thickness of 0.19 inch, shop crimped and
and lateral loads from a new or existing structure to soil inserted in one end of the piling section so that
bearing strata suitable for the applied loads. The approximately 6 inches of the connector extends out of one
hydraulically driven steel piling system is used to transfer end of the piling section.During installation,the subsequent
compressive loads from existing foundations to load-bearing piling section slides over the connector of the previous piling
soil strata that are adequate to support the downward- section. Figure 3 illustrates a typical piling used_in
applied compression loads. Brackets are used to transfer conjunction with a bracket. The starter consists of a 2/8-
the loads from the building foundation to the helical pile inch-diameter (73 mm) steel pipe 3_having a nominal shaft
o
systemr the hydraulically driven steel piling system. thickness of 0.217 inch, and a 24/8-inch-outside-diameter
3.0 or DESCRIPTION (60.3 mm) pipe having a nominal shaft thickness of 0.19-
inch, which is shop crimped and inserted in one end of the
3.1 General: piling section so that approximately 6 inches of the
The Ram Jack® Foundation Systems consist of either connector extends out of one end of the piling section. A
helical piles or hydraulically driven steel pilings connected to 23/8-inch-diameter-by-1/8-inch-thick (3.2 mm by 60.3 mm)
, - ,.. -: • ,_ ._ ASTM A36 steel soil plug is shop-welded inside the
bearing foundation of a structure. 2T/8-inch (73 mm) starter section against the 23/8-inch
60.3 mm)connector.The starter section is jobsite-installed
3.2 System Components: into the end of the initial piling and leads the piling in order
3.2.1 Helical Pile System—Lead Shafts with Helical • expand the soil away from the piling with a
Plates and Extensions: The lead shafts consist of either 1/2-inch-outside-diameter (89 mm) steel ring having a
`..). X_X.Ah. ., e' aril
2014
ICC-ES Evaluation Reports are not to be construed as representing aesthetics or any other attributes not specifically addressed nor are they to be construed
as an endorsement of the subject of the report or a recommendation for its use.There is no warranty by ICC Evaluation Service,LLC,express or implied as
to anyfunding or other matter in this report oras to any product covered by the report tail" ` t
Copyright®2014 Page 1 of 14
Page 11 of 14
ESR-1854 I Most Widely Accepted and Trusted Page 2 of 14
nominal wall thickness of 0.254 inch, shop-welded to the to support axial compressive loads. The bracket is
starter section 1 inch (25.4 mm)from the bottom edge to constructed of a 3/8-inch-thick(9.5 mm)steel plate bent to a
reduce skin friction.Figure 4 illustrates a typical starter joint. 90-degree angle seat measuring 10 inches wide
A steel pipe guide sleeve, shown in Figure 3, is used to (254 mm) by 9 inches(229 mm)long on the horizontal leg
laterally strengthen the driven pile. The starter, guide and 7 inches(178 mm)long on the vertical leg.The seat is
sleeve, and pilings are coated with polymer coating welded to a 31/2-inch-outside-diameter (89 mm) steel
complying with AC228 and having a minimum coating bracket sleeve.The 27/8-inch-outside-diameter(73 mm)pile
thickness of 18 mils (0.46 mm), as described in the is inserted through the bracket sleeve. Once the
approved quality documentation. 2718-inch-outside-diameter(73 mm) pile has been installed,
3.2.3 Brackets: Brackets are constructed from steel plate the pile is cut approximately 6 inches above the bracket.
and steel pipe components, which are factory-welded Two 1-inch-diameter(25 mm)all-thread bolts are installed in
together. The different brackets are described in Sections matching nuts which are factory-welded to each side of the
3.2.3.1 through 3.2.3.7.All brackets are coated with polymer bracket sleeve. A 3/4-inch-thick (19 mm) support strap is
coating complying with AC228 and having a minimum then placed over the all-thread bolts and centered on top of
thickness of 18 mils (0.46 mm), as described in the the pile. The support strap is then attached to the bracket
approved quality documentation. with two 1-inch(25 mm)hex nuts screwed down on the all-
3.2.3.1 Support Bracket#4021.1:This bracket is used to threads.Figure 6 shows additional details.
support existing concrete foundations supporting axial 3.2.3.4 Support Bracket #4039.1: This is a low-profile
compressive loading. The bracket is constructed of a bracket used to underpin existing structures to support axial
3/8-inch-thick(9.5 mm)steel plate bent to a 90-degree angle compressive loads where the bottom of the footing is
seat measuring 10 inches (254 mm) wide by approximately 6 inches to 10 inches below grade. The
9 inches (229 mm)long on the horizontal leg and 7 inches bracket is constructed of a 3/8-inch-thick(9.5 mm)steel plate
(178 mm)on the vertical leg.The seat is factory-welded to a measuring 10 inches (254 mm) wide by 6.75 inches (172
41/2-inch-outside-diameter (114 mm) steel bracket sleeve mm) long, factory-welded to a 41/2-inch-outside-diameter
having a nominal well thickness of 0.438 inch. The external (114 mm)steel bracket sleeve.The external guide sleeve,a
guide sleeve, a 31/2-inch-outside-diameter (89 mm) steel 31/2-inch-outside-diameter (89 mml steel pipe, is inserted
pipe having a nominal wall thickness of 0.254 inch, is through the bracket sleeve. The 2V8-inch-outside-diameter
inserted through the bracket sleeve. The 27/8-inch-outside- (73 mm)pile is inserted through the external guide sleeve.
diameter(73 mm)pile is inserted through the external guide Once the 27/8-inch-outside-diameter(73 mm)pile has been
sleeve. Once the 27/8-inch-outside-diameter (73 mm) pile installed, the pile is cut approximately 6 inches above the
shaft has been installed through the external guide sleeve, bracket. Two 1-inch-diameter(25 mm) all-thread bolts are
the pile is cut approximately 6 inches above the bracket. installed in matching hex nuts which are factory-welded to
Two 1-inch-diameter(25 mm) all-thread bolts are installed each side of the bracket sleeve. A 3/4-inch-thick (19 mm)
into the matching nuts which are factory-welded to each support strap is then placed over the all-thread bolts and
side of the bracket sleeve.A 3/4-inch-thick(19 mm)support centered on top of the pile. The support strap is then
strap measuring 5 inches (127 mm) long by attached to the bracket with two 1-inch (25 mm) hex nuts
2 inches(51 mm)in width is then placed over the all-thread screwed down on the all-threads.This bracket can be used
bolts and centered on top of the pile. The support strap is with both the helical and driven pile systems. Figure 7
then attached to the bracket with two 1-inch (25 mm) hex shows additional details.
nuts screwed down on the all-threads.This bracket can be 3.2.3.5 Slab Bracket #4093: This bracket is used to
used with both the helical and driven pile systems. Figure 5 underpin and raise existing concrete floor slabs to support
shows additional details. axial compressive loading.The slab bracket consists of two
3.2.3.2 Support Bracket#4021.55: The bracket is similar 20-inch-long (508 mm) steel channels (long channels)
to the 4021.1 bracket but is designed to support larger axial spaced 31/2 inches (89 mm) apart, with two sets of 6-inch-
compressive loads from existing structures. The bracket is long (152 mm)channels(short channels)welded flange-to-
constructed of a 3/8-inch-thick(9.5 mm)steel plate bent to a flange(face-to-face)and then factory-welded to the top side
90-degree angle seat measuring 10 inches (254 mm)wide of each end of the long channels.One-quarter-inch-thick-by-
by 9 inches (229 mm) long on the horizontal leg and 7 4-inch-by-S-inch(6 mm by 102 mm by 127 mm)steel plates
inches (178 mm) on the vertical leg. The seat is factory- are factory-welded on the bottom on each end of the long
welded to a 5%2-inch-outside-diameter (140 mm) steel channels. The bracket sleeve is 3112-inch-outside-diameter
bracket sleeve having a nominal wall thickness of 0.375 (73 mm)steel tube factory-welded to and centered between
inch. The external sleeve, a 4%-inch-outside-diameter(114 the two long channels. Two 1-inch-diameter (25 mm)
mm) steel pipe having a nominal wall thickness of 0.438 coupling hex nuts are factory-welded to the long channels
inch, is inserted through the on each side of the bracket sleeve. Once the 27/8-inch-
bracket sleeve.A 3%-inch-outside-diameter(89 mm)pile is outside-diameter(73 mm)pile has been installed,the pile is
inserted through the external guide sleeve. Once the cut approximately 6 inches above the bracket. Two 1-inch-
3%-inch-outside-diameter (89 mm) pile shaft has been diameter(25 mm)all-thread bolts are installed in matching
installed through the external guide sleeve, the pile is cut hex nuts which are factory-welded to each side of the
approximately 6 inches (152 mm) above the bracket. Two bracket sleeve. A 3/4-inch-thick (19 mm) support strap is
114-inch-diameter(32 mm)all-thread bolts are installed into then placed over the all-thread bolts and centered on top of
the matching hex nuts which are shop-welded to each side the pile. The support strap is then attached to the bracket
of the bracket sleeve.A 2'/4-inch-square-bar support strap is with two 1-inch(25 mm)hex nuts screwed down on the all-
then placed over the all-thread bolts and centered on top of threads. This bracket is only used with the helical pile
the pile. The support strap is then attached to the bracket system.Figure 8 contains additional details.
' ., ..�. , • .► - . down on the 3.2.3.6 New Construction Brackets #4075.1, #4076.1
all-threads.Figure 5 s ows additional deta' and#4079.1: These brackets are used with the helical pile
3.2.3.3 Support Bracket#4038.1: This • .cket is similar system in new construction where the steel bearing plate of
to the 4021.1 bracket but is designed for lig r ter loads and is the bracket is cast into the new concrete grade beam,
'1 - , _ u .., - ;sting structures footing or pile cap concrete foundations. The brackets can
Page 12 of 14
ESR-1854 ( Most Widely Accepted and Trusted
Page 8 of 14
loaded helical piles is less than three times the 5.13 Settlement of the helical pile is outside the scope of
diameter of the largest helix plate at the depth of this evaluation report and must be determined by a
bearing. An analysis prepared by a registered design registered design professional as required in 2012 and
professional must also be submitted where the center- 2009 IBC Section 1810.2.3 and 2006 IBC 1808.2.12.
to-center spacing of laterally loaded helical piles is less
than eight times the least horizontal dimension of the 5.14 The interaction between the hydraulically driven pile
pile shaft at the ground surface. Spacing between system and the soil is outside the scope of this report.
helical plates must not be less than 3D,where D is the 5.15 The Ram Jack®Foundation Systems are manufactured
diameter of the largest helical plate measured from the at the Ram Jack Manufacturing, LLC,facility located in
edge of the helical plate to the edge of the helical plate Ada, Oklahoma, under a quality control program with
of the adjacent helical pile;or 4D,where the spacing is inspections by ICC-ES.
measured from the center-to-center of the adjacent 6.0 EVIDENCE SUBMITTED
helical pile plates.
5.12 Connection of the side load bracket or the r Data in accordance with the ICC-ES Acceptance Criteria for
Hel
bracket as it relates to seismic forces and the Jual 13undation Systems and Devices (AC358), dated
unee2013.
provisions found in 2012 and 2009 IBC Sections
1810.3.11.1 and 1810.3.6.1 and 2006 IBC Section 7.0 IDENTIFICATION
1808.2.23.1,and for all buildings under 2012 and 2009 The Ram Jack® Helical Foundation & Driven Foundation
IBC Section 1810.3.6 (second paragraph) and 2006 System components are identified by a tag or label bearing
IBC Section 1808.2.7, are outside the scope of this the Ram Jack logo, the name and address of Gregory
evaluation report. Compliance must be addressed by Enterprises, Inc., the catalog number, the product
the registered design professional for each site, and description,and the evaluation report number(ESR-1854).
the work of the design professional is subject to
approval by the code official.
TABLE 1—FOUN I •TION STRENGTH RATINGS OF BRACKETS'
PRODUCT 1.-. -, ,, -LING DIAMETER ALLOWABLE CAPACITY
NUMBER (inches)
{kips)
Compression Tension Lateral
4021.1 Side load bracket 21/2 33.65'5 N/A N/A
4021.55 Side load bracket 31/2 55.12' N/A N/A
4038.1 Side load bracket 21/2 19.701.5 N/A N/A
4039.1 Side load bracket 22/8 32.07'5 N/A N/A
4075.1 New construction 2'/e See Table 3A See Table 313 1.49�5
4079.1 New construction 21/2 See Table 3A See Table 313 1.4925
4076 New construction 3% See Table 3A See Table 3B 2.7925
4093.1 Slab bracket 21/2 See Table 5 N/A N/A
27.9 t 20"angle(tension only)45
4550.2875.1 Tieback assembly 21/2
27.6(4 30"angle(tension only)45
For SI:1 inch=25.4 mm,110(1000 lbf)=4.48 kN.
'Load capacity is based on full scale load tests per AC358 with an installed 5'-0 unbraced pile length having a maximum of one coupling per
2012 and 2009 iBC Section 1810.2.1 and 2006 IBC 1808.2.9.2.A 4-foot-long guide sleeve must be installed at the top of the shaft as required
in Figures 3,5 and 7.Side load bracket must be concentrically loaded. Side load bracket plate must be fully engaged with bottom of concrete
foundation. Only localized limit states such as mechanical strength of steel components and concrete bearing have been evaluated.
2Lateral load capacity is based on lateral load tests performed in firm clay soil per Section 4.1.1 of this report.For any other soil condition,the
lateral capacity of the pile must be determined by a registered design professional. The bracket must be installed with minimum embedment
of 3 inches when measured from the bottom of the concrete foundation to the bottom of the bracket plate. Minimum width of footing must be
12 inches.
3The capacities listed in Table 1 assume the structure is sidesway braced per 2012 and 2009 IBC Section 1810.2.2 and 2006 IBC Section
1808.2.5.
Tieback assemblies must be installed in accordance with Section 4.2.5 of this report. Only localized limit states such as mechanical strength
of steel components and concrete bearing have been evaluated. The tieback assembly must be installed to support a minimum 6-inch thick
concrete wall. Two through bolts are required for connection between bracket sleeve and helical shaft Bolts must be 314-inch diameter
complying with ASTM A325 and installed snug-tight with threads excluded.
&The tabulated values are based on installation with normal-weight concrete having a minimum compressive strength of 2500 psi(17.23 MPa).
N/A=not applicable.
Page 13 of 14
ESR-1854 I Most Widely Accepted and Trusted Page 11 of 14
TABLE 5-ALLOWABLE COMPRESSIVE LOAD CAPACITY RATING OF RAM JACK'S#4093 SLAB BRACKET SUPPORTING
MINIMALLY REINFORCED NORMAL WEIGHT CONCRETE SLAB''
(Max.load rating=11.7 Idps)
Minimum Area
Concrete of steel
2g day reinforcement' Maximum Pile Spacing Pile Load(kip)
Compressive Concrete Concrete Slab,
Strength,fc Floor Slab A,,,,a, Live
Depth(t) Load
(psi) (In) (In2) (psi) 1&2 Span 3 Span 1&2 Span 3 Span
40 4'-10" 5'-5" 2.12 k 2.65 k
44 0.06 50 4'-6" 5'-1" 2.08 k 2.60 k
100 3'-7" 4'-0" 1.99 k 2.49 k
40 5'4" 6'-4° 3.36 k 4.20 k
54
0.075 50 5'-5" 6'-0" 3.31 k 4.14 k
100 4'-4" 4'-11" 3.15 k 3.94 k
2'500
40 6'-6" 7'-3" 4.90 k 6.13 k
6 0.09 50 6'-2" 6'-11" 4.83 k 6.03 k
100 5'-1" 5'-8" 4.59 k 5.74 k
40 8'-8" 9'-1" 10.61 k 11.70 k
8' 0.12 50 8'-3" 8'-9" 10.30 k 11.70 k
100 6'-9" 7.-7" 9.34 k 11.67 k
40 5'-1" 5'-8" 2.33 k 2.91 k
4' 0.066 50 4'-9" 5'-4" 2.29 k 2.86 k
100 3'-9" 4'-3" 2.19 k 2.73 k
40 6'-0" 6'-8" 3.69 k 4.62 k
54 0.082 50 5'-8" 6'-4" 3.64 k 4.54 k
100 4'-7" 5'-2" 3.46 k 4.33 k
3'000 40 6'-10" 7'4" 5.39 k 6.73 k
6 0.098 50 6'-6" 7.-3° 5.30 k 6.63 k
100 5'-4" 6'-0" 5.05 k 6.31 k
40 9'-1" 9'-2" 11.66 k 11.70 k
8' 0.131 50 8'-8" 8'-9" 11.31 k 11.70 k
100 T-1" T-7" 10.26 k 11.70 k
For SI:1 inch=25.4 mm;1 kip(1000 ibf)=4.48 kN;1 psi=6.89 kPa;1 psf=47.88 Pa.
'The maximum pile spacing shown are for floor slabs constructed of normal weight concrete(150 pcf)with minimum reinforcement(fy=60 ksi)
per ACI 318 Section 10.5.1.
The maximum floor slab spans shown assumes the minimum floor slab reinforcement is placed in the center of the slab(t/2).Longer spans
can be achieved if the slab reinforcement is proven to be larger and/or placed below the central line of the floor slab.Structural calculations
must be submitted for approval by a registered design professional for spans greater than those shown for a reinforced floor slab.
'The maximum load rating of the 4093 slab bracket controls the pile spacing.
'The spans and pile loads shown for the 4-inch and 5-inch thick floor slab assumes the floor stab are being placed on a vapor barrier.Per
Section 7.7.1 of ACI 318,the minimum concrete cover required is 1'/,inches.This table should not be used for the 4-inch and 5-inch thick floor
slabs placed directly on soil,where the minimum concrete cover is 3 inches,which places the reinforcement above the neutral axis.Table 7
should be used for the 4 inch and 5 inch thick concrete slab cast directly on soil.
TABLE 6-ALLOWABLE TENSION AND COMPRESSION LOADS FOR HELICAL PLATES(KIPS)
'1170r71P7TP,1,71•1.^1,P61111PIIPIIIIIIVITIIITeITrr rryir r. mwovifl' `51IIWIIIP•
(Inches) 2'/8 3'/:
8 63.29 79.84
10 55.51 66.29
12 39.40 65.74
14 42.07 60.42
For SI:1 inch=25.4 mm;1 kip=1000 lbf=4.45 kN.
'Allowable load values are for helical plates made from'/B-inch thick steel,except for
the 14-inch diameter plate,which is made from Y2-inch thick steel.
Page 14 of 14